Search NASA⌕ Search

SEARCH · Search NASA

Results for “Implementation Plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Technology Implementation Plan: Irradiation Testing and Qualification for Nuclear Thermal Propulsion Fuel

This document is a notional technology implementation plan (TIP) for the development, testing, and qualification of a prototypic fuel element to support design and construction of a nuclear thermal propulsion (NTP) engine, specifically its pre-flight ground test. This TIP outlines a generic methodology for the progression from non-nuclear out-of-pile (OOP) testing through nuclear in-pile (IP) testing, at operational temperatures, flows, and specific powers, of an NTP fuel element in an existing test reactor. Subsequent post-irradiation examination (PIE) will occur in existing radiological facilities. Further, the methodology is intended to be nonspecific with respect to fuel types and irradiation or examination facilities. The goals of OOP and IP testing are to provide confidence in the operational performance of fuel system concepts and provide data to program leadership for system optimization and fuel down-selection. The test methodology, parameters, collected data, and analytical results from OOP, IP, and PIE will be documented for reference by the NTP operator and the appropriate regulatory and oversight authorities. Final full-scale integrated testing would be performed separately by the reactor operator as part of the preflight ground test.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

The Department of Energy Savannah River Operations Office Savannah River National Laboratory Unmanned Aircraft System Aviation Implementation Plan

The Department of Energy Savannah River Operations Office Savannah River National Laboratory Unmanned Aircraft System Aviation Implementation Plan was written to provide guidance for the safe, efficient, and lawful operation of the SRNL small Unmanned Aircraft System (sUAS) Program. It shall be the intent of every sUAS remote pilot in command to make reasonable effort not to invade a person's reasonable expectation of privacy when operating the sUAS. SRS sUAS operations will be conducted in accordance all applicable Federal Aviation Administration (FAA), Department of Energy (DOE), and DOE-Savannah River Operations Office (DOE-SR) regulations, policies and procedures. All sUAS operations will be conducted in accordance with the applicable FAA issued DOE Certificate of Authorization (COA) and be approved by the applicable DOE-SR Flight Readiness Review Board (FRRB). The scope of this document is limited to remote pilots in command of sUAS's in support of the DOE, DOE-SR, or SRS missions, research & development (R&D) and national security strategic initiatives supported by SRNL, and other approved missions as required in the US National Airspace (NAS) as defined by the FAA.

99 GENERAL AND MISCELLANEOUS↗

DC Solar for All: Implementation Plan to Scale Low- and Moderate- Income Community Solar + Storage Resilience Hubs in the District of Columbia

This implementation plan discusses the District of Columbia's strategy to combine low-income community solar projects with resilience technologies. Through the technical and financial support offered by the Inclusive Shared Solar Initiative and building on extensive stakeholder engagement in LMI neighborhoods around the District, the District of Columbia team expects to reduce energy burdens for LMI residents, address barriers to and streamline SfA program enrollment, and support the development of innovative benefit delivery models, including a community solar-supported climate resilience center.

14 SOLAR ENERGY↗

Strategic implementation plan

The Life Science Division of the NASA Office of Space Science and Applications (OSSA) describes its plans for assuring the health, safety, and productivity of astronauts in space, and its plans for acquiring further fundamental scientific knowledge concerning space life sciences. This strategic implementation plan details OSSA's goals, objectives, and planned initiatives. The following areas of interest are identified: operational medicine; biomedical research; space biology; exobiology; biospheric research; controlled ecological life support; flight programs and advance technology development; the life sciences educational program; and earth benefits from space life sciences.

Source record↗

Field Implementation Plan for the In-Situ Bioremediation Treatability Study at the Technical Area-V Groundwater Area of Concern

This Field Implementation Plan (FIP) was prepared by Sandia National Laboratories, New Mexico (SNL/NM) and provides instruction on conducting a series of in-situ bioremediation (ISB) tests as described in the Revised Treatability Study Work Plan for In-Situ Bioremediation at the Technical Area-V Groundwater Area of Concern, referred to as the Revised Work Plan in this FIP. The Treatability Study is designed to gravity inject an electron-donor substrate and bioaugmentation bacteria into groundwater via three injection wells to perform bioremediation of the constituents of concern (COCs), nitrate and trichloroethene (TCE), in the regions with the highest concentrations at the Technical Area-V Groundwater (TAVG) Area of Concern (AOC). The Treatability Study will evaluate the effectiveness of bioremediation solution delivery and COC treatment over time. This FIP is designed for SNL/NM work planning and management. It is not intended to be submitted for regulator’s approval. The technical details presented in this FIP are subject to change based on field conditions, availability of equipment and materials, feasibility, and inputs from Sandia personnel and Aboveground Injection System contractor.

54 ENVIRONMENTAL SCIENCES↗

Workshop on Establishing and Operating a National Nuclear Security Support Centre Hypothetical Scenario: “Centralia Nuclear Security Support Centre Strategy Implementation Plan”

[This is part of a hypothetical scenario-based exercise for workshop participants, based on the fictitious country "Centralia."] In prior years, as a part of efforts to strengthen and better sustain nuclear security within the State, Centralia requested through the Integrated Nuclear Security Support Plan (INSSP) framework that the International Atomic Energy Agency (IAEA) conduct an expert mission on establishing and operating a national nuclear security support centre (NSSC). After the IAEA conducted the NSSC expert mission, members of the Centralia Committee on Nuclear Security (CNS) agreed to initiate the feasibility determination phase of establishing an NSSC, in line with the systematic process recommended by the IAEA. Centralia Nuclear Regulatory Authority (CNRA), as the designated lead organization for coordinating the feasibility determination process, prepared a Feasibility Report in collaboration with members of the CNS and based on input gathered among relevant national stakeholders. The report was presented to the National Security Advisor (NSA), who reviewed and approved the proposal for Centralia to proceed with establishing an NSSC. After Centralia moved into the planning phase for the Centralia Nuclear Security Support Centre (CNSSC), per REF, the primary stakeholders of the centre jointly developed this strategy implementation plan, which provides an outline of the organizational structure, needs analysis, programme objectives, financial and project management, risk management, and other key aspects of the centre. This document will be reviewed and updated as necessary on a semi-annual basis during the project implementation period of establishing CNSSC.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Digital recording acquisition subsystem for radio interferometry applications implementation plan

The digital recording acquisition subsystem (DRAS) is a wideband digital recording system that can accommodate data sample rates from 0.125 to 8 MHz in binary increments. The implementation of the DRAS for radio interferometry applications in support of the Crustal Dynamics Project is described. The functional and performance characteristics of the equipment and the key aspects of the implementation plan are discussed.

Kapoor, V. B.↗

Feasibility of remote sensing for detecting thermal pollution. Part 1: Feasibility study. Part 2: Implementation plan

A feasibility study for the development of a three-dimensional generalized, predictive, analytical model involving remote sensing, in-situ measurements, and an active system to remotely measure turbidity is presented. An implementation plan for the development of the three-dimensional model and for the application of remote sensing of temperature and turbidity measurements is outlined.

Veziroglu, T. N.↗

Space Station Furnace Facility Preliminary Project Implementation Plan (PIP). Volume 2, Appendix 2

The Space Station Furnace Facility (SSFF) is an advanced facility for materials research in the microgravity environment of the Space Station Freedom and will consist of Core equipment and various sets of Furnace Module (FM) equipment in a three-rack configuration. This Project Implementation Plan (PIP) document was developed to satisfy the requirements of Data Requirement Number 4 for the SSFF study (Phase B). This PIP shall address the planning of the activities required to perform the detailed design and development of the SSFF for the Phase C/D portion of this contract.

Perkey, John K.↗

Material Protection, Accounting and Control Technologies (MPACT) Implementation Plan: Lab-Scale Demonstration of Advanced Safeguard and Security Systems

The Materials Protection, Accounting, and Control Technologies (MPACT) campaign is working towards the goal of developing and demonstrating the next generation of nuclear materials management for the peaceful use of civilian nuclear energy. A major milestone of the campaign is the “Lab-scale demonstration of an advanced safeguards and security system,” due in 2020. This implementation plan describes how tools developed in the MPACT campaign will be used to meet this milestone. These tools consist of instrumentation and devices as well as computer software for modelling, simulation and integration of data and information for safeguard and security analysis. The plan is focused on demonstrating an advanced safeguard and security systems for electrochemical processing plants, but also identifies activities needed to address advanced reactor, aqueous processing and other advanced fuel cycle facilities. A key component to achieving the 2020 milestone is the development of a virtual distributed test bed that incorporates the instruments, data, analysis tools, and models currently under development and provides a framework to link and normalize the data in a way that simulates a facility, including uncertainty quantification. This virtual distributed test bed will integrate computer simulated facilities that make up a fuel cycle of interest, with distributed test beds located in actual operating facilities and laboratories. The MPACT campaign recently issued roadmaps for both Modelling & Simulation and Advanced Integration which address this component, and activities necessary to achieve the 2020 milestone. Research, development and testing of specific technologies have been supported by the MPACT campaign in coordination with other DOE-NE and DOE-NNSA programs. These technologies provide the essential data needed by the safeguard and security systems, and feed into the data analysis and facility models. This plan will identify these technologies, their current status and activities needed to demonstrate the technologies at the laboratory scale. Wherever possible, test of technologies in field conditions using suitable nuclear materials will be used to define performance. Where necessary, surrogate materials and/or simulation will be used to provide useful information for the demonstration. When completed, the 2020 milestone will provide a demonstration of advanced safeguard and security technologies, including advanced modelling, simulation and analysis approaches, applied to electrochemical processing. It will also identify applications of the technology and approaches in other advanced fuel cycle and reactor concepts.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

Space transfer concepts and analysis for exploration missions. Implementation plan and element description document (draft final). Volume 5: Nuclear electric propulsion vehicle

The nuclear electric propulsion (NEP) concept design developed in support of the Space Transfer Concepts and Analysis for Exploration Missions (STCAEM) study is presented. The evolution of the NEP concept is described along with the requirements, guidelines, and assumptions for the design. Operating modes and options are defined and a systems description of the vehicle is presented. Artificial gravity configuration options and space and ground support systems are discussed. Finally, an implementation plan is presented which addresses technology needs, schedules, facilities and costs.

Source record↗

Space transfer concepts and analysis for exploration missions. Implementation plan and element description document (draft final). Volume 3: Nuclear thermal rocket vehicle

This document presents the nuclear thermal rocket (NTR) concept design developed in support of the Space Transfer Concepts and Analysis for Exploration Missions (STCAEM) study. The evolution of the NTR concept is described along with the requirements, guidelines and assumptions for the design. Operating modes and options are defined and a systems description of the vehicle is presented. Artificial gravity configuration options and space and ground support systems are discussed. Finally, an implementation plan is presented which addresses technology needs, schedules, facilities and costs.

Source record↗

Space transfer concepts and analysis for exploration missions. Implementation plan and element description document (draft final). Volume 4: Solar electric propulsion vehicle

This document presents the solar electric propulsion (SEP) concept design developed as part of the Space Transfer Concepts and Analysis for Exploration Missions (STCAEM) study. The evolution of the SEP concept is described along with the requirements, guidelines and assumptions for the design. Operating modes and options are defined and a systems description of the vehicle is presented. Artificial gravity configuration options and space and ground support systems are discussed. Finally, an implementation plan is presented which addresses technology needs, schedules, facilities, and costs.

Source record↗

Space transfer concepts and analysis for exploration missions. Implementation plan and element description document (draft final). Volume 2: Cryo/aerobrake vehicle

The cryogenic/aerobrake (CAB) and the cryogenic all-propulsive (CAP) concept designs developed in support of the Space Transfer Concepts and Analysis for Exploration Missions (STCAEM) study are presented. The evolution of the CAB and CAP concepts is described along with the requirements, guidelines and assumptions for the designs. Operating modes and options are defined and systems descriptions of the vehicles are presented. Artificial gravity configuration options and space and ground support systems are discussed. Finally, an implementation plan is presented which addresses technology needs, schedules, facilities, and costs.

Source record↗

Tracking and data system support for the Viking 1975 mission to Mars. Volume 1: Prelaunch planning, implementation, and testing

The tracking and data acquisition support for the 1975 Viking Missions to Mars is described. The history of the effort from its inception in late 1968 through the launches of Vikings 1 and 2 from Cape Kennedy in August and September 1975 is given. The Viking mission requirements for tracking and data acquisition support in both the near earth and deep space phases involved multiple radar tracking and telemetry stations, and communications networks together with the global network of tracking stations, communications, and control center. The planning, implementation, testing and management of the program are presented.

Mudgway, D. J.↗

Advanced Simulation and Computing FY18 Implementation Plan, Rev. 0

The ASC Program continues to improve its unique tools to solve stockpile problems— with a focus on sufficient resolution, dimensionality, and scientific detail—to enable Quantification of Margins and Uncertainties (QMU) and to resolve the increasingly difficult analyses needed for stockpile stewardship. The needs of the Directed Stockpile Work (DSW) and major modernization programs also drive the requirements for simulation and computational resources. These requirements include planned LEPs, stockpile support activities, and mitigation efforts against the potential for technical surprise. All of the weapons within the current stockpile are in some stage of the life extension process. The simulation and computational capabilities are crucial for successful execution of these lifetime extensions and for ensuring NNSA can certify these life-extended weapons without conducting a UGT. Specific work activities and scope contained in this Implementation Plan (IP) represent the full-year annual operating plan for FY18. The Initial IP effective October 1, 2017, should be consistent with: 1) the Department’s Base Table when operating under a Continuing Resolution (CR); and 2) the final signed appropriation or full-year CR once enacted.

97 MATHEMATICS AND COMPUTING↗

Advanced Simulation and Computing FY19 Implementation Plan, Rev. 1

The capabilities that the ASC Program provides at the national laboratories play a vital role in the Nuclear Security Enterprise and are necessary for fulfilling the stockpile stewardship and life extension requirements outlined for NNSA. The Program develops modern simulation tools that provide insights into stockpile aging issues, provide the computational and simulation tools that enable designers and analysts to certify the current stockpile and life-extended nuclear weapons, and inform the decision-making process when any modifications in nuclear warheads or the associated manufacturing processes are deemed necessary. Furthermore, ASC is enhancing the predictive simulation capabilities that are essential to evaluate weapons effects, design experiments, and ensure test readiness. The ASC Program continues to improve its unique tools to solve stockpile problems— with a focus on sufficient resolution, dimensionality, and scientific detail—to enable Quantification of Margins and Uncertainties (QMU) and to resolve the increasingly difficult analyses needed for stockpile stewardship. The needs of the Directed Stockpile Work (DSW) and major modernization programs also drive the requirements for simulation and computational resources. These requirements include planned LEPs, stockpile support activities, and mitigation efforts against the potential for technical surprise. All of the weapons within the current stockpile are in some stage of the life extension process. The simulation and computational capabilities are crucial for successful execution of these lifetime extensions and for ensuring NNSA can certify these life-extended weapons without conducting a UGT. Specific work activities and scope contained in this Implementation Plan (IP) represent the full-year annual operating plan for FY19. The Initial IP, effective August 8, 2018, should be consistent with the Department’s Base Table when operating under a Continuing Resolution (CR). The final IP, effective date TBD, is consistent with the final, enacted appropriation.

97 MATHEMATICS AND COMPUTING↗