Search NASA⌕ Search

SEARCH · Search NASA

Results for “Heat integration”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Application of a Heat Integrated Post-combustion CO 2 Capture System with Hitachi Advanced Solvent into Existing Coal-Fired Power Plant (Final Technical Report)

The goal of this final project report is to comprehensively summarize the work conducted on project DE-FE0007395. In accordance with the Project Management Plan (PMP), Revision F dated 5/10/2019, and Statement of Project Objectives (SOPO) within, the University of Kentucky (UK) Center for Applied Energy Research (CAER) (Recipient) has successfully demonstrated a unique, versatile CO 2 capture system (CCS) using a heat integrated process combined with two-stage stripping for process intensification, heat recovery and demineralized (DM) water generation. This project involved the design, fabrication, installation, testing of and data analysis from the UK CAER 0.7 MWe small pilot scale CO2 capture process installed at Kentucky Utilities (KU) E.W. Brown Generating Station in Harrodsburg, KY. During each of the four project Budget Periods (BPs), UK CAER met all project deliverables, all project milestones, with National Energy Technology Laboratory (NETL) approved adjustments made to the campaign long-term hours during BP4. The CCS was constructed in modular skids. Two solvent campaigns were initially conducted; the first with a 30 wt% monoethanolamine (MEA) as a baseline, and the second with the Hitachi H3-1 advanced solvent. Additional tests were performed with two advanced solvents including CAER and Proprietary Solvent C. Short-period testing with a higher concentration of 40 wt% MEA was conducted to evaluate the potential saving with high alkalinity. From the various solvent campaigns, unique aspects of the UK CAER CCS technology, as well as its flexibility and versatility were experimentally validated and demonstrated. With respect to solvent evaluation efforts in identifying candidates with significant operational and capital cost savings potential, performance of solvents were evaluated to determine the energy requirements for regeneration; environmental impacts from secondary emissions and degradation products; degradation rates, solvent make-up rates and stability. The assessments were done from parametric tests that determined optimum operating conditions for the individual solvents to maximize process efficiency and minimize the parasitic load of the power plant, and from long term campaigns (1000 hours for 30 wt% MEA and 1000 hours for H3-1) which collectively informed the techno-economic analyses (TEA) of the process. The long term campaigns included corrosion studies which used three types of metal coupons in different sections of the process: (absorber, primary stripper, lean carbon-loaded and rich carbon loaded flow streams in process) to mimic heat and flow dynamics process equipment were exposed to. The estimated corrosion rates were used to elucidate corrosion mechanisms and to further guide process material selection for potential capital cost savings.

gas separation↗

Dynamic optimization and economic evaluation of flexible heat integration in a hybrid concentrated solar power plant

Hybridization of concentrated solar power (CSP) plants provides flexibility in operation that can drastically improve the solar-to-electric (STE) efficiency and levelized cost of electricity (LCOE) relative to standalone CSP plants. Flexible heat integration (FHI) is a novel concept where the collection and integration of CSP within a power plant is modified relative to the amount of solar energy available. FHI improves the thermal efficiency of a hybrid solar tower steam Rankine cycle power plant but leads to increased pumping needs due to continuously elevated molten salt flow rates through the collection system, which can negatively impact STE efficiency. The present work is carried out to maximize the STE efficiency of a hybrid CSP plant utilizing FHI by employing a dynamic optimization framework where a genetic algorithm optimizes the operation of the plant over a given solar irradiance profile. The study concerns a plant hypothetically located in Salt Lake City, Utah. Here, the optimization results confirm the accuracy of a predictive heuristic where the preferred operation of the plant can be estimated relative to local peaks in the incident power generated by the heliostat collection field. The optimized FHI operation demonstrates a yearly STE efficiency of 13.8%, whereas the equivalent base-level hybrid and solar-only plants exhibit solar efficiencies of 13.4% and 11.2%, respectively. Economic analysis shows that FHI reduces yearly natural gas costs, leading to a $\$0.5$/MWh reduction in LCOE relative to the base-level hybrid configuration. Overall, the results show that hybrid FHI schemes exhibit economic benefits along with observed thermodynamic improvements.

14 SOLAR ENERGY↗

Performance analysis of novel thermal storage integrated heat pump system in a residential building at the hot climate for demand flexibility

A novel thermal energy storage integrated heat pump system was proposed to reshape the electricity load profile of residential buildings while maintaining thermal comfort. High-fidelity computer simulations are needed for evaluating the feasibility of the proposed system. This study investigates the annual performance of the proposed system through Modelica-based system simulations. A rule-based control strategy was developed to shift the electric demand of a typical single-family house in Atlanta, GA from peak to off-peak hours to utilize the Time-of-Use electricity rate to lower the energy costs for conditioning the building. For comparison, a conventional air-source heat pump system serving the same building was also developed. Simulation results indicate that the proposed system is capable of shifting around 90% of the building's electricity consumption for meeting the thermal demand from peak to off-peak hours on a daily basis. In addition, the annual power consumption and operating cost for running the HVAC system can be reduced by 6% and 34%, respectively, compared with the conventional air-source heat pump.

Shi, Liang↗

Integrated Heat Exchanger/Thermal Energy Storage System for CSP Plants

The research and development during the project focused on the design and optimization of an integrated heat exchanger/thermal energy storage (HX/TES) system, the charging and discharging performance of the developed HX/TES system, and the experimental investigation of lab-scale prototypes based on the full-scale system.

42 ENGINEERING↗

Dual-season thermal energy storage-integrated heat pump system for load shifting: experiments, modeling and nationwide analysis

Here, this paper proposes and validates a dual-season thermal energy storage-integrated heat pump (TES-HP) system that shifts building electric load in both cooling and heating modes using a single phase-change TES. The design uses the TES as a heat sink for the condenser in summer and a heat source for the evaporator in winter, thereby reducing on-peak electric demand while ensuring compatible with existing air-distribution systems. A 14-kW TES-HP prototype with six operating modes and novel refrigerant charge management strategies was experimentally tested under varied conditions. Subsequently, data-driven polynomial performance curves were developed and validated against experiments, then coupled with a phase change material (PCM) model and a calibrated building model within a rule-based controller. Single-day case studies demonstrated effective on-peak demand reduction while maintaining thermal comfort. During cooling, hourly power was lowered by up to 1.5 kW; in heating, average hourly power decreased from over 3.5 kW to 1.8 kW, compared to an HP-only system, achieving 64.5 % load shifting, and the need for resistance heating was eliminated. Seasonal simulations showed typical on-peak electricity savings of 25–35 % in cooling and 40–65 % in heating, with the largest benefits on the hottest and coldest days. Extended response-surface analysis and nationwide mapping quantified load shifting as functions of ambient and TES temperatures, revealing a seasonal trade-off in TES phase-change temperature. These results demonstrate the TES-HP system as a practical and scalable solution for grid-interactive buildings that reduces on-peak demand and electricity use while maintaining thermal comfort and enhancing grid flexibility and reliability.

Grid-interactive buildings↗

Integral Heat Transfer Test Method for Determining Thermal Resistance of Silicon Carbide Cladding and Liquid Tin System at Elevated Temperatures - Master's Thesis Presentation University of Idaho

Presentation for master's work at University of Idaho discussing Integral Heat Transfer Test Method for Determining Thermal Resistance of Silicon Carbide Cladding and Liquid Tin System at Elevated Temperatures. Presentation covers slight literature review results/previous work, discussions on system design and approach for thermal property measurement of SiC composite and Tin system, modeling efforts, and results.

36 - MATERIALS SCIENCE↗

Aviation Mission Profile Performance Evaluation in a High Specific Power Surface Permanent Magnet Machine with Additively Manufactured Coils and Integrated Heat Pipes

The purpose of this paper is to accurately evaluate the performance and overall efficiency of an electrical machine driving a propeller (as a part of a hybrid or electric propulsion system) during the flight mission profile using electromagnetic-thermal simulations. The study focuses on a 250 kW, 5000 rpm, 1.25 kHz, 36/30 slot/pole surface permanent magnet (SPM) machine with additively manufactured (AM) hollow conductors and integrated heat pipes (HP). The machine drive parameters (frequency, and current) are tuned to maximize the efficiency for a given flight cycle, while providing the highest specific power (SP) during takeoff. Afterward using Multiphysics simulations, the transient thermal behavior of the machine is studied and temperature profile for different parts of the machine is extracted. Finally, steady-state temperatures during cruising are estimated and overall efficiency is re-evaluated.

additive manufacturing↗

Enhancing building resilience in cold climates: Integrating heat pump technologies with renewable energy

As electrification advances and Cold Climate Heat Pump technology progresses, ensuring grid stability becomes increasingly critical for effective heating in cold climates. However, natural disasters, especially during winter, pose significant threats to grid stability, impacting the reliability of air-source heat pumps. Despite these challenges, the integration of renewable energy sources and storage solutions in heating systems has not been extensively studied within the context of resilience. Here, this paper delves into the literature on renewable-powered heat pumps to assess their potential in enhancing building resilience in U.S. cold climate zones, which are particularly susceptible to extreme weather and grid disruptions. By leveraging renewable sources—solar, geothermal, and water—in conjunction with heat pump technology and supported by thermal or battery storage, this approach aims to provide a dependable solution for maintaining indoor heating during grid failures. Our analysis begins with a review of various renewable energy sources suitable for heat pumps, followed by an exploration of their application in cold climate regions across the U.S., and discussions on potential integration strategies with heat pump systems. This study highlights the advantages and suitability of solar irradiance and geothermal resources, emphasizing the importance of tailored, site-specific assessments to maximize energy efficiency and resilience. Additionally, it outlines the economic and environmental considerations necessary for implementing such systems and identifies potential challenges and areas for future research to facilitate the broader integration of renewable energy in heating solutions for enhanced resilience.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Motorette Thermal Performance Testing and Modeling for an Electric Motor with Additively Manufactured Hollow Conductors with Integrated Heat Pipes

This paper discusses the design, build and test of a motorette to characterize the thermal performance of an additively manufactured coil integrated with heat pipes. The motorette is powered using a variable frequency AC power supply and cooled through two independent cooling systems. The first cooling system cools the stator core using forced convection of air flowing over a finned heat sink mounted on the stator outer diameter. The second cooling system cools the heat pipes using forced convection of 50-50 water ethylene glycol (WEG) mixture flowing through condenser chambers. A 3D thermal FEA model of the setup is built and heat transfer coefficients (HTC) of convective boundaries are computed using coolant flow rates from test data and empirical equations. Temperature at locations on the coil and heat sink are recorded and compared to thermal model predicted values. A maximum temperature error of 22.7% occurs at 180ARMS and 800 Hz operating point for the AM dual coil. The thermal model provides higher temperatures compared to test results and hence it is on the conservative side but in general, there is good correlation between test and model results. Lastly, opportunities for improvement to both test data measurement and 3D thermal FEA modeling are discussed.

additive manufacturing↗

Thermal Management System for an Electric Machine With Additively Manufactured Hollow Conductors With Integrated Heat Pipes

Here, this paper discusses steps taken to develop a novel thermal management system for an aircraft propulsion electric machine containing additively manufactured coils integrated with heat pipes aimed at boosting its specific power. Experimental setups are used to size and characterize heat pipes for the application and 3D thermal finite element analysis is used to determine optimum heat transfer coefficient of the convective boundaries. For some of the convective boundaries, fin-based surface area enhancement is required to reach a target combined overall heat transfer coefficient and surface area performance (UA). This enhancement is worked out using a combination of the Engineering Equation Solver tool and 3D thermal FEA. The thermal management system's UA, and by extension its specific power, sensitivity to coolant temperature is explored. Temperature distribution plots of optimized machine components are also presented and discussed. Lastly, additional heat pipe testing is carried out to study its maximum heat transfer capability's sensitivity to condenser coolant temperature and configuration.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Tank-Integrated Heat Exchanger for Boil-Off Reduction

The following document details the initial efforts of the Protium Company in developing reduced boil-off and zero boil-off liquid hydrogen tanks using Vapor-Cooled Shielding (VCS) technology. The intention is to improve upon the performance characteristics of traditional vacuum-jacketed dewars by reducing boil-off rate, cooldown time, and total boil-off during cooldown time while integrating the heat exchanger into the wall of the VCS tank. The work carried out during this project was limited, as the grant recipient The Protium Company was acquired by Plug Power Inc. on October 1st 2021, early in the performance period of the grant. As such, the extent of the work completed includes an initial estimation of the dimensions needed for a 0.1%/day boil-off VCS liquid hydrogen tank. These dimensions are derived from data gathered from sizes of previous VCS tanks. The dimensions and estimated boil-off rate for the VCS tank are by no means validated, and no design was generated for a zero boil-off tank.

08 HYDROGEN↗

Environmental, Health and Safety Assessment Application of a Heat Integrated, Post-combustion CO2 Capture System Using Monoethanolamine and Hitachi H3-1 Solvent at the E.W. Brown Coal-fired Power Plant

An Environmental Health and Safety (EH&S) Assessment was completed for operation of a pilot scale carbon dioxide (CO2) capture system (CCS) at the Louisville Gas & Electric (LG&E) and Kentucky Utilities (KU) Energy, LLC (LG&E-KU) E. W. Brown Generating Station in Harrodsburg, Mercer County, Kentucky. The pilot system was evaluated using two CO2 capture solvents, monoethanolamine (MEA) and Hitachi’s H3-1 solvent. The purpose of the EH&S Assessment was to determine if there were any unacceptable environmental, health or safety concerns that may prevent operation or environmental permitting of a larger scale pilot scale plant. The assessment included review of process flow diagrams, input and output flow rates for primary materials, literature describing similar processes and chemicals used or created during the process, actual air emission and wastewater test data and air emission calculations. The evaluation included identification of risks related to hazardous chemicals, air emissions, wastewater discharges, solid wastes generated and employee hazards. Most potential EH&S issues that were identified are commonly found and successfully managed at large industrial facilities. No risks were identified that could not be successfully managed or would likely prevent implementation or environmental permitting of the pilot or larger scale plant. Potential exposures and resulting health risks from exposure to low concentrations of nitrosamines generated from degradation of the Hitachi H3-1 and possibly MEA solvents may be a health concern for site workers, but additional investigation is needed to accurately assess this risk. Applying the information gained from operating the pilot plant, performing air emission testing and used solvent testing to a large-scale facility at a commercial coal-fired electric generating plant suggests additional air emission control measures may be necessary to reduce potential site worker health risks and possibly community risks. Depending upon the location and regional air quality, considerable effort may be required to obtain the necessary air permit for construction and operation of a similarly configured large-scale PCCCS facility.

gas separation↗

Environmental, Health and Safety Assessment Application of a Heat Integrated, Post-combustion CO 2 Capture System Using Monoethanolamine and Hitachi H3-1 Solvent at the E.W. Brown Coal-Fired Power Plant

An Environmental Health and Safety (EH&S) Assessment was completed for operation of a pilot scale carbon dioxide (CO 2 ) capture system (CCS) at the Louisville Gas & Electric (LG&E) and Kentucky Utilities (KU) Energy, LLC (LG&E-KU) E. W. Brown Generating Station in Harrodsburg, Mercer County, Kentucky. The pilot system was evaluated using two CO 2 capture solvents, monoethanolamine (MEA) and Hitachi’s H3-1 solvent. The purpose of the EH&S Assessment was to determine if there were any unacceptable environmental, health or safety concerns that may prevent operation or environmental permitting of a larger scale pilot scale plant. The assessment included review of process flow diagrams, input and output flow rates for primary materials, literature describing similar processes and chemicals used or created during the process, actual air emission and wastewater test data and air emission calculations. The evaluation included identification of risks related to hazardous chemicals, air emissions, wastewater discharges, solid wastes generated and employee hazards. Most potential EH&S issues that were identified are commonly found and successfully managed at large industrial facilities. No risks were identified that could not be successfully managed or would likely prevent implementation or environmental permitting of the pilot or larger scale plant. Potential exposures and resulting health risks from exposure to low concentrations of nitrosamines generated from degradation of the Hitachi H3-1 and possibly MEA solvents may be a health concern for site workers, but additional investigation is needed to accurately assess this risk. Applying the information gained from operating the pilot plant, performing air emission testing and used solvent testing to a large-scale facility at a commercial coal-fired electric generating plant suggests additional air emission control measures may be necessary to reduce potential site worker health risks and possibly community risks. Depending upon the location and regional air quality, considerable effort may be required to obtain the necessary air permit for construction and operation of a similarly configured large-scale PCCCS facility.

gas separation↗

Integrated heat and energy recovery ventilator system

A heat recovery ventilator (HRV) and/or energy recovery ventilator (ERV) that integrates with a residential capacity air handling unit (AHU) is embodied in a small footprint HRV or ERV unit that connects directly to the return side of an AHU and to outdoor air inlet and exhaust ducts. The ventilator includes a control system incorporating a processor and sensors that control the operation of the system to provide desired ventilation flow rates under varying conditions.

Puttagunta, Srikanth↗

Quantification of Energy Savings and Demand Reduction for a Heat Pump Integrated with Thermal Energy Storage (Final Report)

To mitigate the variation in demand on the electric grid, thermal energy storage (TES) is an alternative to electric batteries or installing new peaking power plants. Stakeholders and policy makers across the United States have expressed interests in promoting TES, as demonstrated by the US Department of Energy’s Grid-Interactive Efficient Buildings program and the efforts of various state legislatures. However, the cost value provided by TES are unclear. If reliable cost benefits were determined, stakeholders would have a clearer picture of the financial returns that can be gained from their investment in TES. The study in this report is conducted by ORNL with collaboration with Emerson the Helix Innovation Center. In the first part of this report, EnergyPlus was used to perform whole-building simulations for two residential buildings in Indianapolis and Atlanta. The HVAC system in both buildings were equipped with phase change material TES. The TES tank was charged in off-peak hours and discharged in peak hours to perform load shifting. First, the economic value implied by existing time-of-use (TOU) rates offered by utility companies was analyzed via whole-building simulation. Second, existing demand reduction (DR) incentives sourced from 3 different electrical grid administrators (i.e., California, Texas, and New England region) were surveyed to determine their implied value. The study suggests that the traditional value analysis that focuses on ROI for the building owner significantly undervalues TES technology making economic viability difficult. A more comprehensive value analysis that includes peak demand management and deferred capital for peaking power plants shows that TES should be economically viable but here the value is greater for the utility and requires large market penetration and aggregation to fully realize the benefits. Therefore, to facilitate commercialization, new business models are needed that include a broader range of stakeholders and distribute the value of TES proportionally. In the 2 nd part of this project, the benefits of a novel phase change material (PCM) integrated heat pump configuration were evaluated via detailed component based simulation. A one-dimensional PCM heat exchanger model which discretizes the PCM tank and refrigerant tubes into small control volumes is developed. Each control volume can have different PCM temperatures, PCM properties, and heat transfer coefficients. The PCM tank is charged by a wrapped tank condenser and discharged by an internal refrigerant coil. The PCM heat exchanger model is integrated into DOE/ORNL Heat Pump Design Model for heat pump system simulation. To demonstrate the performance of the PCM integrated heat pump, a case study in Chicago was performed. A Time-of-Use utility structure-based control strategy is implemented to schedule the PCM tank charging and discharging mode switching. Compared with a conventional electric heat pump, the PCM integrated heat pump shows superior performance on load shifting and utility cost reduction. As a result, the proposed system demonstrates 24.6% utility saving for cooling application and 25.8% utility saving for heating application.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Model Predictive Control for a Grid-interactive Efficient Thermal Storage-integrated Heat Pump System

Building heating and cooling systems can be used to overcome the mismatch between the intermittent supply of renewable power and the fluctuating demand for electricity. A novel underground thermal energy storage integrated with a dual-source heat pump has been proposed to mitigate the mismatch while meeting the thermal demand of buildings efficiently. Conventional thermostat control with heuristic rules cannot provide intelligent decisions to maximize the thermal efficiency and flexibility of the proposed system. Advanced control strategies like model predictive control (MPC) have provided a new paradigm for grid-interactive efficient building operation with the advancement of computation and sensing. This study developed an MPC for the proposed system to provide grid service for Demand Side Management and minimize the operating cost of building owners. A control-oriented dynamic model of the proposed system has been developed. Given an objective function and proper constraints, an optimization problem is formulated to determine the optimal control strategy of the system. Dynamic Programming is adopted to solve the optimization problem. A rule-based control (RBC) is also developed to achieve similar goals. Short-term simulations are conducted to compare the system performance resulting from the two controls. The simulation results indicate that the MPC performs more intelligently than the RBC in charging thermal energy storage and selecting heat pump sources by taking advantage of the predicted cooling demands of the building and the performance of the integrated system. As a result, the MPC could save energy and reduce operating costs compared with the RBC. A case study shows that, for a 3-day operation, the MPC saves 36.9% energy and reduces 38.5% operating cost compared with the RBC.

Shi, Liang↗

Innovating the next generation of commercial smart building software

Nearly 30% of commercial building energy use is wasted due to equipment faults and HVAC controls problems. The result is increased emissions, compromised comfort and productivity, and less reliable coordination of building power needs with a clean grid. The energy impact alone represents $17 billion in potential savings. Today’s smart building software provides a robust solution to address these operational deficiencies. Energy management and information systems (EMIS) are saving up to 9% on average, with two-year paybacks. They are being incorporated into energy management processes, commissioning services, and utility programs. As effective as they are, two barriers prevent even deeper benefits; limited personnel to fix problems once they are identified, and the expense and time to manually implement changes in control systems. In partnership with the research community, the EMIS industry is developing new capabilities to overcome these barriers. Moving beyond siloed products for either fault detection and diagnostics, or optimal control, these new capabilities empower users to not only automatically identify faults, but also to push corrective action, and control improvements to their buildings. In this paper, several areas for enhancements are documented: ‘one-time’ correction of faults such as setpoints, schedules, and economizer lockouts; short-term active testing for automated proportional integral derivative (PID) loop tuning and functional testing; and continuous supervisory control for demand flexibility and year-round efficiency. Results are presented from a pair of partner implementations out of a dozen providers integrating these enhancements into their products, including field tests from across the country, and insights into operator acceptance and integration into operations and maintenance practices.

Casillas, Armando↗

Heat Integration Optimization and Dynamic Modeling Investigation for Advancing the Coal-Direct Chemical Looping Process

The purpose of the project is to address the optimization and startup operation of a modular coal direct chemical looping (CDCL) combustion system integrated with a steam cycle for power generation to reduce the risks involved in further scale-up of the technology. The modular reactor design of the CDCL process provides flexibility in the fabrication of the reactor and in its operating capacity (i.e. turndown ratio) at the cost of a more complex heat exchange network (HEN) design and integration. To address the technology gaps and advance the efficiency and economic feasibility of the CDCL technology, the project will perform a detailed and comprehensive analysis of the integration of a modular CDCL reactor system and a steam cycle system under both static and transient conditions via HEN process performance simulations and system dynamic modeling, respectively. The scope of work consists of 1) Experimental and computational studies of the CDCL combustor reactor 2) Comprehensive static (i.e. steady-state) system HEN design analysis in CDCL 550 MWe commercial unit for power generation and 3) Dynamic modeling of site specific design of 10MWe CDCL large pilot plant. The project team has successfully developed and validated a kinetic model for the oxidation of oxygen carriers in the combustor using the unreacted shrinking core model (UCSM). The model is capable of capturing the oxidation kinetics of fully or partially reduced oxygen carrier particles. A computational fluid dynamics (CFD) model is developed to simulate the hydrodynamics, heat transfer, and chemical reaction occurring in the CDCL combustor. The model is developed in MFIX and ANSYS Fluent. Key aspects of CDCL combustor operation, including heat transfer, oxygen carrier oxidation, and the transport of oxygen carrier particles, are simulated using this CFD model. The HEN for a commercial scale 550 MWe CDCL power plant is simulated and optimized using ASPEN Plus. Practical design considerations are incorporated based on industrial experiences. The performance and cost for the commercial CDCL plant is updated based on these analyses. A dynamic model for the 10 MWe CDCL pilot plant is developed in ProTRAX simulation software. The model is based on the pilot plant design developed in project DE-FE0027654 “10 MWe CDCL Large Pilot Plang – Pre-FEED Study” and the steam cycle data obtained from Dover Light & Power plant. The transient behaviors during pilot plant load variation are simulated using the dynamic model.

01 COAL, LIGNITE, AND PEAT↗