Performance Evaluation of Multi-Vendor Grid-Forming Inverters for Grid-Connected Operation Through Hardware Experimentation: Preprint

Existing real-world projects of GFM inverters that operate in parallel to power grids typically are sized between dozens and a few hundreds Megawatt (MW) scale according to a recent NERC GFM inverter white paper. These large systems are often difficult to evaluate prior to deployments because of their large size. The performance of smaller GFM inverters (dozens to a few hundreds MW) that operate parallel with power grids (distribution systems) is even less understood. There is an opportunity to better understand these systems through hardware testing under controlled laboratory conditions. Therefore, this paper presents the functional performance evaluation tests of multiple (three) commercial GFM inverters when they operate in parallel with the grid through hardware experiments. The goal of these tests is to explore the GFM inverters' functionalities and dynamic response when in parallel with power grids to eventually develop universal specifications for GFM inverters. Both steady state (changing the inverter's frequency and voltage droop) and transient (adding step change in grid's frequency/voltage) tests are performed for each GFM inverter with the same testing circuit and testing protocol. The experimental results indicate the bench-marked performance that: 1) the GFM inverters can be dispatched through frequency and voltage droop intercepts to output the target power when paralleled to the grid; 2) the GFM inverters automatically respond to system frequency and voltage events to output the needed power, however, the GFM inverters all show stability issues when absorbing reactive power from the grid.

grid-forming inverters↗

Small-Signal Analysis of Current-Limiting Grid-Forming Inverters

Grid-forming (GFM) inverters are equipped with a current limiter to protect the device during grid disturbances. Because the intervention of the current limiter can compromise the transient stability of the GFM inverter, various types of current limiter designs and additional frequency-stabilization control methods have been proposed in recent literature to aid in transient GFM inverter stability; however, the small-signal stability implications of adding these additional control blocks during, in particular, off-nominal conditions are not fully understood. To address this challenge, this paper presents a generic small-signal model of a GFM inverter that incorporates various types of current limiters and frequency stability-enhancing controls. With the proposed model, we analyze the root causes of inverter instability, which reveals two critical design trade-offs. First, due to current-limiter engagement caused by a disturbance, the GFM inverter dynamics are altered, which can lead to voltage oscillations. Second, additional frequency-stabilization controls can improve the small-signal stability of the GFM inverter, but at the cost of reduced power and voltage support to the grid. Comprehensive hardware experiments validate the theoretical concept and analysis. The findings in this work underscore the importance of incorporating both transient-response and small-signal dynamics requirements into the design procedure of GFM current limiters and frequency-stabilization controls.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Seamless Transition of Critical Infrastructures using Droop Controlled Grid-forming Inverters

Seamless recovery of power to critical infrastructures, after grid failure, is a crucial need arising in scenarios that are increasingly becoming more frequent. Here, this article proposes a seamless transition strategy using a single and unified mode-dependent droop controlled grid-forming inverters. The control strategy achieves the following objectives: 1) regulates the output active and reactive power by the droop-controlled inverters to a desired value while operating in on-grid mode; 2) seamless transition and recovery of power injections into the load after grid failure by inverters that operates in grid-forming mode all the time; 3) requires only a single bit of information on the grid/network status for the mode transition. A framework for assessing the stability of the system and to guide the choice of parameters for controllers is developed using control-oriented modeling. A controller hardware-in-the-loop-based real-time simulation study on a test system based on the realistic electrical network of a commercial-scale medical center is conducted for initial prototyping of the control strategy. A hardware experiment is conducted with two 3 - $\phi$, 480 -V, 125 -kVA grid-forming inverters, a 3 - $\phi$, 480 -V, 270 -kVA grid simulator, a physical grid switch, and a physical load bank. The experimental data establishes the effectiveness of the always grid-forming operation and control of inverters in meeting power delivery objectives when on-grid and off-grid under various kinds of loads and scenarios while minimizing transients during transitions. Furthermore, performance comparison with existing strategies showcases the advantage of the proposed strategy.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Model-Based Detection Scheme for Spoofed Sensor Data in Grid-Connected Inverters

In this article, a novel method to detect spoofed sensor data (SSD) for grid-connected inverters is proposed. First, a Kalman filter is used to estimate the inverter status in the proposed method. Then, the impact of SSD on the residual between estimation and control reference is analyzed. By leveraging the standard error of residual, an adaptive cumulative sum (CUSUM) chart is developed to achieve fast SSD detection and improve robustness. In addition, the proposed SSD detection method is verified by the hardware experiment. A comparative experiment with a conventional method also demonstrates the rapidity and robustness of the proposed method. Lastly, the performance of the proposed method under different noise covariance matrices is analyzed. Comprehensive analysis shows that the proposed method meets the detection requirement in IEEE 1547 Standard.

42 ENGINEERING↗

Laminated Permanent Magnets Enable Compact Magnetic Components in Current-Source Converters

Magnetic components have become one of the primary barriers to high power density converters, especially to current-source converters (CSCs). In CSCs, the inductors/transformers have a predominantly dc flux to store energy, which can be offset by standard permanent magnets (PMs). However, eddy currents in standard PMs induce significant losses and thermal stress for medium-frequency applications. This article proposes using laminated PMs to offset the dc flux while reducing eddy currents, leading to significant reductions in the size, cost, and losses of inductors/transformers. Furthermore, the laminated PMs’ optimal location, orientation, and distribution are investigated to generalize this approach for maximum benefits. Here, three-dimensional finite-element analysis simulation and hardware experiments are presented to validate the effectiveness of the proposed approach in a medium-frequency transformer (MFT) for CSCs. Compared with standard PMs, the proposed use of laminated PMs reduces aggregate core-plus-PM losses by 85% in experiments, and thus, relaxes the MFT thermal design. Finally, the proposed approach is experimentally validated in a 40 kVA flyback-type MFT for a soft-switching solid-state transformer. Compared to the traditional design without any PMs, the proposed design increases the saturation current by 46% while inducing only 5% more losses, leading to significant savings in magnetics cost and size.

30 DIRECT ENERGY CONVERSION↗

Virtual Dynamic Grid Impedance and Its Impacts on Harmonics and Stability of Inverter Based Resources Plant

Nowadays, a large number of inverter-based resources (IBRs) are integrated into the grid at a single connection point as an IBR plant. In this article, a virtual dynamic grid impedance concept is introduced to evaluate the harmonics and stability for grid integration of an IBR plant containing multiple IBRs. First, a detailed theoretical study is conducted to build a foundation of the virtual grid impedance concept, which is a dynamic impedance that changes with the number of IBRs added into an IBR plant. Then, based on the new virtual dynamic grid impedance concept, frequency spectrum analysis is performed to explore harmonic impact at the interconnection point for an IBR plant with IBRs having L, LC, and LCL filters, respectively. An electromagnetic transient (EMT) simulation model of a grid-connected IBR plant is developed to explore the harmonics and stability of the IBR plant connected to the grid as well as the reliable operation of IBRs within the plant from the novel virtual equivalent dynamic grid impedance point of view. Hardware experiments are conducted to validate the EMT simulation evaluation. The results show that the number of IBRs added into an IBR plant influences the grid impedance, i.e., grid strength, and the grid impedance variation has multiple impacts on the IBR plant and IBRs within the plant depending on the grid-connected filters of the IBRs.

grid impedance↗

Small Hydro Power Plants with Integrated BESS for Enhance Resiliency

Battery energy storage systems (BESS) are an important asset for power systems with high integration levels of renewable energy, and they can be controlled to provide various services to the grid. This paper presents the hardware demonstration and characterization of using a utility-scale BESS with grid-following (GFL) and grid-forming (GFM) controls and a run-of-river (ROR) hydropower plant to perform a bottom-up power system black start that enhances power systems' resiliency. ROR hydropower plants are generally not used for power system restoration due to their frequency instability during islanded operation; however, BESS with droop control can provide critical damping to convert a ROR hydropower generator into a black start- capable unit. To demonstrate this, we carry out hardware experiments at the megawatt-scale integrating a synchronous generator driven by a dynamometer, an actual GFL/GFM BESS, a medium-voltage impedance network, and a load bank. The demonstration shows the different roles of BESS with GFL and GFM control in power system restoration. GFL BESS can suffer from high-frequency oscillations, even instability, depending on the droop control gain and loading condition. The results provide further insights for system operators on how GFL- or GFM controlled BESS can enhance grid stability and how hydro-BESS hybrids can operate as a black-start-capable unit. The presented experimental results are also a valuable resource to understand the different stability characteristics of real-world BESS with different control modes.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Performance Evaluation of Multi-Vendor Grid-Forming Inverters for Grid-Connected Operation Through Hardware Experimentation

This paper presents the functional performance evaluation tests of multiple (three) commercial grid-forming (GFM) inverters when they operate in parallel with the grid through hardware experiments. The goal of these tests is to explore and benchmark the GFM inverters' functionalities and dynamic response when they are operated in parallel with power grids. Both steady-state (changing the inverter's frequency and voltage droop) and transient (adding step changes to grid's frequency/voltage) tests are performed for each GFM inverter with the same testing circuit and testing protocol. The key findings are summarized as follows: 1) The GFM inverters can be dispatched through frequency and voltage droop intercepts to output the target power; and 1) the GFM inverters automatically respond to system frequency and voltage events to output the needed power; 3) all the GFM inviters shows stability issues when absorbing reactive power from the grid.

frequency droop↗

Demonstration of Power System Black Start with Hydropower Generator and Battery Energy Storage: Preprint

Battery energy storage systems (BESS) are an important asset for power systems with high integration levels of renewable energy, and they can be controlled to provide various services to the grid. This paper presents the hardware demonstration and characterization of using a utility-scale BESS with grid-following (GFL) and grid-forming (GFM) controls and a run-of-river (ROR) hydropower plant to perform a bottom-up power system black start that enhances power systems' resiliency. ROR hydropower plants are generally not used for power system restoration due to their frequency instability during islanded operation; however, BESS with droop control can provide critical damping to convert a ROR hydropower generator into a blackstart- capable unit. To demonstrate this, we carry out hardware experiments at the megawatt-scale integrating a synchronous generator driven by a dynamometer, an actual GFL/GFM BESS, a medium-voltage impedance network, and a load bank. The demonstration shows the different roles of BESS with GFL and GFM control in power system restoration. GFL BESS can suffer from high-frequency oscillations, even instability, depending on the droop control gain and loading condition. The results provide further insights for system operators on how GFL- or GFMcontrolled BESS can enhance grid stability and how hydro-BESS hybrids can operate as a black-start-capable unit. The presented experimental results are also a valuable resource to understand the different stability characteristics of real-world BESS with different control modes.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Power-Hardware-in-the-Loop Interfaces for Inverter-Based Microgrid Experiments Including Transitions

Microgrids continue to proliferate, particularly those that rely on inverter-based resources as the microgrid's voltage and frequency leader. Hardware-in-the-loop simulations can de-risk microgrid deployments, and therefore we need power-hardware-in-the-loop (PHIL) interfaces for grid-forming (GFM) inverters to enable simulations of seamless transitions between islanded and grid-connected operation. Such interfaces are particularly challenging when the inverters need to switch modes, i.e., between grid-following (GFL) and GFM as the microgrid transitions between grid-connected and islanded operation. This paper presents two PHIL interfaces for such microgrids and the preliminary experimental results.

experiments↗

Segmented Energy Routing for a Modular AC/DC Hybrid System

This article presents a modular ac/dc system with both distributed and centralized power ports for energy router (ER) applications. In each module of the described system, photovoltaic (PV) power generation units, battery-type energy storage (ES) units, and critical loads are connected to the cascaded H-bridge (CHB)-organized medium-voltage (MV) dc links, with fully distributed low-voltage (LV) dc power ports. Copies of modules share the centralized load bus and interact with an MV ac grid in parallel. Hybrid power port (HPO) assigns flexibility to the system but makes energy routings a necessity for stable operation. In this article, a segmented energy management strategy for the HPO-ER is proposed. In terms of the grid-side power transferring, the system ratings are intentionally designed to match significant power imbalance. Focally, a segmented energy management strategy is proposed to realize fully autonomous energy routing involving MV ac grid, distributed PV generations, distributed battery storages, and LV load. The system is proven to be stable using the derived impedance-based model considering the interaction between power blocks. The feasibility of the topology and control strategy is also verified through software simulation, laboratorial hardware prototype experiment, and hardware-in-the-loop (HIL) emulation.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Experiences Detecting Defective Hardware in Exascale Supercomputers

In May 2022, the newest supercomputer to top the TOP 500 list was Frontier at Oak Ridge National Laboratory, demonstrating the capability of computing more than 1.1 quintillion (1018) floating-point calculations every second. Driving this ground-breaking rate of computing is Frontier’s more than 37,000 graphics processing units (GPUs) and 9,408 central processing units (CPUs). In total, Frontier contains more than 60 million parts. At this scale, the smallest margin of error may generate hundreds of hardware errors across the system. These errors are capable of directly hindering world-class science performed on Frontier if not found. In this work, we describe and evaluate two strategies for finding hardware-level faults in Frontier’s 9,408 compute nodes. There are two strategies developed: the first uses the Slurm scheduler to scavenge available compute time to run the node screen, the second builds upon the lessons learned in the first strategy and enforces a weekly screen of each node. Using June 2023 as a case study, we find that the first scheduling strategy consumed more than ten times the resources as the second scheduling strategy, but successfully detected five hardware defects in Frontier. We summarize the lessons learned while developing and running a node screen on the world’s first exascale supercomputer.

Hagerty, Nick↗

Stabilizing Inverter-Based Transmission Systems: Power Hardware-in-the-Loop Experiments with a Megawatt-Scale Grid-Forming Inverter

This article presents what the authors believe to be the first experimental verification of the ability of grid-forming (GFM) inverters to stabilize a transmission electric power system that is otherwise unstable. The experiments described here were performed using power hardware-in-the-loop (PHIL) simulation to connect a megawatt-scale battery inverter to a real-time electromagnetic transient (EMT) simulation of the near-future Maui power system. This allows the dynamic interactions between the inverter and the power system to be observed without putting the real power system at risk. The ability to use the actual inverter hardware removes the need to rely on a computer model approximation of the inverter's behavior.

electromagnetic transient simulations↗

De-Risking Field Deployment of Power System Innovations Using Hardware-in-the-Loop Experiments

The last decade has seen needs for integrating new technologies in power system. Unlike other industries, field mis-operation of novel technologies in power system can create heavy economic losses. Thus, de-risking field deployment is critical. This webinar will provide background on technology readiness level introduced by the space industry and the use of these readiness levels in power industry to assess the maturity level of power system technologies. This webinar will discuss the different approaches used to de-risk field deployment of controller technologies and power hardware technologies. This webinar will also discuss the challenges and limitations of these de-risking approaches. Finally, the webinar will provide results from hardware-in-the-loop experiments performed at National Renewable Energy Laboratory.

controller hardware-in-the-loop↗

Power-Hardware-in-the-Loop Experiments of a Microgrid with a Grid-Forming Battery Inverter

Microgrids continue to proliferate, and they are transitioning away from using conventional generating resources to increasingly relying on inverter-based resources (IBRs) as the voltage and frequency leaders. It is crucial to evaluate the capability of IBRs to provide microgrid stability and resilience. Hardware-in-the-loop (HIL) experiments were conducted to de-risk the field deployment of the San Diego Gas & Electric Company Borrego Springs Microgrid, where a battery inverter was upgraded with grid-forming (GFM) capability to serve as the island leader. This paper presents the HIL experimental results from an HIL test bed that uses a power-hardware-in-the-loop (PHIL) interface with a power inductor that was previously developed for PHIL simulations of microgrids where the inverters need to switch modes, i.e., between grid-following and GFM as the microgrid transitions between grid-connected and islanded operation. This paper presents more details on the interface and HIL simulation results of the planned islanding and load steps in islanded operation to show the effectiveness of the inverters in managing the voltage and frequency.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Power-Hardware-in-the-Loop Experiments of a Microgrid With a Grid-Forming Battery Inverter: Preprint

Microgrids continue to proliferate, and they are transitioning away from using conventional generating resources to increasingly relying on inverter-based resources (IBRs) as the voltage and frequency leaders. It is crucial to evaluate the capability of IBRs to provide microgrid stability and resilience. Hardware-in-the-loop (HIL) experiments were conducted to de-risk the field deployment of the San Diego Gas & Electric Company Borrego Springs Microgrid, where a battery inverter was upgraded with grid-forming (GFM) capability to serve as the island leader. This paper presents the HIL experimental results from an HIL test bed that uses a power-hardware-in-the-loop (PHIL) interface with a power inductor that was previously developed for PHIL simulations of microgrids where the inverters need to switch modes, i.e., between grid-following and GFM as the microgrid transitions between grid-connected and islanded operation. This paper presents more details on the interface and HIL simulation results of the planned islanding and load steps in islanded operation to show the effectiveness of the inverters in managing the voltage and frequency.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Emulation and detection of physical faults and cyber-attacks on building energy systems through real-time hardware-in-the-loop experiments

The increasing use of remote or mobile access, integrated wearable technologies, data exchange, and cloud-based data analytics in modern smart buildings is steering the building industry towards open communication technologies. The increased connectivity and accessibility could lead to more cyber-attacks in smart buildings. On the other hand, physical faults (e.g., HVAC -heating, ventilation, and air-conditioning faults) may have similar adverse impacts as those from the cyber-attacks on building energy systems, such as occupant discomfort, energy wastage, and equipment downtime. However, current physical behavior-based anomaly detection methods fail to differentiate between cyber-attacks and physical faults in building energy systems. Moreover, the challenge in collecting real-world threat data with ground truth has led researchers to rely on numerical models with user-defined assumptions, which may not accurately reflect real-world conditions due to the lack of in-situ experimental datasets. To address these challenges and gaps, this paper presents a flexible hardware-in-the-loop (HIL) testbed for generating cyber-attack and physical fault datasets and demonstrating threat detection algorithms in a real building automation system (BAS) environment. This testbed combines hardware (i.e., real BAS with local HVAC controllers and a physical network) with software (i.e., high-fidelity models to represent behaviors of building envelope and HVAC energy systems), enabling emulations of realistic threats. Five HIL experiments, including one baseline without any threats, two with physical faults, and two with cyber-attacks, were conducted to generate datasets containing detailed network traffic and system states. A joint classification framework, incorporating a network analyzer and a physical HVAC fault detector, was proposed to automatically detect cyber-physical abnormalities on BAS at both the network and the physical HVAC levels. The network analyzer comprises a conditional random fields (CRF) based command validator and a statistics-based detection strategy. The fault detector employs a weather and schedule-based pattern matching and feature-based principal component analysis (WPM-FPCA) method. Evaluation of the classification using four metrics from the multi-class confusion matrix revealed an average accuracy of 90.2%, recall of 89.7%, precision of 88.5% and F1-score of 89.2%. Finally, these results demonstrate that the proposed joint classification framework can effectively differentiate between specific types of cyber-attacks (e.g., device reinitialization attack, network Denial-of-Service attack) and physical faults (e.g., air handling unit operational fault, cooling coil valve stuck) in real time for improved building energy management.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗