Search NASA⌕ Search

SEARCH · Search NASA

Results for “HYDRAULIC ACTUATOR”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Motion Control of Hydraulic Actuators In the Presence of Discrete Pressure Rail Switching

Conventional off-highway mobile machines are hydraulically actuated and have poor energy efficiencies. The goal to increase system efficiency and to reap the benefits of electrification have led to the creation of a novel Hybrid Hydraulic-Electric Architecture (HHEA) which could significantly increase efficiency, decrease the sizes and cost of electrical components, and maintain control performance. The key concept is to utilize a set of common pressure rails to provide the majority of power via the power dense hydraulics and to modulate that power by small electric components, which are less power dense, for precise control. The paper presents the motion control strategy for this architecture. The architecture presents a distinct challenge in that as the energy minimization algorithm selects different pressure rails, the system could experience large discrete jumps in pressures that impact control performance, especially when the electric components are torque limited. To meet this challenge, a passivity based back-stepping controller is used as the nominal controller between pressure rail switching events and a separate transition controller is used to deal with the pressure rail switching events. Two transition controllers are proposed, one uses the electric motor torque as the input, and the other also uses valve timing as a second input. For both transition controllers, a least norm control approach is used to steer the system states to the exact desired states at the end of the short transition period (~ 40 ms). The transition controllers are able to reduce the tracking error and the required electric motor torque, and hence achieve better control performance even with smaller electric components.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Barrier Self for Hydraulic Actuators

Barrier seal slows loss of pressurized hydraulic fluid due to leakage in primary seal. Barrier seal, placed downstream of primary O-ring seal, serves as secondary obstacle to leakage.

Prout, R. E.↗

Lock for hydraulic actuators

Two clamps hold rod in fixed extension from cylinder even when power is off, converting actuator into stiff structural member. Locked actuator is useful as mechanical support or linkage or as fail-safe device in case of loss of hydraulic pressure. Potential applications include manufacturing processes and specialized handling and holding devices.

Wood, R. H.↗

Wave Energy Power Take-Off Validation with a Hydraulicly Actuated Rotary Dynamometer and a Bidirectional High-Power DC Supply: Preprint

There are many organizations working towards the commercialization of wave energy converter technologies and are advancing their designs through the technology readiness levels (TRLs). A critical step before the field deployment of prototype wave energy converters is the validation of the subsystems and components that are contained in the wave energy converter through laboratory testing and performance characterization. In 2021, the National Renewable Energy Laboratory (NREL) developed and demonstrated a system for testing power takeoffs (PTO) with a low-speed, high-torque dynamometer and a grid-tied high-power DC power source and sink before field deployment. The hydraulic dynamometer allows for the simulation of PTO actuation from wave motion and is capable of a wide range of wave periods and heights which are represented as various speeds and torques from the dynamometer. The high-power bidirectional power supply allows for hardware in the loop and controller in the loop testing to be conducted on WEC power electronics. This presentation was made to describe the methods used by NREL research staff to test all components and sub-systems in the PTO of a novel wave energy converter before field deployment.

dynamometer↗

Wave Energy Power Take-off Validation with a Hydraulicly Actuated Rotary Dynamometer and a Bi-Directional High-Power DC Supply

There are many organizations working towards the commercialization of wave energy converter technologies and are advancing their designs through the technology readiness levels (TRLs). A critical step before the field deployment of prototype wave energy converters is the validation of the subsystems and components that are contained in the wave energy converter through laboratory testing and performance characterization. In 2021, the National Renewable Energy Laboratory (NREL) developed and demonstrated a system for testing power takeoffs (PTO) with a low-speed, high-torque dynamometer and a grid-tied high-power DC power source and sink before field deployment. The hydraulic dynamometer allows for the simulation of PTO actuation from wave motion and is capable of a wide range of wave periods and heights which are represented as various speeds and torques from the dynamometer. The high-power bidirectional power supply allows for hardware in the loop and controller in the loop testing to be conducted on WEC power electronics. This presentation was made to describe the methods used by NREL research staff to test all components and sub-systems in the PTO of a novel wave energy converter before field deployment.

dynamometer↗

Subminiature hydraulic actuator

Subminiature, single-vane rotary actuator for wind-tunnel test-model control-surface actuation systems presents severe torque and system band-pass requirements with stringent space and weight limitations. Actuator has very low leakage of fluid from one side to other, permitting use in precision position servo-systems.

Sevart, F. D.↗

Hydraulic actuator mechanism to control aircraft spoiler movements through dual input commands

An aircraft flight spoiler control mechanism is described. The invention enables the conventional, primary spoiler control system to retain its operational characteristics while accommodating a secondary input controlled by a conventional computer system to supplement the settings made by the primary input. This is achieved by interposing springs between the primary input and the spoiler control unit. The springs are selected to have a stiffness intermediate to the greater force applied by the primary control linkage and the lesser resistance offered by the spoiler control unit. Thus, operation of the primary input causes the control unit to yield before the springs, yet, operation of the secondary input, acting directly on the control unit, causes the springs to yield and absorb adjustments before they are transmitted into the primary control system.

Irick, S. C.↗

Study of hydraulic actuation system for Space Shuttle main engine propellant valves

Recent performance concerns involving the Space Shuttle Main Engine Propellant Valve Actuator assemblies prompted the NASA Marshall Space Flight Center to request an independent design assessment. Moog Inc. responded to this request and received a study contract with objectives of increasing valve reliability, decreasing maintenance costs while preserving the existing design interfaces. The results of the Propellant Valve Actuation System review focus on contamination control and the bypass valve design. Three proof of concept bypass valves employing design changes were built and successfully tested. Test results are presented.

Ewel, Bob↗

Controller modeling and evaluation for PCV electro-mechanical actuator

Hydraulic actuators are currently used to operate the propellant control valves (PCV) for the space shuttle main engine (SSME) and other rocket engines. These actuators are characterized by large power to weight ratios, large force capabilities, and rapid accelerations, which favor their use in control valve applications. However, hydraulic systems are also characterized by susceptibility to contamination, which leads to frequent maintenance requirements. The Control Mechanisms Branch (EP34) of the Component Development Division of the Propulsion Laboratory at the Marshall Space Flight Center (MSFC) has been investigating the application of electromechanical actuators as replacements for the hydraulic units in PCV's over the last few years. This report deals with some testing and analysis of a PCV electromechanical actuator (EMA) designed and fabricated by HR Textron, Inc. This prototype actuator has undergone extensive testing by EP34 personnel since early 1993. At this time, the performance of the HR Textron PCV EMA does not meet requirements for position tracking.

Parker, Joey K.↗

Power Analysis of an ePump Applied to the Linear Functions of an Agricultural Planter

Like many other industries, the agricultural industry has recently ex-perienced pressure to reduce vehicle emissions while improving productivity. Electric actuation is perceived as a viable solution to replace or augment hydrau-lic and mechanical actuation. However, electrification presents challenges with regards to linear functions, where hydraulic actuators have advantages in terms of compactness, tolerance to contamination and resistance to shocks. A combined electro-hydraulic actuation architecture can leverage the benefits of both electric and hydraulic actuation, while reducing the drawbacks of both approaches. This work investigates the potential of a centralized electric driven pump (ePump) system powering the pressure-controlled linear functions of an agricul-tural planter, with the goal of improving the operating point of the main supply pump. In this application, the rotary functions are hydraulically actuated, alt-hough such a solution could be applied also to electric rotary actuation. This is accomplished by setting the ePump to boost the pressure supplied by the tractor to the level required by the linear functions. An accumulator is used to stabilize the flow requirements of the linear functions, and control the pressure supplied to the actuators. Two control schemes are proposed for the regulation of the ac-cumulator pressure, one favoring an efficient operating point for the ePump, the other favoring stable steady state operation. A simulation model of the baseline system and proposed system is developed and validated using experimental data from a full-scale machine. Using the vali-dated simulation, both control architectures are then evaluated for improvement in system power consumption and dynamic requirements on the ePump to assess their effectiveness. Both systems demonstrate significant improvement in power consumption over the baseline system, with the best solution improving effi-ciency by 64%.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Miniature linear-to-rotary motion actuator

A miniature hydraulic actuation system capable of converting linear actuator motion to control surface rotary motion has been designed for application to active controls on dynamic wind tunnel models. Due to space constraints and the torque requirements of an oscillating control surface at frequencies up to 50 Hertz, a new actuation system was developed to meet research objectives. This new actuation system was designed and developed to overcome the output torque limitations and fluid loss/sealing difficulties associated with an existing vane type actuator. Static control surface deflections and dynamic control surface oscillations through a given angle are provided by the actuation system. The actuator design has been incorporated into a transonic flutter model with an active trailing edge flap and two active spoilers. The model is scheduled for testing in the LaRC 16 Foot Transonic Dynamics Tunnel during Summer 1993. This paper will discuss the actuation system, its design, development difficulties, test results, and application to aerospace vehicles.

Sorokach, Michael R., Jr.↗

Forward Skirt Structural Testing on the Space Launch System (SLS) Program

Structural testing was performed to evaluate heritage forward skirts from the Space Shuttle program for use on the Space Launch System (SLS) program. One forward skirt is located in each solid rocket booster. Heritage forward skirts are aluminum 2219 welded structures. Loads are applied at the forward skirt thrust post and ball assembly. Testing was needed because SLS ascent loads are roughly 40% higher than Space Shuttle loads. Testing objectives were to determine margins of safety, demonstrate reliability, and validate analytical models. Two forward skirts were structurally tested using the test configuration. The test stand applied loads to the thrust post. Four hydraulic actuators were used to apply axial load and two hydraulic actuators were used to apply radial and tangential loads. The first test was referred to as FSTA-1 (Forward Skirt Structural Test Article) and was performed in April/May 2014. The purpose of FSTA-1 was to verify the ultimate capability of the forward skirt subjected to ascent ultimate loads. Testing consisted of two liftoff load cases taken to 100% limit load followed by an ascent load case taken to 110% limit load. The forward skirt was unloaded to no load after each test case. Lastly, the forward skirt was tested to 140% limit and then to failure using the ascent loads. The second test was referred to as FSTA-2 and performed in July/August of 2014. The purpose of FSTA-2 was to verify the ultimate capability of the forward skirt subjected to liftoff ultimate loads. Testing consisted of six liftoff load cases taken to 100% limit load followed by the six liftoff cases taken to 140% limit load. Two ascent load cases were then tested to 100% limit load. The forward skirt was unloaded to no load after each test case. Lastly, the forward skirt was tested to 140% limit and then to failure using the ascent loads. The forward skirts on FSTA-1 and FSTA-2 successfully carried all applied liftoff and ascent load cases. Both FSTA-1 and FSTA-2 were tested to failure by increasing the ascent loads. Failure occurred in the forward skirt thrust post radius. The forward skirts on FSTA-1 and FSTA-2 had nearly identical failure modes. FSTA-1 failed at 1.72 times limit load and FSTA-2 failed at 1.62 times limit load. This difference is primarily attributed to variation in material properties in the thrust post region. Test data were obtained from strain gages, deflection gages, ARAMIS digital strain measurement, acoustic emissions, and high-speed video. Strain gage data and ARAMIS strain were compared to finite element (FE) analysis predictions. Both the forward skirt and tooling were modeled. This allows the analysis to simulate the loading as close as possible to actual test configuration. FSTA-1 and FSTA-2 were instrumented with over 200 strain gages to ensure all possible failure modes could be captured. However, it turned out that three gages provided critical strain data. One was located in the post bore and two on the post radius. More gages were not specified due to space limitations and the desire to not interfere with the use of the ARAMIS system on the post radius. Measured strains were compared to analysis results for the load cycle to failure. Note that FSTA-1 gages were lost before failure was reached. FSTA-2 gages made it to the failure load but one of the radius gages was lost before testing began. This gage was not replaced because of the time and cost associated with disassembly of the test structure. Correlation to analysis was excellent for FSTA-1. FSTA-2 was not quite as good because there was more residual strain from previous load cycles. FSTA-2 was loaded and unloaded with 12 liftoff cases and two ascent cases before taking the skirt to failure. FSTA-1 only had two liftoff cases and one ascent case before taking the skirt to failure. The ARAMIS system was used to determine strain at the post radius by processing digital images of a speckled paint pattern. Digital cameras recorded images of the speckled paint pattern. ARAMIS strain results for FSTA-2 just prior to failure. Note a high strain location develops near the left side. This high strain compares well to analysis prediction for both FSTA-1 and FSTA-2. The strain at this location was also plotted versus limit load. Both FSTA-1 and FSTA-2 had excellent correlation between ARAMIS and analysis strains. Acoustic emission (AE) sensors were used to monitor for damage formation that may occur during testing (e.g., crack formation and growth or propagation). AE was very important because after disassembly of FSTA-1, a crack was observed in the ball fitting radius. The ball fitting did not crack on FSTA-2. AE data was used to reconstruct when the crack occurred. The AE energy versus time plot for FSTA. The energy increased considerably at 850 seconds (152% limit load), indicating a crack could have formed at this point. The only visual evidence found that could have corresponded to this was the crack that initiated in the ball fitting. The cracks in the forward skirt aluminum structures would likely have been lower energy due to a lower modulus and all that were found after failure correlated to occurring after the initial crack in the post radius. This was verified by high-speed cameras used to record the failure.

Lohrer, J. D.↗