Search NASASearch

SEARCH · Search NASA

Results for “EnergyPlus”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Artificial Intelligence Thermostat to Detect Faults

Residential air conditioners and heat pumps often experience faults due to inadequate maintenance, which can severely reduce efficiency or even cause system failure. Common issues include dirty or clogged air filters and refrigerant leaks. These problems degrade performance and increase energy use and operating costs. This study presents a smart thermostat with embedded artificial intelligence to detect such faults and alert homeowners when maintenance is needed. The thermostat uses low-cost measurements—including return-air temperature, relative humidity, supply-air temperature, outdoor-air temperature, and condenser subcooling—to identify abnormal operations. Because different faults produce distinct response patterns, tailored algorithms are developed to recognize characteristic fault signatures. The investigation is built on a detailed co-simulation platform that couples EnergyPlus with the DOE/ORNL Heat Pump Design Model (HPDM). EnergyPlus represents the building’s dynamic environment, while HPDM is a high-fidelity, hardware-based model that can simulate fault-free performance as well as a wide range of faults, including gradual degradation such as minor refrigerant leakage. This platform provides a virtual training and testing environment that helps distinguish fault-induced behavior from normal operation and supports development of robust diagnostic algorithms. Using this framework, a Dynamic Bayesian Network was developed to identify two common faults—gradual refrigerant charge loss and indoor airflow blockage—and the AI-embedded thermostat was verified through annual building simulations.

Shen, Bo [ORNL] (ORCID:0000000336600393)

A digital twin platform for building performance monitoring and optimization: Performance simulation and case studies

Advancements in sensor technology, data analytics, affordable compute, and communication infrastructure have paved the way for Digital Twin technology in optimizing building operations and controls. This study presents the development of an open and interoperable web-based Digital Twin platform for integrating diverse data streams and facilitating effective user interactions. The platform utilizes modern technologies for the web framework and time-series data management, ensuring scalability and responsiveness. The backend supports seamless integration of diverse data sources and emulators, incorporating data from building sensors and meters, external weather Application Programming Interfaces, and advanced EnergyPlus simulation models of the building and its energy systems including the Distributed Energy Resources that are formulated in Functional Mockup Units. A simulation case study was conducted with FlexLab, a test facility on Lawrence Berkeley National Laboratory campus. The case study includes normal operations, Distributed Energy Resource integration, and power outage scenarios, to illustrate the Digital Twin’s ability to provide critical insights into energy performance and thermal resilience. The results demonstrated the platform’s potential as a decision-support tool for optimizing building energy performance and enhancing resilience against extreme weather events. Future work will focus on deploying the Digital Twin platform to a real building for field validation, extending its capabilities to cover more scenarios such as bidirectional Electric Vehicle interactions, and enhancing user engagement.

EnergyPlus

Techno-economic feasibility of borehole thermal energy storage system connected to geothermal heat pumps for seasonal heating load of two buildings in Fairbanks, Alaska

Borehole thermal energy storage (BTES) is an effective solution for managing imbalanced heating and cooling loads in cold regions. This study evaluated the long-term feasibility of a BTES system in the Fairbanks area, Alaska, through building energy modeling, resource characterization, and numerical modeling. The system was designed to store waste heat from a nearby coal power plant during summer and provide thermal energy during winter to geothermal heat pumps supplying heating loads in two buildings. Heating load profiles were modeled for the buildings using EnergyPlus, and the results indicated the annual heating load was 5.6 times greater than the cooling load. 40 borehole heat exchangers were pre-designed approximately 100 m away from the two buildings in terms of land availability and regulatorily optimized depth. The 20-year performance of the designed BTES system under two operational scenarios—one with a 5-year preheating period and one without—was numerically modeled using subsurface temperature and properties characterized through the literature review and thermal response tests. Both scenarios demonstrated that the BTES has the capacity to fully cover the heating loads in the two buildings throughout the 20-year lifetime. Production temperatures at central wells were 33 % higher on average than at outer wells in both scenarios. The 5-year preheating period increased subsurface and extraction temperatures, and correspondingly annual average and total thermal energy production was higher for 8 years than in the scenario without the preheating period. These results highlight the long-term reliability and sustainability of the BTES system in meeting heating demands over its lifetime, with the preheating period offering potential performance improvements. Implementing the BTES system in cold regions with high heating demand, such as Fairbanks, Alaska, could provide a long-term, sustainable energy solution for managing imbalanced heating and cooling loads.

15 GEOTHERMAL ENERGY

Design Heating and Cooling Load Calculation Versus Building Load Simulation for Cold Climate Heat Pumps: Understanding the "Gap"

This report explores the differences between Manual J-equivalent block load calculations and building HVAC energy simulation results using EnergyPlus™ calculations when designing cold climate heat pump systems for residential use. This study will help HVAC researchers and advanced designers understand the impacts of oversizing heat pumps on home energy use.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI

Impact of Geothermal District Heating System on Flexibility of Microgrid in Tuttle, Oklahoma: Preprint

Flexibility is the capability of the power grid to maintain a balance between electricity generation and variable demand. This study presents preliminary results evaluating the impact of geothermal district heating systems on the flexibility of a conceptual microgrid in Tuttle, Oklahoma. Heating demand profiles were modeled using EnergyPlus for the district that includes two schools and 250 single-family houses. Then, geothermal energy production was modeled using GEOPHIRES to estimate how much heating demand in the district can be supplied by five different geothermal system scenarios. The results indicated that geothermal energy production varied depending on the resource temperature at different depths, system configurations, and flow rates. For the grid flexibility analysis, electricity consumptions in the five geothermal systems were estimated for pump operations to circulate water from the wells to radiators, while electricity consumption by air-source heat pump in the base case was estimated to supply the same heating load. Electricity consumption in the geothermal systems was significantly lower than those in base cases. The electricity saved by the geothermal system was then incorporated into the microgrid electrical load profiles where variable renewable electricity generation is significantly high. The results visually showed that geothermal district heating system can improve grid flexibility as a baseload during the winter season. The results also highlighted potential opportunities to save energy costs that will be further analyzed in future study.

Cambium

Impact of Geothermal District Heating System on Flexibility of Microgrid in Tuttle, Oklahoma

Flexibility is the capability of the power grid to maintain a balance between electricity generation and variable demand. This study presents preliminary results evaluating the impact of geothermal district heating systems on the flexibility of microgrid in Tuttle, Oklahoma. Heating demand profiles were modeled using EnergyPlus for the district that includes two schools and 250 single-family houses. Then, geothermal energy production was modeled using GEOPHIRES to estimate how much heating demand in the district can be supplied by five different geothermal system scenarios. The results indicated that geothermal energy production varied depending on the resource temperature at different depths, system configurations, and flow rates. For the grid flexibility analysis, electricity consumptions in the five geothermal systems were estimated for pump operations to circulate water from the wells to radiators, while electricity consumption by air-source heat pump in the base case was estimated to supply the same heating load. Electricity consumption in the geothermal systems was significantly lower than those in base cases. The electricity saved by the geothermal system was then incorporated into the microgrid electrical load profiles where variable renewable electricity generation is significantly high. The results visually showed that geothermal district heating system can improve grid flexibility as a baseload during the winter season. The results also highlighted potential opportunities to save energy costs that will be further analyzed in future study.

Cambium

Latent heat thermal energy storage performance maps enabling fast & accurate building energy simulations

Thermal energy storage (TES) using phase change materials (PCMs) has gained attention as an effective approach to manage energy demand fluctuations and shift peak building loads. PCM embedded heat exchangers (PCM-HXs) offer high energy storage density and low temperature variation during phase change, being suitable for load-shifting applications. However, this component is typically evaluated using computationally expensive methods, which present significant challenges when the ultimate goal is to assess the performance of PCM-HX integrated thermal energy storage systems in the full building context. In this paper, we present a methodology to generate highly accurate and computationally efficient PCM-HX performance maps which can be easily integrated into building energy simulation tools to analyze the feasibility of space conditioning systems with latent heat PCM-based TES. The performance maps are generated using a computationally efficient PCM-HX simulation tool based on a Generalized Resistance-Capacitance Model (GRCM) which can simulate arbitrary PCM-HXs with high accuracy and significantly less computational effort compared to full CFD simulations. The methodology was verified for a case study considering a 5-ton (~17.5 kW) air-to-water heat pump-thermal energy storage system (HP-TES), which was co-simulated in Modelica for a DOE prototype small-office building in Vienna, Austria, using Spawn of EnergyPlus™. The TES performance maps provided accurate predictions of PCM-HX behavior when used as Modelica component, with deviations within 2-4% while also achieving at least 103 computational time reduction. Leveraging this faster prediction capability, four PCMs with different melting temperatures for cooling (12°C, 16°C) and heating (31°C, 36°C) were assessed to investigate their impact on system performance. This work highlights the importance of robust PCM-HX models for efficient and high-fidelity building-level simulations, presenting new opportunities for advanced control strategy development and parametric analysis of TES configurations in a computationally efficient manner

Modelica Building Simulations

Developing a Control Strategy for Minimum Airflow Setting Considering CO2 Level and Energy Consumption in a Variable Air Volume System

In an office building equipped with a Variable Air Volume (VAV) system, this paper introduces a novel method for controlling the minimum supply airflow fraction in each zone’s VAV box, having a capability to consider indoor CO2 level and energy consumption. The EnergyPlus simulation using the medium office prototype model was employed, which evaluated the performance of the energy and CO2 concentration for five VAV box airflow control strategies. The paper focuses on CO2 concentration-based airflow control method and compares it with other four methods including conventional single-max, reduced minimum single-max, demand-controlled ventilation(DCV), and dualmax control methods according to guidelines and common practices. The newly proposed control strategy directly correlates the minimum airflow fraction to CO2 concentration. A general trend emerged when comparing CO2 concentrations—lower minimum airflow fractions were associated with higher concentrations. The proposed control method effectively maintained low CO2 concentrations and enabled a lower airflow fraction contributing to energy consumption reduction. It was confirmed that heating energy consumption in climate zone 4A, 5B, and 6A showed a maximum saving of approximately 30% compared to the conventional single-max and dual max control strategies. It was found that cooling energy consumption in climate zone 4A and 6A can achieve a maximum saving of approximately 10% compared to the conventional control strategies. The proposed CO2 concentration-based control logic is promising as it not only improves the indoor air quality lowering the CO2 concentration in the occupied spaces, but also contributes to HVAC energy savings.

Lee, Jong Man

Informing electrification strategies of residential neighborhoods with urban building energy modeling

Electrifying end uses is a key strategy to reducing GHG emissions in buildings. However, it may increase peak electricity demand that triggers the need to upgrade the existing power distribution system, leading to delays in electrification and needs of significant investment. There is also concern that building electrification may cause an increase of energy costs, leading to further energy burden for low-income communities. This study uses the urban scale building modeling tool CityBES to assess the electrification impacts of more than 43,000 residential buildings in a neighborhood of Portland, Oregon, USA. Energy efficiency upgrades were investigated on their potential to mitigate the increase of peak electricity demand and energy burden. Simulation results from the calibrated EnergyPlus models show that electrification with heat pumps for space heating and cooling as well as for domestic water heating can reduce CO2e emissions by 38%, but increase peak electricity demand by about 9% from the baseline building stock. Combining electrification measures and energy efficiency upgrades can reduce CO2e emissions by 48% while reducing peak electricity demand by 6% and saving the median household energy costs by 28%. City and utility decision makers should consider integrating energy efficiency upgrades with electrification measures as an effective residential building electrification strategy, which significantly reduces carbon emissions, caps or even decreases peak demand while reducing energy burden of residents.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI

Evaluating indoor thermal resilience of passive and low-power cooling shelters for outdoor workers in India

India’s 231 million outdoor workers are exposed to deadly heat during heat waves. We report results from a simulation-based study that focuses on passive design of cooling shelters for the hot and dry climate zone of India. The goal is to design a cooler-than-outdoor shelter for outdoor workers’ intermittent rest and recovery from heat stress during their arduous outdoor work, to avoid heat-related morbidities and mortality. Expected indoor thermal conditions in low-cost cooling shelters deploying a range of passive designs and low-power active measures are investigated, consistent with the current Indian standards and practices, located in the city of Jodhpur in western India. Heat resilience of the shelter was measured with the predicted reduction of hazardous hours inside the shelter based on the wet-bulb globe temperature (WBGT) and extended heat index. These measures include improving the building envelope, installing cool roofs, using internal thermal mass, and natural ventilation. Additionally, a low-power active measure of using ventilation fans and ceiling fans is explored. EnergyPlus-based simulation results show that simple, commonly available measures, particularly natural ventilation and ceiling fans, achieve the most significant reductions in overheating danger hours, by 22% and 21%, respectively, while more complex or costly passive strategies yield only marginal additional benefits. Moreover, combined measure packages are identified that can reduce the indoor WBGT by 8 to 10 °C, eliminating overheating danger hours. These findings highlight the critical importance of scalable, low-cost, and easily deployable cooling solutions for developing resilient cooling shelters for vulnerable outdoor workers during heat waves in India.

building performance

Coupling thermal energy storage with a thermally anisotropic building envelope for building demand-side management across various US climate conditions

Here, the thermally anisotropic building envelope (TABE) is a novel active building envelope that enhances energy efficiency and thermal comfort in buildings by transferring heat and cold between building envelopes and hydronic loops. When coupled with thermal energy storage (TES) units, the TABE + TES enables the storage of both heat and cold energy captured by the TABE roof or exterior walls. This stored energy can be later released by the TABE floor for indoor heating and cooling, benefiting both the grid and the end user. This paper evaluates the merits of TABE + TES for building demand-side management across various US climate conditions, focusing on peak load shaving, annual energy savings, and cost savings under time-of-use (TOU) electric rate schedules. Simulations were conducted by integrating time-of-day–informed, rule-based control strategies in MATLAB, TABE components and TES units in COMSOL Multiphysics, and whole-building energy analysis in EnergyPlus. A case study using the US Department of Energy’s prototype single-family detached house model in Birmingham, Alabama; Los Angeles, California; Oak Ridge, Tennessee; and Denver, Colorado, showed that the TABE + TES system achieved (1) 70 % peak load shaving in Los Angeles and Denver and 20 % in Birmingham and Oak Ridge; (2) significant peak electricity savings of 351–497 kWh, reducing peak energy consumption by 38 %–78 %; and (3) annual heating cost savings of 0.79 $\$$/m2–1.17 $\$$/m 2 and cooling cost savings of 0.60 $\$$/m 2 –1.17 $\$$/m 2 using a normal utility rate or low-TOU rate. The benefits of employing the TABE + TES system are even more significant under high TOU rates.

25 ENERGY STORAGE

Energy performance of an operational government building retrofitted with ceiling phase change material tiles in a mixed-humid climate

The aging U.S. building stock requires various retrofit measures to enhance their energy efficiency. Here, this study explores the integration of thermal energy storage and advanced building controls as viable retrofit solutions for load flexibility and peak demand response while maintaining the occupants' comfort. A detailed assessment is conducted on the energy use of an administrative building in Sumner County, Kansas, focusing on the implementation of phase change materials (PCMs) in the ceiling of occupied zones. First, a time-resolved, whole-building energy model is developed in EnergyPlus, incorporating complex thermal behaviors such as air exchange between the plenum space and occupied zones, envelope leakage, and operational schedules. The model is then validated using experimental field test data, and subsequently a parametric assessment of key PCM properties and application strategies is performed to evaluate cooling electricity demand benefits. The parametric study shows that the optimal retrofit strategy, comprising a PCM with 23°C peak melting temperature, 0.125 in. (3.17 mm) thickness, and 150 kJ/kg latent heat, combined with active controls that include 8 h of precooling, forced convection under the ceiling, and a 2°C thermostat setback during peak hours, can result in a maximum load shift during the peak period of 99.6 % and the total electricity savings during the peak period of 98.9 % for the optimum case and thus provide significant cost savings under time-of-use pricing scenarios.

24 POWER TRANSMISSION AND DISTRIBUTION

Ice storage model-predictive control in an office building with PV: scenario, error and sensitivity analysis

Thermal energy storage (TES) can enable more building-sited renewable electricity generation and lower utility bill costs for buildings owners and occupants, especially when there are high demand and variable time-of-use (TOU) charges. A model predictive control (MPC) strategy can offer additional savings over a schedule-based control with added complexity and reliance on forecasts. Here, this study examines savings for medium office buildings with chiller plants in three locations with building-installed solar photovoltaics (PV) to understand the impact of MPC. Control setpoints are fixed by a schedule-based control or optimized by nonlinear MPC. These control setpoints are actuated within EnergyPlus building models to simulate the utility cost of the chiller plant. NLP solutions can be unstable or unrealistic, but our results show that by regularizing the NLP, the solutions can be reasonably followed by the building model. MPC models make simplifications that lead to errors once the controller is participating in and changing the operation of the building. These errors average 9 % across the cases, showing that the most important parts of the system are represented. The no-thermal load costs are computed to show that the optimization can in some cases achieve both the minimum TOU and minimum monthly demand costs by demand management while reducing TOU energy costs by energy arbitrage. The MPC saves 35–66 % in the annual chiller plant operating costs, which is an additional savings above the schedule by 1–33 %. PV and TES are complementary and mostly independent, but a load with PV often results in better performance for the schedule. Our case study and sensitivity analysis show the importance of modeling and optimization for complex rates, but also the circumstances wherein a simpler strategy achieves the same performance with less potential for error.

14 SOLAR ENERGY

Experimental validation of a co-simulation architecture for modeling whole-building and detailed electrical distribution performance

This article presents an experimental validation of a co-simulation architecture for simultaneously modeling whole-building energy performance and detailed building electrical distribution system performance. The co-simulation architecture consists of a whole-building energy model (EnergyPlus®) embedded within a Modelica-based building electrical distribution system library called the Building Electrical Efficiency Analysis Model (BEEAM) using the Functional Mock-up Interface standard. We validate the model using experimental data collected at a full-scale test cell within Lawrence Berkeley National Laboratory’s FLEXLAB® facility. In conclusion, we show that the co-simulation model accurately predicts the electrical, mechanical, and thermal performance of the test cell for typical loads with both an AC and a DC electrical distribution topology.

29 ENERGY PLANNING, POLICY, AND ECONOMY

An economic and technical feasibility analysis of a dual-source heat pump using both the air and the ground

The study investigates the economic and technical performance of a novel dual-source heat pump (DSHP) compared with that of air-source heat pumps (ASHPs) and ground-source heat pumps (GSHPs). The DSHP can use both ambient air and the ground as a heat source or heat sink. It uses ambient air when its temperature is favorable for efficient heat pump operation. When the ambient temperature is too hot or cold, the ground source is used to retain high-efficiency heat pump operation. Since the DSHP can alternately use either the ground heat exchanger (GHE) or ambient air to meet the thermal load, the required size of GHE can be smaller than those of GSHPs. This study models the DSHP using a whole building energy simulation tool (EnergyPlus) coupled with a Python plug-in and Heat Pump Design Model (HPDM) to simulate its heating and cooling performance for a typical single-family home in 15 US climate zones. The required GHE size of the DSHP system is determined through simulations and compared with that of GSHPs. DSHP deployment can reduce electricity use compared to ASHPs, especially in cold climates where it shows a reduction of around 50%. When compared to GSHPs, DSHPs use 20%–40% more electricity in warm climates but consume around the same amount in moderate and colder climates. Since the DSHP can use air source when the ambient temperature is mild, the GHE size needed for the DSHP is about 40% less than that needed for GSHPs in hot climates and about 25% less in cold climates. In conclusion, the life cycle cost analysis shows that the DSHP is economically more feasible than ASHPs in colder regions and economically more feasible than GSHPs in hot and cold regions.

Dual-source heat pumps

A practical control strategy for demand flexibility with ensured occupant comfort in grid-interactive efficient buildings

This study proposes a practical and simplified demand response (DR) control strategy from the perspective of grid-interactive efficient buildings (GEBs), aiming to secure demand flexibility while ensuring occupant thermal comfort. Focusing on summer on-peak periods, a linear demand response (LDR) strategy that integrates cooling setpoint adjustment and lighting dimming was designed, and its performance was quantitatively evaluated. A case study was conducted using EnergyPlus-based simulations for a U.S. DOE small office prototype building under summer on-peak weather conditions. Compared with a conventional rapid demand response (RDR) strategy, the proposed LDR approach gradually reduced electrical loads while maintaining occupant thermal comfort indices, including predicted mean vote (PMV) and predicted percentage of dissatisfied (PPD), within acceptable comfort ranges. Quantitative analysis of demand flexibility using the grid-interactive impact index (GII) and the flexibility strength index (FSI) showed that the LDR strategy provided approximately 12.5% demand flexibility during DR periods and achieved an electricity cost reduction of about 8.8%. In addition, the results of the part-load ratio (PLR)-based cooling system performance analysis showed that, in the on-peak period, the LDR strategy exhibited improved cooling performance compared with the baseline. Overall, this study shows the potential of a practical DR control strategy that can simultaneously achieve occupant comfort and demand flexibility without relying on complex advanced control technologies.

Jung, Dong Eun

The value of integrating a geothermal district heating system into a microgrid

As electrical grids increasingly rely on variable renewable energy, maintaining reliability and cost efficiency becomes more complex. To address these challenges, this study analyzed the integration of geothermal district heating as a grid-responsive thermal resource within a microgrid in Tuttle, Oklahoma. Building energy modeling using EnergyPlus estimated annual district heating demand at 2.9 GWh, with a peak load of 2.8 MW th . Techno-economic analyses were conducted to meet the heating demand under three geothermal scenarios, varying by production depth, flow rate, and thermal output, each supplemented by natural gas peaking boilers. In parallel, equivalent electrical load profiles were developed using typical coefficients of performance (COPs) for air-source heat pumps and electric boilers to establish an electrified baseline scenario. A complete end-use electrical load profile was also developed for the microgrid using Cambium dataset. The modeling results demonstrated reliable and economic operation of the geothermal systems over 30 years, with COPs ranging from 2.6 to 8.9 and the lowest levelized heating cost at $\$$54.6/MWh. Geothermal integration reduced electricity consumption by up to 94.7 % compared to the non-geothermal base case, yielding annual energy savings of up to $\$$803 k. Avoided grid costs ranged from $\$$65 k–$\$$147 k per year, with individual events avoiding up to $\$$4,863 per hour. Grid-responsive operation further reduced wholesale energy costs by 53–56 %. These findings demonstrate geothermal heating, traditionally treated as a non-grid-responsive thermal resource, can be reconfigured to support dynamic grid services, offering a scalable pathway to enhance reliability and reduce costs in renewable-rich microgrids and district heating networks.

15 GEOTHERMAL ENERGY

An approach for fast and accurate simulation of phase change material based thermal energy storage in buildings

Latent heat thermal energy storage (LHTES) has significant potential for mitigating peak electricity demand and enabling load shifting in buildings. Phase Change Material embedded heat exchangers (PCM-HX) can significantly improve energy demand management due to high storage capacity. However, PCM-HX evaluation typically depends on computationally expensive fully transient simulations, posing significant challenges for scalable system- and building-level energy assessments across different climates and system architectures. This paper presents a generalized, accurate, and computationally efficient methodology for simulating building energy systems integrated with LHTES. The PCM-HX transient performance is represented by performance maps generated using a Generalized Resistance-Capacitance Model (GRCM) that enables accurate predictions of arbitrary PCM-HXs at low computational cost. The feasibility of the proposed approach was verified using a case study considering a dual-mode heat pump-thermal energy storage (HP-TES) system simulated in Modelica with Spawn of EnergyPlus™ for a DOE prototype small office building in two locations: Tampa, FL, and International Falls, MN. The PCM-HX performance maps provided accurate predictions of PCM-HX transient behavior, with mean absolute percentage deviations within 2–4% compared to GRCM while also achieving at least 1800× reduction in computational time. Moreover, the HP-TES system achieved energy savings of up to 17.4% in Tampa, FL, and 62.2% in International Falls, MN, demonstrating the broader applicability of the proposed methodology across different climate zones. This work highlights the importance of robust PCM-HX models in enabling accurate and computationally efficient building-level simulations and enabling future research opportunities for investigating optimized HP-TES designs and advanced control strategies for grid-interactive buildings.

Modelica