Search NASA⌕ Search

SEARCH · Search NASA

Results for “FIRE HAZARDS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Utilization of the LMP Methodology in Support of the VTR Conceptual Safety Design Report

The Versatile Test Reactor (VTR) is a fast spectrum test reactor currently being developed in the United States under the direction of the US Department of Energy (DOE), Office of Nuclear Energy. The VTR is utilizing a risk-informed performance-based (RIPB) approach for design support and authorization by the DOE, derived from recent efforts by the US industry led Licensing Modernization Project (LMP). This document contains an overview of the implementation of the LMP approach in support of the VTR Conceptual Safety Design Report (CSDR). The work reported here is the result of studies supporting a VTR conceptual design, cost, and schedule estimate for DOE-NE to make a decision on procurement. As such, it is preliminary. The VTR RIPB authorization approach utilizes information from the probabilistic risk assessment (PRA), coupled with deterministic analyses, to aid in decision-making regarding the identification and categorization of safety basis events (SBEs), the classification of structures, systems, and components (SSCs), and the evaluation of defense-in-depth (DID) adequacy. As part of initial reactor design efforts, a VTR conceptual design PRA was developed to support the RIPB process, which focused on at-power internal events, with scoping analyses for seismic and sodium fire hazards. In addition to supporting numerous design studies, preliminary results from the RIPB approach and the VTR conceptual design PRA were utilized as the basis of the VTR CSDR. The initial identification and categorization of SBEs, SSC classification, and DID evaluation were contained within the CSDR, which was submitted to DOE in 2019 as part of the CD-1 submittal package. Following review, DOE approved the CSDR in April 2020 and the CD-1 package in late 2020. Valuable experience was gained through the implementation of the RIPB approach for design and authorization during the VTR conceptual design phase, which is summarized in this document. To the extent possible, this experience has been shared with the advanced reactor industry, through publications and participation in licensing tabletops, in addition to informing DOE:NE advanced reactor regulatory development efforts. Furthermore, the approval of the CSDR by the DOE as part of CD-1 represents a significant milestone in the use of RIPB approaches for advanced reactor licensing.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Lignetics CRADA closeout report

Lignetics is one of the leading domestic producers of wood pellet fuels used for domestic heating. The company also produces pellets for other applications including animal bedding. The primary feedstock used for the production of Lignetics products is woody biomass. To improve the economics of pellet production, Lignetics is evaluating advanced preprocessing technologies developed by researchers at INL. In the proposed project, INL and Lignetics will work collaboratively to assess the feasibility of integrating INL’s advanced preprocessing technologies (fractional milling, high moisture pelleting and low temperature drying) in Lignetics production facilities. The successful completion of the project relies on the integration of the fractional milling and high moisture pelleting (HMP) process and low temperature drying to improve the economics of woody biomass pellet production for use in biofuel and bioproduct applications. In the HMP process, the biomass loses some moisture during compression and extrusion through the pellet die due frictional heat developed. Also, as pellets have a definite size and shape, they can be further dried in low temperature grain or belt dryers. Belt dryers are better suited to take advantage of low-grade and waste heat because they operate at lower temperatures than rotary dryers (Tumuluru et al.) Rotary dryers, for example, typically require inlet temperatures of 260°C, but more optimally operate around 400°C. In contrast, the inlet temperature of a belt dryer, such as a commercially available vacuum dryer, can be as low as 10°C above the ambient temperature, although more typically they operate at higher temperatures, between 90°C and 200°C. Because of their lower temperature operation, fire hazards and emissions to the air are lower for belt dryers in addition to reducing drying and overall pelleting costs, INL’s technology also has potential to reduce emissions at Lignetics facilities.

09 BIOMASS FUELS↗

Pull Force Evaluation of CCS Insulated End Caps

Insulated end caps installed on DC pins of Combined Charging System (CCS) inlets have been identified as potential debris sources within electric vehicle supply equipment (EVSE) connectors, increasing the risk of electric shock and fire hazards. Although standards such as IEC 62196-1:2022 specify mechanical pull-force requirements for these end caps, it remains unclear whether these requirements provide adequate robustness under real-world conditions. To address this concern, the National Charging Experience (ChargeX) Consortium's Hardware Task Force conducted evaluations of insulated end caps used in OEM CCS inlets. This study assesses the performance of insulated end caps used in OEM CCS inlets, specifically those installed on DC pins, using the procedures defined in IEC 62196-1:2022 (Section Sign) 26.7 and SAE J3400, supplemented by additional experimental conditioning. To ensure relevance to real-world conditions, NLR collaborated with charging network operators (CNOs) to guide the selection of charging inlet samples. Material analyses of the insulated end cap samples were conducted to confirm that the tested materials reflected the types and properties commonly observed in the field. The selected samples underwent temperature and humidity conditioning followed by pull-force testing to evaluate the end-cap integrity. Although SAE J3400 inlets were not directly tested due to limited diversity in available field data, the underlying end-cap principles between CCS and SAE J3400 are comparable, allowing the study's insights to be relevant to both technologies. Overall, this study provides a structured evaluation framework to inform potential refinements to mechanical pull-force requirements in charging standards.

33 ADVANCED PROPULSION SYSTEMS↗

A Safe Response to Renewable Energy Hazards

The International Association of Fire Fighters (IAFF) and Underwriters Laboratories, LLC (UL) in conjunction with UL Solutions initiated a joint project in 2022 under an agreement with the United States Department of Energy-Office of Energy Efficiency and Renewable Energy (DOE-EERE). This project focused on two separate and important initiatives related to energy efficiency in residential buildings. Initiative 1: Fire Performance on Energy Efficient Exterior Walls. Initiative 2: Firefighting Tactics in Residential Properties with Building Energy Storage Systems (BESS). The project’s first initiative addresses concerns surrounding new technologies with enhanced, energy-efficient exterior walls installed on residential properties. The concerns of fire rapidly traveling vertically up the exterior of these walls were examined. This addressed a growing concern from the first responder community that many times, the fires on the exterior of residential buildings have already evolved into an attic fire by the time of arrival – making it problematic to address the fire scenario. The test plan for Initiative 1 incorporated a modified version of an American Society for Testing and Materials (ASTM) test method, ASTM E2707, Standard Test Method for Determining Fire Penetration of Exterior Wall Assemblies Using a Direct Flame Impingement Exposure, as the foundation of the research. The test method involved a wall structure intended to represent retrofit construction to evaluate how fire would spread vertically or laterally. The second aspect of the UL-IAFF Project focuses on the fire service response to Residential Battery Energy Storage System (RBESS) incidents. These simulation tests were constructed in the large-scale fire test facility at UL Solutions’ Northbrook, IL campus. A baseline test was conducted that involved a test structure with no batteries—shelving units populated with standardized commodities, representing a typical garage with cellulosic and plastic contents. Three additional tests have been conducted to generate data with the contribution of energy storage system (ESS) batteries to compare fire and explosion hazards against the baseline test. Through this work, fire service tactical considerations can be explored. From the data, the team can determine 1) the visual indicators of a residential fire that has involved an RBESS (or, potentially, other large batteries) and 2) the impact of fire service-initiated ventilation of the structure on the fire conditions and explosion risks.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Wildfire-Power Grid Interactions: Feedback, Impacts, Monitoring, Modeling, and Mitigation Strategies

Wildfires are increasingly interacting with electric power systems through a two-way hazard chain: fires damage grid assets and trigger cascading outages, while grid faults can ignite new fires under hot, dry, and windy conditions. This review synthesizes the state of knowledge across five domains: (i) physical impacts of flames, heat, and smoke on lines, towers, insulators, and substations; (ii) power-infrastructure-initiated ignitions via conductor clash, high-impedance faults, and corona discharge; (iii) widespread blackouts and disproportionate societal impacts; (iv) multi-scale monitoring spanning laboratory tests, in-situ and grid-integrated sensors, and Earth observation; (v) coupled modeling that links fire behavior with grid operations; and (vi) technological and strategic mitigation pathways spanning prevention, response, and recovery. We integrate these domains into a novel 'feedback-aware' socio-technical framework. Through a longitudinal analysis (2005-2025) of global incidents, we identify that while vegetation contact remains the most frequent ignition source, aging infrastructure failure has emerged as a critical driver of catastrophic 'mega-fires'. We further identify persistent gaps, including limited interoperability of high-frequency grid and environmental data, scarce real-time data assimilation, and under-developed equity metrics for outage management. We conclude by outlining a research agenda to (1) deploy interoperable sensing architectures, (2) advance feedback-coupled fire-grid simulations, and (3) evaluate mitigation portfolios through techno-economic and fairness lenses. Recognizing wildfire-grid interactions as coupled socio-technical systems is essential for protecting infrastructure and communities and for ensuring reliable, sustainable electricity in a changing world.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Evaluation of flame propagation of retrofit energy efficient wall assemblies

Leveraging safety science experience and industry relationships, UL Solutions and the International Association of Fire Fighters (IAFF) initiated a joint project in 2022 under an agreement with the US Department of Energy to evaluate the flame propagation of retrofit energy efficient wall assemblies. A draft of the protocol from the ASTM work was used to test and comparatively study various retrofit energy efficient designs to gain a better understanding of their fire behavior. The goals of this study were as follows: Develop an understanding of fire propagation across new, cost effective, and energy efficient exterior retrofit wall assemblies. Refine the flame propagation draft test method for exterior wall assemblies based on ASTM E2707. Identify conditions that create fire propagation hazards in exterior wall assemblies and educate the fire service on the findings.

42 ENGINEERING↗

A Prefire Approach for Probabilistic Assessments of Postfire Debris‐Flow Inundation

Increases in wildfire activity and rainfall intensification are driving more postfire debris flows (PFDF) in many regions around the world. PFDFs are most common in the first postfire year and may even occur before a fire is fully controlled. This underscores the importance of assessing postfire hazards before a fire starts. Evaluation of PFDF hazards prior to fire can help strategize interventions lessening the negative effects of future fires. However, debris-flow runout and inundation analyses are not routine in PFDF hazard assessments, partially due to time constraints and substantial uncertainties in boundary conditions. Here, we propose a prefire PFDF inundation assessment framework using a debris-flow runout model based on the Herschel-Bulkley (HB) rheology (HEC-RAS v6.1). We constrain model inputs and parameters using Bayesian posterior analysis, rainfall-runoff simulations, and a debris-flow volume model. We use observations from recent PFDF incidents in northern Arizona, USA, to calibrate model components and then apply our prefire inundation assessment framework in a nearby unburned area. Specifically, we (a) identify yield stress as the most influential factor on inundation extent and arrival time in a HB model, (b) establish posterior distributions for model parameters suitable for forward modeling by leveraging uncertainties in field observations, and (c) implement a predictive forward analysis in an area that has not burned recently to evaluate PFDF inundation under several future fire scenarios. This study improves our ability to assess postfire debris-flow hazards before a fire begins and provides guidance for future applications of single-phase rheological models when assessing PFDF hazards.

54 ENVIRONMENTAL SCIENCES↗

A Prefire Approach for Probabilistic Assessments of Postfire Debris-Flow Inundation

Increases in wildfire activity and rainfall intensification are driving more postfire debris flows (PFDF) in many regions around the world. PFDFs are most common in the first postfire year and may even occur before a fire is fully controlled. This underscores the importance of assessing postfire hazards before a fire starts. Evaluation of PFDF hazards prior to fire can help strategize interventions lessening the negative effects of future fires. However, debris-flow runout and inundation analyses are not routine in PFDF hazard assessments, partially due to time constraints and substantial uncertainties in boundary conditions. Here, we propose a prefire PFDF inundation assessment framework using a debris-flow runout model based on the Herschel-Bulkley (HB) rheology (HEC-RAS v6.1). We constrain model inputs and parameters using Bayesian posterior analysis, rainfall-runoff simulations, and a debris-flow volume model. We use observations from recent PFDF incidents in northern Arizona, USA, to calibrate model components and then apply our prefire inundation assessment framework in a nearby unburned area. Specifically, we (a) identify yield stress as the most influential factor on inundation extent and arrival time in a HB model, (b) establish posterior distributions for model parameters suitable for forward modeling by leveraging uncertainties in field observations, and (c) implement a predictive forward analysis in an area that has not burned recently to evaluate PFDF inundation under several future fire scenarios. This study improves our ability to assess postfire debris-flow hazards before a fire begins and provides guidance for future applications of single-phase rheological models when assessing PFDF hazards.

54 ENVIRONMENTAL SCIENCES↗

A Simple, Revolutionary Approach to Waste Packaging Utilizing Proven Technology - 20201

Historically, removing hazardous waste from gloveboxes involves the use of bags as the primary containment method. This method can prove tedious, repetitive, and time consuming to ensure the process follows all safeguards required to contain the waste and mitigate any breach of containment. Layers of bags, yards of tape, and multiple filters are added to the waste stream in order to transfer the hazardous waste from the glovebox safely into the drum package. Then, finally, it can be shipped and disposed of. The process to cut, tie, and tape each bag for disposal involves manual effort by multiple operators. Following Administrative Safety Controls, good operators are able to safely perform those tasks; but, since the bag is the only confinement layer, incidents can occur. Operators, in some cases, are also at close proximity to this waste which may increase the risk of radiation exposure. Once the waste is transferred out through these bags, it is nearly impossible to remove packaged waste that may contain higher dosage levels, thus increasing drum disposal costs incurred by the facility. Exceeding the allowable radiation levels, and drums not fully filled, both contribute significantly to excess disposal costs. Central Research Laboratories (CRL), based in Red Wing Minnesota, has developed the Waste Drum Transfer System (WDTS) building upon the proven technology and containment of the Rapid Transfer Port (RTP) as an alternate, more efficient method of waste transfer. This solution consists of an RTP Alpha port mounted inside a glovebox and Beta assembly unit composed of a drum liner fitted inside a standard 55 gallon drum. The use of the Beta drum liner bypasses the typical use of bags, sleeves or tape to provide leak tight containment. The process to connect and disconnect a drum from the glovebox is achieved by the self-docking and rotating system controls of the RTP Alpha, all done with only one operator standing in an upright ergonomic position. This system also allows for greater flexibility in available Beta connection options, expanding the overall functionality of the system. This system can be disconnected and reconnected multiple times to maximize volume containment. This will minimize drum disposal costs and reduce the overall volume of waste output by more efficiently filling the drums. Radiation levels inside each drum can be monitored and adjusted more efficiently by operators utilizing the reconnect option. Minimal As Low As Reasonably Achievable (ALARA) levels are also achievable with this system. This paper will show how highly efficient packaging and disposal of hazardous waste can be accomplished in a cost-effective manner utilizing the proven RTP technology. Maximized operator productivity and safety, as well as minimized radiation dose exposure, are all attainable through the system's engineered controls. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Pilot-Scale Testing of an Integrated Circuit for the Extraction of Rare Earth Minerals and Elements from Coal and Coal Byproducts Using Advanced Separation Technologies

The primary objective of this project was to develop and demonstrate an integrated pilot-scale circuitry for recovering high-value rare earth elements (REEs) from coal and coal byproducts. The target performance was to produce a mixed REE product with content of at least two percent by weight on a dry mass basis in a cost-effective and environmentally benign manner. During the first nine months of the project period (Phase 2 Budget Period 2), pilot plant construction was completed including all field site startup activities such as permitting, engineering design, procurement/bidding, unit fabrication, site construction, equipment installation, module assembly, safety training, and circuit shakedown. During the remaining 21 months of project period (Phase 2 Budget Period 3), detailed field-testing activities were performed including feedstock sample collection and preparation, exploratory testing, circuit modification, detailed parametric study, and performance optimization. A detailed techno-economic analysis was performed based on the pilot plant testing findings which provided various scenarios for REE production. The project successfully accomplished the proposed target performance by producing mixed rare earth oxide (REO) with greater than 90% purity by weight in a continuous pilot scale operation from two distinctly different coarse refuse materials (i.e., West Kentucky No. 13 and Fire Clay coal seams), and at least three secondary sources (i.e., heap leach process and naturally formed acid mine drainage system). Project partners included the University of Kentucky, Virginia Tech, West Virginia University, Alliance Coal, Blackhawk Mining, Mineral Refining Company, and Mineral Separation Technologies. The pilot scale test facility was constructed at a former mining complex owned by Alliance Natural Resource Partners (Alliance Coal). The site was rehabilitated to accommodate the equipment installation, construction and fabrication, electrical power requirement, water line management and containment. The process units constructed and installed included X-ray sorting unit, crushing and grinding unit, physical separation unit, acid leaching unit, solvent extraction unit, and wastewater management unit. A rare earth mineral concentration unit was constructed as a standalone unit for flexible operation. A detailed environmental assessment and control plan was carried out to identify and quantify any potential impacts of the pilot-scale processing circuitry on the human and eco-system health and well-being. Corresponding mitigation strategies and control measures were provided. A conceptual flowsheet was developed to effectively remove thorium and uranium from high purity rare earth oxide mix or any potential radionuclide enriched stream. The two distinct feedstock materials were secured from the Blackhawk Mining Complex in eastern Kentucky where the Fire Clay (Hazard No. 4) seam is processed. The West Kentucky No. 13 (Baker) coarse refuse material was collected from an active process stream at an Alliance coal preparation plant located in western Kentucky. Characterization analysis indicated that both of feed materials generated from the two sources contained >300 ppm of TREEs on a dry whole mass basis which met the requirements for a qualified feed stock. The two feedstocks were further upgraded using a dual x-ray sorter to prepare the feed material for hydrometallurgical circuit. Thermal treatment on feed material prior to leaching was found to: 1) improve the leaching recovery of REEs, 2) increase the leaching kinetics, and 3) allow the leaching reaction to occur at lower acidity. Roasting at 600°C was selected as the pre-treatment condition for both West Kentucky No. 13 and Fire Clay coarse refuse material. Over 40% of leaching recovery was achieved by roasting West Kentucky No. 13 material having a top particle size of 3 mm in the pilot scale operation using 1.2M sulfuric acid leaching at 75OC. Initial pilot scale testing involved continuous operation of the pilot plant for 94 hours. The leaching unit was operated at solid-to-liquid ratio of 1 to 10 (w/v) using 0.5M sulfuric acid solution at a temperature of 75°C. The continuous solvent extraction circuit utilized rougher and cleaner units with DEHPA and TBP as the extractants. An innovative stripping circuit was developed to accumulate the REE concentration in the stripping solution to a level above 600 ppm. A bleed stream from the recycled strip solution was treated using oxalic acid precipitation which produced a high grade rare earth oxalate. The oxalate product was roasted to remove the oxalate which produced a rare earth oxide product having a purity greater 90%. Due to high concentrations of contaminant ions in the pregnant leach solution (PLS), a modified flowsheet was developed that involved pre-concentration of the REEs using multiple stages of precipitation and redissolution. The advantage of this process was improved removal of contamination before the downstream purification process and a significant cost reduction relative to the circuit that utilized the solvent extraction process. The modified circuitry included processes involving leaching, multistage precipitation, redissolution, and oxalate precipitation followed by roasting of the oxalate product. The circuit produced a mixed REO that was 92.96% pure from the initial test. A detailed parametric test plan was carried out which involved varying key parameters including solids feed rate, acid flowrate, acid concentration, multistage precipitation pH, redissolution pH, oxalate precipitation dosage and pH. The response variables included REE recovery, contaminant recovery, REO product grade and overall chemical consumption. Test results indicated that the acid-to-solid ratio is the key parameter to leaching efficiency as performance deteriorated with an increase in solids concentration. The optimal pH determined for REE precipitation and redissolution was 6.5 and 2.5, respectively. Additional tests were conducted to further improve the flowsheet. Recirculating a portion of the PLS to the feed of the leach tanks improved the leaching performance by lowering the pH of the leaching system and reducing the contamination recovery by shortening the residence time. Moreover, the removal of Al prior to REE precipitation significantly reduced the oxalic acid consumption in the oxalate precipitation circuit. The modified circuit produced over 90% grade REO by weight from both West Kentucky No. 13 and Fire Clay coarse refuse material in pilot scale continuous test programs. A case analysis model was developed to project the REE and major contaminants concentration in each PLS stream based on the leaching condition, pH cut point, and oxalic acid dosage. A correlation was established using empirical and semi-empirical models. Using the models, chemical consumption required for each stage was predicted based on the projected performance of the hydrometallurgy circuit. After identifying the optimum conditions, validation tests were carried out for the treatment of both West Kentucky No. 13 and Fire Clay coarse refuse materials in the pilot plant. The actual circuit performance and chemical consumptions were very close to the model predictions. Other than the two coarse refuse sources, several secondary feedstocks were also tested in the pilot plant facility. A “heap leach” system was constructed using the coarse refuse material generated from cleaning the West Kentucky No. 13 seam coal. Using the two stage SX rougher and cleaner circuit, a concentrate with a grade >90% REO was produced while recovering >97% of the REEs from the heap leach PLS. Naturally generated acid mine drainage (AMD) from West Kentucky No.13 mine was processed using the multistage precipitation circuit in the pilot plant in a test conducted for a period of 32 hours. The final grade of the mix RE oxide produced from the AMD was 90.84% with an overall circuit recovery of 64%. The primary source of REE was the selective precipitation steps involving iron and aluminum rejection. The hydrophobic-hydrophilic separation (HHS) process was proven to effectively recover coal from fine waste materials. For REM recovery, the HHS process was able to produce concentrates at grades of approximately 1.8% REE on an ash basis; however, recovery values were typically low, <10%, under the optimal conditions determined in the laboratory-scale testing. Staged testing of the pilot-scale HHS process for coal recovery and semi-continuous laboratory testing for REM testing showed that a total concentration ratio of more than 15x was observed for the REM recovery process. A circuit simulation package was developed for REE extraction and purification using a spreadsheet-based platform (Microsoft Excel). The REESim circuit simulation package is configured to track the mass and volume flows of components passing through a series of unit operations specified and configured by the user. The mass rates can then be utilized by the user to determine important performance indicators such as product mass yields, concentrate purity levels, element-by-element recoveries, and so forth. The techno-economic analysis showed that the roasting and leaching operations were the most expensive capital items, each contributing approximately 30% to the total capital cost. One notable contributor to the high production costs was the low REE recovery observed in the pilot scale trials. The product basket price was shown to have a strong influence on the economic viability of the scenarios, with the scandium price being the most significant influencer. Operating cost was shown to be extremely sensitive to REE recovery, REE feed grade, and leaching acid consumption. An analysis of ten different scenarios for a 500 t/h commercial operation revealed that three were economically favorable, producing internal rates of return varying from 27.7% to 33.1% and payback periods of 4 to 5 years. The project successfully developed and demonstrated a process to recover REEs from coal and coal byproducts in a pilot-plant operation which consistently produced over 90% grade REO mix from varies types of feedstocks. Commercialization analysis showed that the technology readiness level successfully achieved TRL 6 at the end of the project and demonstrated the need and the potential for scaling the process to further advance the technologies toward the goal of providing a domestic supply of REEs at a commercial scale.

01 COAL, LIGNITE, AND PEAT↗

Novel Foaming Solutions for High Level Waste (HLW) Processing - 20195

Foaming occurs during treatment of high level waste (HLW) at Savannah River Site's Defense Waste Processing Facility (DWPF) in the Chemical Process Cell (CPC) due to high gas generation from process steam and chemical offgas products [1]. The presence of amphiphilic particles in the waste slurry stabilizes the foam [2], [3]. Efficient processing of HLW requires foam control, as foam-overs lead to lower productivity and potential radioactive contamination of condensate streams. DWPF currently employs Siovation Antifoam 747, a surfactant produced by Momentive Performance Materials, as an antifoaming agent during waste treatment. Despite its ability to control foam generation, processing issues have arisen from its use [4]. During DWPF chemical processing, a chemical antifoam agent must be effective at temperatures up to 103 deg. C between pH 3-13. Antifoam 747 is effective at pH 7 but degrades as pH deviates [5]. Antifoam 747 is 90% by weight Momentive{sup TM} L77 and 10% by weight Momentive{sup TM} Y-17580. These ingredients are trisiloxane products, which are especially vulnerable to attack in acidic and caustic environments. Since Antifoam 747 readily degrades, periodic addition is required. Several processing concerns related to Antifoam 747 have affected DWPF operation. Its overuse warranted concern of potential flammable melter offgas under upset conditions due to the generation of carbon dioxide and hydrogen. As a result, a Potential Inadequacy in the Safety Analysis (PISA) was declared [6]. Antifoam contribution has been included in the melter offgas flammability strategy and the quantity of antifoam is monitored to ensure limits are not exceeded. Testing at Savannah River National Laboratory (SRNL) determined that propanal, tri-methylsilanol, and hexamethyldisiloxane are generated as Antifoam 747 degrades, leading to a second PISA [7]. The formation of these byproducts poses additional flammability risks. Furthermore, the methyl and ethyl groups of these compounds may be responsible for the formation of the methyl and ethyl mercury discovered in DWPF [8], [9]. The formation of organomercury has specifically been called out by DOE as a need for increased research. The effectiveness of non-chemical methods for foam control and the efficiency of alternative antifoam agents were evaluated as part of an effort to improve HLW treatment operations at DWPF and to reduce, or eliminate, the flammability hazards associated with Antifoam 747 currently in use. Foaming of high-level waste (HLW) slurries is an issue at the Defense Waste Processing Facility (DWPF) Chemical Process Cell (CPC) which is currently mitigated with a chemical antifoam agent. The effectiveness of non-chemical methods for foam control and the efficiency of alternative antifoams were examined to improve HLW treatment at DWPF and to eliminate the flammability hazards associated with Siovation Antifoam 747 currently in use. Non-chemical foam control methods were deemed unviable for chemical processing at DWPF, as the spray/mist technique requires too much water and space limitations make installation and implementation of headspace agitators unfeasible. The use of ultrasonic energy thickened and further stabilized the foam. Two suitable alternative defoaming agents, Momentive{sup TM} Y- 17112 and Evonik Surfynol{sup R} MD-20, were identified. Both defoamers control foam over a pH range of 4- 13 at boiling, with no flammable degradation products, and only minimal quantities (100-200 mg/kg) are required under glycolic acid conditions. In order to validate the effectiveness of these defoaming agents, SRNL recommends irradiation testing and laboratory scale SRAT/SME experiments with actual radioactive waste. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Effect of Evaporation on Vapor Space Flammability in DWPF Process Vessels - 20278

The Savannah River Site (SRS) Defense Waste Processing Facility (DWPF) processes liquid high-level waste (HLW) and encapsulates it in glass within stainless-steel containers suitable for safe, long-term storage and disposal. Radiolytic and chemical decomposition of the liquid waste generates hydrogen and other flammable gases creating a hazard. The rate of flammable gas generation increases by an order of magnitude as temperature increases from sub-boiling to boiling. DWPF controls this hazard in process tanks by ensuring a minimum purge flow through each tank's head space. The minimum purge flow rate is established assuming dry air and neglecting evaporation. However, this study determined that steam from boiling in a representative process tank is sufficient to dilute flammable gases and, thereby, preclude flammability. For sub-boiling, water vapor is an insufficient diluent considering hydrogen's lower flammable limit (LFL) in air. However, the upper and lower flammable limits approach each other in a hydrogen-air-water-vapor environment as the water vapor concentration increases. This effect may preclude flammable conditions if water vapor concentration is about 60 volume percent or higher. A saturated, constant-pressure air-water system would achieve 60 volume percent water vapor at 86 deg. C. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Flammable Gas Generation and Control at the Idaho Completion Project Legacy Combustible Gas Generation - 20191

On April 11, 2018, four drums containing transuranic waste at the Idaho National Laboratory underwent over-pressurization, ejecting their lids and spreading radiological waste within a facility. An investigation has found that waste in the drums generated methane gas, which contributed to the event. Subsequent to the investigation, the potential for drums to have methane and other flammable analytes whose concentrations could approach or exceed the lower flammability limit (LFL) and the adequacy of the controls to prevent or mitigate a possible deflagration was evaluated. An extensive review of the historical records was performed to determine how many drums exceed the LFL. The historical record identified a small quantity of drums that exceeded the LFL for xylene, hydrogen, and methane. The primary codified applicable code or standard for handling drums is 29 CFR 1910.120 (j) 'Handling Drums and Containers.' It is used throughout the commercial and government sector. This code is integrated throughout the Fluor Idaho safety management programs and procedures to control the Standard Industrial Hazards (SIHs) associated with drum and container handling. Example requirements include: - Drums and containers are inspected, and their integrity assured prior to being moved. - Site operations are organized to minimize the amount of drum or container movement. - When there is a reasonable possibility of flammable atmospheres being present, material handling equipment and hand tools are of the type to prevent sources of ignition. Drums and containers under pressure, as evidenced by bulging or swelling, are not moved until the cause for excess pressure is determined and appropriate containment procedures have been implemented to protect employees from explosive relief of the drum. Drums which exceed the WIPP FGA limit have NCRs associated with them. Once a drum fails flammable gas sampling, an NCR is initiated. The NCR drives placement into NCR dense pack rows. A standing order drives placement of the FGA failures to a single planer segregation location. These drums are not allowed for further processing or shipment until the NCR has been cleared. Once in the single planer rows, follow-up FGA testing is performed by CCP. The NCR is dispositioned by follow-up sampling occurring after adequate time has been provided for the gas to diffuse through the filter assembly, or, in some cases, the drums are repackaged into additional drums to reduce the source term. To date, the ICP project has performed approximately 1.5 million drums moves without a deflagration event due to combustible gas generation. Flammable gas generation in a transuranic waste drum is not unique to the ICP but is common across the DOE complex. Based on the experience at Idaho, application of industry standards is sufficient to control the risk of drum deflagration due to drum movements. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Examining Rail Transportation Route of Crude Oil in the United States Using Crowdsourced Social Media Data

Safety issues associated with transporting crude oil by rail have been a concern since the boom of the U.S. domestic shale oil production in 2012. During the last decade, over 300 crude-oil-by-rail incidents have occurred in the United States. Some of them have caused adverse consequences including fire and hazardous materials leakage. However, only limited information on crude-on-rail routes and their associated risks is available to the public. To this end, this study proposed an unconventional way to reconstruct crude-on-rail routes using geotagged photos harvested from the Flickr website. The proposed method linked the geotagged photos of crude oil trains posted online with national railway networks to identify potential railway segments that those crude oil trains were traveling on. Here, a shortest path-based method was applied to infer the complete crude-on-rail routes, by utilizing the confirmed railway segments as well as their directional information. Validation of the inferred routes was performed using a public map and official crude oil incident data. The results suggested that the inferred routes based on geotagged photos had high coverage, with approximately 96% of the documented crude oil incidents aligned with the reconstructed crude-on-rail network. The inferred crude oil train routes were found to pass through several metropolitan areas of high population density, who were exposed to potential risk. These findings could improve situational awareness for policy makers and transportation planners. In addition, with the inferred routes, this study has established a good foundation for future crude oil train risk-analyses along the rail route.

42 ENGINEERING↗