Search NASA⌕ Search

SEARCH · Search NASA

Results for “Injection testing”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

In-flight Testing of the Injection of the LISA Pathfinder Test Mass into a Geodesic

LISA Pathfinder is a technology demonstrator space mission, aimed at testing key technologies for detecting gravitational waves in space. The mission is the precursor of LISA, the first space gravitational waves observatory, whose launch is scheduled for 2034. The LISA Pathfinder scientific payload includes two gravitational reference sensors (GRSs), each one containing a test mass (TM), which is the sensing body of the experiment. A mission critical task is to set each TM into a pure geodesic motion, i.e. guaranteeing an extremely low acceleration noise in the sub-Hertz frequency bandwidth. The grabbing positioning and release mechanism (GPRM), responsible for the injection of the TM into a geodesic trajectory, was widely tested on ground, with the limitations imposed by the 1-g environment. The experiments showed that the mechanism, working in its nominal conditions, is capable of releasing the TM into free-fall fulfilling the very strict constraint imposed on the TM residual velocity, in order to allow its capture on behalf of the electrostatic actuation. However, the first in-flight releases produced unexpected residual velocity components, for both the TMs. Moreover, all the residual velocity components were greater than maximum value set by the requirements. The main suspect is that unexpected contacts took place between the TM and the surroundings bodies. As a consequence, ad hoc manual release procedures had to be adopted for the few following injections performed during the nominal mission. These procedures still resulted in non compliant TM states which were captured only after impacts. However, such procedures seem not practicable for LISA, both for the limited repeatability of the system and for the unmanageable time lag of the telemetry/telecommand signals (about 4400 s). For this reason, at the end of the mission, the GPRM was deeply tested in-flight, performing a large number of releases, according to different strategies. The tests were carried out in order to understand the unexpected dynamics and limit its effects on the final injection. Some risk mitigation maneuvers have been tested aimed at minimizing the vibration of the system at the release and improving the alignment between the mechanism and the TM. However, no overall optimal release strategy to be implemented in LISA could be found, because the two GPRMs behaved differently.

LISA↗

Effectiveness of Shield Termination Techniques Tested with TEM Cell and Bulk Current Injection

This paper presents experimental results of the effectiveness of various shield termination techniques. Each termination technique is evaluated by two independent noise injection methods; transverse electromagnetic (TEM) cell operated from 3 MHz 400 MHz, and bulk current injection (BCI) operated from 50 kHz 400 MHz. Both single carrier and broadband injection tests were investigated. Recommendations as to how to achieve the best shield transfer impedance (i.e. reduced coupled noise) are made based on the empirical data. Finally, the noise injection techniques themselves are indirectly evaluated by comparing the results obtained from the TEM Cell to those from BCI.

Bradley, Arthur T.↗

Overview of the Environmental Control and Life Support System (ECLSS) Testing At MSFC

Previously, almost all water used by the crew during space flight has been transported from earth or generated in-flight as a by-product of fuel cells. Additionally, this water has been stored and used for relatively short periods. To achieve the United States' commitment to a permanent manned presence in space, more innovative techniques are demanded. Over 20,000 pounds of water and large quantities of air would have to be transported to the International Space Station (ISS) every 90 days with a corresponding amount of waste returned to earth, for an 8-person crew. This approach results in prohibitive logistics costs, and necessitates near complete recovery and recycling of water. The potential hazards associated with long-term reuse of reclaimed water and revitalized air resulted in the recognition that additional characterization of closed-loop systems and products is essential. Integrated physical/chemical systems have been designed, assembled, and operated to provide air and potable water meeting ISS quality specifications. The purpose of the Environmental Control and Life Support System (ECLSS) test program at NASA's Marshall Space Flight Center is to conduct research related to the performance of the ISS and its Environmental Control components. The ECLSS Test Program encompasses the Water Recovery Test (WRT), the Integrated Air Revitalization Test (IART), and Life Testing, which permits ECLSS design evaluation. These subsystems revitalize air and reclaim waste waters representative of those to be generated on-orbit. This paper provides an overview of MSFC's 1997 ECLSS testing. Specific tests include: the Stage 10 Water Recovery Test; the Contaminant Injection Test; the Performance Enhancement Test and Life Testing of the Four Bed Molecular Sieve; the Oxygen Generator Assembly Life Test; and the ISS Water Distribution Biofilm Life Test.

Traweek, Mary S.↗

Humate Amendment Injection Viability Testing – Supplementary Batch Mixture and Soil Column Studies

Groundwater in the Lost Lake Aquifer Zone (LLAZ) in the Southern Sector of the M-Area Hazardous Waste management Facility (HWMF) is contaminated with chlorinated ethenes, including trichloroethylene (TCE) and tetrachloroethylene (PCE). Treatment of contaminated groundwater with humic acid is being evaluated as a potential corrective action for these volatile organic compounds (VOCs) in the LLAZ in Southern Sector (SRNS, 2019). Pilot scale injections of Huma-K brand humic acid for groundwater treatment were previously performed in M-Area between 2017 and 2020 (Amidon, 2023). Groundwater was extracted from the Lost Lake Aquifer Zone (LLAZ), then a solution of humate was mixed with recovered groundwater and subsequently re-injected into the same aquifer unit. Operations of the historical humate pilot testing were discontinued in 2020 due to COVID-19 restrictions, low injection rates, and recirculation fluid spillage. No further field scale or laboratory research to investigate humate amended groundwater injection was performed at the SRS until 2024. At the request of Area Completion Projects (ACP), the Savannah River National Laboratory (SRNL) performed supplementary testing to help determine the viability of further injection of humate as a remedial option for VOCs within the LLAZ in the Southern Sector of the M-Area HWMF.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Skin factor and potential formation damage from chemical and mechanical processes in a naturally fractured carbonate aquifer with implications to CO 2 sequestration

Here, in this study, we investigate formation damage due to acidization and water injection tests into the naturally fractured carbonate Middle Duperow Formation at Kevin Dome, Montana, potentially diminishing the chance of a future successful Geological Carbon Sequestration (GCS) project. Multiple well-test analytical models, correlated with core description and lithology data, are used to determine flow behavior and communication between the water injection interval and surrounding formations. An improved three-dimensional (3D) geologic model with dual-continuum matrix and fracture properties is constructed based on most recent seismic, core, and water sample measurements. Brine injection is simulated to verify the interpretation from the analytical models, followed by CO 2 injection simulation. Geochemical calculations are performed to understand the in-situ processes that led to formation damage. Our findings suggest: (1) there are two possible scenarios that could lead to a positive total effective skin factor and permeability decline: partial penetration and formation damage; (2) analytical models indicate a positive total skin factor, contradicting results of a previous study suggesting that the well was mildly stimulated; (3) numerical simulation supports the formation damage hypothesis by matching the pressure buildup observed during the latter two brine injection tests; (4) several mechanical and chemical processes may have occurred during injection to clog the matrix/fracture system: anhydrite fines migration and/or calcite precipitation. We then make preventative suggestions for future GCS projects into carbonate reservoirs and remediation recommendations for GCS operation at the Kevin Dome.

54 ENVIRONMENTAL SCIENCES↗

In situ quantification of fracture slip induced by hydraulic injections in a deep borehole: A comparison of two different borehole techniques

In situ measurements of fracture deformation during fluid injection are rare, yet essential for understanding the mechanical response of fractured rock. In this study, we evaluate the reliability of two methods by comparing their slip vector estimates: high-resolution borehole acoustic televiewer images captured before and after injection tests, and displacement data from a three-component borehole deformation probe recorded during the injections. Acoustic televiewer images capture only final in-plane displacement, whereas three-component borehole deformation measurements provide full 3D, transient fracture movement. Four injection tests in a fractured granitic rock mass along an inclined borehole at the Bedretto Underground Laboratory (Switzerland), beneath more than 1100 m of overburden, were analyzed. The two methods yielded consistent kinematics and comparable slip magnitudes, typically in the range of 0.2 – 0.6 mm. Angular differences between estimated slip directions ranged from 0.2° to 28°. For two test intervals with pre-existing fractures optimally oriented for slip, the measured slip vectors agreed with forward-modeled slip vectors based on the regional in situ stress field, supporting the Wallace–Bott hypothesis. Measurable shear displacement was identified in two test intervals containing fractures oriented nearly perpendicular to the least principal stress, including a newly formed hydraulic fracture. This demonstrates that even fractures unfavorably oriented for slip can undergo shear due to local stress perturbations around an inclined borehole.

Acoustic televiewer↗

Midwestern Regional Carbon Sequestration Partnership (MRCSP) Phase III (Development Phase) (Final Report)

The Midwest Regional Carbon Sequestration Partnership (MRCSP) was founded in 2003 as part of the U.S. Department of Energy’s (DOE’s) Regional Carbon Sequestration Partnership (RCSP) Initiative. The public/private consortium, funded through the MRCSP, brings together nearly 40 industry partners in 10 contiguous states in Mid-West and North-East regions. Battelle, as the project lead, oversees research & development, operations, and coordinates activities among various partners. Since its founding, MRCSP has made significant progress towards advancing CCS and CCUS technologies for participating states in the region. Between 2008 to 2020, Phase III of the MRCSP program focused on the development of large-scale injection tests. This report is part of a series of topical reports prepared under the MRCSP Phase III. The MRCSP Final Technical Report summarizes the research conducted while monitoring large-scale injection tests at a CO 2 -EOR facility in Northern Michigan. The project successfully injected more than one million metric tons of CO 2 into depleted oil fields in the Northern Niagaran Pinnacle Reef Trend (NNPRT) for enhanced oil recovery (EOR). These commercial-scale tests provided valuable real-world knowledge that has been used to refine technologies and methods, reduce uncertainties, and demonstrate safety and effectiveness of CCUS technologies to increase public acceptance. The Final Technical Report provides an overview of Phase III efforts including advancing the understanding of the regional geology, storage capacities, deployment of many monitoring and modeling techniques and its efficacy, and technical demonstration of large-scale CO 2 injection, containment, and associated storage in the NNPRT region. Specific topical reports on the subjects covered in the Final Technical Report are also available through EDX/OSTI.

01 COAL, LIGNITE, AND PEAT↗

Chemically Enabled CO 2 -Enhanced Oil Recovery in Multi-Porosity, Hydrothermally Altered Carbonates in the Southern Michigan Basin - Task 2 Topical Report

This attachment A is a detailed Topical Report for Task 2 (Advanced Field Characterization and Machine Learning Based Data Integration) under the project "Chemically Enabled CO 2 -Enhanced Oil Recovery in Multi-Porosity, Hydrothermally Altered Carbonates in the Southern Michigan Basin." The overall project activity and finding, including the field pilot testing of CO 2 injection are summarized in the companion Final Technical Report The Advanced Field Characterization and Machine Learning Based Data Integration task (Task 2) involved a systematic geologic characterization of the Trenton-Black River (TBR) play in the SMB which included the development of comprehensive datasets, advanced data analytics, risk assessment, and piggyback field characterization. These activities aimed to address the complex carbonate systems by evaluating the extent of fractures, dolomitization, facies, and reservoir properties with the primary objective of informing the static and dynamic modeling, field injection test, and providing input into the development strategy plan. The task was divided into four subtasks: • Subtask 2.1 – Data compilation, review, and analysis • Subtask 2.2 – Risk Assessment • Subtask 2.3 – Advanced Field Characterization • Subtask 2.4 – Integrated Physics-Based Machine Learning and Advanced Data Analytics

02 PETROLEUM↗

Performance and automatic calibration scheme of the waveform sampler in the ETROC2 ASIC chip

The waveform sampler in the CMS ETROC2 chip for LGAD gain aging monitoring is a 2.56-GS/s 12-bit 8x-Interleaved ADC that consists of a coarse SAR stage, and a fine stage. This architecture delivers high performance on a relatively modest 65 nm process, while requires finding up to 24 calibration constants through calibration. We developed an automatic calibration method using charge injection test data. After calibration, the baseline random error is reduced by a factor of 2.5–3 compared to the default calibration, and a 5% charge measurement precision is achieved in 15 fC charge injection tests.

Fu, Tao [Unlisted, US]↗

Closed cycle MHD power generation experiments using a helium-cesium working fluid in the NASA Lewis Facility

A MHD channel, which was previously operated for over 500 hours of thermal operation, ten thermal cycles, and 200 cesium injection tests, was removed from the facility and redesigned. The cross sectional dimensions of the channel were reduced to 5 by 16.5 cm to allow operation over a variety of conditions. The redesigned channel has been operated for well over 300 hours, 10 thermal cycles, and 150 cesium injection tests with no problems. Experiments have been run at temperatures of 1900-2100 K and Mach numbers from 0.3 to 0.55 in argon and 0.2 in helium. The best results to date have been obtained in the helium tests. Power outputs of 2.2 kw for tests with 28 electrodes and 2.1 kw for tests with 17 electrodes were realized. Power densities of 0.6 MW/cu m and Hall fields of about 1,100 V/m were obtained in the tests with 17 electrodes.

Sovie, R. J.↗

Ignition overpressure study from solid rocket motor firings

The objective was to investigate, through experimental means, the basic mechanisms influencing ignition overpressure and to determine ways to suppress ignition overpressure. Ignition overpressure was studied using solid rocket motors with geometry scaled at 1 percent of the Shuttle's Solid Rocket Boosters. Both water injection and aerosol foam were examined as a mean of reducing ignition overpressure. The results of the water injection tests indicate that a relatively small amount of water is sufficient to provide significant suppression. Of the flow rates tested, the lower water injection flow rates provided the best reduction of the ignition overpressure wave. Also, the test results show there is an optimum water flow rate range that provides the best suppression, and as this range is exceeded the effectiveness of water to reduce ignition overpressure is decreased. Aerosol foam provided very little reduction of ignition overpressure, but only small volumes of foam were used and further testing is necessary to determine its total effectiveness as a means of suppression.

Counter, Douglas D.↗

Go/No-Go Decision Point 1 Report

To satisfy the G/NG point 1 we have employed GEOS hydraulic fracturing module to simulate one of the Diagnostic Fracture Injection Tests conducted at well 58-32. The hydraulic fracturing solver relies on a finite element discretization of the mechanics fully coupled to a finite volume discretization of the fluid flow. Fractures are explicitly modeled as lower dimensional manifolds and discretized by 2D elements sitting at the boundary of cell elements. We have calibrated our model to reproduce the DFIT corresponding to Zone 2 Cycle 4 of the injection tests that took place at well 58-32.

15 GEOTHERMAL ENERGY↗

Western Sector In-Situ Chemical Oxidation Project: Additional Injection Pilot Testing Supplemental Results (U)

Trichloroethylene (TCE) and tetrachloroethylene (PCE) are persistent at elevated concentrations in the Western Sector of the M-Area Hazardous Waste Management Facility (HWMF) groundwater plume. Migration of these chlorinated ethenes as Dense Non-Aqueous Phase Liquids (DNAPLs) occurred from the M-Area Settling Basin along geologic strata resulting in a high concentration groundwater plume in Western Sector. Pump-and-treat has been active for over 30 years at the M-Area HWMF to hydraulically contain the primary sources of the plume in addition to other remediation strategies throughout the contaminated zone, like soil vapor extraction, dynamic underground stripping, groundwater recirculation wells, and bioremediation. In-situ chemical oxidation (ISCO) has been identified as a viable treatment method for removal of these volatile organic compounds (VOCs) due to the complex lithology and high concentrations in this part of the aquifer. In addition to ISCO, a new recovery well (i.e., RWM018) was also installed in Western Sector to contain the high concentration VOC plume. The ISCO projects have utilized the gradient induced by RWM018 to help plan the injection and monitoring locations. The combination of ISCO and the additional pump and treat in Western Sector with the installation of RWM018 will help to control the plume and maximize remediation efforts.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

High Fidelity Modeling of WELL58-32 DFITS

Between 2017 and 2019, a series of injection tests were performed at pilot vertical well 58-32 at the Utah FORGE site. These injection activities were conducted in three distinct zones, isolated with packers and bridge plugs during the tests. Zone 1 consists of an open-hole section at the toe of the well, whereas Zones 2 and 3 are three-meter long cased and perforated sections. Several injection cycles were conducted in each zone. A detailed description of the geology of the FORGE site, of well 58-32 and of all injection cycles can be found in (Xing et al., 2020). The injection cycles included Diagnostic Fracture Injection Tests (DFITs). DFITs comprise two primary stages: an injection (pump-in) phase, where controlled fluid injection is employed to create a small hydraulic fracture in the surrounding rock, followed by a shut-in phase, where injection ceases, allowing observation of the formation’s pressure response. Utilizing methodologies such as the G-function analysis, DFITs provide valuable insights, including fracture closure pressure and the Instantaneous Shut-in Pressure (ISIP) and can be employed to estimate the minimum horizontal stress.

42 ENGINEERING↗

Recent Developments at the Raft River Geothermal Field

The Raft River geothermal field, located in Cassia County in southwestern Idaho, is the site of a Department of Energy Enhanced Geothermal System project. U.S. Geothermal, Inc. currently produces about 11 MWe from Precambrian metamorphic rocks. These lie beneath ~5,000 ft of Quaternary and Tertiary volcaniclastic and volcanic deposits. Maximum temperatures range from 271°F to 300°F. Well RRG-9 ST1, the well targeted for stimulation is located approximately 1 mile south of the main bore field. The open hole section of the well, from 5,551 to 5,900 ft MD, consists of Precambrian Elba Quartzite, the stimulation target, granite and minor diabase. Prior to setting the casing acoustic, gamma ray, and density logs were run. After completing the well, a step rate/step down test was conducted. The maximum injection rate achieved was 18 bpm at a wellhead pressure of 1,150 psig. A borehole televiewer run in the open hole section showed evidence of more than eighty fractures. The majority of these fractures trend from N20⁰W to N20°E and dip from 40° to 60°W. Permeable fractures were encountered in the Elba Quartzite at 5,640-5,660 ft MD. Analysis of the injection test indicates that the minimum in-situ principal stress in this zone is 3,050-3,200 psi, corresponding to a fracture gradient of 0.59-0.62 psi/ft. A discrete fracture network model was developed using measured and inferred fracture orientations, distributions and dimensions. A three-phase stimulation program is proposed for RRG-9 ST-1. During the first two stages, water at 140°F, and later 40°F, will be injected to pre-condition and thermally fracture the reservoir. Here, the third stage will consist of a high rate, large volume conventional hydraulic stimulation.

Bradford, Jacob↗

Coupling Factor Determination in the Control of Unintentionally Generated RF Fields

Radiated emissions and susceptibility requirements imposed in bands where intentional RF reception or transmission does not occur is problematical. It is often desired to compare radiated emissions with radiated susceptibility performance to assess system level compatibility. For reasons purely theoretical and because of practical measurement limitations, this not realistic. McCollum and Clark proposed a limit and test method that provided a direct comparison of radiated emissions and radiated susceptibility performance in those cases where only unintentional emissions and reception are of interest (non-tunable electronics). This test method, referred to as bulk current emissions (BCE) testing, and its associated limit is a complementary test method to bulk current injection testing and radiated susceptibility testing. Previous work utilized victim and culprit circuits with low common-mode loop impedance. Forward work identified in this publication was to determine how different loop impedance on culprit and victim circuits affected cable-to-cable coupling and the corresponding BCE test limit. Cable coupling factors for victim and culprit circuits with different loop impedance are investigated.

McCollum, Matthew B.↗

Utah FORGE: Phase 2C Topical Report

This is the topical report that wraps up the work and results achieved during Utah FORGE Phase 2C. The zip file includes several folders containing (1) an overview; (2) the results; (3) the lessons learned; and (4) the conclusions. It also contains a folder containing appendices including (1) the updated permitting inventory; (2) the updated site characterization data inventory; (3) the updated conceptual geological model; and (4) the stakeholders engagement and outreach status.

15 GEOTHERMAL ENERGY↗

MRCSP Final Technical Report

Final technical report discussing the project background, the Michigan Basin large scale injection test, regional analyses, and additional studies.

background↗