Search NASA⌕ Search

SEARCH · Search NASA

Results for “Installation Testing”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

HydraGNN v5.0

HydraGNN v5.0 expands the code base into a more portable, scalable, and flexible framework for scientific graph learning, with particular strength in atomistic machine-learning interatomic potentials and large-scale distributed training. The release adds Fully Sharded Data Parallel (FSDP) support alongside existing DDP and DeepSpeed paths, including FSDP-aware checkpointing and optimizer integration, and introduces a configurable multi-precision training workflow supporting FP32, BF16, and FP64 across GPUs and Intel XPUs. For atomistic modeling, HydraGNN v5.0 strengthens its MLIP capabilities through dynamic graph construction at every forward pass, energy-conserving force prediction via automatic differentiation, and per-atom energy loss formulations, while extending EGNN models to properly handle periodic boundary conditions. The release also broadens model expressiveness through graph-level attribute conditioning, adds new multi-task and model-parallel extensions such as MACE support and encoder/decoder branch optimization, and expands application coverage with integrated examples for datasets including OC25, Nabla2-DFT, QCML, Open Polymers 2026, and OPF. In parallel, HydraGNN v5.0 improves production readiness through performance optimizations for large-scale runs, stratified sampling and linear-regression preprocessing utilities, and tested installation scripts for DOE supercomputers including Frontier, Aurora, Perlmutter, and Andes. Overall, the release advances HydraGNN as a robust software platform for scalable graph neural networks across materials science, chemistry, and scientific machine learning workflows

Lupo Pasini, Massimiliano [Oak Ridge National Labo↗

Lessons from commissioning of the cryogenic system for the Short-Baseline Neutrino Detector at Fermilab

Results from commissioning and first year of operations of the cryogenic system of the Short-Baseline Neutrino Detector (SBND) and its membrane cryostat installed at the Fermi National Accelerator Laboratory are described. The SBND detector is installed in a 200 m$^3$ membrane cryostat filled with liquid argon, which serves both as target and as active media. For the correct operation of the detector, the liquid argon must be kept in very stable thermal conditions while the contamination of electronegative impurities must be consistently kept at the level of small fractions of parts per billion. The detector is operated in Booster Neutrino Beams (BNB) at Fermilab for the search of sterile neutrinos and measurements of neutrino-argon cross sections. The cryostat and the cryogenic systems also serve as prototypes for the much larger equipment to be used for the LBNF/DUNE experiment. Since its installation in 2018-2023 and cooldown in spring of 2024, the cryostat and the cryogenic system have been commissioned to support the detector operations. The lessons learned through installation, testing, commissioning, cooldown, and initial operations are described.

43 PARTICLE ACCELERATORS↗

Fort Mojave Indian Tribe Aha Macav Power Service Renewable Energy Project

Aha Macav Power Service (AMPS), on behalf of the Fort Mojave Indian Tribe received a Department of Energy Solar grant. Partnering with Stockbridge Energy Group and the Department of Energy, AMPS was able to construct, install, test and successfully put into operation a 2.3 MW solar field. As provided in the solar data, this project has helped to offset the cost of open market purchase power needed to meet the needs of the Tribe. The estimated value of the solar energy produced in FY2021 currently is more than $294,000. Eventual expansion of the solar project is projected to create future energy independence for the Fort Mojave Indian Tribe.

14 SOLAR ENERGY↗

A New Plasma Radar Concept for Simultaneous Magnetic and Density Measurements

An innovative, compact 288GHz interferometer has been fabricated, tested, installed and successfully demonstrated on the LAPD-U magnetized plasma at UCLA. The system takes advantage of frequency modulated (FM) radar techniques to deliver a compact heterodyne system. In addition, the reflected power from the source is taken advantage of to eliminate the need for additional quasi-optical components. Electron density in LAPD-U plasma has recently been increased substantially thereby requiring a higher frequency/shorter wavelength interferometer to avoid deleterious refractive effects. This system satisfies those needs. The system uses a 96GHz varactor tuned Gunn oscillator which passes to a passive tripler. This tripler has ~3% conversion efficiency. The 288GHz radiation is then coupled to free space using a so-called dual-mode or Pickett horn. The output 288GHz beam is then coupled to an aspheric lens manufactured from low-loss, high-density polyethylene. This lens is employed to collimate the emerging beam. Small axial adjustment of the lens position can also be used to create a slowly focusing beam so as to optimize the measured signal. In addition, up-down or side-to-side adjustment of the lens can be utilized to steer the beam vertically or horizontally – again to optimize alignment. The propagating beam passes through a beam splitter and then through a water-free, bubble-free fused quartz window into the LAPD-U vacuum vessel. The beam-splitter is a thin sheet of G10 which reflects a small fraction of the incident power (~5 %) towards a zero-bias detector optimized for the frequency range from 220 to 300GHz. Note that waveguides at this frequency have dimensions of ~0.9mm x 0.45mm and so have very large conductive losses. This drives the use of quasi-optical propagation. The detector requires no DC bias and is very responsive (> 1V/mW into 1MΩ). Radiation is coupled to the detector via a similar lens-horn arrangement used for the launch. This reflected beam acts as the local oscillator or reference millimeter-wave beam for the detector. The remainder of the launched source beam then enters the LAPD-U vacuum vessel and passes through the plasma at the mid-plane until reaching the opposing port which is closed off with an aluminum flange. This flange is used as a mirror to retroreflect the incident 288GHz beam back along its path. The retroreflected beam exits the input port but does NOT couple directly into the zero-bias detector. Instead, the majority of the return power continues towards the 288GHz source. As mentioned above the transmitted beam enters the source a second time. This would appear undesirable. However, at these frequencies multipliers are highly non-linear elements which results in a significant portion of the return beam (~20%) re-emerging from the multiplier and horn and then coupling via the G10 beam-splitter to the zero-bias detector. This approach eliminated the need for a second quasi-optical beam-splitter. The system is extremely compact measuring approximately 28 inches x 20 inches. The above did not explain how heterodyne operation was achieved. As mentioned above the Gunn oscillator is able to be varactor tuned. This allows a low voltage to be applied to control the operating frequency of the Gunn oscillator. During heterodyne operation a sawtooth shaped voltage is applied to the varactor at 750kHz using an 80MHz Arbitrary Waveform Generator (AWG). This voltage changes the Gunn frequency linearly during the up-sweep which is then reset abruptly at the sawtooth crash to be immediately followed by another linear sweep. Passage through the 288GHz multiplier triples the frequency change experienced by the electromagnetic wave. These frequency changes are small – tens of megahertz. This FM radar approach results in the launched electromagnetic wave frequencies at the detector for the reference and plasma wave to be different. The approximately 10 ns delay propagation delay for the plasma beam results in the local oscillator and plasma beams NOT having an identical frequency – there is in fact a fixed difference frequency. The frequency tuning level of the Gunn oscillator is then adjusted so that there is ONE cycle of this difference frequency during each linear ramp. During the sawtooth crash or downward re-sweep this one cycle replays in reverse but on a very fast timescale. The process then repeats. Low-pass filtering eliminates the fast re-sweep to leave a pure sine wave heterodyne signal. When the plasma is present it introduces a phase delay in the sine wave (caused by the extremely small Doppler shift resulting from the optical path length change). Of course, to measure this phase change we need a reference. This is simply obtained from an arbitrary waveform generator which provides a synchronized output pulse train which again is low pass filtered to obtain a 750kHz sinusoidal voltage reference for the interferometer. The interferometer was installed on LAPD-U where it has worked reliably and has established that electron densities exceeding 1x10 13 cm -3 are routinely achieved. In addition, the system sensitivity was able to easily observe density fluctuation at frequencies up to 50kHz. FM Radar techniques have enabled a full demonstration of a compact, sensitive, high frequency (288GHz/1mm) heterodyne interferometer.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Saving Energy, Saving Money [Slides]

Make sure you have CO detectors installed; Test batteries regularly; Have your furnace serviced annually; Don’t use grills or generators indoors.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Overview and Status of the Long-Baseline Neutrino Facility Far Detectors Cryogenics System

The Sanford Underground Research Facility (SURF) will host the Far Detectors of the Deep Underground Neutrino Experiment (DUNE), an international multi-kiloton Long-Baseline neutrino experiment that will be installed about a mile underground in Lead, SD. Detectors will be located inside four cryostats filled with almost 70,000 metric tons of ultrapure liquid argon, with a level of impurities lower than 100 parts per trillion of oxygen equivalent. The cryogenics infrastructure supporting this experiment is provided by the Long- Baseline Neutrino Facility (LBNF). This contribution presents modes of operation, layout and main features of the LBNF Far Detectors cryogenics system, which is composed of the following subsystems: argon receiving facilities, nitrogen system, argon distribution system, argon purification and regeneration systems, argon circulation system, argon condensers system, internal cryogenics, miscellaneous items, and process controls. An international engin eering tea m is designing these systems and will manufacture, install, test, commission, and qualify them. This contribution describes the main features, performance, functional requirements, and modes of operation of the LBNF Far Detectors cryogenics system. It also presents the status of the design, along with present and future needs to support the DUNE experiment.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Lessons from commissioning of the cryogenic system for the Short-Baseline Neutrino Detector at Fermilab

Results from commissioning and first year of operations of the cryogenic system of the Short-Baseline Neutrino Detector (SBND) and its membrane cryostat installed at the Fermi National Accelerator Laboratory are described. The SBND detector is installed in a 200 m3 membrane cryostat filled with liquid argon, which serves both as target and as active media. For the correct operation of the detector, the liquid argon must be kept in very stable thermal conditions while the contamination of electronegative impurities must be consistently kept at the level of small fractions of parts per billion. The detector is operated in Booster Neutrino Beams (BNB) at Fermilab for the search of sterile neutrinos and measurements of neutrino-argon cross sections. The cryostat and the cryogenic systems also serve as prototypes for the much larger equipment to be used for the LBNF/DUNE experiment. Since its installation in 2018-2023 and cooldown in spring of 2024, the cryostat and the cryogenic system have been commissioned to support the detector operations. The lessons learned through installation, testing, commissioning, cooldown, and initial operations are described.

Geynisman, Michael [Fermilab]↗

High Pressure Hydrogen Nozzle Assembly and Dispenser for Heavy Duty Vehicles (Final Technical Report)

Electricore, Inc. along with partners Bennett Pump Company (Bennett), WEH Technologies, Inc. (WEH), National Renewable Energy Laboratory (NREL), and Quong & Associates, Inc. (QAI) have developed a high-pressure hydrogen nozzle assembly and dispenser for heavy-duty (HD) vehicles. The system was installed, tested and demonstrated at NREL’s Hydrogen Infrastructure Testing and Research Facility (HITRF). The system was designed to have a maximum operating pressure of 87.5 MPa and an approximate average flow rate of 10 kg/min over 10 minutes at fuel temperatures of -40°C. To further develop the specifications and design of the system, the team performed an industry survey to ensure the system met the needs of potential users.

08 HYDROGEN↗

FINAL TECHNICAL AND ECONOMIC FEASIBILITY STUDY ON THE APPLICATION OF A HEAT INTEGRATED POST-COMBUSTION CO2 CAPTURE SYSTEM WITH HITACHI ADVANCED SOLVENT INTO EXISTING COAL-FIRED POWER PLANT

This report contains the results of a techno-economic assessment (TEA) conducted of a heat integrated post-combustion CO2 capture process with Hitachi advanced solvent for retrofit into an existing coal-fired power plant (but treated as greenfield plant on cost analysis). The process has been developed by the University of Kentucky Center for Applied Energy (UK CAER). EPRI was chiefly responsible for this analysis, with significant input from WorleyParsons, Hitachi Power Systems America (Hitachi) and UK CAER. The project also involves the design, fabrication, installation, testing, and analyses of a slipstream facility located at L&GE-KU’s E.W. Brown Generating Station to demonstrate the UK CAER carbon capture system that could utilize heat integration with the main power plant. The design, start-up, and baseline of the pilot system was performed with a generic 30 wt% MEA solvent to obtain data for direct comparison with the DOE/NETL Reference Case followed by testing Hitachi’s proprietary solvent H3-1. In this techno-economic analysis, two cases utilizing the UK CAER process are compared, using different approach temperatures and solvent, against the DOE/NETL Reference Case (Case 10). The results are shown comparing the energy demand for post-combustion CO2 capture and the net higher heating value (HHV) efficiency of the power plant integrated with the post-combustion capture (PCC) plant. A levelized cost of electricity (LCOE) assessment was performed showing the costs of the options presented in the study. The key factors contributing to the reduction of LCOE were identified as CO2 partial pressure increase at the flue gas inlet, thermal integration of the process, and performance of the Hitachi H3-1 solvent. Recent UK CAER process pilot-scale testing data and process simualtion data showed that the packing heights of absorber and stripper columns were significantly oversized in the prelimanary TEA (Task 2 of this project) and thus updated in this final TEA for the H3-1 case only. In addition, the solvent make-up cost for H3-1 was updated based on lattest test results. Finally, a heat integration with the main power plant was applied in this final TEA to increase overall energy effciency for both the MEA and H3-1 cases. Additonal reductions in capital and operational costs are expected but not taken into account here. Shorter columns result in reduced pressure drops, smaller blower head and pump hydraulic head requirements. An increase in overall energy efficiency resuls in a decreased size of the power plant, the CCS and a reduced parasitic steam requirement to the CCS. The net efficiency of the UK CAER integrated PC power plant with CO2 capture changes from 26.2% for the Reference Case 10 plant in 2010 revised DOE/NETL baseline report to 27.6% for the MEA options considered, and 29.1% for the options utilizing the Hitachi advanced solvent. The UK CAER Process + Hitachi case also produces an extra 30.9 MW of generation compared to the UK CAER Process + MEA case and total 60.9 MW more than DOE Case 10. LCOE ($/MWh) values are $172.08/MWh for the MEA option and $157.65/MWh for the Hitachi H3-1 solvent cases considered in comparison to $189.59/MWh in January 2012 dollar for the Reference Case 10. The UK CAER CCS process with MEA case lowers energy consumption for CO2 capture to 1340 Btu/lb-CO2 captured as compared to 1540 Btu/lb-CO2 in the Reference Case 10. The UK CAER CCS process with H3-1 case further lowers energy consumption for CO2 capture to 973 Btu/lb-CO2 captured, for an advantage of 36.8% less energy consumption than Case 10. The study also shows 38.1% less heat rejection associated with the carbon capture system from 3398 MBtu/hr (Case 10) to 2104 MBtu/hr for the UK CAER + MEA system. Heat rejection is reduced to 2464 MBtu/hr in the UK CAER + H3-1 case, for a 27.5 % decrease compared to Case 10. Modeling outputs show that in the UK CAER process, the cooling water that is 2-5°C cooler than conventional cooling tower water can be achieved for ambient conditions common to the midwest and other regions. The results from the techno-economic assessment show that the proposed technology can be investigated further as a viable alternative to conventional CO2 capture technology. The evaluation also shows the effect of the critical parameters on the LCOE, with the main variables being the approach temperature and CO2 partial pressure increase at the flue gas inlet. A summary of the key advantages of the UK CAER Process + H3-1 case for LCOE and other economic factors compared to the DOE Case 10 is as follows: • A lower variable operating cost by $1.56/MWh ($1.08MWh less than the UK CAER Process + MEA Case), a 11.7% reduction compared to the DOE Case 10 • A lower COE by $25.32MWh ($13.94/MWh lower than the UK CAER Process + MEA Case), a 16.9% reduction compared to the DOE Case 10 • A lower LCOE by $31.94/MWh ($17.51/MWh lower than the UK CAER Process + MEA Case), a 16.9% reduction compared to the DOE Case 10 • A lower cost of CO2 captured by $18.65/tonne CO2 ($9.44/tonne CO2 lower than the UK CAER Process + MEA Case), a 30.4% reduction compared to the DOE Case 10 • A lower cost of CO2 avoided by $34.95/tonne CO2 ($18.53 tonne CO2 lower than the UK CAER Process + MEA Case), a 38.7% reduction compared to the DOE Case 10

Bhown, Abhoyjit S.↗

Delivery of a Solar-Powered Forward Osmosis Seawater Desalination Plant: Trevi’s 500 m3/day Zero-Carbon FO Seawater Desalination Plant at NELHA

This paper presents an account of Trevi’s delivery of a 500 m3/day solar powered forward osmosis (FO) seawater desalination plant at the Ocean Science and Technology Park of the Natural Energy Laboratory of Hawaii Authority (NELHA). The project aimed to demonstrate the viability of solar thermal-powered desalination for agricultural applications through the integration of a 2MW micro-dish solar thermal array with a state-of-the-art FO system. Highlighted in the paper are the three distinct project phases; Planning and Design, System Construction, Installation & Testing followed finally by System Operation and Optimization. Results and decisions which led to the final plant design will be shared, highlighting how Trevi Systems succeeded in producing a zero-carbon FO seawater desalination plant with a projected Levelized Cost of Water (LCOW) estimate competitive with existing carbon-intensive RO technologies (based on some assumptions and the cost of heat which is required for FO.

14 SOLAR ENERGY↗

Fabrication of the Fermilab Pre-Series Cold Mass for the HL-LHC Accelerator Upgrade Project

Fermilab is fabricating ten full length cold masses for the high-luminosity Large Hadron Collider Accelerator Upgrade Project (HL-LHC AUP). One practice assembly and one pre-series assembly have been completed. Here this paper summarizes the construction details. Topics include incoming inspection, bus assembly, component machining, shell forming, beam tube insertion, bus expansion loop installation, instrumentation installation, electrical testing, heat exchanger installation and final assembly welding. In-process surveys, alignment measurements and testing are presented and explained. Problems encountered during construction and their solutions are discussed.

43 PARTICLE ACCELERATORS↗

Installation, commissioning, and testing of the HB650 CM at PIP2IT

The Proton Improvement Plan-II (PIP-II) is a major upgrade to the Fermilab accelerator complex, featuring a new 800-MeV Superconducting Radio-Frequency (SRF) linear accelerator (LINAC) powering the accelerator complex to provide the world’s most intense high-energy neutrino beam. This paper describes the conversion of the PIP-II Injector Test Facility (PIP2IT) cryogenic system into a test stand for PIP-II High-Beta 650 MHz (HB650) cryomodules at Fermilab’s Cryomodule Test Facility (CMTF). A description of the associated mechanical, electrical, and controls modifications necessary for testing HB650 cryomodules are provided. The cooldown and warmup requirements, procedures and associated controls logic is described.

43 PARTICLE ACCELERATORS↗

VERA Installation Guide

This guide describes the structure and setup of the standard VERA development environment (VERA Dev Env) and standard VERA Third Party Libraries (TPLs) that need to be in place before installing many of the VERA simulation components. It describes everything from the initial setup on a new machine to the final build, testing, and installation of VERA components. The goal of this document is to describe how to create the directories and contents outlined in 'Standard VERA Dev Env Directory Structure' and then obtain the remaining VERA source and build, test, and install any of the necessary VERA components on a given system. This document describes the process both for a development version of VERA and for a released tarball of the VERA sources.

97 MATHEMATICS AND COMPUTING↗

FAST-1.2 User Installation and Verification Guide: Developed Under NQA-1-2017

The purpose of this document is to provide the user information about the installation of Fuel Analysis for Steady state and Transient (FAST)-1.2 on their computers or servers. General information about the code and supported operating systems is described in Section 1.0. Self-service oriented FAST-1.2 software licensing steps are described in Section 2.0. An installation verification test suite is provided with FAST-1.2 and described in Section 3.0. A convenience script for converting Fuel Rod Analysis Program – Constant (FRAPCON) to FAST inputs is discussed in Section 4.0. FAST-1.2 was developed and released under a software quality assurance program based upon NQA-1-2017 at Pacific Northwest National Laboratory (PNNL). FAST-1.2 is the latest baseline code. The installation verification test suite contains both steady state and transient Anticipated Operation Occurrences (AOOs), accident conditions, such as Reactivity Initiated Accidents (RIAs) and Loss of Coolant Accidents (LOCAs).

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

FAST-1.0.1 User Installation and Verification Guide

The purpose of this document is to provide the user information about the installation of FAST-1.0.1 on their computers or servers. General information about the code and supported operating systems is described in Section 1.0.1. Self-service oriented FAST-1.0.1 software licensing steps are described in Section 2.0. An installation verification test suite is provided with FAST-1.0.1 and described in Section 3.0. A convenience script for converting FRAPCON to FAST inputs is discussed in Section 4.0. FAST-1.0.1 was developed and released under a software quality assurance program based upon NQA-1-2017. FAST-1.0.1 is the latest baseline code and the result of a bug fixes to FAST-1.0 with other software and methodology developments. The installation verification test suite contains both steady state and transient Anticipated Operation Occurrences (AOOs). Capability to model accident conditions, such as Reactivity Initiated Accidents (RIAs) and Loss Of Coolant Accidents (LOCAs), are targeted for a later release of FAST. FRAPTRAN-2.0 will continue to be used for accident conditions until the release of FAST with accident condition modeling capabilities.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Heavy Duty Natural Gas Single Cylinder Research Engine Installation, Commissioning, and Baseline Testing

Natural Gas (NG) Internal Combustion Engines (ICE) are a promising alternative to diesel engines for on-road heavy-duty applications to reduce greenhouse gas and harmful pollutant emissions. NG engines have not been widely adopted due to the lower thermal efficiency compared with diesel engine counterparts. To develop the base knowledge required to reach the desired efficiency, a Single Cylinder Engine (SCE) is the most effective platform to acquire reliable and repeatable data. A SCE test cell was developed using a Cummins 15-liter six-cylinder heavy-duty engine block modified to fire one cylinder (2.5-liter displacement). A Woodward Large Engine Control Module (LECM) is integrated to permit implementation of real-time advanced combustion control. Intake and exhaust characteristics, fuel composition, and exhaust gas recirculated substitution rate (EGR) are fully adjustable. A high-speed data acquisition system acquires in-cylinder, intake, and exhaust pressure for combustion analysis. The baseline testing shows reliable and consistent results for engine thermal efficiency, indicated mean effective pressure (IMEP), and coefficient of variance of the IMEP over a wide range of operating conditions while achieving effective control of all engine control and operation variables. This test cell will be used to conduct a research program to develop new and innovative control algorithms and CFD optimized combustion chamber designs, allowing ultra-high efficiency and low emissions for NG ICE heavy-duty on-road applications.

03 NATURAL GAS↗