At least 37 records · Page 2

Integrated Application of Active Controls (IAAC) technology to an advanced subsonic transport project: Final ACT configuration evaluation

The Final ACT Configuration Evaluation Task of the Integrated Application of Active Controls (IAAC) technology project within the energy efficient transport program is summarized. The Final ACT Configuration, through application of Active Controls Technology (ACT) in combination with increased wing span, exhibits significant performance improvements over the conventional baseline configuration. At the design range for these configurations, 3590 km, the block fuel used is 10% less for the Final ACT Configuration, with significant reductions in fuel usage at all operational ranges. Results of this improved fuel usage and additional system and airframe costs and the complexity required to achieve it were analyzed to determine its economic effects. For a 926 km mission, the incremental return on investment is nearly 25% at 1980 fuel prices. For longer range missions or increased fuel prices, the return is greater. The technical risks encountered in the Final ACT Configuration design and the research and development effort required to reduce these risks to levels acceptable for commercial airplane design are identified.

Source record↗

Mixing processes following the final stratospheric warming

An investigation is made of the dynamics responsible for the mixing and dissolution of the polar vortex during the final stratospheric warmings. The dynamics and transport during a Northern Hemisphere final stratospheric warming are simulated via a GCM and an associated offline N2O transport model. The results are compared with those obtained from LIMS data for the final warming of 1979, with emphasis on the potential vorticity evolution in the two datasets, the modeled N2O evolution, and the observed O3 evolution. Following each warming, the remnants of the originally intact vortex are found to gradually homogenize with the atmosphere at large. Two processes leading to this homogenization are identified following the final warmings, namely, the potential vorticity field becomes decorrelated from that of the chemical tracer, and the vortex remnants begin to tilt dramatically in a vertical direction.

Hess, Peter G.↗

Final STS-35 Columbia descent BET products and results for LaRC OEX investigations

Final STS-35 'Columbia' descent Best Estimate Trajectory (BET) products have been developed for Langley Research Center (LaRC) Orbiter Experiments (OEX) investigations. Included are the reconstructed inertial trajectory profile; the Extended BET, which combines the inertial data and, in this instance, the National Weather Service atmospheric information obtained via Johnson Space Center; and the Aerodynamic BET. The inertial BET utilized Inertial Measurement Unit 1 (IMU1) dynamic measurements for deterministic propagation during the ENTREE estimation process. The final estimate was based on the considerable ground based C-band tracking coverage available as well as Tracking Data and Relay Satellite System (TDRSS) Doppler data, a unique use of the latter for endo-atmospheric flight determinations. The actual estimate required simultaneous solutions for the spacecraft position and velocity, spacecraft attitude, and six IMU parameters - three gyro biases and three accelerometer scale factor correction terms. The anchor epoch for this analysis was 19,200 Greenwich Mean Time (GMT) seconds which corresponds to an initial Shuttle altitude of approximately 513 kft. The atmospheric data incorporated were evaluated based on Shuttle derived considerations as well as comparisons with other models. The AEROBET was developed based on the Extended BET, the measured spacecraft configuration information, final mass properties, and the final Orbiter preoperation databook. The latter was updated based on aerodynamic consensus incrementals derived by the latest published FAD. The rectified predictions were compared versus the flight computed values and the resultant differences were correlated versus ensemble results for twenty-two previous STS entry flights.

Oakes, Kevin F.↗

Cassini's Grand Finale: A Mission Planning Retrospective

On September 15, 2017, Cassini plunged deep into Saturn, down to where the atmosphere was sufficiently dense to destroy the spacecraft, making it part of Saturn forever. In the five months leading up to its destruction, Cassini flew between Saturn and its rings 22 times, collecting data from the never before-explored region of the Kronian system. These orbits, the Grand Finale of Cassini, were the culmination of years of planning by the Cassini flight team. This paper looks back upon the mission planning effort in particular, comparing the baseline operational scenarios and contingency plans to the as flown Grand Finale. The bulk of the Grand Finale mission planning effort was focused on the environmental hazards present in the region between Saturn and its rings: the dust and the atmosphere. Dust hazard and atmospheric transit contingency plans were in place to help ensure spacecraft health and maximize science data return. The dust hazard plan gave the operations team the option to turn the spacecraft to a safe attitude during ring-plane crossings had the dust environment proved more threatening than anticipated. The atmospheric transit plan would have made use of an orbital trim maneuver in order to raise or lower periapsis depending on the density of the atmosphere. The proximal environment did have its surprises, though they were good surprises. The dust was significantly less hazardous than predicted. So much so that elements of the contingency plan were leveraged in order to remove a dust hazard protection from the baseline plan, rather than add one to it. While the atmosphere was substantially denser than predicted, it was not dense enough to warrant a periapsis-raise maneuver and actually meant that better in-situ data was gathered. Ultimately, from a mission planning perspective, the Grand Finale went better than expected.

Sturm II, Erick J.↗

Skimming through Saturn's Atmosphere: The Climax of the Cassini Grand Finale Mission

On September 15, 2017, the long-lived Cassini Mission to Saturn came to a triumphant end as the Cassini orbiter plunged deep into Saturn’s atmosphere, all the while transmitting engineering and science data back to Earth before Saturn’s atmosphere destroyed the orbiter. Even before the final plunge, the Cassini spacecraft became the first spacecraft to successfully skim Saturn’s atmosphere and collect atmospheric data during its final five complete orbits around Saturn (Rev-288 through Rev-292). During those five final orbits, the spacecraft was flying in Reaction Control Subsystem (RCS) control in order to maintain greater control authority. Therefore, by analyzing the thruster on-time flight data telemetered back to Earth after each orbit, atmospheric density estimates can be extracted. This paper proposes a method of using Cassini Attitude Control Flight Data to reconstruct Saturn atmospheric density profiles for each of the five final orbits around Saturn.

Andrade, Luis G.↗

Apollo LM guidance computer software for the final lunar descent.

In all manned lunar landings to date, the lunar module Commander has taken partial manual control of the spacecraft during the final stage of the descent, below roughly 500 ft altitude. This report describes programs developed at the Charles Stark Draper Laboratory, MIT, for use in the LM's guidance computer during the final descent. At this time computational demands on the on-board computer are at a maximum, and particularly close interaction with the crew is necessary. The emphasis is on the design of the computer software rather than on justification of the particular guidance algorithms employed. After the computer and the mission have been introduced, the current configuration of the final landing programs and an advanced version developed experimentally by the author are described.

Eyles, D.↗

Final analysis and design of a thermal protection system for 8-foot HTST combustor

The cylindrical shell combustor with T-bar supports in the 8-foot HTST at the NASA-Langley Research Center encountered vibratory fatigue cracking over a period of 50-250 tunnel tests within a limited range of the required operating envelope. A preliminary design study provided several suitable thermal protection system designs for the combustor, one of which was a two-pass regenerative type air-cooled omega-shaped segment liner. A final design layout of the omega segment liner was prepared and analyzed for steady-state and transient conditions. The design of a support system for the fuel spray bar assembly was also included. Detail drawings suitable for fabrication purposes were also prepared. Liner design problems defined during the preliminary study included (1) the ingress of gas into the attachment bulb section of the omega segment, (2) the large thermal gradient along the leg of the omega bulb attachment section and, (3) the local peak metal temperature at the radius between the liner ID and the leg of the bulb attachment. These were resolved during the final design task. Analyses of the final design of the omega segment liner indicated that all design goals were met and the design provided the capability of operating over the required test envelope with a life expectancy substantially above the goal of 1500 cycles.

Moskowitz, S.↗

Integrated Application of Active Controls (IAAC) technology to an advanced subsonic transport project: Wing planform study and final configuration selection

The Wing Planform Study and Final Configuration Selection Task of the Integrated Application of Active Controls (IAAC) Technology Project within the Energy Efficient Transport Program is documented. Application of Active Controls Technology (ACT) in combination with increased wing span resulted in significant improvements over the Conventional Baseline Configuration (Baseline) and the Initial ACT Configuration previously established. The configurations use the same levels of technology, takeoff gross weight, and payload as the Baseline. The Final ACT Configuration (Model 768-107) incorporates pitch-augmented stability (which enabled an approximately 10% aft shift in cruise center of gravity and a 44% reduction in horizontal tail size), lateral/directional-augmented stability, an angle-of-attack limiter, and wing-load alleviation. Flutter-mode control was not beneficial for this configuration. This resulted in an 890 kg (1960 lb) reduction in airplane takeoff gross weight and a 9.8% improvement in cruise lift/drag. At the Baseline mission range (3589 km 1938 nmi), this amounts to 10% block-fuel reduction. Results of this task strongly indicate that the IAAC Project should proceed with the Final ACT evaluation, and begin the required control system development and test.

Source record↗

Integrated Application of Active Controls (IAAC) technology to an advanced subsonic transport project: Wing planform study and final configuration selection

This report summarizes the Wing Planform Study Task and Final Configuration Selection of the Integrated Application of Active Controls (IAAC) Technology Project within the Energy Efficient Transport Program. Application of Active Controls Technology (ACT) in combination with increased wing span resulted in significant improvements over the Conventional Baseline Configuration (Baseline) and the Initial ACT Configuration previously established. The configurations use the same levels of technology (except for ACT), takeoff gross weight, and payload as the Baseline. The Final ACT Configuration (Model 768-107) incorporates pitch-augmented stability (which enabled an approximately 10% aft shift in cruise center of gravity and a 45% reduction in horizontal tail sizes), lateral/directional-augmented stability, an angle-of-attack limiter, and wing-load alleviation. Flutter-mode control was not beneficial for this configuration. This resulted in an 890 kg (1960 lb) reduction in airplane takeoff gross weight and a 9.8% improvement in cruise lift/drag. At the Baseline mission range (3590 km) (1938 nmi), this amounts to 10% block fuel reduction. Good takeoff performance at high-altitude airports on a hot day was also achieved. Results of this task strongly indicate that the IAAC Project should proceed with the Final ACT evaluation and begin the required control system development and testing.

Source record↗

Mod-5A wind turbine generator program design report. Volume 3: Final design and system description, book 2

The design, development and analysis of the 7.3MW MOD-5A wind turbine generator is documented. The report is divided into four volumes: Volume 1 summarizes the entire MOD-5A program, Volume 2 discusses the conceptual and preliminary design phases, Volume 3 describes the final design of the MOD-5A, and Volume 4 contains the drawings and specifications developed for the final design. Volume 3, book 2 describes the performance and characteristics of the MOD-5A wind turbine generator in its final configuration. The subsystem for power generation, control, and instrumentation subsystems is described in detail. The manufacturing and construction plans, and the preparation of a potential site on Oahu, Hawaii, are documented. The quality assurance and safety plan, and analyses of failure modes and effects, and reliability, availability and maintainability are presented.

Source record↗

Final-Approach Spacing Aids (FASA) evaluation for terminal-area, time-based air traffic control

A jointly funded (NASA/FAA) real-time simulation study was conducted at NASA Langley Research Center to gather comparative performance data among three candidate final-approach spacing aid (FASA) display formats. Several objective measures of controller performance and their display eye-scan behavior as well as subjective workload and rating questionnaires were used. For each of two representative pattern-speed procedures (a 170-knot procedure and a 210-knot procedure with speed control aiding), data were gathered, via twelve FAA controllers, using four final-controller display format conditions (manual/ARTS 3, graphic marker, DICE countdown, and centerline slot marker). Measured runway separations were more precise with both the graphic marker and DICE countdown formats than with the centerline slot marker and both (graphic and DICE) improved precision relative to the manual/ARTS 3 format. For three separate rating criteria, the subject controllers ranked the FASA formats in the same order: graphic marker, DICE countdown, and centerline slot marker. The increased precision measured with the 210-knot pattern-speed procedure may indicate the potential for the application of speed-control aiding where higher pattern speeds are practical after the base-to-final turn. Also presented are key FASA issues, a rationale for the formats selected for testing, and their description.

Credeur, Leonard↗

Ubiquitous Low-FeO Relict Grains in Type II Chondrules and Limited Overgrowths on Phenocrysts Following the Final Melting Event

Type II porphyritic chondrules commonly contain several large (>40 microns) olivine phenocrysts; furnace-based cooling rates based on the assumption that these phenocrysts grew in a single-stage melting-cooling event yield chondrule cooling-rate estimates of 0.01-1 K/s. Because other evidence indicates much higher cooling rates, we examined type 11 chondrules in the CO3.0 chondrites that have experienced only minimal parent-body alteration. We discovered three kinds of evidence indicating that only minor (4-10 microns) olivine growth occurred after the final melting event: (1) Nearly all (>90%) type II chondrules in CO3.0 chondrites contain low-FeO relict grains; overgrowths on these relicts are narrow, in the range of 2-12 microns. (2) Most type II chondrules contain some FeO-rich olivine grains with decurved surfaces and acute angles between faces indicating that the grains are fragments from an earlier generation of chondrules; the limited overgrowth thicknesses following the last melting event are too thin to disguise the shard-like nature of these grains. (3) Most type II chondrules contain many small (<20 microns) euhedral or subhedral phenocrysts with central compositions that are much more ferroan than the centers of the large phenocrysts; their small sizes document the small amount of growth that occurred after the final melting event. If overgrowth thicknesses were small (4-10 microns) after the final melting event, it follows that large fractions of coarse (>40 microns) high-FeO phenocrysts are relicts from earlier generations of chondrules, and that cooling rates after the last melting event were much more rapid than indicated by models based on a single melting event. These observations are thus inconsistent with the "classic" igneous model of formation of type II porphyritic chondrules by near-total melting of a precursor mix followed by olivine nucleation on a very limited number of nuclei (say, <10) and by growth to produce the large phenocrysts during a period of monotonic (and roughly linear) cooling. Our observations that recycled chondrule materials constitute a large component of the phenocrysts of type II chondrules also imply that this kind of chondrule formed relatively late during the chondrule-forming period.

Wasson, John T.↗

A Final Approach Trajectory Model for Current Operations

Predicting accurate trajectories with limited intent information is a challenge faced by air traffic management decision support tools in operation today. One such tool is the FAA's Terminal Proximity Alert system which is intended to assist controllers in maintaining safe separation of arrival aircraft during final approach. In an effort to improve the performance of such tools, two final approach trajectory models are proposed; one based on polynomial interpolation, the other on the Fourier transform. These models were tested against actual traffic data and used to study effects of the key final approach trajectory modeling parameters of wind, aircraft type, and weight class, on trajectory prediction accuracy. Using only the limited intent data available to today's ATM system, both the polynomial interpolation and Fourier transform models showed improved trajectory prediction accuracy over a baseline dead reckoning model. Analysis of actual arrival traffic showed that this improved trajectory prediction accuracy leads to improved inter-arrival separation prediction accuracy for longer look ahead times. The difference in mean inter-arrival separation prediction error between the Fourier transform and dead reckoning models was 0.2 nmi for a look ahead time of 120 sec, a 33 percent improvement, with a corresponding 32 percent improvement in standard deviation.

Gong, Chester↗

What is the Final Verification of Engineering Requirements?

This slide presentation reviews the process of development through the final verification of engineering requirements. The definition of the requirements is driven by basic needs, and should be reviewed by both the supplier and the customer. All involved need to agree upon a formal requirements including changes to the original requirements document. After the requirements have ben developed, the engineering team begins to design the system. The final design is reviewed by other organizations. The final operational system must satisfy the original requirements, though many verifications should be performed during the process. The verification methods that are used are test, inspection, analysis and demonstration. The plan for verification should be created once the system requirements are documented. The plan should include assurances that every requirement is formally verified, that the methods and the responsible organizations are specified, and that the plan is reviewed by all parties. The options of having the engineering team involved in all phases of the development as opposed to having some other organization continue the process once the design has been complete is discussed.

Poole, Eric↗

Advanced Air Transportation Technologies Project, Final Document Collection

This CD ROM contains a compilation of the final documents of the Advanced Air Transportation Technologies (AAIT) project, which was an eight-year (1996 to 2004), $400M project managed by the Airspace Systems Program office, which was part of the Aeronautics Research Mission Directorate at NASA Headquarters. AAIT focused on developing advanced automation tools and air traffic management concepts that would help improve the efficiency of the National Airspace System, while maintaining or enhancing safety. The documents contained in the CD are final reports on AAIT tasks that serve to document the project's accomplishments over its eight-year term. Documents include information on: Advanced Air Transportation Technologies, Autonomous Operations Planner, Collaborative Arrival Planner, Distributed Air/Ground Traffic Management Concept Elements 5, 6, & 11, Direct-To, Direct-To Technology Transfer, Expedite Departure Path, En Route Data Exchange, Final Approach Spacing Tool - (Active and Passive), Multi-Center Traffic Management Advisor, Multi Center Traffic Management Advisor Technology Transfer, Surface Movement Advisor, Surface Management System, Surface Management System Technology Transfer and Traffic Flow Management Research & Development.

Mogford, Richard H.↗

Feasibility Study for Low Drag Acoustic Liners Final Report

This report documents the design and structural analysis as a final deliverable for the Phase 1 contract activity. Also included is a community noise test plan, which is a key deliverable for Phase 2. Finally, a high-level estimate (Phase 3 deliverable) is provided for the work statement of Phases 2-4, which covers the build of two inlet test articles, planning and execution of a flight test with the test inlets, as well as data analysis and final documentation. The two test inlets will be compared to the production baseline inlet configuration. There is also a plan to test one of the inlets "hardwalled" using speed tape or some other similar tape to block the acoustic perforations.

Riedel, Brian↗

Space Power Heritage Study Final Results

NASA space missions have long employed Radioisotope Power Systems (RPS) and solar-based power generation architectures. RPS have been used to enable or significantly enhance missions that venture deep into the solar system to distances from the sun which can make using solar architectures unfeasible and to areas where the sun is obscured due to shadows or atmospheric phenomena. The destination, however, is not the absolute factor of the determination of RPS or solar. This is highlighted by the Jupiter missions Galileo and Juno, which employed RPS and solar architectures, respectively. When baselining either RPS or solar architectures for a planetary mission, numerous factors must be considered, including scientific objectives, cost, schedule, and mass just to name a few. In an effort to better understand the decision-making process and provide insight for potential future missions, the NASA RPS Program Office tasked The Aerospace Corporation (Aerospace) to study historical missions that used RPS and solar architectures. Data was collected for a variety of RPS and solar missions to look for possible trends from the selected implementation. Additionally, mission case studies were developed based on interviews with mission personnel who were responsible for defining the power architecture of their mission. Informed by the data collected and case studies, two Measures of Effectiveness (MoEs) were produced: one based on cost of RPS versus solar, and one based on science mission cost effectiveness. The final results of this study have been captured in this briefing package which is available for full and open release. Additionally, a final report document also provides the same details of this package. This briefing package also includes an appendix which contains data not for public release which was used to provide detailed answers to questions raised during this study. The results of these inquiries are discussed in the report, but the proprietary data is not included. Finally, an executive summary package is also publicly available which was used to present the results of the study at the 2018 Aerospace Space Power Workshop.

Study↗

Dawn's final mission at Ceres: navigation and mission design experience

On Oct. 31st, 2018, the Dawn spacecraft completed its space journey covering more than 11 years including exploration of Vesta and Ceres, two protoplanets in the main asteroid belt. After successfully completing its prime mission at the dwarf planet Ceres, the Dawn mission was extended twice to pursue new scientific objectives. The second extended mission at Ceres, and the final mission for Dawn, presented a series of challenges that were new to the experienced and accomplished Dawn navigation team. This paper discusses mission design and navigational experiences and challenges during Dawn’s final transfer and orbit at Ceres. Topics include reference orbit design of the final science orbit, mission design and planning for the transfer, periapsis targeting over a surface feature, and analysis for planetary protection requirements.

Karimi, Reza↗