Search NASA⌕ Search

SEARCH · Search NASA

Results for “FERC”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Commercial Building Planning and Retrofitting Strategy for Grid Services

The increasing integration of distributed energy resources (DERs) plays an important role in improving energy consumption efficiency. In September 2020, the Federal Energy Regulatory Commission (FERC) approved Order 2222 which opens wholesale electricity markets to small capacity DERs. The benefit of this new FERC Order 2222 is that DERs, such as rooftop solar panels and batteries, will be able to participate in regional electricity markets and provide grid services. Meanwhile, the planning and operation strategies of DERs are facing new challenges to account for the impact of the wholesale market with numerous uncertainty factors. Therefore, in this paper, we propose a new planning and retrofitting model for long-term commercial buildings that considers both DER investment and market participation. Specifically, we explore the capability of implementing DERs for grid services. The effectiveness of the proposed model is validated using real-world data. Simulation results also validate that participating in grid services can significantly increase revenues through appropriate building energy management and shorten the payback period of DER investments.

building energy management↗

A Comparison of the Environmental Effects of Open-Loop and Closed-Loop Pumped Storage Hydropower

Pumped storage hydropower (PSH) capabilities are generally characterized as either open-loop or closed-loop. The U.S. Department of Energy (DOE) defines open-loop PSH as “continuously connected to a naturally flowing water feature,” and closed-loop PSH as “not continuously connected to a naturally flowing water feature.” All the PSH projects constructed in the United States to date are open-loop, so the potential environmental effects of closed-loop systems are not as well documented as the effects of open-loop systems. To address this knowledge gap, the DOE Water Power Technologies Office, under its HydroWIRES Initiative, has prepared this report to: (1) compare the potential environmental effects of open-loop PSH projects with those of closed-loop PSH projects; (2) describe how these effects are being avoided, minimized, or mitigated at existing projects in other countries and proposed projects in the United States; and (3) discuss the relative significance of the environmental issues. The report begins with a brief introduction on the current status of PSH development in the United States. Next, the report describes the current Federal Energy Regulatory Commission (FERC) hydropower licensing process, emphasizing some recent regulatory changes that affect closed-loop PSH development. The report then provides a summary comparison of the environmental effects of constructing and operating open-loop and closed-loop PSH systems and discusses the relative significance of those issues. This comparison and discussion are based on the results of a literature review and a review of FERC licensing records. The literature review includes journal articles, technical reports, and presentations on the environmental effects of PSH systems. It includes literature from the United States as well as countries where closed-loop PSH projects have been constructed. The FERC records review examines the FERC licensing record (e.g., National Environmental Policy Act documents and license orders) to identify the environmental effects anticipated and mitigation measures proposed for six of the closed-loop PSH projects currently licensed or permitted in the United States. For comparison, the FERC records review also discusses the environmental effects and mitigation measures for four open-loop PSH projects proposed or currently operating in the United States. The comparison of effects between open-loop and closed-loop projects is relative; that is, it characterizes the impacts of each project type as generally lower or higher than another project type. The comparison reflects general trends among project types because there are sometimes exceptions to the examples cited. The comparison is based on both spatial (location) and temporal (duration) factors and reflects both the severity and likelihood of effects. The report concludes that the environmental effects of closed-loop PSH projects are generally lower (i.e., more localized and of shorter duration) than those of open-loop PSH projects because they are located “off-stream,” minimizing aquatic and terrestrial impacts, and often have greater siting flexibility than open-loop PSH projects. For certain closed-loop project designs, however, impacts to groundwater may be higher relative to open-loop projects and should be considered in any environmental review.

13 HYDRO ENERGY↗

Challenges in the post-licensing stage of U.S. hydropower development: Current status and some potential solutions

The issuance of a Federal Energy Regulatory Commission (FERC) license is an important milestone in the development process of new U.S. hydropower projects. The complexity and uncertain timeline of the licensing process have been often cited as a key deterrent to new hydropower installations in the United States. However, very little attention has been paid to post-licensing timelines and attrition rates. This article explores the challenges faced by developers in bringing their FERC-licensed hydropower projects to the construction stage. Post-licensing activities to be completed before starting construction include obtaining additional permitting from other federal or state agencies, completing the technical design, securing financing, and in most cases, negotiating a power purchase agreement. For the set of projects that obtained a FERC license between 2007 and 2018, we assembled a dataset—combining information from FERC dockets and responses from a questionnaire to developers—to calculate attrition rates and development timelines and to examine the reasons for delays and cancellations.

13 HYDRO ENERGY↗

Environmental Impacts of Closed-Loop Pumped Storage Hydropower

The goal of this report is to help license applicants, resource agencies, and other members of the hydropower community involved in closed-loop pumped storage hydropower permitting and licensing process, focus the scope of environmental reviews, and more quickly identify impacts with project nexus and potential mitigation measures for these impacts. Pumped storage hydropower (PSH) is an energy storage technology that uses energy to pump water up from a lower reservoir to an upper reservoir where water is stored until electricity is needed and the water is released to a lower reservoir passing through turbines. Closed-loop PSH—PSH that is not continuously connected to a naturally flowing water feature—is one of the lowest greenhouse gas emitting energy storage technologies and is therefore a critical part of the transition to renewable energy (Simon et al. 2023). Proposals for closed-loop PSH facilities in the United States currently account for more than 40% of original licenses and 99% of potential generation capacity in the Federal Energy Regulatory Commission (FERC) hydropower licensing pipeline (Johnson et al. 2023). While closed-loop PSH facilities can have lower environmental impacts than open-loop PSH facilities, no closed-loop facilities have been constructed in the United States to enable direct accounting of project impacts and efficacy of mitigations. Many proposals for closed-loop PSH submitted to FERC are abandoned early in the permitting and licensing process prior to license applications and environmental assessments, so there is little documentation describing potential project impacts and proposed mitigations. The newness of closed-loop PSH proposals in the United States may mean that tribal, federal, and state agencies with authorities for cultural and natural resources protection and management involved in the FERC licensing process may not have experience with closed-loop PSH regulation. Moreover, many proposed closed-loop PSH facilities are in areas that do not have high concentrations of conventional hydropower, so these agencies may also be unfamiliar with the FERC hydropower licensing process. The goal of this report is to help license applicants, resource agencies, and other members of the hydropower community focus the scope of environmental review for the closed-loop PSH development, licensing, and federal authorization process enabling quicker identification of potential impacts, mitigations, and situations where mitigation may not be possible. We found that environmental impacts of closed-loop PSH are highly site-specific, and generalizations about the types of environmental impacts across closed-loop PSH projects are difficult to make. Environmental impacts of closed-loop PSH are like those for open-loop PSH with a few exceptions including water sourcing, which can lead to delays and contention due to potential complexities with water rights, impacts to aquatic resources, and greenhouse gas emission potential. Cultural resource impacts were commonly reported in National Environmental Policy Act (NEPA) documents reviewed and discussed in interviews, but in many cases such impacts cannot be mitigated.

13 HYDRO ENERGY↗

Understanding the Environmental Study Life Cycle in the United States Hydropower Licensing and Federal Authorization Process

We analyzed United States Federal Energy Regulatory Commission (FERC) documents prepared for 29 recently licensed hydropower projects and created two novel datasets to improve understanding of the environmental study life cycle, defined here as the process that begins with an environmental study being requested by a hydropower stakeholder or regulator, and ends with the study either being rejected or approved/conducted. Our two datasets consisted of summaries of information taken from (1), study determination letters prepared by FERC for 23 projects that were using the integrated licensing process, and (2), environmental study submittals and issuances tracked and attributed to seven projects using the FERC record. Our objective was to use the two resulting environmental life cycle datasets to understand which types of environmental studies are approved, rejected, and implemented during FERC licensing, and how consistently those types of studies are required across multiple hydropower projects. We matched the requested studies to a set of 61 river function indicators in eight categories and found that studies related to the category of biota and biodiversity were requested most often across all 29 projects. Within that category, studies related to river function indicators of presence, absence, detection of species and habitat/critical habitat were the most important to stakeholders, based on the relative number of studies requested. The study approval, rejection, and request rates were similar within each dataset, although the 23 projects with study determination letters had many rejected studies, whereas the dataset created from the seven projects had very few rejected studies.

13 HYDRO ENERGY↗

Variable Transmission Line Ratings

This paper outlines the concept of variable-transmission facility ratings. This topic is of heightened importance following the recent Federal Energy Regulatory Commission (FERC) Order No. 881 which requires the implementation of ambient adjusted ratings (AARs) for FERC jurisdictional portions of the transmission system. Additionally, FERC issued an Advanced Notice of Proposed Rulemaking (ANOPR) implying a future order on Dynamic Line Rating (DLR) requirements. The various types of facility-rating methodologies will be discussed with a focus on how they can benefit the stability, capacity, and reliability of the grid.

24 - POWER TRANSMISSION AND DISTRIBUTION↗

Cost of Fish Exclusion and Passage Technologies for Hydropower

Hydropower represents a reliable source of renewable energy and accounts for approximately 7% of the total electrical generation in the United States. Future expansion of hydropower is likely to be in the form of either smaller new stream development projects or powering existing non-powered dams. For these new projects to be successful, careful analysis of risks, costs, and uncertainty to offset reduced power production as well as ensuring the protection and safe passage of migratory fish to gain public support, will be required. Exclusion and passage are two common approaches to protect fish from entrainment and impingement at hydropower facilities. The thresholds for entrainment risk and requirements for exclusion and passage often differ depending on the species involved, the characteristics of the facility, and the goals of stakeholders. While the costs associated with environmental mitigations represent a large proportion of the total costs required for the licensing of hydropower facilities, little quantitative information is present within the literature regarding the specific costs of fish exclusion and passage. Working with FOA awardee Natel Energy, scientists at Oak Ridge National Laboratory were tasked with assessing the capital construction costs for downstream fish exclusion and passage infrastructure. This report used keyword searches of an existing environmental mitigation cost data set and manual extraction of additional cost data associated with protection, mitigation, and enhancement (PM&E) measures related to positive barrier screening and passage from regulatory licensing documents available in the Federal Energy Regulatory Commission (FERC) eLibrary. This approach yielded a total of 50 PM&E mitigation measures with estimated capital construction costs pertaining to positive barrier screens, 142 pertaining to passage studies, and 26 pertaining to passage-related studies. PM&E measures associated with positive barrier screens represented <10% of the 171 total FERC project dockets available in the data set. These data were highly skewed toward conventional relicensing projects, as <7% were associated with new stream development (NSD) projects. Results from these data indicate highly variable costs associated with fish screening, with flow-normalized costs one to two orders of magnitude higher for screening with the highest exclusion capability (≤0.09 in. spacing) compared with coarser screening (1 to 2 in.). Furthermore, estimated capital costs of passage infrastructure were positively related to the scale of the project based on installed capacity for some, but not all, types of passage. These data provide an initial baseline for estimating exclusion and passage costs for hydropower development and may help developers consider options for more fish-friendly generation technologies, though gaps remain relating to a lack of data, particularly for NSD projects. More data may still be available within the FERC eLibrary, but significant effort will be required to manually identify and extract the data for future analyses.

13 HYDRO ENERGY↗

Basin-Scale Relicensing Opportunity Product User Guide

The Basin-Scale Relicensing Opportunity products provide a platform for identifying favorable areas for basin-wide collaboration using metrics derived from anticipated Federal Energy Regulatory Commission (FERC) relicensing dates. The hydropower relicensing process requires long-term resource allocation by agencies, hydropower owner/operators, non-governmental organizations, and tribal, state, and federal governments. Basin-scale hydropower relicensing has begun to receive attention as a potential solution for reducing licensing timelines, costs, and uncertainty which can provide benefits to a broad spectrum of participants in the licensing process. Two products were developed: (1) an interactive web map that allows users to browse facilities and rivers of interest and uncover locations for potential collaboration based on FERC relicensing metrics summarized along river reaches and (2) a spreadsheet that contains 1,261 facilities with associated FERC relicensing metrics and that allows users to join these data to others and develop and conduct their own analyses.

13 HYDRO ENERGY↗

Basin-Scale Relicensing Opportunity

This dataset contains 1,261 hydropower facilities with associated Federal Energy Regulatory Commission (FERC) relicensing metrics. Anticipated FERC license renewal dates are summarized by river reach for observing areas of opportunities for basin-wide collaboration on environmental mitigations. Identifying rivers and basins with facilities that have similar anticipated Federal Energy Regulatory Commission (FERC) relicensing dates may be one potential indicator that multiple licensees within the same basin may be willing to collaborate on a basin-scale relicensing effort. The hydropower relicensing process requires long-term resource allocation by agencies, hydropower owner/operators, non-governmental organizations, and tribal, state, and federal governments. Basin-scale hydropower relicensing has begun to receive attention as a potential solution for reducing licensing timelines, costs, and uncertainty which can provide benefits to a broad spectrum of participants in the licensing process. This dataset contains one a data file in comma separated (*.csv) format, a data dictionary in *.csv format, and a user guide in *.pdf format. These data are also available as an interactive web map available at:

13 HYDRO ENERGY↗

A Blockchain Based Co-Simulation Framework for Integrating DERs to Wholesale Electricity Markets

As the number of distributed energy resources (DERs) continue to increase across energy-delivery systems, there remains a need for integrating their capabilities into traditional grid operations. In this paper, a blockchain-based solution is proposed to facilitate FERC's Order No. 2222 implementations. The presented use-case enables small-scale DERs to participate in wholesale market operations through DER aggregators, while also enabling local distribution system operators to enforce distribution system constraints in a secure and traceable manner. The presented use case is built around the Unified Testing Platform (UTP) being developed as a part of the Blockchain for Optimized Security and Energy Management (BLOSEM) project. This is a multi-lab effort intended to simplify the deployment of blockchain-powered grid solutions by enabling the integration of simulation tools, and blockchain technologies through the use of system-agnostic interfaces that provide a modular, interoperable, and reusable connectivity layer.

blockchain interoperability↗

Estimated capital costs of fish exclusion technologies for hydropower facilities

Hydropower is a reliable source of renewable energy, and its future expansion is likely to be in the form of either smaller new stream development (NSD) projects or powering existing non-powered dams. Thresholds for entrainment risk to fish and the requirements for fish exclusion at hydropower facilities often differ depending on the species involved, the characteristics of the facility, and the goals of stakeholders, but little quantitative information is present within the literature regarding the specific costs of fish exclusion measures. Cost data associated with protection, mitigation, and enhancement (PM&E) measures related to positive barrier screening were identified using keyword searches of an existing environmental mitigation cost data set and manual extraction from regulatory licensing documents available in the Federal Energy Regulatory Commission (FERC) eLibrary. This approach yielded a total of 50 p.m.&E mitigation measures with estimated capital construction costs pertaining to positive barrier screens and represented <10% of the 171 total FERC project dockets available in the data set. These data were highly skewed toward conventional relicensing projects, as <7% were associated with NSD projects. Results indicate highly variable costs are associated with fish screening, with flow-normalized costs one to two orders of magnitude higher for screening with the highest exclusion capability (≤0.09 in. spacing) compared with coarser screening (1–2 in.). These data provide an initial baseline for estimating exclusion costs for hydropower development and may help developers consider options for more fish-friendly generation technologies, though gaps remain relating to a lack of data, particularly for NSD projects.

13 HYDRO ENERGY↗

A Decision Support System to Compile Environmental Mitigations from Hydropower Licensing Documents

The process of deciphering, extracting, and compiling information from texts dense with domain-specific terminology and technical jargon is a challenging endeavor. It demands considerable expertise and deep knowledge in the respective field, resulting in a labor-intensive process when executed by humans. Furthermore, the task of identifying multiple class labels in extensive texts presents a challenge due to intra- and inter-reader variability, making the process time-consuming and costly.We’re introducing a user-friendly graphical interface, fortified with a BERT model-powered decision support system. This advanced system aims to augment efficiency, curtail data collection time, and sustain high precision in data acquisition. It is instrumental in deciphering and synthesizing intricate texts teeming with a spectrum of expressions, even within similar mitigation categories. Such tasks traditionally demand substantial human effort and specialized knowledge in the domain.Our system is specifically engineered for the task of extracting environmental mitigation information to promote sustainable hydropower development from licenses issued by the Federal Energy Regulatory Commission (FERC). These license documents are comprehensive, each containing over 15,000 words and requiring the identification of 135 different class labels. We anticipate that our system will boost reading speed, improve the consistency of classification outputs among readers, and contribute to the development of a robust scientific database of environmental mitigations associated with the 2,000+ non-federal hydropower facilities licensed by FERC in the United States.

Yoon, Hong-Jun [ORNL] (ORCID:0000000254505878)↗

What Role Do Aggregators Play in Power System Security and Resilience?

Barriers to the participation of distributed energy resources (DERs) in wholesale electricity markets have limited the use of DERs for power system security and resilience. In September 2020, the Federal Energy Regulatory Commission (FERC) approved an order to reduce these barriers. FERC Order No. 2222 enables the participation of DER aggregators in wholesale electricity markets. DERs include renewable generation and technologies that support the integration of renewable generation by increasing grid flexibility and resilience. Requiring wholesale energy markets to allow DER aggregator participation provides a path for DERs to become competitive in these markets. As the contribution from aggregated DERs continues to increase, the aggregator's role in supporting grid security and resilience will become more critical. This paper reviews work that demonstrates how DER aggregators can provide resilience support through technical capabilities, operational strategies, and secure communication architectures. Socioeconomic influences and impacts of aggregators, including implications for social resilience, are presented. In surveying the current state-of-the-art across different but interconnected topics, we illustrate how aggregators can be power system participants that enhance grid security. There is no one-size-fits-all approach to enhancing resilience in a power grid that includes a growing cohort of DER aggregators, but there are many options for aggregators to contribute to a more resilient and secure power grid.

aggregator↗

Flexible Service Contracting for Risk Management within Integrated Transmission and Distribution Systems

The general objective of our project has been to investigate the ability of Independent Distribution System Operators (IDSOs), functioning as linkage agents for Integrated Transmission and Distribution (ITD) systems, to facilitate the flexible availability and usage of reserve in support of ITD system operations. This general objective is in accordance with Order 2222 of the U.S. Federal Energy Regulatory Commission (FERC), titled “Participation of Distributed Energy Resource Aggregations in Markets Operated by Regional Transmission Organizations and Independent System Operators”. The Final Rule for FERC Order 2222 was issued on September 17, 2020. The primary contribution of our project is that we have formulated an innovative energy management Transactive Energy Design (TES) approach for ITD systems that provides promising support for our project objective. Specifically, we have developed a new type of IDSO-managed TES design for distribution system operations, as well as new types of swing contracts permitting IDSOs to participate in transmission system operations as providers of reserve harnessed from distribution system resources in return for appropriate compensation. Together, these design elements constitute a scalable market-based approach facilitating efficient reserve procurement for ITD system operations from a fuller range of power resources. The efficacy of our approach has been demonstrated by means of detailed conceptual analyses as well as test case simulations. To implement the latter, we have developed the ITD TES Platform V2.0, a computational platform that permits the modeling and software implementation of ITD system operations over time. The Electric Reliability Council of Texas (ERCOT) energy region has been used as the empirical anchor for the development of this platform. Our conceptual and test-case work has been reported in a Wiley/IEEE Press book, two refereed book chapters, and seven refereed journal articles. The key components comprising the ITD TES Platform V2.0 have been released as documented open-source software at online GitHub repositories.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Onshore U.S. Carbon Pipeline Deployment: Siting, Safety, and Regulation

Carbon capture, utilization, and storage (CCUS) technology has significant potential to reduce greenhouse gas (GHG) emissions and mitigate the impact of climate change, particularly in hard to decarbonize industrial and commercial sectors. CCUS involves capturing carbon dioxide (CO 2 ) from industrial processes or power generation and utilizing it for other purposes, such as enhanced oil recovery (EOR), or storing the captured CO 2 underground. CCUS technology can reduce the environmental impact of continued fossil fuel use while smoothing the transition to a low-carbon economy. CCUS can create new economic opportunities, such as the development of new industries and job creation, and can enhance energy security by diversifying energy sources. For these reasons, enabling CCUS has become a key objective of the Biden-Harris administration’s clean energy policy and has received bipartisan support. Despite its environmental and economic potential, CCUS faces multiple barriers to widespread deployment. One of the main challenges is the high cost and technical difficulty of implementing and operating large-scale CCUS infrastructure. CCUS remains a relatively expensive way to reduce carbon emissions (e.g., compared to solar photovoltaic technology’s displacement of coal generation). Additionally, financial incentives and supportive policies like those enacted to support solar photovoltaic development, especially at the state level, are inconsistent or nonexistent, which can discourage investment in CCUS projects. There are also technical challenges associated with safe and secure underground CO 2 storage and the development of new carbon utilization technologies. Public opposition to various aspects of CCUS technologies, ranging from concerns that CCUS will extend reliance on fossil fuels to CCUS infrastructure being sited in disadvantaged communities, is a growing challenge. This paper focuses on another significant barrier to broad CCUS deployment: the need for considerable expansion of the dedicated land-based CO 2 pipeline network in the United States to meet CCUS goals and the unique regulatory challenges to its development. To reach carbon emissions targets in the United States by 2050, CCUS technology will need to be supported by tens of thousands of miles of CO 2 pipelines. Estimates range from a minimum of roughly 29,000 pipeline miles (according to a 2020 Great Plains Institute study) to 66,000 pipeline miles (as per a 2021 Princeton University–led study). As of October 2022, however, the U.S. Department of Transportation (U.S. DOT) reports fewer than 5,400 miles of U.S. pipelines carrying CO 2 . This deficit—and what it means for the prospect of moving substantially larger quantities of CO 2 from source to use or storage—threatens to stifle the development of CCUS projects and technologies identified as an important tool to meet emissions targets. The current regulatory landscape facing CO 2 pipeline development can best be described as uncertain. At the federal level, the U.S. DOT Pipeline and Hazardous Materials Safety Administration (PHMSA) oversees safety regulation of pipelines transporting hazardous materials, including CO 2 upon commencement of operation. However, PHMSA’s definition of CO 2 as “a fluid consisting of more than 90 percent CO 2 molecules compressed to a supercritical state” has not been updated since its 1991 addition to the Federal Register. Because CO 2 can be transported in a gaseous, liquid, or supercritical state (indeed, the physical state of CO 2 can fluctuate within a single pipeline due to environmental changes), doubts persist about the extent of PHMSA’s purview—and raise questions about what, if anything, states should do to address this apparent gap. PHMSA has begun a major revision of its existing rules, but the agency does not expect a first draft before 2024. Economic oversight of CO 2 pipelines is even less clear. The Federal Energy Regulatory Commission (FERC) and Surface Transportation Board (STB)—which regulate the rates of interstate oil/natural gas and non-energy pipelines, respectively—have both declined jurisdiction over interstate CO 2 pipelines. This presumably leaves economic regulation to state and/or local governments, but few if any states have the laws or resources in place to oversee just and reasonable rates. Further, the interstate nature of CO 2 pipeline development creates questions around how different states should align their rate-making decisions. Onshore U.S. Carbon Pipeline Deployment: Siting, Safety, and Regulation Currently, regulatory responsibilities regarding CO 2 pipeline siting and permitting fall to state and local governments. The variety of laws and regulations across the country, however, creates a maze of requirements for pipeline developers to navigate. To secure necessary permits, most states require pipeline companies to be “common carriers” that provide transport service to the public at uniform rates. However, the specific definition of that term varies. Some states require clear evidence that a pipeline services the public, while others automatically deem any pipeline company transporting energy products or hazardous materials to be a “common carrier”—with little consideration for accessibility to third parties. Other states have eschewed common-carrier terminology entirely, placing private and publicly accessible pipelines on equal footing. Much like the variation in common-carrier requirements, laws governing eminent domain authority to secure rights-of-way (ROW) to commence construction on a planned pipeline route differ by state. Several states have no laws or rules governing CO 2 pipelines. In addition to creating questions about whether long-standing rules for other pipelines (e.g., natural gas or petroleum products) apply to CO 2 , this policy vacuum leaves local governments as the sole authority over sections of pipe within their boundaries. With dozens of counties along a given route, the probability of inconsistent regulation of the same pipeline is significant. Even in states with CO 2 pipeline laws in place, local regulatory attempts to address rising concerns over pipeline routing and safety have triggered lawsuits by pipeline companies seeking to delimit areas of federal, state, and local government responsibility. Meanwhile, legislators across the country have introduced bills to restrict the application of eminent domain to CO 2 pipeline projects, which could threaten a key means of securing ROW that companies cannot secure through negotiation with landowners. Taken separately, any of these regulatory issues—the narrow federal definition of CO 2 , FERC’s and STB’s decisions that CO 2 pipelines are not within their jurisdiction, and the considerable variation in state and local governments’ laws regulating CO 2 pipeline technologies—are extremely difficult to resolve. Adding the required scale of CO 2 pipeline expansion and the currently identified narrow window of time in which to reach climate target goals, the task becomes even more difficult—and raises a host of urgent questions for regulators. How should CO 2 be defined in federal regulations to ensure consistent safety standards across the country? What is the potential impact radius of a CO 2 pipeline rupture, and how should that inform local emergency response? In the absence of centralized federal oversight, what should state legislatures do to increase alignment for interstate CO 2 pipeline projects? This paper intends to serve as a primer for regulators and stakeholders who seek to better understand the regulatory challenges and opportunities facing this critical infrastructure.

42 ENGINEERING↗

Third-Party Aggregation Rulemaking in MISO and SPP Footprints

The report highlights key considerations for retail regulators in the footprints of the Southwest Power Pool (SPP) or Midcontinent Independent System Operator (MISO) in states that previously opted out of allowing third-party aggregation participation under FERC Order 719 and that may want to explore reversing the decision due to a changing policy environment under new FERC orders (i.e., 2222) and/or tightening resource adequacy constraints. Through a document review and a series of 27 interviews with regulators, aggregators, and other industry professionals, this document provides a high-level policy overview of the retail regulator’s role in a selection of processes, rules, and regulations to better understand how states have treated and/or integrated aggregators into wholesale markets. The report summarizes findings in two sections: General Findings and Specific Policy Findings. The General Findings offer high level takeaways such as the fact that 17 of the 20 states in MISO and SPP footprints opted out of third party aggregations following Order 719. Additionally, there is only one state that is fully restructured in the MISO and SPP footprints whereas the rest are vertically integrated, and the majority of third-party aggregations in the U.S. take place in restructured states outside of these footprints. Even so, third-party aggregations do take place in MISO and SPP albeit in small numbers and in an ad hoc regulatory environment. The specific policy findings delve deeper into specific examples of state actions on the topics of jurisdiction, registration and licensing, data governance, dual participation, and dispute resolution. Tables in each category organize state actions into Tiers I-III, which roughly correspond to the possible level of involvement or possible change necessary by state regulators and/or legislators to implement these actions. The tier level does not indicate any value judgement, as each state has respective regulatory limitations and each decision comes with various tradeoffs. One main tradeoff is between simplicity and quick implementation versus comprehensive and prolonged implementation. In many cases, actions in Tier I could be implemented without significant changes by relying on the use of existing processes for an aggregator context. On the other hand, many actions in Tier III are more narrowly designed to address aggregators specifically, but often require more significant changes including the involvement of additional parties through stakeholder engagement or legislative action. In some cases, these tiers are discrete. However, state regulators may also choose to progress through these various tiers sequentially as they phase in aggregators while learning from their experience. With the ability to stack bulk system level services, distributed energy resource aggregations in MISO and SPP could provide various private benefits (e.g., increased value streams to the owner) as well as societally beneficial grid services (e.g., peaking capacity, ancillary services, and other services that increase the grid’s overall operational efficiency). In deciding how to best to enable these benefits, states and retail regulators must weigh various tradeoffs if considering reversing a previous opt out.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Empirical Indicators of Transmission Value in the Southeast United States

Concurrent differences in energy price between different parts of the electric grid are a key indicator of the value of additional transmission. In areas without a wholesale electricity market, such as the Southeast, an alternative indicator to price is the Federal Energy Regulatory Commission’s (FERC) system lambda data. This economic metric represents the minimized marginal production costs of thermal generators, including fuel and other variable operation and maintenance expenses. Balancing Authorities report a single system lambda for their entire balancing area. Most Southeastern lambdas exhibit sufficient price variation to support a transmission valuation analysis, although incomplete accounting of congestion costs or scarcity rents during peak load hours may underestimate the true value of transmission capacity. With transmission value defined as the annual average hourly absolute price difference between two regions and FERC’s system lambda data used as a price proxy, we find the following results in the Southeast region during 2012-2023 (reported in $\$2024$/MWh): Intra‐regional findings: Annual averages historically span $\$2$–$\$28$/MWh and average $\$12$/MWh in SERTP and span $\$4$–$\$19$/MWh and average $\$9$/MWh in FRCC, disregarding transmission value driven by anomalous data. The ranges of transmission value reported here are large, spanning an order of magnitude in some cases. Much of this variation is driven by year-to-year changes, with 2022 having a particularly high intra-regional transmission value due to elevated natural gas prices. Inter‐regional corridors: Annual average transmission values across three broader regions range from $\$6$ to $\$28$/MWh with a long-term average of $\$11$/MWh. Much of the transmission value is concentrated in a small portion of hours. Across all regions, severe weather—particularly polar vortex events in January 2018, February 2021, and December 2022—drives the largest price spreads. Seasonal patterns also emerge, with summer afternoons and fall mornings contributing consistently to transmission value, as for example between MISO and SOCO in 2023.

24 POWER TRANSMISSION AND DISTRIBUTION↗