Search NASA⌕ Search

SEARCH · Search NASA

Results for “Grid Optimization Competition”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

27 records · Page 2

Nuclear Thermal Energy Storage Configurations for Industrial Combined Heat and Power Supply: Conceptual Study and Engineering Designs

The industries examined in this report primarily rely on moderate-temperature heat provided by gas- or coal-fired boilers and combined heat and power (CHP) plants, delivered through standard process steam systems. High-temperature energy demands are often industry-specific and typically exceed the capabilities of high-temperature gas-cooled reactors (HTGRs). While it is technically feasible to replace process steam from fossil-based heat sources with nuclear energy, certain industries, such as methanol production and pulp and paper, face technoeconomic challenges in integrating nuclear energy without major changes or a technological shift. This is mainly due to the limited external energy demand remaining after the use of internal byproducts, waste heat recovery, and simple efficiency improvements. Achieving full decarbonization of these processes with nuclear energy would require significant technological advancements, involving experimental technology and substantial investments, making widespread adoption in existing industrial plants unlikely in the near term. This study reviews TES options in the context of enabling a flexible CHP supply while maintaining a steady nuclear heat input. Heat storage systems that interface between the reactor primary fluid and the CHP system offer superior performance and flexibility. Specifically, steam extraction downstream of the reheater with a two-tank molten-salt TES appears as the best solution regarding thermodynamic system benefits and system drawbacks. Using selected system configurations, a conceptual design of an industrial energy park was developed for industries with varying energy demands, such as steel production plants utilizing electric arc furnaces (EAFs) and chemical plants, as well as for those with constant energy demands, like petroleum refineries. This design highlights the capabilities of TES and explores its potential business cases. The study also conceptually develops the potential for integrating additional energy sources with nuclear systems through the implementation of TES. The potential of the HTGR-TES-CHP system was also evaluated considering key uncertainties such as industrial demand profiles, external grid access availability, and eligible tax credit levels, using the Holistic Energy Resource Optimization Network. Sensitivity of net present value to these uncertainties was analyzed to determine the optimal number of nuclear reactors (and CHP systems) and the suitable TES capacity. The results were interpreted from a decision-maker’s perspective, focusing on three key areas: deployment strategy (oversized units vs. undersized units with TES support), industrial process characteristics (thermal-intensive single profiles vs. electricity-intensive combined profiles), and operational goals (maximizing profits vs. minimizing natural gas (NG) consumption or external grid dependence). The optimization results indicate that the HTGR-TES-CHP system significantly reduces reliance on NG boilers for individual industrial processes by 9-60% (in NG capacity factor), with an average reduction of 38%, compared to standalone NG boiler operation case (Business As Usual [BAU]). For combined industrial processes, the reduction ranges from 37-77%, with an average of 60%. Additionally, the system greatly reduces dependence on external grids. In meeting industrial electrical demands, a 33-100% self-sufficient internal electricity supply is achieved for single industrial process, with an average of 74%, compared to the BAU scenario, where 100% of electricity is imported. For combined processes, 35-100% of internal electricity demands are met by the reactor, with an average of 73%. At last, the relative NG price levels at which the proposed HTGR-TES-CHP system can cost-effectively enter the market currently dominated by existing NG boilers were estimated. For a moderate HTGR CAPEX level ($\$$2500/kWth, $\$$6329/kWe), the analysis suggests that NG prices must be 2.5 to 7 times higher than HTGR variable operating and maintenance costs for single industrial process, and 5.5 to 9.5 times higher for a combined process scenario. Tax credit modeling shows that the Investment Tax Credit significantly reduces the price threshold needed to break even, making the system competitive with NG boilers in certain cases.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

A New Design Consideration for Bidirectional Resonant Converters

This paper introduces innovative design considerations for a bidirectional resonant converter, optimized for Electric Vehicle (EV) charging and vehicle-togrid (V2G) applications. By eliminating the need for complex voltage or current gain functions, the proposed design greatly simplifies the development process, making it more accessible for manufacturers and system integrators. This approach not only reduces engineering time and resource investment but also accelerates time-to-market, giving stakeholders a competitive edge in rapidly expanding EV infrastructure markets. In addition, the streamlined design ensures soft switching at maximum output power, leading to higher efficiency and improved durability, which translates to lower operating costs and a longer service life for EV charging equipment. These benefits provide a clear pathway to more cost-effective, scalable, and sustainable EV charging and V2G solutions, enhancing value for stakeholders by facilitating smoother integration into the grid and supporting energy resilience. To validate the benefits, a 60 kW bidirectional charger with a flexible input range of 700−900VDC and an output range of 400−1250VDC was developed, underscoring the design's adaptability and potential for large-scale implementation.

Asa, Erdem [ORNL] (ORCID:0000000190884812)↗

Scientific frontiers of agrivoltaic cropping systems

Agrivoltaic (AV) systems integrate agriculture with electricity conversion through photovoltaic (PV) modules. Compared with conventional ground-mounted PV systems, AV systems can reduce land-use competition and offer agronomic and economic advantages, such as more stable crop production and additional farm income. However, AV systems can decrease agricultural performance and are typically 20-90% costlier to install than conventional PV systems. Here, in this Review, we analyse the implementation of AV cropping systems to preserve agricultural activities and highlight challenges and barriers. The global electricity potential of AV systems is ~66-385 PWh annually, depending on PV technology and installation density, if deployed in the most suitable areas, without accounting for grid availability. Scaling up has been hindered by crop selection for shading conditions, decreased energy conversion per unit of land area and issues with social acceptance, landscape impact and environmental sustainability. These issues can be addressed by developments such as wavelength-selective PV; system configurations, such as optimizing module spacing to reduce shading; and operational methods, such as optimizing tracking strategies and integrating agricultural infrastructure. Cross-sector policies can support AV systems by addressing the needs of diverse stakeholders over shared land resources. Further development will require collaboration among the design, performance, deployment and systems research communities.

14 SOLAR ENERGY↗

Learning from Arctic Microgrids: Cost and Resiliency Projections for Renewable Energy Expansion with Hydrogen and Battery Storage

Electricity in rural Alaska is provided by more than 200 standalone microgrid systems powered predominantly by diesel generators. Incorporating renewable energy generation and storage to these systems can reduce their reliance on costly imported fuel and improve sustainability; however, uncertainty remains about optimal grid architectures to minimize cost, including how and when to incorporate long-duration energy storage. This study implements a novel, multi-pronged approach to assess the techno-economic feasibility of future energy pathways in the community of Kotzebue, which has already successfully deployed solar photovoltaics, wind turbines, and battery storage systems. Using real community load, resource, and generation data, we develop a series of comparison models using the HOMER Pro software tool to evaluate microgrid architectures to meet over 90% of the annual community electricity demand with renewable generation, considering both battery and hydrogen energy storage. We find that near-term planned capacity expansions in the community could enable over 50% renewable generation and reduce the total cost of energy. Additional build-outs to reach 75% renewable generation are shown to be competitive with current costs, but further capacity expansion is not currently economical. We additionally include a cost sensitivity analysis and a storage capacity sizing assessment that suggest hydrogen storage may be economically viable if battery costs increase, but large-scale seasonal storage via hydrogen is currently unlikely to be cost-effective nor practical for the region considered. While these findings are based on data and community priorities in Kotzebue, we expect this approach to be relevant to many communities in the Arctic and Sub-Arctic regions working to improve energy reliability, sustainability, and security.

25 ENERGY STORAGE↗

Assessment of the polygeneration approach in wastewater treatment plants for enhanced energy efficiency and green hydrogen/ammonia production

Wastewater treatment plants (WWTPs) offer opportunities to optimize resource utilization and enhance energy efficiency. Here, this study provides a comprehensive analysis of using the polygeneration approach in WWTPs to reduce grid energy dependence, optimize energy distribution, and utilize surplus energy for hydrogen (H 2 ) and ammonia (NH 3 ) production. Several models were employed, including photovoltaic (PV) cells, parabolic trough collectors (PTCs), steam methane reforming, and polymer electrolyte membranes, to assess the feasibility of this approach. Three scenarios were evaluated and compared: Scenario 1 (Baseline) represents the current situation, Scenario 2 maximizes the Net Present Value (NPV), and Scenario 3 minimizes NH 3 production costs. Real data from As-Samra WWTP in Jordan was used to accurately assess the feasibility of each scenario. The results show that Scenario 2 offers the highest profitability and efficiency, with a NPV of 87.48 million USD and an annual NH 3 production of 15,417 tons, reducing both grid dependency and biogas fuel consumption. Both Scenarios 2 and 3 demonstrate the ability to meet thermal demands efficiently while generating significant revenue from NH 3 production. Scenario 3, in particular, achieves competitive H 2 and NH 3 production costs. Environmentally, Scenario 2 significantly reduces annual greenhouse gas emissions by 12.66 kilotons of CO 2eq , with near-zero carbon intensity for thermal energy due to solar reliance. In conclusion, the polygeneration approach offers a promising pathway for WWTPs to achieve greater sustainability, economic gains, and reduced environmental impact, providing valuable insights for decision-makers.

42 ENGINEERING↗

A multi‐variable framework for selecting WRF physics configurations at convection‐permitting scales: An Amazon wet‐season case study

Tropical convection over rainforests modulates atmospheric circulation and the energy and hydrological cycles across multiple scales. However, the scarcity of observations still limits our understanding of these processes. Although numerical models are utilized to investigate atmospheric physical processes, their performance depends on the choice of parameterizations and grid resolution. Here, in this work, we introduce and apply a multi‐variable, multi‐physics framework to evaluate and rank the Advanced Research Weather Research and Forecasting (WRF–ARW) configurations at 1‐km resolution over the central Amazon during the wet season. A 48‐member ensemble combines three land‐surface models (LSMs), four planetary boundary layer (PBL), and four microphysics (MP) schemes. Model performance for seven convection‐related near‐surface and boundary‐layer variables is assessed using Taylor diagrams and the Taylor skill score (TSS), analysis of variance (ANOVA)‐based sensitivity metrics, and non‐parametric rank tests. We then construct a combined, weighted TSS to identify configurations that are comparatively robust across variables. Results showed that most configurations reproduce near‐surface temperature, sensible and latent heat fluxes, and boundary‐layer height reasonably well, whereas humidity and rainfall remain challenging. LSM choice has the strongest impact on the surface fluxes and a secondary influence on near‐surface temperature and humidity, PBL schemes dominate boundary‐layer height, and MP schemes exert the largest control on rainfall. No single configuration is optimal for all variables, but the combination of Noah (LSM), Yonsei University (PBL), and Morrison (MP) emerges as the most robust configuration for this case, with the WRF single‐moment six‐class scheme (WSM6) providing a competitive, computationally cheaper MP alternative. The framework is general and can be applied to other regions, seasons, and convective regimes.

Amazon rainforest↗

Competitiveness Assessment of Decarbonizing Electricity and Process Heat Supply to a Campus with a Small Nuclear Reactor

This paper analyzes the competitiveness of siting a small nuclear reactor to support decarbonization of sites requiring tens of MW of electricity and/or process heat to support centralized heating and cooling system. This paper focuses on campuses as representative of sites with collections of buildings and research facilities with decarbonization needs represented by buildings heating, and electricity consumption by electrical loads which may include cooling via chilled water (e.g., for air conditioning and to cool down computer clusters). A nuclear reactor can be considered to decarbonize a site’s high-temperature steam generation used mostly for building heating needs, climate control, and hot water, by supplying process heat capabilities, while electricity decarbonization would be achieved mostly by the grid. However, a secondary application can be considered to maximize reactor utilization and avoid ramping down the reactor if the steam demand varies significantly throughout the year. Chilled water generation through steam-driven systems was identified as an attractive secondary option for the site analyzed, due to potential for plant design simplification, while electricity generation could be considered as well to reduce electricity purchases for a wider range of site applications. For a campus with peak 60MW thermal power demand, a small nuclear reactor with similar thermal power rating would almost eliminate CO2 emissions from steam generation and reduce electricity imports for chilled water production. A preliminary techno-economic feasibility study shows that a small nuclear reactor design that is optimized to support process heat can represent an economically feasible option when compared with other decarbonization alternatives.

Stauff, Nicolas E.↗

Modeling and Experimental Validation of a Direct-Contact Counter-Flow Fluidized Bed Heat Exchanger for Thermal Energy Storage (TES) Applications

Particle-based thermal energy storage (TES) systems are an emerging energy storage technology. The technological advances have reduced costs, making TES more competitive and reliable in the marketplace but an efficient and reliable operation is heavily dependent on coherent heat transfer between air to particles or vice versa. The particle-based TES technologies provide an intermediate system that can store energy for short (0-10 h), long (10-200 h) and seasonal (> 200 h) timescales. The TES systems store energy by converting electricity to thermal energy; electricity can be directly sourced intermittent generation technologies and/or the grid, helping manage peak loads and other mismatches in supply and demand. The overall efficiency of the TES system depends on the performance of system components (particle storage silos and particle transfer mechanism etc.). The particle heat exchanger is one of the key system components that affects the system efficiency. The pressurized fluidized bed heat exchanger (PFB HX) performance is challenging to predict due to the chaotic behavior of particle and fluid interaction. This research presents a computational study of a novel direct-contact, counter-flow and air-to-particles PFB HX, that contributes in advancing the particle-based long-duration TES technologies. For the current analysis an unsteady Eulerian-Eulerian CFD model was developed and validated against experiments performed at the National Laboratory of the Rockies for two particle sizes (600 ..mu..m and 825 ..mu..m ). Following validation, parametric simulations were conducted to evaluate the effects of interphase drag models (Syamlal-O'Brien and Gidaspow), particle size, bed height and the influence of a frictional-viscosity term on hydrodynamics and heat transfer between the air & particles. The key findings from the analysis are: (1) for the studied operating window Syamlal-O'Brien provides superior agreement with measured gas temperatures (errors generally < 10%) while Gidaspow shows large deviations for the coarse particle case; (2) model predictions are most sensitive in the lower 0.2 m above the air distributor where bubble initiation and local mixing dominate interphase heat transfer; (3) representation of the distributor (number of inlet ports) materially affects predicted local mixing and temperature stratification; and (4) the Eulerian-Eulerian framework reproduces bulk thermal trends but shows regime dependent limitations for coarse particles, motivating mesoscale informed closures for scale-up analysis for future studies. These results provide validated guidance for drag selection and distributor design in particle-based thermal energy storage applications. Collectively, the validated model and parametric results quantify key drivers of PHB-HX performance and provide practical guidance for design and optimization. The results provide confidence in the model predictability and provide a step forward to improve on heat exchange performance. The demonstrated performance and modeling approach support the deployment and further development of this novel PHB-HX concept for robust, particle-based long-duration thermal energy storage systems.

25 ENERGY STORAGE↗

Field Validation of Thermoelectric Generation System at Holcim Cement Plant in Alpena, Michigan

Executive Summary Project Background The Industrial Technology Validation (ITV) program aims to identify and demonstrate the performance of new, emerging, and underutilized energy-saving technologies in the industrial sector to help inform decisions to help accelerate their commercialization and deployment, as well as to help make industries more competitive. This ITV demonstration evaluated a thermoelectric generation (TEG) technology at a cement plant, aiming to reduce energy demand in the cement industry. A median cement plant consumes 5.73 million British thermal units per ton of clinker production (resulting in 0.838 metric tons of carbon dioxide [CO₂] emissions per ton of clinker) (Boyd and Zhang 2011, EPA 2021), equivalent to approximately 6.9 trillion British thermal units (TBtu) per year in energy consumption at a cement plant producing 3,300 tons of clinker per day.¹ Collaborating with Holcim, Advanced Thermovoltaic Systems (ATS) developed and deployed a pilot-scale thermoelectric power system to efficiently capture and convert waste heat to electricity. The system leverages the Seebeck effect to convert temperature differences on two sides of semiconductor cartridges into electrical power (ScienceDirect, n.d.). This generation is realized with minimal moving parts compared to existing waste-heat-to-generation solutions and allows capture from heat sources with temperatures as low as 150°C. This project aimed to validate a scalable solution applicable for capturing medium-temperature waste heat, including ambient losses from other high-temperature processes, and high-temperature sources less suitable for other waste-heat-to-power solutions. By recovering this otherwise wasted heat, this project intends to validate improvements to overall process efficiency through reduction in purchased electricity, thereby reducing operational costs while enhancing resiliency and competitiveness. Description and Scope This study evaluated the performance of a TEG system from ATS as a solution to convert waste heat into useful power at a Holcim cement plant in Alpena, Michigan. This plant is a fully integrated cement plant that has been operating since 1907. The facility operates continuously (24/7/365) with approximately 250 employees and five long dry kilns, yielding a total production capacity of 7,852 tons of cement per day (EPA 2023). Currently, the Alpena plant uses waste heat boilers to convert waste heat from the exhaust of each kiln into steam, which drives steam turbine generators. The ATS TEG is being evaluated for its potential to supplement the steam turbines by capturing the remaining lower grade heat. This technology is also being considered for other Holcim plants where steam turbines are not a viable option. ATS installed a pilot-scale TEG unit with an array of 582 individual thermoelectric semiconductor cartridges, of which 573 were operational. The cartridges are sandwiched between 48 hot plates and 49 cold plates. Each cartridge is designed to generate 20 watts (W) of gross power at a hot-side temperature of 240°C and cold-side temperature of 20°C. As such, the total gross generation capacity of the installed system is 11.5 kilowatts (kW) at design conditions. The system configuration for the evaluation was designed to prioritize convenience of installation and minimize disruption to production at the site, while ensuring that the heat required can be obtained for evaluating the TEG system at various operational conditions. To accomplish this, a portion of the steam supplied to Alpena’s steam turbine generation system was diverted to be used as the heat source for the TEG system, while water was supplied to the cold side of the system from nearby Lake Huron. This configuration was designed for the evaluation of the pilot-scale system to assess the performance at different conditions. A commercial-scale system will likely vary from the pilot system depending on typical configurations, including both scale and application. Future commercial applications of the ATS system would involve integrating the system into the exhaust from kiln preheaters, clinker coolers, or radiant heat capture from kiln shells for the heat source. For the cold source, a range of cooling solutions can be considered, including a mechanical cooling system, depending on the location and the application. To increase the generation capacity for commercial applications, the technology provider is working toward developing a commercial-scale TEG system, which would combine multiple TEG units (each similar in design to the pilot system) together. The scope of this evaluation includes the pilot-scale TEG system and all impacted equipment including pumps, controllers, and power handling equipment. Study Objectives The evaluation's goal was to assess the potential of the ATS TEG system to generate useful electrical power by capturing waste heat from cement production kilns. The objectives of this study are to evaluate and verify the following claims made by ATS regarding the pilot-scale system installed at the Holcim Alpena plant. The following design parameters and claims are also outlined in Table ES- 1 and Table ES- 2: • Gross Power: The thermoelectric system converts heat into power to create gross power, the total measured power generated by the system. The 573 active cartridge pilot-scale system is expected to generate 11.5 kW of gross power at the designed hot-side temperature of 240°C and cold-side temperature of 20°C. Power production is dependent on the temperature difference between the heat source (ultimately from the waste heat) and cold temperature supply source. • Net Power: The net power is the total usable power provided to the site by the TEG system after deducting parasitic power loads from the gross generated power. Supplementary equipment is required to operate the TEG system including pumps, controllers, and, in certain anticipated applications, mechanical cooling, which introduce parasitic loads to system operation. After deducting the parasitic loads from the gross power generation, ATS anticipates achieving a net power generation of 7.5 kW from the pilot-scale system. • Thermal Efficiency: The thermal efficiency is the percent of the total heat transferred to the TEG system that is converted to gross power. Historically, TEGs have a thermal efficiency of 2%–5% (DOE 2008). Prior industrial-scale TEG systems, such as the E1 TEG offered by Alphabet Energy, operated at an efficiency of 2.5% (Lamonica, 2014). ATS anticipates achieving an average efficiency of 4.8% or higher in converting heat energy to usable electricity. • Cartridge Performance: The TEG system comprises 573 active individual semiconductor cartridges, each of which generates a portion of the total power. Cartridge optimization and selection is an important design consideration for potential future TEG system design performance. Therefore, understanding the distribution of gross power and efficiency within the pilot system is vital to understanding what is achievable. At a design hot-side temperature of 240°C and cold-side temperature of 20°C, ATS anticipates a cartridge performance of 20 W of gross power per cartridge at an efficiency of 4.8% per cartridge. In addition to evaluating the claimed performance of the TEG pilot-scale unit, the study estimated the potential annual impacts of a scaled-up commercial system used to capture kiln waste heat over annual operations. The evaluation estimated the gross and net annual electric generation achievable by capturing heat from the two proposed tap-in points: the kiln exhaust and the clinker cooler exhaust; see Section 2.1 for details. Two use cases were examined: • Holcim Alpena: The Holcim Alpena site consists of long dry kilns with superheater boilers, which differs from the rest of Holcim’s cement plant portfolio and results in lower waste heat temperatures. The study estimates gross and net annual generation using the superheater boiler exhaust and clinker cooler exhaust, based on 2023 operational data. • Typical Installation: Common cement plants have preheater kilns with higher exhaust temperatures than Holcim Alpena across a range of production rates. The study estimates gross and net annual generation using the preheater exhaust and clinker cooler exhaust, with a sensitivity analysis to account for the typical range of preheater exhaust temperatures, clinker cooler exhaust temperatures, and clinker production rates. Methodology The evaluation methodology followed a measurement and verification (M&V) strategy based on the International Performance Measurement and Verification Protocol Option B through comprehensive measurements and analyses of the affected systems. Evaluation data was collected from March 9 to March 11, 2024, the test period of the pilot TEG system. During the test period, in coordination with the ITV team, the ATS team adjusted system operations to capture the range of variability expected for each of the variables pertinent to performance of the system. The methodology consisted of two parts: evaluating the performance of the pilot unit's TEG system and estimating the annual TEG impact in terms of gross and net power based on a given waste heat profile. First, the evaluation of the thermoelectric generation performance of the pilot unit relative to the claims was performed by analyzing the collected test data. Gross power of the pilot TEG system was directly measured. Net power was determined by deducting the measured parasitic power from the gross power. The gross power generation was compared to heat transferred to the system by the working fluid (which was heated by steam generated from the kiln waste heat) to calculate the thermal efficiency achieved by the system. Performance of individual semiconductor cartridges within the pilot array was also assessed in terms of measured gross cartridge power and calculated cartridge thermal efficiency. The second part of the evaluation estimated the annual TEG impacts in terms of gross power and net power (calculated from the difference between gross power and parasitic power). This analysis comprised development of mathematical regression models for gross power and parasitic power, with assessment of each model’s goodness-of-fit characteristics to ensure satisfaction of statistical requirements. The models predicted the gross power generation, the parasitic load based on the temperature difference between the hot working fluid and the cold-side fluid (cold water from Lake Huron) entering the system, the volumetric flow rate of the cold-side fluid at the inlet, and the volumetric flow rate of the hot working fluid at the inlet. The annual impact analysis considered a theoretical commercial-scale system sized to capture the available waste heat at a cement plant, consisting of linked pilot-scale units that receive heat from a theoretical gas-to-working-fluid heat exchanger. To estimate annual impacts at the Alpena plant, the gross power and parasitic power regression models were applied to the arrays in the theoretical commercial-scale system. The heat supplied to the unit was calculated based on the kiln run time, annual production, kiln exhaust waste heat, and clinker cooler waste heat derived from 2023 Holcim Alpena kiln operational data. Net power impacts were calculated by deducting the resulting parasitic power from the estimated gross power. Inputs for the model were generated from a combination of hourly data, assumed design considerations for TEG system scale-up from the pilot-scale unit, and assumptions regarding TEG system operations. This analysis was then used as the basis for estimating annual impacts of typical TEG installation at cement plants, by applying sensitivity analyses to key kiln operational characteristics including kiln preheater exhaust temperatures, cooler clinker exhaust temperatures, and plant daily production rates across a range of expected values. Project Results/Findings Table ES- 2 and Table ES- 2 provide a summary of the operating conditions and evaluation results compared to the stated claims from the technology provider. Key takeaways include: • Gross Power: The peak gross power achieved during the testing period was 10.0 kW, compared to the 11.5 kW expected for 573 active cartridges. The claimed gross power was associated with a target hot side of 240°C; however, the system only received a maximum hot-side mean plate temperature of 212°C during the testing period. • Net Power: The pilot-scale unit exceeded the claims for net power, achieving a peak of 7.7 kW net compared to a claim of 7.5 kW. One factor contributing to the higher achieved net power is the relatively high water pressure available through Lake Huron. The pilot TEG system did not require cold-side pumps during the test, whereas most installations would. This reduced the parasitic loads on the system, ultimately contributing to higher net power relative to the gross power. • Thermal Efficiency: The pilot-scale unit outperformed the claimed efficiency, achieving a peak system efficiency of 5.0% thermal efficiency compared to the stated 4.8%. • Cartridge Performance: To compare cartridge performance against claims, the study focused on the third day of testing, which aimed for conditions closest to the design specifications, with a hot side of 240°C and cold-side exit temperature of 6.4°–30°C. On this day, the mean gross power observed in the cartridges within the TEG array was 18.1 W/cartridge, and the peak performance was 34.7 W/cartridge. The estimated mean cartridge efficiency was 5.2%, and the estimated efficiency at peak gross cartridge power was 10%. The regression models developed for gross power generation and parasitic loads were used to estimate the generation impact for given heat input to the TEG from the working fluid (captured from the waste heat) and from the cold loop (Lake Huron) on an hourly basis for a year of operation. Based on this analysis, installation of a commercial-scale TEG system at the Holcim cement plant in Alpena, Michigan, with a waste heat exchanger of 0.85 effectiveness, would generate up to 391 kW of net power, translating to between 920,000 and 1,800,000 kilowatt-hours (kWh) in net electricity per year. Based on typical grid emissions for Alpena, this would avoid estimated net emissions by 752 metric tons of CO₂ annually.² The sensitivity analysis estimated that typical TEG system installations at cement plants could generate an average of 56–1,040 kW of net power, or between 488,000 and 9,110,000 kWh of net energy. This generation potential is most significantly affected by plant production rates and also influenced by preheater and clinker cooler exhaust temperatures. Applying the national average emission rate, typical commercial-scale installations at Holcim plants are projected to avoid between 182 and 3,401 metric tons of CO₂ annually per site. Table ES- 3 shows a summary of the estimated annual impacts.³ While parasitic loads are significant and vary by application, this analysis assumed the use of heating loop pumps and access to Lake Huron as a cold sink. This setup assumed no need for cooling loop pumps due to the available water pressure at the test site. Applications that require cooling towers or additional equipment are likely to experience higher parasitic loads. Therefore, the study’s estimates are most applicable to scenarios with similar parasitic load configurations—namely, access to a high-pressure cold sink. Applicability to other locations may be limited, as differing conditions could necessitate additional pumps and cooling systems, potentially impacting performance significantly.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗