Search NASA⌕ Search

SEARCH · Search NASA

Results for “H-Canyon”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Flowsheet Development for the University of Tokyo YAYOI (UTY) Fuel

The Savannah River National Laboratory (SRNL) was requested by H-Canyon Engineering to determine the flowsheet parameters needed to dissolve and store the YAYOI Material Test Reactor (MTR) uranium fuel safely and efficiently. In response to this request, a literature review of existing SRNL MTR dissolution flowsheets and general fuel dissolution literature in the nuclear fuel processing industry was performed to evaluate chemical dissolution parameters required to dissolve the YAYOI fuel and the tin-plated carbon steel product cans (PC). Based on past dissolutions of similar fuel in the H-Canyon and open literature reviews on chemical dissolution of spent nuclear fuel (SNF), the following conclusions and flowsheet recommendations were made.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Technical Evaluation of Accelerated Basin De-Inventory Material Addition to Sludge Batch 11 (Rev. 1)

The Accelerated Basin De-inventory (ABD) program involves discarding spent nuclear fuel that is currently stored in L-Basin to the Defense Waste Processing Facility (DWPF) for vitrification. The first ABD discards will occur during the preparation of Sludge Batch (SB) 11. Savannah River Mission Completion has requested that the Savannah River National Laboratory assess the technical gaps related to the increased gadolinium poisoning requirement and the impacts of performing the Low Temperature Aluminum Dissolution (LTAD) process in Tank 51 with H-Canyon discards present. The following summarizes the evaluation of the impacts of increasing the quantity of gadolinium (and related topics) from what was previously evaluated in the SRNL studies of gadolinium-poisoned ABD material solubility, the overall ABD flowsheet review, and increasing the fissile mass loading in glass: 1) Based on literature surveys, there is no indication that organic interactions with gadolinium will be significant at the high pH (typically >13) conditions of the Concentration, Storage, and Transfer Facilities. Any interactions of gadolinium with organics in DWPF are not expected to adversely impact DWPF or downstream facilities. Thus, there is little-to-no residual risk from organic interactions with gadolinium [Gap closed]; 2) Adding depleted uranium to ABD material, targeting 235 U enrichment of 4.90% within each transfer window, will mitigate potential impacts from an increase in soluble 235 U enrichment during sludge washing and LTAD. The plan to take advantage of previous transfers and allow 235 U enrichment of >5% during the final transfer window carries a risk that Tank 51 supernate will have a 235 U enrichment of >5%, which should be evaluated for acceptance; 3) Increasing the gadolinium mass ratio to 3.0:1 Gd: 235 U(eq SLU ) should lead to the same or higher partitioning of gadolinium into the solid phase within the DWPF Chemical Process Cell, resulting in both liquid and solid phases with expected partitioning of Gd consistent with the prior solubility study [Gap closed for SB11]; 4) There are no expected impacts on DWPF melt temperature and melter operations due to the minimal ~0.2 weight percent (wt%) increase in Gd concentration relative to previous sludge batches [Gap closed for SB11]; 5) As observed previously, Gd is expected to enter the off-gas system via physical entrainment, but at a slightly higher concentration than what was observed for SB9 melter off-gas pluggage deposits (0.07 wt%) [Gap closed for SB11] ; 6) There are no expected impacts on DWPF recycle or the Recycle Collection Tank glycolate destruction process. [Gap closed for SB11]; 7) Gd is projected to be a trace component in the SB11 glass (<0.5 wt%) and can be ignored for process control. Trace components do not significantly impact glass durability, thus the conclusions of the previous Product Consistency Test evaluation at a fissile mass loading of 2,500 g fissile/m3 glass still applies to SB11. The ~0.1 wt% increase in Gd2O3 concentration relative to the previous study will not impact the predictability of SB11 glass with the DWPF Product Composition Control System (PCCS) models for durability or the acceptability of glass according to the Waste Acceptance Product Specifications (WAPS) criterion for product consistency [Gap closed for SB11]; 8) No additional Toxicity Characteristic Leaching Procedure testing is necessary for SB11 and the hazardous waste specification of the SB11 DWPF waste form is unchanged after the addition of the ABD stream [Gap closed for SB11]. The following summarizes the evaluation of the impacts of adding two-thirds of the ABD material to Tank 51 prior to LTAD: 1) The addition of two-thirds of the ABD increases overall aluminum mass from 1.39×10 4 kg to 1.64×10 4 kg (15.5% ABD Al). The form of the insoluble portion of the Al resulting from ABD addition should be the more readily dissolved Al(OH) 3 and amorphous forms. The portion of the ABD aluminum that is processed by LTAD is expected to be completely soluble, thus requiring that less of the boehmite in the sludge be dissolved to reach the same Al target in the SB. [Gap closed for SB11]; The expected LTAD impact on other components, as related primarily to the components in ABD, are discussed. Gd is expected to remain insoluble during LTAD and not impact the solubility of other components. [Gap closed for SB11]; The addition of two-thirds of the ABD increases overall projected SB11 uranium mass from 4,740 kg to 13,100 kg (63% ABD U) and the projected plutonium mass from 86.0 kg to 89.5 kg (3.9% ABD Pu). The addition of all of the ABD increases overall projected SB11 uranium mass from 4,740 kg to 16,100 kg (70% ABD U) and the projected plutonium mass from 86.0 kg to 90.4 kg (5.3% ABD Pu). The 235 U enrichment will be ≤5%. The fissile uranium will be adequately poisoned by Gd and the fissile Pu will be adequately poisoned by Fe from the sludge. [Gap closed for SB11]; There is a low risk that ABD addition will impact the rheology or pumpability of the slurry. There is a low but higher risk of ABD addition prior to LTAD impacting the settling rate; Based on the evaluation of adding two-thirds of the ABD material and all of the ABD material prior to the LTAD process, there is no volume or mass limit that would need to be imposed on ABD additions prior to LTAD. [Gap closed for SB11]. Revision 1 of this report addresses a variation on the ABD additions and LTAD strategy where sodium hydroxide additions for LTAD may be performed intermittently or concurrently with an ABD addition window. The proposed change does not alter the conclusions of this evaluation.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Bench-Scale Electrolytic Dissolution of Quarter-Scale FCA Cans

In 2016, the Savannah River National Laboratory (SRNL) led, in support of and under sponsorship of the Department of Energy’s National Nuclear Security Administration (DOE/NNSA) Office of Material Management and Minimization (M3), the removal and transfer of the plutonium based Fast Critical Assembly (FCA) fuel from the Japan Atomic Energy Agency (JAEA) Tokai facility to the Savannah River Site (SRS). The team also included JAEA, multiple organizations in Savannah River Nuclear Solutions (SRNS), International Nuclear Services, and many other entities. The FCA fuel removal project completion was a key deliverable for M3 to the 2016 Nuclear Security Summit and constituted the largest inventory of weapons-usable plutonium removed under the nonproliferation program. The FCA materials consist of thousands of stainless steel (SS) clad plates and hundreds of SS clad rods. The FCA fuel elements were packaged in a carrier can and stored at SRS pending disposition of the fuel. Following an assessment of candidate disposition options, SRNS identified electrolytic dissolution (ED) as the most promising disposition option for the FCA plates and their preferred option was endorsed by DOE. This option entails electrochemically dissolving the entire FCA carrier can with fuel elements and was based on bench-scale laboratory testing and historical work on processing SS-clad and zirconium-clad uranium-based fuel in the H-Canyon electrolytic dissolver (last operated in 1980). The FCA plate consists of a plutonium-aluminum metal alloy core hermitically sealed in SS cladding.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Metallurgical Analysis of the High Flux Isotope Reactor (HFIR) Carrier Lifting Bails (Rev.1)

The dissolution rates of the aluminum alloys in the High Flux Isotope Reactor (HFIR) element carriers and the Material Test Reactor (MTR) L-bundles in the H-Canyon facility have been identified as the possible cause of extended dissolutions that result in significant time and financial expenditures. A study, carried out by Savannah River National Laboratory (SRNL) to determine relationships between the dissolution rates and the metallurgical properties of the aluminum alloy materials of construction of the HFIR carriers and the L-bundles, considered the dissolution rates of aluminum alloy (AA) series 1100, 6061, and 6063. The study determined that the aluminum alloy compositions played a principal role in the dissolution rate of the carrier/bundle components. Higher dissolution rates were correlated with lower concentrations of the minor element additions in the alloys and with specific element concentrations. Aluminum alloys 1100 and 6063 were found to have similar dissolution rates that were approximately two orders of magnitude (100X) greater than those of AA6061. Based on the results of the dissolution behavior study, a Technical Assistance Request (TAR) was first issued to determine if the replacement of AA6061-T6 with AA6063-T6 is feasible for the HFIR carrier lifting bails. A Technical Task Request was then issued to consider AA6063-T5 as well as other alloys to improve possible supply chain issues. The metallurgical properties of the L-bundle (specifically the end caps) were not evaluated in this report because L-Bundle drawings already allow for the use of AA6063-T6 in all structural components. The HFIR carriers are composed of thin-walled components with significant surface areas that allow for relatively quick overall dissolution times. Conversely, the carrier lifting bails and the supporting constituents are composed of solid bars and thick plate regions with relatively small surface areas that experience longer overall dissolution times. While the MTR L-bundle design includes allowances for the materials of construction to be either AA6061-T6 or AA6063-T6, the HFIR carriers are specified to be constructed fully with AA6061-T6 alloy. This report analyzes the recommendations of the dissolution behavior study to replace the materials of construction of the HFIR carrier lifting bails. The analysis considers the operational requirements of the lifting bail and its supporting structures. To decrease dissolution times, the analysis considers direct replacement of the material as well as reductions in the thicknesses of the components to decrease the mass of the elements. Material reductions are considered on options for using either AA6061 and/or AA6063. The calculations are based on specifications from the American Society of Mechanical Engineer (ASME) and The Aluminum Association, Inc. design codes. The analysis finds that direct replacement of the lifting bail material of construction with AA6063-T6, and AA6063-T5 as well as reductions in the dimensions of the lifting bail components are acceptable. Note that this study considers the structural suitability of the alloys. It does not consider their dissolution rates in the dissolvers.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Caustic Neutralization and Precipitation of Acidic Dissolved Simulated Stainless Steel–Clad Plutonium and Plutonium/Uranium Nuclear Fuel

Simulated dissolved stainless steel (SS) clad Pu and Pu/U nuclear fuel in HNO 3 was neutralized to a free hydroxide (OH - ) concentration of 0.6 M. A thermal neutron poison, Gd, was added to the simulants at concentrations of either ~3 - 6 g/L or ~37 - 38 g/L. The supernate Pu concentration the day of neutralization ranged from 0.48 to 8.75 mg/L. The supernate Pu concentration of a simplified simulant neutralized to 0.6 M OH - above precipitated solids containing Pu was demonstrated to decrease over 18 days. A significant portion of precipitated Pu was found to be insoluble in 8 M HNO 3 at ambient temperature, but essentially quantitative Pu dissolution was achieved in 11.5 M HNO 3 /0.1 M KF at 100 °C. The difficulty in dissolving the Pu precipitate is believed to be due to the formation of refractory PuO 2 •xH 2 O during the neutralization process. Initial Gd concentrations of ~37 – 38 g/L were found to result in a greater Al precipitation when neutralized to 0.6 M OH - than initial Gd concentrations of ~3 – 6 g/L. Physical properties of the resultant slurries were measured and used to calculate limiting flowrates and slurry velocities by gravity only in transfer piping between the Savannah River Site’s H-Canyon Facility and the Concentration, Storage, and Transfer Facility (CSTF). These results were compared to calculated deposition velocities to predict if solids would settle during the transfer. The Newtonian model was found to be reasonable for each diluted slurry evaluated. Deposition velocities of Pu containing slurries are lower than nuclear fuel slurries primarily composed of U due to the high density of Pu solids. In conclusion, dilution of slurries reduces the margin between the slurry and deposition velocities due to the reduction in viscosity because higher viscous forces on the particles promote maintained suspension.

Actinide Neutralization↗

Analysis of DWPF Sludge Batch 6 (Macrobatch 7): Pour Stream Glass Samples

The Defense Waste Processing Facility (DWPF) began processing Sludge Batch 6 (SB6), also referred to as Macrobatch 7 (MB7), in June 2010. SB6 is a blend of the heel of Tank 40 from Sludge Batch 5 (SB5), H-Canyon Np transfers and SB6 that was transferred to Tank 40 from Tank 51.1 SB6 was processed using Frit 418. Sludge is received into the DWPF Chemical Processing Cell (CPC) and is processed through the Sludge Receipt and Adjustment Tank (SRAT) and Slurry Mix Evaporator Tank (SME). The treated sludge slurry is then transferred to the Melter Feed Tank (MFT) and fed to the melter. During processing of each sludge batch, the DWPF is required to take at least one glass sample to meet the objectives of the Glass Product Control Program (GPCP) and to complete the necessary Production Records so that the final glass product may be disposed of at a Federal Repository. The DWPF requested various analyses of radioactive glass samples obtained from the melter pour stream during processing of SB6 as well as reduction/oxidation (REDOX) analysis of MFT samples to determine the impact of Argon bubbling. Sample analysis followed the Task Technical and Quality Assurance Plan (TTQAP) and an Analytical Study Plan (ASP). Four Pour Stream (PS) glass samples and two MFT slurry samples were delivered to the Savannah River National Laboratory (SRNL) from the DWPF. Table 1-1 lists the sample information for each pour stream glass sample. SB6 PS3 (S03472) was selected as the official pour stream sample for SB6 and full analysis was requested. This report details the visual observations of the as-received SB6 PS No.3 glass sample as well as results for the chemical composition, Product Consistency Test (PCT), radionuclide content, noble metals, and glass density. REDOX results will be provided for all four pour stream samples and vitrified samples of MFT-558 and MFT-568A. Where appropriate, data from other pour stream samples will be provided.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Measurement Acceptance Region (MAR) Assessment Results Based On Sludge Batch 10 Projections from December 2021, February 2022 and August 2022

The Defense Waste Processing Facility (DWPF) is currently preparing to initiate processing of Sludge Batch 10 (SB10), which is comprised of material from Tanks 11H, 13H, 15H, and 26F, Alternate Feed Stock-2 and Sodium Reactor Experiment material from H-Canyon. Frit 473 (8B 2 O 3 -8Li 2 O-5Na 2 O-79SiO 2 , in weight percent) was recommended for sludge-only (SO) and coupled processing with the Salt Waste Processing Facility (SWPF) based on previous assessments of SB10 projections with the DWPF Product Composition Control System (PCCS) glass property models and their associated Measurement Acceptance Region (MAR) constraints. Due to the lower processing rate of Sludge Batch 9 (SB9), the heel in Tank 40 is anticipated to be greater than 40 inches at the projected start of SB10 processing to meet the upcoming Accelerated Basin Deinventory addition dates in Tank 51 for Sludge Batch 11. In December 2021 and February 2022, Savannah River Remediation System Planning provided updated SB10 Tank 40 blend projections based on heels of 74 inches, 84 inches, 94 inches and 103.4 inches. Savannah River Mission Completion (SRMC) subsequently pursued Wash Cycle Y to further reduce the total sulfur in the sludge batch and increase processing flexibility at DWPF. In August 2022, SRMC System Planning provided an updated SB10 Tank 40 blend projection with a 76 inch-heel representing Decant Y2 and 60 kilogallons of bearing water inleakage that is anticipated during the Tank 51 to Tank 40 transfer. The objectives of this task were to: • Determine the impact on the operating windows for SO and coupled processing • Determine whether any composition gaps exist between the already completed SB10 variability study and the reprojected SB10 glass composition region • Compare the SB10 reprojected glass composition region to the DWPF PCCS model development and validation ranges to ensure that compositional gaps do not exist between the data sets. This report documents the results of these evaluations. Calculation-based frit assessments were performed using the DWPF PCCS glass property models and their associated MAR constraints. Evaluated parameters for coupled processing included the following transfer volumes per Sludge Receipt and Adjustment Tank batch: 5700 gallons of Tank 40 sludge, 2400-4500 gallons of the SWPF monosodium titanate (MST) and sludge solids stream, and 15,000 gallons of strip effluent. Based on these MAR assessment results, Frit 473 remains viable for SB10 processing. A target waste loading (WL) of 36% is possible for SO operation and single strike (0.4 g/L MST) coupled processing up to 600 mg/L of SB9 insoluble sludge solids at a nominal transfer volume of ~2800 gallons. Increasing the single strike transfer volume to 4500 gallons may reduce the maximum WL below 40%. Operating windows are 12 percentage points for SO processing and 14-16 percentage points for coupled processing. Frit 625 allows for a target WL of 36% and is acceptable for use during the SB9 to SB10 transition to deplete remaining inventory as needed. Operating windows are 8 percentage points for SO processing and 12-14 percentage points for coupled processing. Predictive PCCS evaluations performed at DWPF will provide insight into batch-specific acceptability at desired WLs for compositions having expected oxide ratios during processing versus the extreme vertices (corner points) evaluated in this study. The reprojected SB10 glass composition region generally overlaps the previously evaluated SB10 variability study composition region. Thus, the minor composition shift of these updated SB10 projections indicates that no additional glasses are necessary to demonstrate acceptability relative to the chemical durability of the Environmental Assessment benchmark glass and predictability using the current PCCS models for durability. Based on a comparison of the PCCS model development and validation data to the reprojected SB10 glass composition region, the viscosity and liquidus temperature models will reliably predict SB10 compositions. No additional glasses are necessary to demonstrate predictability of these models.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Analysis of DWPF Sludge Batch 6 (Macrobatch 7) Pour Stream Glass Samples

The Defense Waste Processing Facility (DWPF) began processing Sludge Batch 6 (SB6), also referred to as Macrobatch 7 (MB7), in June 2010. SB6 is a blend of the heel of Tank 40 from Sludge Batch 5 (SB5), H-Canyon Np transfers and SB6 that was transferred to Tank 40 from Tank 51. SB6 was processed using Frit 418. During processing of each sludge batch, the DWPF is required to take at least one glass sample to meet the objectives of the Glass Product Control Program and to complete the necessary Production Records so that the final glass product may be disposed of at a Federal Repository. Four pour stream glass samples and two Melter Feed Tank (MFT) slurry samples were collected while processing SB6. The samples were transferred to the Savannah River National Laboratory (SRNL) where they were analyzed.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Measurement Acceptance Region (MAR) Assessment Results Based on Confirmation Sample Sludge Batch 10 Projections

The Defense Waste Processing Facility (DWPF) is currently preparing to initiate processing of Sludge Batch 10 (SB10), which is comprised of material from Tanks 11H, 13H, 15H, 26F, 40H (heel only), and Alternate Feed Stock-2 and Sodium Reactor Experiment material from H-Canyon. Frit 473 was recommended for sludge-only (SO) and coupled processing with the Salt Waste Processing Facility (SWPF) based on previous assessments of SB10 projections with the DWPF Product Composition Control System (PCCS) glass property models and their associated Measurement Acceptance Region (MAR) constraints. Savannah River Mission Completion (SRMC) subsequently pursued Wash Cycle Y to further reduce the total sulfur in the sludge batch and increase processing flexibility at DWPF. In October 2022, SRMC System Planning provided an updated SB10 Tank 40H blend baseline projection based on the Tank 51 confirmation sample results. Due to the reduced Na concentration relative to previous SB10 projections, two additional projections based on the addition of 7,000 gallons of caustic were provided in November 2022.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Evaluation of the 0.65 Weight Percent Sulfate Solubility Limit for Sludge Batch 10 Based on November 2022 Projections

The Defense Waste Processing Facility (DWPF) is currently preparing to initiate processing of Sludge Batch 10 (SB10), which is comprised of material from Tanks 11H, 13H, 15H, 26F, 40H (heel only), and Alternate Feed Stock-2 and Sodium Reactor Experiment material from H-Canyon. Frit 473 was recommended for sludge-only (SO) and coupled processing with the Salt Waste Processing Facility (SWPF) based on previous assessments of SB10 projections with the DWPF Product Composition Control System glass property models and their associated Measurement Acceptance Region constraints. Savannah River Mission Completion (SRMC) subsequently pursued Wash Cycle Y to further reduce the total sulfur in the sludge batch and increase processing flexibility at DWPF. In October 2022, SRMC System Planning provided an updated SB10 Tank 40H blend baseline projection based on the Tank 51 confirmation sample results. Due to the reduced Na concentration relative to previous SB10 projections, two additional projections based on the addition of 7,000 gallons of caustic were provided in November 2022.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Accelerated Basin De-Inventory Maximum Fissile Estimate

The Accelerated Basin De-inventory (ABD) program increases processing of Spent Nuclear Fuel (SNF) in H-Canyon to accelerate the closure of L Basin. The dissolved SNF will be dispositioned to Sludge Batches that will be processing in the Defense Waste Processing Facility and converted to glass. The fissile glass loading directly impacts the amount of glass canisters made. This memorandum provides an estimated maximum quantity of total fissile expected to be transferred to a Sludge Batch to support increasing the fissile glass loading and thus reducing the number of canisters created across the lifetime of the ABD mission.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Dissolution of a Can Carrier Pin in Concentrated Nitric Acid

H=Canyon will be dissolving Fast Critical Assembly (FCA) fuel from the Japan Atomic Energy Agency (JAEA). The FCA fuel will be dissolved in the electrolytic dissolver in a solution that is a 50 wt.% nitric acid (HNO 3 ), 0.5 g/l gadolinium (Gd), and 0.05 M potassium fluoride (KF). The nitric acid concentration is expected to decrease during the batch process from 10.3 to 7 M. The temperature of the nitric acid solution may be as low as 15 °C. The fuel can will be placed in the dissolver basket insert utilizing a reusable charging device. The charging device is a coated stainless-steel rod with a clevis design. The charging device employs a linchpin to secure the FCA fuel can as it is being charged into the H-canyon dissolver. Prior to beginning the electrolytic dissolution process, the pin will be dissolved, the fuel can will remain in the dissolver basket insert and the charging device will be removed. Currently the time necessary for complete dissolution of the pin is unknown and thus the timing of the removal of the charging device cannot be planned. This process is to be performed remotely and therefore complete dissolution of the pin will not be able to be visually determined. The pin will be made of a material that dissolves in the concentrated nitric acid solution in the dissolver. The facility desired to know the time that the pin would be dissolved so that the charging device for the FCA can could be removed from the dissolver. In particular, the pin dissolution time as a function of the nitric acid concentration and the temperature was desired. The facility would like to ensure that the solution environment was such that the charging device could be removed within an operational shift (8-12 hours).

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Thermal Calculations to Determine Maximum Zircaloy Temperatures During Reactor Operations for Campaign 1 Fuel Assemblies

The H-Canyon Facility plans on processing bundles from Non-Aluminum Spent Nuclear Fuel (NASNF) Risk Group 1 (UO 2 core fuels). Uranium-zirconium (UZr) alloys and zirconium clad UO 2 fuel containing UZr intermetallic compound have the potential to cause explosions during dissolution. UZr intermetallic typically only forms when uranium and zirconium (or zirconium alloy) cladding are in contact at high temperatures. Thermal modeling was performed to determine the maximum cladding temperature for Campaign 1 Zircoloy cladded fuel assembles during reactor operation to help determine if the UZr intermetallic compound could have formed during reactor operations. The temperature of 350°C was chosen as a conservative minimum value for the possible formation of intermetallic UZr compound. The modeling approach, inputs, and results are outlined in this document.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Increasing the Fissile Mass Loading of High-Level Waste Glass Canisters to Greater Than 2,500 g/m 3 at the Savannah River Site

To eliminate future fissile mass loading constraints for the Savannah River Site H-Canyon Facility and Liquid Waste system, the Savannah River National Laboratory recommends a repository evaluation of a uranium fissile mass loading in glass at 7,144 g/m 3 in addition to the existing International Atomic Energy Agency safeguards and security limit of 2,500 g/m 3 total plutonium. This recommended increase above the authorized 2,500 g/m 3 fissile mass loading limit is based on concentrations of uranium and plutonium shown to produce an acceptable glass waste form rather than projections of the maximum fissile mass loading in future sludge batches. An authorized fissile mass loading limit greater than 2,500 g/m 3 will increase facility flexibility, reduce the number of high-level waste canisters produced, and potentially avoid an increase in the Department of Energy Environmental Management mission life without compromising safety or glass product quality.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Impacts of Fast Critical Assembly Fuel Discards on Liquid Waste Processes

The Savannah River Nuclear Solutions (SRNS) Fast Critical Assembly (FCA) mission is reestablishing the electrolytic dissolver for processing of Pu and Pu-U materials clad in stainless steel (SS). H-Canyon is planning to dissolve and neutralize FCA fuel without recovering the special nuclear material (i.e., Pu) prior to discarding to the Concentration, Storage, and Transfer Facilities (CSTF) operated by the Savannah River Mission Completion (SRMC) Liquid Waste (LW) Organization. The FCA discards will be combined with sludge in the CSTF after Low Temperature Aluminum Dissolution (LTAD) if needed. The combined waste will be washed, concentrated, and vitrified at the Defense Waste Processing Facility (DWPF). The high level waste canisters produced will be temporarily stored in the Glass Waste Storage Buildings prior to transfer to a future federal repository. Decants from LTAD and sludge washing will be combined with DWPF recycle and dissolved salt cake to prepare salt batches for processing in the Salt Waste Processing Facility. The resulting decontaminated salt solution will be processed in the Saltstone Production Facility.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Zirconium Sludge Criticality Calculations in Large Process Tanks

The Savannah River Site’s H-Canyon facility has been tasked with accelerating the disposition of used research reactor fuels. • Future missions will involve dissolution of “Non-Aluminum” clad fuels – not easily dissolved – Nitric acid is not capable of dissolving stainless steel, Zirconium, and Hastelloy, clad fuels by itself • The electrolytic dissolver has been (re) selected as a disposition path for these fuels. 2

Devine, Nathan P.↗

Literature Review Investigating Historical Plutonium Solubility in SRS Tank Waste

The Savannah River Site (SRS) has designed the Accelerated Basin De-inventory (ABD) program to accelerate the de-inventory of L-Basin and accelerate the Spent Nuclear Fuel (SNF) disposition mission. Similarly, the H-Canyon facility at SRS is reestablishing the 6.3D electrolytic dissolver for dissolving unirradiated stainless-steel (SS) clad Fast Critical Assembly (FCA) fuel. In both discard types (ABD and FCA), plutonium is present and its complex solubility when composited to Concentration, Storage, and Transfer Facility (CSTF) sludge is being investigated as it may have downstream impacts to the liquid waste (LW) organization. This literature review aims to highlight and compile the existing literature on plutonium solubility in waste streams relevant to ABD and FCA discards, as well as discuss some considerations in analyzing solubility data of plutonium. This review serves to help define the analysis methods for future experiments involving plutonium (and other actinides) and in designing appropriate testing conditions surrounding these studies. This review is broken up into five parts and will discuss: (i) The possible effects of testing hold time and temperature on plutonium solubility, (ii) the influence of neutralization rate and particle size of freshly precipitated discards, (iii) the coprecipitation of plutonium with iron and uranium, (iv) predictive solubility modeling and the influence of supernate anions on solubility, and (v) the speciation of plutonium in solutionas a result of supernate anions.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Statistical Analysis of Imaging Laser Scan Data of an Exhaust Tunnel at the SRS

• The SRS H-Canyon Building is a critical facility under the responsibility of DOE-EM. • It includes an Air Exhaust Tunnel (HCAEX) that allows for ventilation of the process airflow. • Inspections are performed remotely because of hazards, e.g. radioactivity, debris, high airflow, and nitric acid vapors.

Wells, William Willie [Savannah River National Lab↗