Search NASA⌕ Search

SEARCH · Search NASA

Results for “Estimated Ultimate Recovery”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

20 records · Page 2

High-Temperature Active Magnetic Bearing Development for Supercritical CO 2 Machinery Applications

Hermetic machinery utilizing gas bearings for MW-scale supercritical CO 2 (sCO 2 ) machinery applications can have significantly lower power loss and enable improved cycle efficiency compared to conventional machinery with oil-lubricated bearings. Active magnetic bearings (AMBs) are another option anticipated to have similar power loss and load capacity to gas bearings as well as offering larger mechanical tolerances, the ability to tune properties, and high reliability due to lack of mechanical wear. AMBs also have proven commercial experience at MW-scale, though environments for high-temperature sCO 2 power cycle machinery conditions are novel. Besides the potential impact of AMBs for sCO 2 turbomachinery, the technology also offers promising benefits for steam and gas turbines for power generation, compressors and expanders for industrial heat and power, and in other oil and gas and space applications. The goals of this project were to conceptual design an AMB and perform material testing. Conceptual designs for radial and thrust AMBs were produced based on a hermetically-sealed sCO 2 machinery waste-heat recovery (WHR) application for sizing and loads, and choosing a target design temperature of 540°C useful for high-temperature sCO 2 turbines for concentrating solar power (CSP) applications. Conceptual designs were initially developed for multiple radial and thrust AMBs with spreadsheet-based calculations before selecting one of each to develop further using higher-fidelity design methods for magnetic and structural performance. It was found that the radial AMB at 540°C was feasible, but the thrust AMB needed to be limited to 315°C for high-speed operation. The decision for a reduced-temperature thrust AMB was the result of several significant conclusions: 1) Hiperco 50A, originally chosen for good magnetic performance at high temperature, had insufficient strength for high-speed operation, so it was replaced with 17-4 PH. 2) The reduced magnetic performance from 17-4 PH yielded a larger bearing size, reducing the strength margin. 3) This ultimately led to a creative design implementing a more-compact E-core topology, compared to the original (conventional) C-core, and an integral shaft-disk with Hirth joint connection. These conceptual designs are unique for the size and temperature in CO 2 , relevant for MW-scale CSP applications. Long term, high temperature test data was generated for several materials, filling a void in the current body of literature. Corrosion and magnetic performance measurements were produced for PM materials (Alnico 5-7C, Alnico 9C, and SmCo) with and without nickel-coating for environments of high-temperature CO 2 up to 550°C at atmospheric pressure and 450°C at 103 bar for up to 6,000 hours. Corrosion measurements were also produced for Hiperco 50, a SM material relevant for AMB laminations, with and without C5 coating. Comparisons were also made for 450°C and 550°C, atmospheric pressure air exposures up to 5,000 hours. Results generally show that coatings can be effective at improving oxidation resistance of the bare materials, and Alnicos generally outperformed SmCo after high-temperature exposure. In addition to technical feasibility demonstrated by the design, economic feasibility was demonstrated by updating the TEA from the reference machine, re-evaluating it with CAPEX and OPEX to reflect estimated changes from process-lubricated bearings to AMBs. AMBs were shown to be comparable in performance to process-lubricated bearings, still showing a notable improvement over conventional machinery architecture with oil-lubricated bearings.

42 ENGINEERING↗

Findings on Subtask 3.1 - Bakken Rich Gas Enhanced Oil Recovery Project

Total in-place oil for the Bakken petroleum system (BPS) (which includes the Bakken and Three Forks Formations) has been estimated to be 600 billion barrels (bbl). However, BPS wells have decline rates as high as 85% over the first 3 years of their lives, and primary recovery factors typically range from 3% to 10% of original oil in place. Given the low initial recovery rates, even small incremental productivity improvements could dramatically increase technically recoverable oil in the BPS. One potential solution is enhanced oil recovery (EOR) using gas injection, such as carbon dioxide (CO2) or hydrocarbon (HC) gases. While commonly used in conventional reservoirs, CO2 EOR in unconventional tight oil reservoirs has been limited to pilot tests. EOR using rich gas (mixture of methane, ethane, and propane) has also been employed in numerous pilots in several unconventional plays and has recently been successfully applied in the Eagle Ford play. If successful, large-scale gas-based EOR in the BPS could dramatically increase oil productivity and recovery factors and extend the life of the play for decades. While CO2 may be a technically suitable working fluid for EOR in the BPS, supplies are limited and costs for using CO2 in EOR pilots are prohibitively high. Meanwhile, produced gas flaring has presented challenges for BPS operators in North Dakota. Analysis conducted by the North Dakota Pipeline Authority indicates that the current gas-gathering infrastructure in North Dakota is insufficient to accommodate all of the associated gas that is produced from the BPS. The geographically isolated location of North Dakota relative to large natural gas markets, combined with suppressed natural gas prices, has made it economically challenging for industry to invest capital in expanding gas-gathering infrastructure in the state. These circumstances led to a research program conducted by the Energy & Environmental Research Center (EERC) in partnership with Liberty Resources Management Company LLC (LR) to examine the potential to use rich gas injection for EOR and mitigate flaring. A rich gas EOR pilot test was designed and executed by LR at its Stomping Horse development area in Williams County, North Dakota. From July 2018 through May 2019, a total of 160 million standard cubic feet (MMscf) of rich produced gas was injected into the BPS using five different wells in a sequential injection strategy. LR’s Leon–Gohrick drill spacing unit (DSU) was used as the test site. Regulatory oversight was provided by the North Dakota Industrial Commission (NDIC). Technical support was provided by the EERC through a series of laboratory, modeling, and field-based activities, and additional post-pilot research activities incorporated learnings from the test, developed new laboratory data, improved fracture modeling methods, and developed machine learning and big data analytics. The results from the Stomping Horse rich gas EOR pilot activities indicate that developing an effective, economical EOR approach for the BPS will require more field tests. Another key lesson learned from the Stomping Horse tests is that detailed pre- and posttest data on reservoir conditions and fluids production are essential. Robust reservoir characterization provides information that is crucial to creating realistic geomodels and conducting valid dynamic simulations of potential EOR scenarios. A detailed understanding of the completions and production history of offset wells is also necessary for valid test result interpretations. This knowledge is essential to designing the operational parameters of injectivity tests and interpreting the results. A conformance control strategy is also essential to success. Laboratory-based examinations of rich gas interactions with reservoir fluids and rocks were conducted, with an emphasis on determining the ability to mobilize oil in the tight reservoir rocks and shales of the BPS. Injection fluid composition was shown to have a positive impact on reducing reservoir oil minimum miscibility pressure (MMP), reducing interfacial tension (IFT), and altering wettability. IFT and contact angle measurements demonstrated that wettability can be altered in the presence of rich gas, suggesting the potential to improve oil recovery. Iterative modeling of surface infrastructure and reservoir performance using data generated by the various project activities was conducted. A geologic model of the Stomping Horse area was built; history-matched oil, gas, and water production was used in simulations of various EOR scenarios. Early programmatic modeling results were used to support LR’s design and operation of the EOR pilot and to provide insight regarding optimization of future commercial-scale BPS EOR design and operations. Post-pilot modeling focused on alternative methods of understanding complex fracture networks and accelerating simulation time. These led to improved simulation run times and provide excellent history-matching results. Several of these iterative models were used as the bases for developing algorithms into machine learning and big data analytics. History matching in reservoir simulation is time-consuming and computer processing-intensive. Machine learning algorithms were created, and an automated history-matching tool was developed. A large set of synthetic reservoir simulations were created to generate well responses (oil, gas, and water production, well bottomhole pressure [BHP], and tracer or propane breakthrough) for a set of EOR operating parameters that included offset well status (open or closed), injectate (rich gas or propane), injection rate, and injection well BHP. A user interface was developed to provide real-time visualization. Machine learning-based models were developed to provide rapid forecasting of well performance given a set of user-defined EOR operating parameters. These predictive models allow the user to modify the offset well status, injection rate, and injection well BHP and rapidly forecast future production performance. The combination of real-time visualization tools with real-time forecasting tools provides a framework for real-time control—operational changes that the EOR site operator can enact (e.g., changing gas injection rates) to affect the observed performance and potentially improve the EOR outcome. There is great reason to be optimistic about the future of EOR in the Bakken. The results of the laboratory studies suggest significant potential for high rates of oil mobilization using produced field gas injection under the right conditions. The results of the lab studies, combined with rigorous statistical analysis of well production data and associated modeling efforts, confirm the notion that fluid mobility within the reservoir is controlled by fractures. As more knowledge is gained about the nature and distribution of fracture networks in the Bakken, the industry will be in a better position to predict and, ultimately, influence fluid mobility. New field tests are necessary to develop a more complete understanding of those conditions. Thoughtful and creatively engineered field tests within a well-characterized geologic setting will yield the fundamental knowledge needed to take Bakken oil production to the next level. This subtask was cofunded through the EERC–U.S. Department of Energy Joint Program on Research and Development for Fossil Energy-Related Resources Cooperative Agreement No. DE-FE0024233. Nonfederal funding was provided by the North Dakota Industrial Commission’s Oil and Gas Research Program and Computer Modelling Group.

04 OIL SHALES AND TAR SANDS↗