Search NASA⌕ Search

SEARCH · Search NASA

Results for “HUBBLE SPACE TELESCOPE”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

A distributed architecture for intelligent monitoring and anomaly diagnosis of the Hubble Space Telescope

Lockheed, the Hubble Space Telescope mission operations contractor, is currently engaged in a project to develop a distributed architecture of communicating expert systems to support vehicle operations. This architecture, called Telemetry Analysis for Lockheed Operated Spacecraft (TALOS), has potentially wide applicability to spacecraft operations. The architecture mirrors the organization of the human experts within an operations control center. The prototype analyzes telemetry from a history tape to determine the state of the vehicle with respect to on-board safemode events. The prototype is currently being expanded along two fronts. One consists of expert systems modules which perform deeper level diagnostics and which operate in an off-line mode. The other is a high speed front-end expert system which will monitor real time telemetry for anomalies and spacecraft status and send activation and initialization messages to the off-line modules when an anomaly is detected.

Cruse, Bryant G.↗

TALOS: A distributed architecture for intelligent monitoring and anomaly diagnosis of the Hubble Space Telescope

Lockheed, the Hubble Space Telescope Mission Operations Contractor, is currently engaged in a project to develop a distributed architecture of communicating expert systems to support vehicle operations. This architecture, named Telemetry Analysis Logic for Operating Spacecraft (TALOS), has the potential for wide applicability in spacecraft operations. The architecture mirrors the organization of the human experts within an operations control center.

Cruse, Bryant G.↗

Initial performance improvements due to design modifications for the Pointing Control System on the Hubble Space Telescope

Shortly after Hubble Space Telescope was deployed on orbit it became apparent that the Pointing Control System was experiencing unexpectedly large disturbances during certain portions of the orbit. While these disturbances were most pronounced during transitions of the Earth's shadow, significant disruptions to the pointing occurred at other times in the orbit. Careful analysis of the flight data has lead to the conclusion that the disturbances are caused by a combination of rapid thermal deformations of the Solar Arrays together with striction-friction mechanisms within the array that randomly release stored thermal/mechanical energy. This paper describes the baseline pointing control system design and the flight data that characterized the effects of the extraneous disturbances. The paper goes on to describe the procedure for modifying the onboard controller to attenuate the disturbances to levels consistent with the science operations. Flight data demonstrating the improved performance are shown and are tabulated to compare performance prior to and after phase I of the redesign.

Nurre, G. S.↗

Thermal Control Replacement Materials Evaluated for Durability and Selected for the Hubble Space Telescope

During the Hubble Space Telescope (HST) second servicing mission, astronauts noticed that the outer layer of the multilayer insulation (MLI) was cracked in many locations around the telescope. The insulation s outer layer is composed of 5-mil (0.127 mm) Teflon FEP (DuPont; fluorinated ethylene propylene) with vapor-deposited aluminum (VDA) on the backside. The MLI blankets, which are used on over 80 percent of the external surface of the telescope, provide passive thermal control for equipment. Two large cracks were observed on the light shield directly above the high gain antenna. The upper light shield crack propagated from a cut placed in the blanket during installation around a handrail standoff. Two cracks propagated almost normal to each other, with the outer layer curling tightly as the cracks propagated. A second much larger vertical crack had started to curl and lift away from the telescope, as seen in the figure. MLI on the equipment bays was cracked extensively also, and in some areas it had pulled away from the bay. Continued degradation of the equipment bay insulation would potentially cause limited observations because of housekeeping boxes; for example, the data interface unit could overheat during some portions of the year, in certain sun angles.

deGroh, Kim K.↗

Environmental Exposure Conditions for Teflon FEP on the Hubble Space Telescope Investigated

The Hubble Space Telescope (HST) was launched into low Earth orbit on April 24,1990. During the first servicing mission in December 1993 (3.6 years after launch), multilayer insulation (MLI) blankets were retrieved from the two magnetic sensing systems located on the light shield. Retrieval of one of the solar arrays during this mission also provided MLI blanket material from the solar array drive arm. These MLI materials were analyzed in ground-based facilities, and results indicate that the space-facing outer layer of the MLI, aluminized Teflon FEP (DuPont; fluorinated ethylene propylene), was beginning to degrade. Close inspection of the FEP revealed through-the-thickness cracks in areas with the highest solar exposure and stress concentration. During the second servicing mission in February 1997 (6.8 years after launch), astronauts observed and documented severe cracking in the outer layer of the MLI blankets on both the solar-facing and anti-solar-facing surfaces. During this second mission, some material from the outer layer of the light shield MLI was retrieved and subsequently analyzed in ground-based facilities. After the second servicing mission, a Failure Review Board was convened by NASA Goddard Space Flight Center to address the MLI degradation problem on HST. Members of the Electro-Physics Branch of the NASA Glenn Research Center at Lewis Field participated on this board. To determine possible degradation mechanisms, board researchers needed to consider all environmental constituents to which the FEP MLI surfaces were exposed. On the basis of measurements, models, and predictions, environmental exposure conditions for FEP surfaces on HST were estimated for various time periods from launch in 1990 through 2010, the planned end-of-life for HST. The table summarizes these data including the number and temperature ranges of thermal cycles; equivalent Sun hours; fluence and absorbed radiation dose from solar event x rays; fluence and absorbed dose from solar wind protons and electrons trapped in Earth s magnetic field; fluence of plasma electrons and protons; and atomic oxygen fluence.

Dever, Joyce A.↗

New Horizons: Long-Range Kuiper Belt Targets Observed by the Hubble Space Telescope

We report on Hubble Space Telescope (HST) observations of three Kuiper Belt Objects (KBOs), discovered in our dedicated ground-based search campaign, that are candidates for long-range observations from the New Horizons spacecraft: 2011 epochY31, 2011 HZ102, and 2013 LU35. Astrometry with HST enables both current and future critical accuracy improvements for orbit precision, required for possible New Horizons observations, beyond what can be obtained from the ground. Photometric colors of all three objects are red, typical of the Cold Classical dynamical population within which they reside; they are also the faintest KBOs to have had their colors measured. None are observed to be binary with HST above separations of approx. 0.02 arcsec (approx. 700 km at 44 AU) and delta m less than or equal to 0.5.

Photometry↗

Evolution of the Hubble Space Telescope Safing Systems

The Hubble Space Telescope (HST) was launched on April 24 1990, with an expected lifespan of 15 years. Central to the spacecraft design was the concept of a series of on-orbit shuttle servicing missions permitting astronauts to replace failed equipment, update the scientific instruments and keep the HST at the forefront of astronomical discoveries. One key to the success of the Hubble mission has been the robust Safing systems designed to monitor the performance of the observatory and to react to keep the spacecraft safe in the event of equipment anomaly. The spacecraft Safing System consists of a range of software tests in the primary flight computer that evaluate the performance of mission critical hardware, safe modes that are activated when the primary control mode is deemed inadequate for protecting the vehicle, and special actions that the computer can take to autonomously reconfigure critical hardware. The HST Safing System was structured to autonomously detect electrical power system, data management system, and pointing control system malfunctions and to configure the vehicle to ensure safe operation without ground intervention for up to 72 hours. There is also a dedicated safe mode computer that constantly monitors a keep-alive signal from the primary computer. If this signal stops, the safe mode computer shuts down the primary computer and takes over control of the vehicle, putting it into a safe, low-power configuration. The HST Safing system has continued to evolve as equipment has aged, as new hardware has been installed on the vehicle, and as the operation modes have matured during the mission. Along with the continual refinement of the limits used in the safing tests, several new tests have been added to the monitoring system, and new safe modes have been added to the flight software. This paper will focus on the evolution of the HST Safing System and Safing tests, and the importance of this evolution to prolonging the science operations of the telescope.

Pepe, Joyce↗

Hubble Space Telescope Servicing Mission 3A

The Hubble Space Telescope's purpose is to spend 20 years probing the farthest and faintest reaches of the cosmos. Crucial to fulfilling this objective is a series of on-orbit servicing missions. Hubble was placed in orbit on April 25, 1990, by the shuttle Discovery and subsequent servicing followed in December 1993 and February 1997. The third in the series of planned servicing missions for the Hubble Space Telescope was scheduled for June 2000. This third Servicing Mission has been separated into two flights. The first of these flights, Servicing Mission 3A, is scheduled for December 1999, and the second, Servicing Mission 3B, is scheduled for 2001. The fourth Servicing Mission is scheduled for 2003 with a "close-out" Mission in 2010. Three instruments are currently in active scientific use on Hubble - the Wide Field and Planetary Camera 2, the Space Telescope Imaging Spectrograph, and Fine Guidance Sensor I R, which has been designated as the prime FGS for astrometric science. Other instrument bays are occupied by the Near Infrared Camera and Multi-Object Spectrometer (NICMOS), which is now dormant due to the depletion of its solid nitrogen cryogen, the Faint Object Camera, which has been decommissioned, and the corrective optical device called COSTAR, which is no longer needed.

Source record↗

Hubble Space Telescope observations of Mars

Hubble Space Telescope (HST) afforded the possibility of resolving features as small as 100 km on the Martian surface even when it is at the far point of its orbit. Therefore it is ideally suited for monitoring seasonal changes on the red planet. The objectives research include: the study of Martian dust storms; use of images obtained through different filters to study the spectral reflectance of regions on the Martian surface; use of ultraviolet images and spectra to measure the amount of ozone in the planet's atmosphere as a function of location of the planet; use of images to study changes in the albedo of the Mars surface; and use of Planetary Camera images to study Martian clouds and to measure the opacity of the atmosphere.

James, Philip B.↗

Determination and characterization of the Hubble Space Telescope pointing stability

The Hubble Space Telescope (HST) was designed to maintian a pointing stability (jitter) of 0.007 arc seconds rms throughout every observing period, which can last from a few seconds to several orbits. On-orbit measurements indicate that the hardware excitation induced by the reaction wheels. gyros, high gain antennae, science instrument mechanisms and tape recorders are well within specifications. Unexpectedly, the solar arrays because the dominant source of jitter. Every passage through an orbital terminator produces vibrations which emanate from the solar arrays due to thermal effects, which affect the relative positional stability. Broadband frequencies centered about 0.11 and 0.65 Hz were detected in the frequency content of the vehicle jitter. On-board modifications to the control law have attenuated the disturbance torques and reduced the vehicle jitter close to specification. Replacement of the solar arrays in December, 1993, should eliminate the torque distubances. Astrometric science observations are extremely susceptible to corruption from vehicle jitter. The removal of vehicle jitter from astrometric Transfer function scans of binary stars is explained in detail. A binary star separation of 16 milli-seconds of arc has been achieved, a separation resolution of 10 to 12 milli-seconds of arc appears feasible, with a binary star magnitude of 9 m(sub V). The achievement of this resolution is in part due to vehicle jitter removal. Comparison of vehicle jitter measurements from the position path of the vehicle control law, or from the guiding Fine Guidance Sensors (FGS), are shown to be equivalent to approximately 0.001 arc second.

Bradley, A. J.↗

The role of scientists in developing Hubble Space Telescope

The objective of the Hubble Space Telescope Program is to build and operate a high-performance, fully-instrumented and long-lived optical observatory in earth orbit. Key Program elements are (1) a logistic strategy of Shuttle launch/maintenance and TDRSS communications, (2) overall responsibility at the MSFC Project for developing both the flight and ground systems, and (3) scientific participation in ST development and responsibility after launch for conducting the observing program. The ST Project is a management structure with a budget and schedule for delivering an ST system capable of achieving its established scientific objectives. The Project distributes through contracts the responsibility for supplying particular components, but retains the responsibility for system-level integrity. Scientists have set the performance objectives and now support the Project during the development stage by providing (1) PI management of the five Science Instruments, (2) continuing translations of scientific requirements into engineering specifications, (3) oversight of designs and performance tests, and (4) specific expertise on technical concerns.

Brown, R. A.↗

Technology and the Hubble Space Telescope

The components of the Hubble Space Telescope which is a 13.1 m long, 4.27 m in diameter, and weighs 11,000 kg are described. The telescope will be placed in a 600-km circular orbit of 28.5 deg inclination and it has an expected service life of 15 years. The optical telescope assembly contains the hyperbolic Ritchey-Chretin type primary and secondary mirrors and the optical control system. The telescope is to have a field of view of 28 arcmin in diameter. The use of the fine guidance sensors for pointing stability is examined. The optical and scientific system of the telescope are contained in the support system module. A wide-field/planetary camera, ESA-furnished faint object camera, the high-speed photometer, faint-object spectrograph, high resolution spectrograph, and ESA-furnished solar arrays are located on the telescope. The maintenance and refurbishment of the telescope are discussed. The precise lambda/20 optics, stringent cleanliness, and stable pointing of the telescope produce good image quality for astronomical and solar system science studies.

Mitchell, R. E.↗

Passive isolation/damping system for the Hubble space telescope reaction wheels

NASA's Hubble Space Telescope contain large, diffraction limited optics with extraordinary resolution and performance for surpassing existing observatories. The need to reduce structural borne vibration and resultant optical jitter from critical Pointing Control System components, Reaction Wheels, prompted the feasibility investigation and eventual development of a passive isolation system. Alternative design concepts considered were required to meet a host of stringent specifications and pass rigid tests to be successfully verified and integrated into the already built flight vehicle. The final design employs multiple arrays of fluid damped springs that attenuate over a wide spectrum, while confining newly introduced resonances to benign regions of vehicle dynamic response. Overall jitter improvement of roughly a factor of 2 to 3 is attained with this system. The basis, evolution, and performance of the isolation system, specifically discussing design concepts considered, optimization studies, development lessons learned, innovative features, and analytical and ground test verified results are presented.

Hasha, Martin D.↗

The Hubble Space Telescope high speed photometer

The Hubble Space Telescope will provide the opportunity to perform precise astronomical photometry above the disturbing effects of the atmosphere. The High Speed Photometer is designed to provide the observatory with a stable, precise photometer with wide dynamic range, broad wavelenth coverage, time resolution in the microsecond region, and polarimetric capability. Here, the scientific requirements for the instrument are examined, the unique design features of the photometer are explored, and the improvements to be expected over the performance of ground-based instruments are projected.

Vancitters, G. W., Jr.↗

Flight software operation of the Hubble Space Telescope fine guidance sensor

The Hubble Space Telescope (HST) is to carry five major scientific instruments to collect imagery, spectrographic, and photometric astronomical data. The Pointing Control System is designed to achieve pointing accuracies and line of sight jitter levels an order of magnitude less than can be achieved with ground mounted telescopes. This paper describes the operation of the pointing control system flight software in targeting a celestial object in a science instrument aperture and in performing the coordinate transformations necessary for commanding the fine guidance sensor and determining the attitude-error corrections.

Rodden, J. J.↗

What the longest exposures from the Hubble Space Telescope will reveal

NASA's Hubble Space Telescope (HST) is expected to reveal the sizes, shapes, and contents of faint, distant galaxies. Results are presented from detailed simulations of the longest HST exposures of representative galaxy fields, together with predictions of the numbers and types of objects that will emerge on exposures of different duration. Observations made during the first year of HST operations should confirm or disprove the quantitative understanding of telescopic capabilities reflected in the present simulations and predictions; significant departures would indicate that novel populations of astronomical objects may be present.

Bahcall, John N.↗

Long range science scheduling for the Hubble Space Telescope

Observations with NASA's Hubble Space Telescope (HST) are scheduled with the assistance of a long-range scheduling system (SPIKE) that was developed using artificial intelligence techniques. In earlier papers, the system architecture and the constraint representation and propagation mechanisms were described. The development of high-level automated scheduling tools, including tools based on constraint satisfaction techniques and neural networks is described. The performance of these tools in scheduling HST observations is discussed.

Miller, Glenn↗

Hubble Space Telescope electrical power system

The Hubble Space Telescope (HST) electrical power system (EPS) is supplying between 2000 and 2400 W of continuous power to the electrical loads. The major components of the EPS are the 5000-W back surface field reflector solar array, the six nickel-hydrogen (NiH2) 22-cell 88-Ah batteries, and the charge current controllers, which, in conjunction with the flight computer, control battery charging. The operation of the HST EPS and the results of the HST NiH2 six-battery test are discussed, and preliminary flight data are reviewed. The HST NiH2 six-battery test is a breadboard of the HST EPS on test at Marshall Space Flight Center.

Whitt, Thomas H.↗