Search NASA⌕ Search

SEARCH · Search NASA

Results for “Injection Orbit”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

A Mars sample return mission using a rover for sample acquisition

Mission and vehicle concepts are discussed for obtaining surface and subsurface samples of Mars, acquired by a roving vehicle, and returning those samples to earth for detailed analyses in scientific laboratories. Mission options that were traded off in order to arrive at a baseline mission considered most worthy of further study comprised the following: (1) direct entry vs entry out of Mars orbit; (2) direct return from the Mars surface vs rendezvous in Mars orbit and return to earth from there; and (3) propulsive orbit injection and aeroballistic entry (similar to Viking) vs aerocapture into Mars orbit and aeromaneuvering entry. After a comparison of relative merits - based primarily on mass and cost estimates and secondarily on configurational constraints - a baseline mission was selected: out-of-orbit entry, return after Mars orbit rendezvous, and aerocapture/aeromaneuvering. Trajectory design is based on the 1996 launch opportunity. Launch mass requirements for eight mission options, a mission and vehicle description for the baseline mission, and the outline of a mission sequence of events are presented.

De Vries, J. P.↗

LANDSAT-1 and LANDSAT-2 flight evaluation report

The LANDSAT-1 spacecraft was launched from the Western Test Range on 23 July 1972, at 18:08:06.508Z. The launch and orbital injection phase of the space flight was nominal and deployment of the spacecraft followed predictions. Orbital operations of the spacecraft and payload subsystems were satisfactory through Orbit 147, after which an internal short circuit disabled one of the Wideband Video Tape Recorders (WBVTR-2). Operations resumed until Orbit 196, when the Return Beam Vidicon failed to respond when commanded off. The RBV was commanded off via alternate commands. LANDSAT-1 continued to perform its imaging mission with the Multispectral Scanner and the remaining Wideband Video Tape Recorder providing image data.

Source record↗

Magnetospheric Multiscale (MMS) Mission Commissioning Phase Orbit Determination Error Analysis

The Magnetospheric MultiScale (MMS) mission commissioning phase starts in a 185 km altitude x 12 Earth radii (RE) injection orbit and lasts until the Phase 1 mission orbits and orientation to the Earth-Sun li ne are achieved. During a limited time period in the early part of co mmissioning, five maneuvers are performed to raise the perigee radius to 1.2 R E, with a maneuver every other apogee. The current baseline is for the Goddard Space Flight Center Flight Dynamics Facility to p rovide MMS orbit determination support during the early commissioning phase using all available two-way range and Doppler tracking from bo th the Deep Space Network and Space Network. This paper summarizes th e results from a linear covariance analysis to determine the type and amount of tracking data required to accurately estimate the spacecraf t state, plan each perigee raising maneuver, and support thruster cal ibration during this phase. The primary focus of this study is the na vigation accuracy required to plan the first and the final perigee ra ising maneuvers. Absolute and relative position and velocity error hi stories are generated for all cases and summarized in terms of the ma ximum root-sum-square consider and measurement noise error contributi ons over the definitive and predictive arcs and at discrete times inc luding the maneuver planning and execution times. Details of the meth odology, orbital characteristics, maneuver timeline, error models, and error sensitivities are provided.

Chung, Lauren R.↗

Upper stage in-flight retargeting to enhance geosynchronous satellite operations

Real time utilization of propellant reserves that are not needed is available with the implementation of the in-flight retargeting capability for the Centaur Upper Stage. Application to a performance critical, geosynchronous mission is discussed. The operational duration of the satellite may be increased by selectively choosing the appropriate final orbit injection conditions. During ascent Centaur evaluates the amount of propellant excess available and adjusts the final orbit target to consume the excess. Typical satellite mission requirements are introduced to illustrate the mission analysis process to determine the pre-flight nominal target and the in-flight retarget function.

Lee, Otto W. K.↗

Local Time Dependence of Jovian Radio Emissions Observed by Galileo

Galileo has been in orbit around Jupiter since December 1995. All the orbits are equatorial and elliptical, with apogees between 60 R(sub J) - 142 R(sub J) and perigees from 8 - 12 R(sub J). Since orbit injection, the plasma wave instrument (PWS) has been collecting data over specific intervals of each of the orbits at all local times and a range of different radial distances. We present the results of a survey of the data for the frequency range 300 kHz to 5.6 MHz, which includes the hectometric (HOM) and low-frequency decametric (DAM) emissions. The results indicate that both the HOM and DAM emission are more intense and occur more frequently in the midnight sector of Jupiter. This is in analogy to Earth and consistent with a magnetic substorm source for a portion of the radio emissions in this frequency range. Another peak in the power levels is observed on the Jovian dayside in the local time range 11 hrs < LT < 12 hrs. This peak does not have a terrestrial counterpart. We speculate that this dayside peak may be a result of sampling near perigee, but we cannot rule out the possibility that this is not the case.

Menietti, J. D.↗

The Lunar IceCube Mission Design: Construction of Feasible Transfer Trajectories with a Constrained Departure

Lunar IceCube, a 6U CubeSat, will prospect for water and other volatiles from a low-periapsis, highly inclined elliptical lunar orbit. Injected from Exploration Mission-1, a lunar gravity assisted multi-body transfer trajectory will capture into a lunar science orbit. The constrained departure asymptote and value of trans-lunar energy limit transfer trajectory types that re-encounter the Moon with the necessary energy and flight duration. Purdue University and Goddard Space Flight Center's Adaptive Trajectory Design tool and dynamical system research is applied to uncover cislunar spatial regions permitting viable transfer arcs. Numerically integrated transfer designs applying low-thrust and a design framework are described.

Cis-lunar↗

SIMBOL-X: A Formation Flying Mission on HEO for Exploring the Universe

SIMBOL-X is a high energy new generation telescope covering by a single instrument a continuous energy range starting at classical X-rays and extending to hard X-rays, i.e. from 0.5 to 80 keV. It is using in this field a focalizing payload which until now was used for energy below 10 keV only, via the construction of a telescope distributed on two satellites flying in formation. SIMBOL-X permits a gain of two orders of magnitude in sensibility and spatial resolution in comparison to state of the art hard X-rays instruments. The mirror satellite will be in free flight on a high elliptical orbit and will target the object to observe very precisely, thus focusing the hard X-ray emission thanks to this mirror module. At the focal point area which is situated 20 meters behind the mirror satellite, the detector satellite maintains its position on a forced orbit thanks to a radio link with the mirror satellite and a lateral displacement sensor using a beam emitted onboard the mirror satellite. This configuration is said "formation flying". The location of the detector satellite shall be very finely tuned as it carries the focal plane of this distributed telescope. To provide science measurements, the Simbol-X orbit has been chosen High elliptic (HEO), which means elliptical orbit with a high perigee altitude. Preliminary studies where made with an orbit with an altitude of the perigee of 44000km and altitude of the apogee of 253000km. The orbit was seven days ground track repeated in order to maintain a perigee pass over the Malindi ground station to download scientific telemetry. But as studies went on, difficulties in mass budget, link budget, perigee maintenance and formation flying maintenance were raised. This was mainly due to the vicinity of the Moon and its disturbing effect on the satellites orbits. Alternative orbits have been proposed in order to demonstrate the feasibility of the mission. The problematic of bringing the two satellites from their injection orbit to their operational orbit 20 m apart from each other and then maintain this configuration is very challenging. It requires theoretical development of the relative motion between two satellites in high eccentric orbit with large differential disturbance on the two bodies. This paper will present the mission analysis for the Simbol-X satellites with the complex problematic of doing formation flying in high elliptic orbit.

Gamet, Philippe↗

Ascent, abort, and entry capability assessment of a Space Station rescue and personnel/logistics vehicle

The ascent, abort, and entry capability of a vehicle for rescue of the Space Station crew or ferry of personnel and supplies to and from the Space Station are analyzed. The configurations of the Space Station rescue vehicle and the Space Station personnel/logistics vehicle (SSPLV) are discussed and illustrated. The nominal ascent trajectory for the SSPLV delivered to orbit on a Titan II is presented. The ascent abort modes from launch to orbital injection are evaluated. It is shown that five landing sites with runways longer than 10,000 ft could provide a landing opportunity from every orbit of the Space Station in a 220-nmi circular orbit with a 28.5 deg inclination.

Naftel, J. C.↗

Pioneer 6 through 8

The DSN (Deep Space Network) mission support requirements for Pioneer 6, 7 and 8 are summarized. The primary objective of these Pioneer missions is to collect scientific data relative to interplanetary phenomena within a range of approximately 0.8 to 1.2 astronomical units from the sun. Following orbital injection, each spacecraft was oriented with its spin axis normal to the ecliptic plane so that the high gain antenna pattern would be aligned with Earth's orbit. The mission objectives are outlined and the DSN support requirements are defined through the presentation of tables and narratives describing the spacecraft flight profiles; DSN support coverage; frequency assignments; support parameters for telemetry, command and support systems; and tracking support responsibility.

Lozier, D.↗

Maneuver design and implementation for the Mariner 9 mission.

The maneuver strategy and operational techniques employed in controlling the Mariner 9 flight path from earth launch, through interplanetary space, Mars orbit insertion, and the subsequent orbital trim maneuvers are presented. It is shown how the maneuver strategy was tailored to meet the mission requirements with maximum reliability in the presence of launch vehicle injection, orbit determination, and spacecraft maneuver execution errors as great as 3 sigma. The major error sources and constraints are discussed. The in-flight results are summarized and are compared with the preflight predictions.

Mitchell, R. T.↗

Construction of a Direct Water-Injected Two-Stroke Engine for Phased Direct Fuel Injection-High Pressure Charging Investigations

The development of a water injected Orbital Combustion Process (OCP) engine was conducted to assess the viability of using the powerplant for high altitude NASA aircraft and General Aviation (GA) applications. An OCP direct fuel injected, 1.2 liter, three cylinder, two-stroke engine has been enhanced to independently inject water directly into the combustion chamber. The engine currently demonstrates low brake specific fuel consumption capability and an excellent power to weight ratio. With direct water injection, significant improvements can be made to engine power, to knock limits/ignition advance timing, and to engine NO(x) emissions. The principal aim of the testing was to validate a cyclic model developed by the Systems Analysis Branch at NASA Ames Research Center. The work is a continuation of Ames' investigations into a Phased Direct Fuel Injection Engine with High Pressure Charging (PDFI-ITPC).

Somsel, James P.↗

Landsat Data Continuity Mission (LDCM) Ascent and Operational Orbit Design

For the past 40-years, Landsat Satellites have collected Earth's continental data and enabled scientists to assess change in the Earth's landscape. The Landsat Data Continuity Mission (LDCM) is the next generation satellite supporting the Landsat science program. LDCM will fly a 16-day ground repeat cycle, Sun-synchronous, frozen orbit with a mean local time of the descending node ranging between 10:10 am and 10:15 am. This paper presents the preliminary ascent trajectory design from the injection orbit to its final operational orbit. The initial four burn ascent design is shown to satisfy all the LDCM mission goals and requirement and to allow for adequate flexibility in re-planning the ascent.

Mann, Laurie M.↗

Trajectory description

The launch, interplanetary, encounter, and Mars orbit phases of the Viking 1 and 2 spacecraft trajectories are described. Time history plots of several parameters relative to the trajectories are presented along with tables of the geocentric, heliocentric, aerocentric, and injection orbital elements appropriate to each of the spacecraft trajectories.

Farless, D. L.↗

A Method of Implementing Cutoff Conditions for Saturn V Lunar Missions Out of Earth Parking Orbit Assuming a Continuous Ground Launch Window

A method of implementing Saturn V lunar missions from an earth parking orbit is presented. The ground launch window is assumed continuous over a four and one-half hour period. The iterative guidance scheme combined with a set of auxiliary equations that define suitable S-IVB cutoff conditions, is the approach taken. The four inputs to the equations that define cutoff conditions are represented as simple third-degree polynomials as a function of ignition time. Errors at lunar arrival caused by the separate and combined effects of the guidance equations, cutoff conditions, hypersurface errors, and input representations are shown. Vehicle performance variations and parking orbit injection errors are included as perturbations. Appendix I explains how aim vectors were computed for the cutoff equations. Appendix II presents all guidance equations and related implementation procedures. Appendix III gives the derivation of the auxiliary cutoff equations. No error at lunar arrival was large enough to require a midcourse correction greater than one meter per second assuming a transfer time of three days and the midcourse correction occurs five hours after injection. Since this result is insignificant when compared to expected hardware errors, the implementation procedures presented are adequate to define cutoff conditions for Saturn V lunar missions.

PARKING ORBIT↗