Search NASA⌕ Search

SEARCH · Search NASA

Results for “Group decision making.”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Visualizing ultrasound through computational modeling

The Doppler Ultrasound Hematocrit Project (DHP) hopes to find non-invasive methods of determining a person s blood characteristics. Because of the limits of microgravity and the space travel environment, it is important to find non-invasive methods of evaluating the health of persons in space. Presently, there is no well developed method of determining blood composition non-invasively. This projects hopes to use ultrasound and Doppler signals to evaluate the characteristic of hematocrit, the percentage by volume of red blood cells within whole blood. These non-invasive techniques may also be developed to be used on earth for trauma patients where invasive measure might be detrimental. Computational modeling is a useful tool for collecting preliminary information and predictions for the laboratory research. We hope to find and develop a computer program that will be able to simulate the ultrasound signals the project will work with. Simulated models of test conditions will more easily show what might be expected from laboratory results thus help the research group make informed decisions before and during experimentation. There are several existing Matlab based computer programs available, designed to interpret and simulate ultrasound signals. These programs will be evaluated to find which is best suited for the project needs. The criteria of evaluation that will be used are 1) the program must be able to specify transducer properties and specify transmitting and receiving signals, 2) the program must be able to simulate ultrasound signals through different attenuating mediums, 3) the program must be able to process moving targets in order to simulate the Doppler effects that are associated with blood flow, 4) the program should be user friendly and adaptable to various models. After a computer program is chosen, two simulation models will be constructed. These models will simulate and interpret an RF data signal and a Doppler signal.

Guo, Theresa W.↗

A multicriteria approach to evaluate district heating system options

District energy systems, in which renewable energy sources may be utilized, are centralized systems to provide energy to residential and commercial buildings. The aim of this paper is to evaluate and rank energy sources available for a case of district heating system in Vancouver, Canada, based on multiple criteria and the view points of different stakeholders, and to show how communication would affect the ranking of alternatives. The available energy sources are natural gas, biomass (wood pellets), sewer heat, and geothermal heat. The evaluation criteria include GHG emissions, particulate matter emissions, maturity of technology, traffic load, and local source. In order to rank the energy options the PROMETHEE method is used. In this paper, two different scenarios were developed to indicate how the communication between the stakeholders would affect their preferences about criteria weights and would change the ranking of alternatives. The result of this study shows that without communication the best energy source for the considered district energy system is different for different stakeholders. While, addressing concerns through efficient communication would result in a general consensus. In this case, wood pellet is the best energy alternative for all the stakeholders.

03 NATURAL GAS↗

Feasibility Studies as Catalysts for Capacity Building: The DEVELOP Experience from Local to National Scale

The NASA DEVELOP National Program occupies a unique niche in the capacity development ecosystem. It is not a traditional training or educational program primarily focused on individual capacity, nor is it a full-scale co-development program focused on institutional capacity. NASA DEVELOP conducts 10-week feasibility studies that bring together teams of participants and decision making partners. The participants are competitively selected students and emerging or transitioning professionals, who build their STEM and professional skillsets. The partners are groups that have decision making requirements that may benefit from insights that Earth observations can provide. The interaction of the participants and partners over the intense 10-week time period is especially well adapted to building capacity at smaller scales. DEVELOP projects have shown good results when working at municipal and smaller administrative levels like U.S. counties. Even when working with higher administrative levels like provinces, U.S states, or even national or federal levels, DEVELOP has shown most success when working with more localized institutions like state forests or national parks. This presentation will recount case studies of how DEVELOP projects worked with more local or “localized” partners and compare with outcomes with partners at other scales: state/provincial and federal/national levels.

NASA DEVELOP↗

Feasibility Studies as Catalysts for Capacity Building: The DEVELOP Experience from Local to National Scale

The NASA DEVELOP National Program occupies a unique niche in the capacity development ecosystem. It is not a traditional training or educational program primarily focused on individual capacity, nor is it a full-scale co-development program focused on institutional capacity. NASA DEVELOP conducts 10-week feasibility studies that bring together teams of participants and decision making partners. The participants are competitively selected students and emerging or transitioning professionals, who build their STEM and professional skillsets. The partners are groups that have decision making requirements that may benefit from insights that Earth observations can provide. The interaction of the participants and partners over the intense 10-week time period is especially well adapted to building capacity at smaller scales. DEVELOP projects have shown good results when working at municipal and smaller administrative levels like U.S. counties. Even when working with higher administrative levels like provinces, U.S states, or even national or federal levels, DEVELOP has shown most success when working with more localized institutions like state forests or national parks. This presentation will recount case studies of how DEVELOP projects worked with more local or “localized” partners and compare with outcomes with partners at other scales: state/provincial and federal/national levels.

Capacity Building↗

Toward Single Pilot Operations: The Impact of the Loss of Non-Verbal Communication on the Flight Deck

Since the 1950s, the crew required to fly transport category aircraft has been reduced from five to two. NASA is currently exploring the feasibility of a further reduction to one pilot. In this study we examine the effects of separating the pilots on crew interaction. The results are consistent with earlier research on decision-making between remote groups. Pilots strongly prefer face-to-face interactions; however, we could find no impact of separation on their ultimate decisions. There were a number of areas in which separation negatively affected communications. We discuss possible mitigations for these areas.

Single Pilot Operations↗

Positioning People for Effective Communication and Coordination - 18033

If the aim of people working together is to solve complex problems and develop creative solutions, would it make sense to position people to actually do this kind of work? A growing number of project teams span organizational boundaries: government agencies coordinate with other government agencies, private companies conduct major projects for government agencies, and public utilities coordinate decision-making with citizen groups. In such instances, these project teams are especially vulnerable to experiencing a gap in expectations in terms of how people should communicate and coordinate with one another. If these gaps are not addressed, communication bogs down, those involved in the project become frustrated and impatient, and solving complex problems and developing creative solutions becomes challenging if not impossible. However, it is possible to position people to effectively communicate and coordinate. One approach is to give attention to the discussion and development of a P3 Plan that describes how the project team agrees to coordinate its efforts and toward what ends. A P3 Plan is developed by the project team typically through one or more facilitated conversations. Multiple US government-to-government, government/contractor, and government/public citizen groups and teams have used this approach and have been successful moving beyond their own self-interests to deal with controversial issues. The project benefits because the work product combines the best thinking from everyone, eliminating potential political and turf battles from the start. (authors)

99 GENERAL AND MISCELLANEOUS↗

Integrating narratives into decision making for complex systems engineering design issues

Abstract Engineering decision making and design requires collaboration between groups from different disciplines, each with different tools, vocabulary, and concerns. Traditional engineering decision‐making tools are generally based on understanding the decision makers’ values, modeling uncertainty with probability, and selecting the alternative that maximizes utility. This rational approach to decision making may not be well understood or used by many stakeholders involved in the engineering design process. Constructing narratives, a basic means of human communication, may aid in engineering communication and comprehension and help with decision making. Narratives represent events by means of a story and usually include characters or agents who cause events and to whom events happen. This paper recommends three methods for how the use of narrative can be applied to the area of engineering decision making. These methods include connecting the decision maker to the analysis, creating narrative simulations for training decision makers, and fostering consensus in problems with multiple stakeholders. An illustrative example of designing a better cookstove for the developing world demonstrates the role that understanding narratives of various stakeholders can play for accomplishing complex systems engineering.

MacKenzie, Cameron A.↗

CMIP7 data request: Earth system priorities and opportunities

This paper presents a comprehensive overview of the Coupled Model Intercomparison Project Phase 7 (CMIP7) request for data pertaining to Earth systems science, and provides justification for the resources needed to produce this data. Topics within the CMIP7 Earth System (CMIP7-ES) theme centre around tracking of flows of energy, carbon, water and other fluxes across domains, and constraining feedbacks between these cycles and the climate system. These topics are summarized in this paper as scientific “opportunities” describing specific model intercomparison experiments and use cases for next-generation Earth System Model (ESM) output. These opportunities were submitted by modelling groups and scientific consortia following an extended public consultation process. Contained within each opportunity are requests for groups of Climate & Forecasting (CF) variables, which are bundled into variable groups representing all data required to address the opportunities' needs. Novel opportunities in CMIP7 compared with previous phases will include running `emissions-driven' simulations that integrate carbon emissions and removal scenarios with updated representations of the global carbon cycle, expanded variable groups needed to model marine trophic interactions and biogeochemistry, and data needed to understand the risk of global tipping points, among others. The production of these variables will close key gaps and uncertainties identified during previous rounds of CMIP, and support the 7th Intergovernmental Panel on Climate Change Assessment Report (AR7). We argue that CMIP7-ES data will be broadly used by scientific, policy, governmental, industry, and other communities that rely on climate model projections for research and decision making. As an author group we also reflect on the evolution of the CMIP7-ES data request as a part of a deliberative process in support of the global CMIP program.

54 ENVIRONMENTAL SCIENCES↗

Space Program Advocacy Can Distort Project Management and Damage Systems Engineering

Over-optimistic project advocacy often causes exaggerated performance claims and underestimated costs and schedules. This can distort project management and damage systems engineering. NASA projects such as the space shuttle and Hubble are extreme examples. NASA's spectacular success in the Apollo moon landings seems to have produced overconfidence and carelessness, but also to have gained tolerance for unrealistic claims and forgiveness when they were proven wrong. Apollo risk analysis predicted many astronaut fatalities. This was believed but was potentially damaging to the Apollo program, so risk analysis was discontinued. The moon landings beat bad odds because Apollo obsessively reduced risk. Its success seemed to confirm that risk analysis was unreasonably pessimistic and that risk could be overcome by good engineering. This understanding caused risk to be increased during space shuttle engineering and led to an unnecessarily dangerous approach. The shuttle design placed a fragile spacecraft next to the fuel tanks and failed to provide crew escape or launch abort. These design decisions directly caused the Challenger and Columbia tragedies. After Challenger, risk analysis was re-established. The current rocket and capsule design does consider risk and the result strongly resembles Apollo. Apollo advocacy led NASA to abandon risk analysis and this was ultimate cause of the Shuttle tragedies. Excessive advocacy that distorts risk, cost, and schedule could be prevented in an ideal organization that used systems engineering to make rational and fair decisions. However, most real organizations accommodate human and group needs using informal methods often described as "the system." Humans have biases, use innate decision making heuristics, instinctively rely on "gut feel," and establish deviant groups through groupthink. Expecting organizations to become totally rational is impractical, but specific problems such as neglecting risk and underestimating cost and schedule can be directly challenged with some hope of success.

Jones, Harry W.↗

Advanced Outage and Control Center: Strategies for Nuclear Plant Outage Work Status Capabilities

The research effort is a part of the Light Water Reactor Sustainability (LWRS) Program. LWRS is a research and development program sponsored by the Department of Energy, performed in close collaboration with industry to provide the technical foundations for licensing and managing the long-term, safe and economical operation of current nuclear power plants. The LWRS Program serves to help the US nuclear industry adopt new technologies and engineering solutions that facilitate the continued safe operation of the plants and extension of the current operating licenses. The Outage Control Center (OCC) Pilot Project was directed at carrying out the applied research for development and pilot of technology designed to enhance safe outage and maintenance operations, improve human performance and reliability, increase overall operational efficiency, and improve plant status control. Plant outage management is a high priority concern for the nuclear industry from cost and safety perspectives. Unfortunately, many of the underlying technologies supporting outage control are the same as those used in the 1980’s. They depend heavily upon large teams of staff, multiple work and coordination locations, and manual administrative actions that require large amounts of paper. Previous work in human reliability analysis suggests that many repetitive tasks, including paper work tasks, may have a failure rate of 1.0E-3 or higher (Gertman, 1996). With between 10,000 and 45,000 subtasks being performed during an outage (Gomes, 1996), the opportunity for human error of some consequence is a realistic concern. Although a number of factors exist that can make these errors recoverable, reducing and effectively coordinating the sheer number of tasks to be performed, particularly those that are error prone, has the potential to enhance outage efficiency and safety. Additionally, outage management requires precise coordination of work groups that do not always share similar objectives. Outage managers are concerned with schedule and cost, union workers are concerned with performing work that is commensurate with their trade, and support functions (safety, quality assurance, and radiological controls, etc.) are concerned with performing the work within the plants controls and procedures. Approaches to outage management should be designed to increase the active participation of work groups and managers in making decisions that closed the gap between competing objectives and the potential for error and process inefficiency.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

The Fernald Closure Project: Lessons Learned

For nearly 37 years, the U.S. Department of Energy site at Fernald - near Cincinnati, Ohio - produced 230,000 metric tons (250,000 short tons) of high-purity, low-enriched uranium for the U.S. Defense Program, generating more than 5.4 million metric tons (6 million short tons) of liquid and solid waste as it carried out its Cold War mission. The facility was shut down in 1989 and clean up began in 1992, when Fluor won the contract to clean up the site. Cleaning up Fernald and returning it to the people of Ohio was a $4.4 billion mega environmental-remediation project that was completed in October 2006. Project evolved through four phases: - Conducting remedial-investigation studies to determine the extent of damage to the environment and groundwater at, and adjacent to, the production facilities; - Selecting cleanup criteria - final end states that had to be met that protect human health and the environment; - Selecting and implementing the remedial actions to meet the cleanup goals; - Executing the work in a safe, compliant and cost-effective manner. In the early stages of the project, there were strained relationships - in fact total distrust - between the local community and the DOE as a result of aquifer contamination and potential health effects to the workers and local residents. To engage citizens and interested stakeholders groups in the decision-making process, the DOE and Fluor developed a public-participation strategy to open the channels of communication with the various parties: site leadership, technical staff and regulators. This approach proved invaluable to the success of the project, which has become a model for future environmental remediation projects. This paper will summarize the history and shares lessons learned: the completion of the uranium-production mission to the implementation of the Records of Decision defining the cleanup standards and the remedies achieved. Lessons learned fall into ten categories: - Regulatory approach with end-state determinations; - Interaction with stakeholders; - The balanced approach - on-site and off-site waste-disposal alternatives; - The contracting model; - Site safety performance; - Effectiveness of cleanup remedies; - Worker training and transition; - Client interface; - Cost and schedule performance; - Legacy management. Lessons learned can be applied: While each site and project has its own issues, the various lessons learned from the Fernald Closure Project, when taken from a global perspective, can be applied to similar efforts so that pitfalls are avoided and efficiencies realized.

54 ENVIRONMENTAL SCIENCES↗

Information Technology and Community Restoration Studies/Task 1: Information Technology

Executive Summary The Interagency Biological Restoration Demonstration—a program jointly funded by the Department of Defense's Defense Threat Reduction Agency and the Department of Homeland Security's (DHS's) Science and Technology Directorate—is developing policies, methods, plans, and applied technologies to restore large urban areas, critical infrastructures, and Department of Defense installations following the intentional release of a biological agent (anthrax) by terrorists. There is a perception that there should be a common system that can share information both vertically and horizontally amongst participating organizations as well as support analyses. A key question is: "How far away from this are we?" As part of this program, Pacific Northwest National Laboratory conducted research to identify the current information technology tools that would be used by organizations in the greater Seattle urban area in such a scenario, to define criteria for use in evaluating information technology tools, and to identify current gaps. Researchers interviewed 28 individuals representing 25 agencies in civilian and military organizations to identify the tools they currently use to capture data needed to support operations and decision making. The organizations can be grouped into five broad categories: defense (Department of Defense), environmental/ecological (Environmental Protection Agency/Ecology), public health and medical services, emergency management, and critical infrastructure. The types of information that would be communicated in a biological terrorism incident include critical infrastructure and resource status, safety and protection information, laboratory test results, and general emergency information. The most commonly used tools are WebEOC (web-enabled crisis information management systems with real-time information sharing), mass notification software, resource tracking software, and NW WARN (web-based information to protect critical infrastructure systems). It appears that the current information management tools are used primarily for information gathering and sharing—not decision making. Respondents identified the following criteria for a future software system. It is easy to learn, updates information in real time, works with all agencies, is secure, uses a visualization or geographic information system feature, enables varying permission levels, flows information from one stage to another, works with other databases, feeds decision support tools, is compliant with appropriate standards, and is reasonably priced. Current tools have security issues, lack visual/mapping functions and critical infrastructure status, and do not integrate with other tools. It is clear that there is a need for an integrated, common operating system. The system would need to be accessible by all the organizations that would have a role in managing an anthrax incident to enable regional decision making. The most useful tool would feature a GIS visualization that would allow for a common operating picture that is updated in real time. To capitalize on information gained from the interviews, the following activities are recommended: • Rate emergency management decision tools against the criteria specified by the interviewees. • Identify and analyze other current activities focused on information sharing in the greater Seattle urban area. • Identify and analyze information sharing systems/tools used in other regions.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Decarbonizing residential buildings in the United States: A comparative analysis of households and construction professionals

In this study, we present a comparative analysis of surveys distributed to home occupants and construction professionals in the U.S., focused on energy upgrades and electrification retrofits that support residential building decarbonization. The surveys were executed by separate research groups and combined for this study. The study examines the decision-making, sentiments, perceptions, experiences, and practices of both groups by analyzing data from three separate surveys. These surveys assess technologies, attitudes, awareness, motivations, barriers, and opportunities related to energy retrofits and electrification. The analysis highlights key differences in the perceptions and behaviors of households and construction professionals, revealing substantial barriers to achieving decarbonization goals. For example, households cite climate change and sustainability as key motivators for pursuing energy retrofits (89%), while construction industry professionals view these themes as less important for their clients (44%). This suggests an opportunity for the construction industry to align its messaging with the values that households prioritize, helping to advance residential decarbonization. Overall, the study identifies challenges faced by both groups, factors influencing the adoption of energy-efficient practices, and inconsistencies between occupant and construction industry professionals' views. These insights contribute to the development of targeted strategies and policies to accelerate the decarbonization of residential buildings in the U.S.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Packages of Distributed Energy Technologies Demonstrating Demand Flexibility at Community Scale

The combination of increased electric load growth across all sectors, deferred electrical infrastructure investment, and other factors resulting in variable electric power supply, has created technical challenges to maintaining a resilient and reliable grid. Many federal, regional, and local efforts are in play to modernize the electric grid, including advancing building technologies and distributed energy resources (DERs) that are utilizing smarter controls to become responsive to both occupant and grid needs. This report reviews ten pilot projects demonstrating how groups of buildings combined with behind-the-meter (BTM) DERs such as electric vehicle (EV) charging, battery storage, flexible HVAC and domestic hot water systems, and photovoltaic systems can reliably and cost effectively provide grid services. Each of the ten pilot projects aim to deliver both energy efficiency and demand flexibility (DF) while supporting load growth. The ten demonstration teams are piloting flexible DER packages across diverse communities of residential and commercial buildings to address a variety of regional grid needs. The outcomes of these pilot projects will be used to inform future scaling through utility program development. This paper characterizes the ten teams, showcasing the decision-making process used by each group to develop their packages (Section 2), the grid services they plan to deliver (Section 3), the types of DER packages selected for deployment within building sectors (Section 4) and trends between building sector, DER types, and grid services In order to achieve community scale benefits, the pilot projects must utilize aggregated control mechanisms for coordinating buildings and DERs together. Several types of coordinated control architectures have evolved amongst the teams, influenced by use type, existing market conditions, and integration type. Three coordinated controls architectures have been characterized, highlighting their use cases, benefits, challenges, and tradeoffs in their design. These insights can aid utilities, control vendors, and developers in scaling community-level energy systems (Paul, 2024). Ultimately, the technology packages selected by the ten teams will be coordinated to provide power system services, also known as grid services. Insights from these demonstrations will be useful for grid operators, regulators, aggregators and other stakeholders as they look to deploy demand flexible resources as grid services in the future. The grid services that each team is targeting for demonstration are described in Section 3 and Section 4. Methods for evaluating the grid services have been described in the paper Metrics for Evaluating Grid Service Provision from Communities of Grid-interactive and Efficient Buildings and other DER (MacDonald, 2023). To identify technology packages for demonstration, Section 2 shows that project teams used a range of analysis approaches, including building energy modeling, AMI data analysis, cost-benefit frameworks, and utility pilot data. Some teams emphasized technical modeling to quantify grid impacts and demand reduction potential, while others prioritized economic evaluations, stakeholder input, or exploratory pilots to inform deployment decisions. This diversity reflects the need to tailor selection methods to project goals, available data, and organizational context. Section 5 discusses trends between the DER technologies deployed and the grid service provisions from each team. Residential buildings (multifamily and single family) lean towards technologies that enhance energy efficiency (e.g. weatherization upgrades, smart thermostats) and onsite power generation integration (e.g. solar PV). Commercial building demonstrations prioritize technologies that ensure operational reliability (e.g. battery storage) and centralized energy management systems and optimization solutions. Teams that are deploying controllable storage-based technologies are more likely to provide grid services that require a near real-time response. Teams incorporating load shifting technologies like smart thermostats with HEMs are likely to include energy markets participation and customer bill management offerings. Campus demonstrations are adopting diverse sets of DERs to emphasize renewable generation, paired with centralized control. This section also describes technologies that were considered during project planning but ultimately excluded from final deployment. These demonstrations reveal that effective DER package design should be tailored to building type, customer segment, and construction vintage. Multifamily buildings benefit from centralized HVAC upgrades and supervisory controls, while single-family homes are well-suited for individualized technologies like solar, storage, and smart home energy monitors. Commercial and campus settings prioritize EMIS integration and load optimization. New construction enables cost-effective integration of DER-ready infrastructure, whereas retrofits require deployments aligned with owner and tenant value streams. For utility program planners, early coordination with developers and building owners, paired with segmented and modular program offerings, can improve adoption, scalability, and grid impact.

24 POWER TRANSMISSION AND DISTRIBUTION↗