Search NASA⌕ Search

SEARCH · Search NASA

Results for “Fourth Quarter”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Electric Vehicle Charging Infrastructure Trends from the Alternative Fueling Station Locator (Fourth Quarter 2022)

Electric vehicle (EV) charging infrastructure continues to rapidly change and grow. Using data from the U.S. Department of Energy's (DOE) Alternative Fueling Station Locator, this report provides a snapshot of the state of EV charging infrastructure in the United States in the fourth calendar quarter of 2022 (Q4 2022) by charging level, network, and location. Additionally, this report measures the current state of charging infrastructure compared with two different 2030 infrastructure requirement scenarios. This information is intended to help transportation planners, policymakers, researchers, infrastructure developers, and others understand the rapidly changing landscape of EV charging infrastructure. This is the twelfth report in a series. Reports from previous quarters can be found in the Alternative Fuels Data Center (AFDC) and National Renewable Energy Laboratory (NREL) publication databases, as well as the AFDC Charging Infrastructure Trends page (https://afdc.energy.gov/fuels/electricity_infrastructure_trends.html).

33 ADVANCED PROPULSION SYSTEMS↗

Electric Vehicle Charging Infrastructure Trends from the Alternative Fueling Station Locator: Fourth Quarter 2023

Electric vehicle (EV) charging infrastructure continues to rapidly change and grow. Using data from the U.S. Department of Energy's (DOE's) Alternative Fueling Station Locator, this report provides a snapshot of the state of EV charging infrastructure in the United States in the fourth calendar quarter of 2023 (Q4 2023) by charging level, network, and location. Additionally, this report measures the current state of charging infrastructure compared to the infrastructure requirement scenario outlined in the National Renewable Energy Laboratory (NREL) report, The 2030 National Charging Network: Estimating U.S. Light-Duty Demand for Electric Vehicle Charging Infrastructure. This information is intended to help transportation planners, policymakers, researchers, infrastructure developers, and others understand the rapidly changing landscape of EV charging infrastructure. This is the sixteenth report in a series. Reports from previous quarters can be found in the Alternative Fuels Data Center (AFDC) and NREL publication databases, as well as the AFDC Charging Infrastructure Trends page (https://afdc.energy.gov/fuels/electricity_infrastructure_trends.html).

33 ADVANCED PROPULSION SYSTEMS↗

Electric Vehicle Charging Infrastructure Trends from the Alternative Fueling Station Locator: Fourth Quarter 2021

The U.S. Department of Energy's Alternative Fueling Station Locator contains information on public and private nonresidential alternative fueling stations in the United States and Canada and currently tracks ethanol (E85), biodiesel, compressed natural gas, electric vehicle (EV) charging, hydrogen, liquefied natural gas, and propane stations. Of these fuels, EV charging continues to experience rapidly changing technology and growing infrastructure. This report provides a snapshot of the state of EV charging infrastructure in the United States in the fourth calendar quarter of 2021 (Q4). Using data from the Station Locator, this report breaks down the growth of public and private charging infrastructure by charging level, network, and location. Additionally, this report measures the current state of charging infrastructure compared with two different 2030 infrastructure requirement scenarios. This information is intended to help transportation planners, policymakers, researchers, infrastructure developers, and others understand the rapidly changing landscape for EV charging. This is the eighth report in a series. Reports from previous quarters can be found in the Alternative Fuels Data Center (AFDC) and National Renewable Energy Laboratory (NREL) publication databases, as well as the AFDC Charging Infrastructure Trends page (https://afdc.energy.gov/fuels/electricity_infrastructure_trends.html).

33 ADVANCED PROPULSION SYSTEMS↗

FOURTH QUARTER / ANNUAL TRANSPORTATION REPORT FISCAL YEAR 2021

Waste Shipments to and from the Nevada National Security Site, Radioactive Waste Management Complex. This report satisfies the U.S. Department of Energy (DOE) commitment to prepare a quarterly summary of waste shipments to the Nevada National Security Site (NNSS) Radioactive Waste Management Complex (RWMC) in Area 5.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Nevada National Security Site - E-Tunnel Wastewater Disposal System: Fourth Quarter 2019

This report includes the results of monthly inspections and monitoring for October, November, and December 2019. Monthly inspections and monitoring were conducted on October 15, November 26, and December 18, 2019. Inspections include a visual assessment of the berms, ponding, water levels relative to the overflow pipes, tunneling or burrowing into the berms, soil conditions on and around the berms, erosion or sloughing of the slopes of the berms, seeps at the toe of the berms, deep-rooting botanicals on the berms, and fencing. Monthly monitoring includes measurements of the instantaneous flow rate, hydrogen ion activity (pH), and specific conductance of the E-Tunnel Wastewater Disposal System (ETDS) discharge. Annual sample results of the effluent water from the ETDS are also included in this report. The effluent sample was collected on September 11, 2019, and analyzed for the parameters listed in Table 1-B of Permit NEV 96021. In addition, Permit NEV 96021 requires the collection and analysis of representative groundwater samples from Well ER 12-1 every 24 months. This summary report provides the information pertaining to the sampling and analysis of groundwater samples collected on April 10, 2019.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

FY20 Quarter Four Volume Disposal Report

The one-page summary report shows Nevada National Security Site (NNSS) waste disposal volume for the fourth quarter, FY20.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Results for the October 2023 Semiannual Salt Waste Processing Facility Decontaminated Salt Solution Sample

In this Technical Report, the chemical and radionuclide contaminant results from the October 2023 Semiannual sample of the Salt Waste Processing Facility (SWPF) Decontaminated Salt Solution (DSS) salt solution are presented in tabulated form. The information from this characterization will be used by Savannah River Mission Completion (SRMC) for the transfer of aqueous waste from SWPF to the Saltstone Production Facility (SPF) where the waste will be treated and disposed in the Saltstone Disposal Facility. This Technical Report compares results, where applicable, to SPF Waste Acceptance Criteria (WAC) LIMITS and TARGETS that were established at the time the SWPF DSS sample was obtained. The October 2023 Semiannual sample of the SWPF DSS is a composite from the six months of SWPF processing during the Third Quarter Fiscal Year 2023 (3QFY2023) and the Fourth Quarter Fiscal Year 2023 (4QFY2023).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Results for the October 2025 Semiannual Salt Waste Processing Facility Decontaminated Salt Solution Sample

In this Technical Report, the chemical and radionuclide contaminant results from the October 2025 Semiannual sample of the Salt Waste Processing Facility (SWPF) Decontaminated Salt Solution (DSS) salt solution are presented in tabulated form. The information from this characterization will be used by Savannah River Mission Completion (SRMC) for the transfer of aqueous waste from SWPF to the Saltstone Production Facility (SPF) where the waste will be treated and disposed in the Saltstone Disposal Facility. This Technical Report compares results, where applicable, to SPF Waste Acceptance Criteria (WAC) LIMITS and TAR GETS that were established at the time the SWPF DSS sample was obtained. 1 The October 2025 Semiannual sample of the SWPF DSS is a composite from one month of SWPF processing during the Third Quarter Fiscal Year 2025 (3QFY2025) and two months of SWPF processing during the Fourth Quarter Fiscal Year 2025 (4QFY2025).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Quarter 4 Report: Report on Final Findings and Opportunities for Future Work in the Use of Mixed Precision in Iterative Solvers

The fourth quarter of the project was spent developing an error analysis of the s-step Lanczos and CG algorithms. Our theoretical bounds and numerical experiments show that the numerical behavior of the algorithm can be significantly improved by using extra precision in a small part of the computation related to the computation and application of the Gram matrix. We have published a technical report which includes all steps of the analysis [8]; a shortened version for journal submission is in preparation. We plan to submit this paper in the following weeks. Activities related to this also include a collaboration with Ichitaro Yamazaki on gathering performance results for these new mixed precision s-step Krylov subspace methods using single/double precision on GPUs. Namely, we would like to obtain performance results that show that the performance overhead of using double the working precision in these select computations is minimal. Other activities include attending biweekly xSDK meetings and presenting a pitch talk on this work to the group on February 25, 2021. In the remainder of the document, we summarize our findings on the potential for mixed precision in classical Krylov subspace methods and s-step Krylov subspace methods, as well as key opportunities for future work.

97 MATHEMATICS AND COMPUTING↗

Planning Near-Term Tasks for the Development of Advanced Reactor Mechanistic Source Term Modeling and Simulation Tools

To assist both the advanced reactor industry and U.S. Nuclear Regulatory Commission (NRC) in the pursuit of reactor design and licensing, the U.S. Department of Energy (DOE) Nuclear Energy Advanced Modeling and Simulation (NEAMS) program has established a mechanistic source term (MST) research project under the auspices of the Application Drivers technical area. The MST research project is a collaboration between Argonne National Laboratory (Argonne) and Sandia National Laboratories (SNL) with a high-level objective to coordinate the development of comprehensive advanced reactor MST mod/sim capabilities to support risk-informed design and licensing decisions. As part of this effort, an MST mod/sim development pathway was developed in FY21, which outlines the high-level objectives and near-term tasks necessary to achieve the project objectives. Since publication of the development pathway, Argonne and SNL have been addressing the “near-term tasks” outlined in the report. The current provides a status update of the progress achieved in the fourth quarter of FY21. The report structure follows that of ref and is divided by advanced reactor type: High temperature gas reactor (HTGR), molten salt reactor (MSR) including fluoride salt-cooled high temperature reactor (FHR), and sodium fast reactor (SFR). Each section reviews the near-term tasks associated with the reactor type, current progress, and future plans. The near-term tasks associated with consequence modeling are reviewed in an upcoming work by SNL.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

VA EDH Data Curation Documentation FY25-Q1

This data source documentation report provides researchers with valuable insights into the structure, contents, and data sources used to compile the datasets. It specifically covers the Fiscal Year 2024, Fourth Quarter (FY25-Q1) dataset curation documentation for the Environmental Determinants of Health (EDH) project.

97 MATHEMATICS AND COMPUTING↗