Search NASA⌕ Search

SEARCH · Search NASA

Results for “Installation and Assembly”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Installation of the Dark Energy Spectroscopic Instrument at the Mayall 4-meter telescope

The Dark Energy Spectroscopic Instrument (DESI) is a Stage IV ground-based dark energy experiment that will measure the expansion history of the Universe using the Baryon Acoustic Oscillation technique. The spectra of 35 million galaxies and quasars over 14000 square degrees will be measured during the life of the experiment. We describe the installation of the major elements of the instrument at the Mayall 4m telescope, completed in late 2019. The previous prime focus corrector, spider vanes, and upper rings were removed from the Mayall’s Serrurier truss and replaced with the newlyconstructed DESI ring, vanes, cage, hexapod, and optical corrector. The new corrector was optically aligned with the primary mirror using a laser tracker system. The DESI focal plane system was integrated to the corrector, with each of its ten 500-fiber-positioner petal segments installed using custom installation hardware and the laser tracker. Ten DESI spectrographs with 30 cryostats were installed in a newly assembled clean room in the Large Coude Room. The ten cables carrying 5000 optical fibers from the positioners in the focal plane were routed down the telescope through cable wraps at the declination and hour angle axes, and their integral slitheads were integrated with the ten spectrographs. The fiber view camera assembly was installed to the Mayall’s primary mirror cell. Servers for the instrument control system replaced existing computer equipment. The fully integrated instrument has been commissioned and is ready to start its operations phase.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Automated installation of large platform utilities

The capabilities of the assembler in installing nonstructural platform systems were assessed. These systems include electrical power distribution, heat transport, command and data signal transmission, and payload data transmission. The effects of including installation of utilities on the assembly process and on the design, operation, and performance of the assembler were evaluated. In addition, any special requirements on the assembler and/or the platform due to the installation of utilities were identified. The procedure followed was to define a set of candidate utility characteristics and installation requirements, define and design installation concepts, and perform an assessment of impacts on the assembler and its operation.

Vernon, R. M.↗

Panel installation development in Automated Structures Assembly Lab

The design requirements for panel installation process are listed and photographs are presented of the following: panel latches to truss via adaptors; panel end effector; arm retrieving panel from canister; arm installing panel; and facility view with panel installed.

Cuong Quach↗

Development of termination and utilization concepts for flat conductor cables. Volume 3: Cost study comparison, flat versus round conductor cable

A cost study comparing flat conductor cable (FCC) with small-gage wire (SGW) and conventional round conductor cable (RCC) is presented. This study was based on a vehicle wiring system consisting of 110,000 ft of conventional RCC equally divided between AWG sizes 20,22, and 24 using MIL-W-81044-type wire and MIL-C-26500 circular connectors. Basic cost data were developed on a similar-sized commercial jet airplane wiring system on a previous company R&D program in which advanced wiring techniques were carried through equivalent installations on an airplane mockup; and on data developed on typical average bundles during this program. Various cost elements included were engineering labor, operations (manufacturing) labor, material costs, and cost impact on payload. Engineering labor includes design, wiring system integration, wiring diagrams and cable assembly drawings, wire installations, and other related supporting functions such as the electronic data processing for the wiring. Operations labor includes mockup, tooling and production planning, fabrication, assembly, installation, and quality control cost impact on payload is the conversion of wiring system weight variations through use of different wiring concepts to program payload benefits in terms of dollars.

Source record↗

Rotation Fixture Tooling

Lawrence Livermore National Lab has a need to rotate a device 180 degrees partway through device assembly to install components located on the opposite side of the assembly. This rotation operation must be done in a controlled matter to ensure safe handling of the device, which contains delicate instrumentation and hazardous materials. These devices can take several years and millions of dollars to design, manufacture, and build. The device may weigh up to 200 lbs, which exceeds the laboratory limit of 50 lbs for a one man manual lift or 100 lbs for a two man manual lift. In the past, an overhead crane and come-alongs were used to rotate the device, which was a complex operation that presented more opportunities for mistakes than the desired solution. Complexities of the prior solution include the required proper come-along set-up by skilled workers, several come-along configurations during the rotation of the device, and limited control during the rotation operation. A simpler engineered solution is desired.

42 ENGINEERING↗

Method for providing concentricity of pilot fuel assembly in a combustor

Concentric installation of a pilot fuel assembly in an opening in a gas turbine combustor casing is achieved by providing a boss having at least two flat surfaces which are perpendicular to each other on the combustor casing surrounding the opening and a mounting flange having at least two flat surfaces which are perpendicular to each other on the pilot fuel assembly. The pilot fuel assembly is concentrically installed to the combustor casing by inserting the assembly into the combustor casing opening, and moving the pilot fuel assembly as far as it will go in a first direction substantially parallel to one of the flat boss surfaces. The distance between the other flat boss surface and one of the flat flange surfaces is then taken. Next, the pilot fuel assembly is moved in the direction opposite the first direction, at which point, the distance between the same two flat surfaces is again measured. Lastly, the pilot fuel assembly is located at a position where the distance between the two measuring surfaces is equal to the average of the first and second measurements. If desired, these steps can be repeated back and forth along an axis perpendicular to the first and second directions.

Halila, Ely E.↗

STS-109 Crew Interviews - Altman

STS-109 crew Commander Scott D. Altman is seen during a prelaunch interview. He answers questions about his inspiration to become an astronaut and his career path. He gives details on the mission's goals and significance, which are all related to maintenance of the Hubble Space Telescope (HST). After the Columbia Orbiter's rendezvous with the HST, extravehicular activities (EVA) will be focused on several important tasks which include: (1) installing the Advanced Camera for Surveys; (2) installing a cooling system on NICMOS (Near Infrared Camera Multi-Object Spectrometer); (3) repairing the reaction wheel assembly; (4) installing additional solar arrays; (5) augmenting the power control unit; (6) working on the HST's gyros. The reaction wheel assembly task, a late addition to the mission, may necessitate the abandonment of one or more of the other tasks, such as the gyro work.

Source record↗

Full Length Assembly Testing in PELICAN (Final Report)

In support of the development of the U.S. Department of Energy (DOE) Versatile Test Reactor (VTR), a thermal hydraulics test facility was constructed to generate experimental measurement of the pressure drop across a single full-scale assembly containing prototypic axial reflectors, fuel, and plena components. Constructed and operated at Argonne National Laboratory, the Pressure drop Experimental Loop for Investigations of Core Assemblies in Nuclear reactors (PELICAN) facility was designed to achieve hydraulic conditions identical to those anticipated for a full-scale fuel assembly located in the VTR core in the region with the highest flow rate. Using water as surrogate for liquid sodium, the flow loop was operated at elevated temperatures and pressures to match the thermophysical properties of liquid sodium and ensure matching Reynolds and Euler numbers. The measurement objectives for data generated from this test facility was driven primarily by the validation needs for code calculations and simulations of the reference VTR core. These objectives focused on the need to validate pressure drop results across the various segments of the fuel assembly as they relate directly to the pumping power and safety of the reactor. Presented in this report are experimental results and analytical comparisons based on testing of a full-length assembly in PELICAN. Housed within a hexagonal test section extending 3.4 m in length, the tested assembly features a prototypic lower reflector, grid plates, wire-wrapped rod bundle, upper reflector, and exit region. The rod bundle extends over 1.5 m in length and contains 217 individual wire-wrapped rods with dimensions that best reflect the reference VTR design. The as-tested bundle assembly was fabricated using 316 stainless steel 0.25-inch (6.35-mm) diameter rods wrapped with 0.04-inch (1.016-mm) diameter wire at a helical pitch of 10.51 inch (26.6 cm). Details of the method for in-house wire-wrapping, assembly, and installation are provided later in this report. Experimental measurements of pressure drop at 19 positions along the test assembly were recorded for a range of flow conditions, with special attention paid to key locations within the assembly, including component inlet and outlet, transition, and wire-wrapped rod bundle regions. Testing conditions were based on 110°C water with flow rates ranging from 50 to 450 GPM (3 to 27 kg/s) at the inlet of the test assembly generating Reynolds numbers and velocities up to ~8.0×10 4 and ~7.8 m/s, respectively, within the rod bundle region. Non-dimensional values for the friction factor were then calculated based on these experimental measurements and compared against those predicted by various analytical correlations available from open literature. Predictions by the upgraded Cheng and Todreas, Rehme, and Novendstern correlations fell within 4% to those values measured experimentally.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Hot tap thermowell installation

System permits valve housings or other fillings to be installed in live steam lines or water pipes without interrupting their operation, thus eliminating current tapping restrictions. Two basic assemblies for installation under pressure are described.

Romero, C. A.↗

An automated system for the alignment of large area modular solar simulators

A real-time optical alignment and diagnostic system is being assembled for installation at the Space Environment Simulation Laboratory. This system will be used to measure and analyze the performance of optical components, assemblies, and full modules. This information, in turn, is used to align assemblies and modules. The system capability includes such functions as the generation and updating of a catalog, which serves as permanent record, in addition to providing the capability to predict in-chamber performance of optics combinations before they are mounted in the chamber.

Vincent, J. P.↗

Drop C: The Drop-In, Ring-of-Power Heliostat (Final Report)

This report summarizes the work performed within the Drop-C: The Drop-In, Ring-of-Power Heliostat project. The Drop-C project aimed to develop a novel heliostat with an installed cost of $\$50$/m 2 ($\$2015$) which is a drastic cost reduction compared to the state-of-the-art. The resulting 27m 2 SunRing TM heliostat’s relative small size necessitates the parallel development of a wireless solar field network and a rapid calibration system. The SunRing heliostat is an evolution of the Ring-of-Power (ROP) design from Abengoa Solar LLC which had a reported installed cost of $114/m 2 . Cost savings relative to the ROP were sought by increasing the mirror area, improving the structural efficiency, a more accurate assessment of wind loads, and an improved assembly and installation procedure. The project spanned three Budget Periods (BP) where a digital heliostat was developed in BP1 using wind tunnel testing to define load conditions.

14 SOLAR ENERGY↗

A study of mass production and installation of small solar thermal electric power systems

Technological constraints, materials availability, production capacity, and manufacturing and installations plans and costs at different production levels are included in a study of concentrating collector industrialization. As cobalt for the engine and receiver is supply limited, alternative lower temperature alloys and higher temperature materials such as ceramics are discussed. Economics and production efficiency favor co-location of cellular and thin glass production for reflectors. Assembly and installation are expensive for small sites and few alternatives exist to apply mass production techniques to lower these costs for the selected design. Stepping motors in the size and quantities required are not commercially available today but could be in the future.

Butterfield, J. F.↗

Installation and Commissioning of the SBC-LAr10 Detector at Fermilab

This report describes the progress towards a scalable detector capable of quasi-background-free detection of sub-keV nuclear recoils under DOE award DE-SC0024254. Work supported by this award follows two distinct thrusts: (1) the first calibration of sensitivity to sub-keV nuclear recoils in a liquid-noble bubble chamber, based on data taken in a prototype liquid xenon bubble chamber run previously at Northwestern University, and (2) the successful assembly and installation of the 10-kg liquid argon bubble chamber SBC-LAr10 in the MINOS underground area at Fermilab. These accomplishments have paved the way for the precision calibration of SBC-LAr10 in the MINOS underground area at Fermilab in the coming year, which will use novel calibration techniques to measure the potential of the liquid noble bubble chamber technology for the detection of GeV-scale dark matter particles and the measurement of coherent elastic nuclear scattering by reactor anti-neutrinos (CEvNS).

47 OTHER INSTRUMENTATION↗

Experimental Studies and Energy Modeling for Evaluating Performance of Various Deep Wall Retrofits

The Pacific Northwest National Laboratory, Oak Ridge National Laboratory, and the University of Minnesota conducted a three-year, multipart study on residential retrofit wall assemblies. The project, which was funded by the U.S. Department of Energy’s Building Technology Office, aimed to compare a range of residential wall retrofit systems that prioritized affordability, durability, and energy savings potential. The research team identified, constructed, tested, simulated, and analyzed the feasibility and economics of 16 wall retrofit assemblies (14 test configurations and two baseline configurations) that can be applied to the exterior side of existing walls (either with or without the existing cladding). The 16 wall assemblies were installed in an in-situ laboratory environment, to evaluate the ease of construction and study the thermal and hygrothermal performance of the walls. This paper presents the methodology used to evaluate the thermal performance of the walls and discusses the energy modeling results of the study. The results from the experiments were used to calibrate a THERM model of each wall assembly, which was then applied to a whole building using the EnergyPlus 8.6 simulation engine. A residential prototype building was used to extrapolate whole-building energy savings in each U.S. climate zone. To capture the conditions of the largest number of homes in the United States, the most frequent building characteristics (e.g., attic insulation level, window specifications, foundation insulation, etc.) were extracted from ResStock data and applied to the prototype model. Results from the energy modeling showed that the climate zones with the highest potential for retrofit savings are those which are heating-dominated (i.e., Cold and Very Cold climate designations). In these climate zones, heating and cooling energy savings due to the wall retrofits alone ranged from 21.5% to 38.2%.

Nagda, Harshil↗

A Simple Transient Thermal Test Assembly for Insulation Materials

A simple transient thermal test was developed for evaluating the thermal performance of high-temperature flexible insulation materials in atmospheric pressure air. The test setup was inspired by the test assembly used for evaluating the performance of fire shelters and fire protective clothing. The heating source used was a burner supplied with propane gas that can generate relatively uniform heating over a wide area. The ratio of the in-plane width to thickness of the insulation test sample in the test assembly was selected to be greater than ten so that the heat transfer in the center of the test assembly was nearly one-dimensional. A rigid, thin Inconel plate was used as the septum plate directly exposed to the flame to provide a relatively uniform, known-temperature boundary condition for the test assembly, and to prevent convective heat transfer through the test insulation from the burner. The test sample, flexible alumina paper insulation, was placed between the Inconel plate and a thin titanium witness plate. The overall assembly was further insulated using a combination of rigid and flexible ceramic insulations to minimize heat losses from the periphery of the test assembly. Thermocouples installed on the septum and witness plates and inside the insulation test sample provided temperature measurements at various locations. For the evaluation tests, the Inconel septum plate reached temperatures between 780°C and 850°C for tests with flame exposure durations of 120 sec to 300 sec. The measured temperatures for various tests with similar flame exposure times were repeatable. A one-dimensional numerical heat transfer model of the test assembly was developed. The close agreement between measured and predicted temperatures on the titanium witness plate and inside the insulation test sample indicated that this test may provide a one-dimensional thermal testing capability for evaluation of thermal performance of similar insulations.

Daryabeigi, Kamran↗

Development of a 12-Thrust Chamber Kerosene /Oxygen Primary Rocket Sub-System for an Early (1964) Air-Augmented Rocket Ground-Test System

Airbreathing/Rocket combined-cycle, and specifically rocket-based combined- cycle (RBCC), propulsion systems, typically employ an internal engine flow-path installed primary rocket subsystem. To achieve acceptably short mixing lengths in effecting the "air augmentation" process, a large rocket-exhaust/air interfacial mixing surface is needed. This leads, in some engine design concepts, to a "cluster" of small rocket units, suitably arrayed in the flowpath. To support an early (1964) subscale ground-test of a specific RBCC concept, such a 12-rocket cluster was developed by NASA's Marshall Space Flight Center (MSFC). The small primary rockets used in the cluster assembly were modified versions of an existing small kerosene/oxygen water-cooled rocket engine unit routinely tested at MSFC. Following individual thrust-chamber tests and overall subsystem qualification testing, the cluster assembly was installed at the U. S. Air Force's Arnold Engineering Development Center (AEDC) for RBCC systems testing. (The results of the special air-augmented rocket testing are not covered here.) While this project was eventually successfully completed, a number of hardware integration problems were met, leading to catastrophic thrust chamber failures. The principal "lessons learned" in conducting this early primary rocket subsystem experimental effort are documented here as a basic knowledge-base contribution for the benefit of today's RBCC research and development community.

Pryor, D.↗

AERoBOND Project Summary

Under NASA’s Convergent Aeronautics Solutions (CAS) project, the Adhesive-Free Bonding of Complex Composites (AERoBOND) project investigated off-stoichiometric epoxy polymers for fast, reliable assembly of epoxy matrix composite structures. The project goal was to demonstrate feasibility of the AERoBOND joining method by demonstrating mechanical properties greater than 80% of conventional co-cured materials while reducing structure weight by 1%. The project consisted of three convergent research areas: material and process development, systems analysis, and material and process modeling. Material and process development was the largest component of AERoBOND with approximately 6 FTE and 1WYE of support to formulate and characterize new resins, prepare carbon fiber prepregs, fabricate laminates, measure mechanical properties, analyze failure results, and select material and process improvements. The systems analysis activity estimated the potential reduction in part count and aircraft weight by comparing models of composite wing boxes with no fasteners (co-cured structure), fasteners in major joints (co-cured stringers), and fasteners in all joints. The materials and process modeling activity included a molecular model of the AERoBOND materials system to predict mechanical properties of resins with offset stoichiometry and a process model to predict the effect of resin formulation and processing conditions on the extent of mixing and degree of cure in a finished joint. As the number of airline passenger trips doubles in the next 20 years (IATA/Tourism Economics Air Passenger Forecasts, April 2019), the increased demand for new commercial aircraft is now the single greatest technical challenge to the airframe manufacturing industry. To meet efficiency requirements, new aircraft must be fabricated primarily from high performance structural composites, but manufacturing processes are inherently slow with the largest bottleneck attributed to assembly and installation of fasteners (NASA/TM–2019-220428). Manufactures of commercial transport aircraft are compelled to install more than 100,000 redundant fasteners into bonded joints to prevent failures due to unpredictable weak bonds. In structural adhesive bonds, the interface between adherend and adhesive is nearly two-dimensional making it susceptible to minute quantities of contamination, which can cause weak bonds. Currently, bond strength assessment is only possible through destructive testing (i.e., breaking the joint). For these reasons, regulatory organizations such as the Federal Aviation Administration (FAA) often require redundant load paths in secondary-bonded, primary-structures to alleviate concerns with bond performance. The AERoBOND process enables reflow of matrix resin during assembly to eliminate the material discontinuity at the interface, thereby eliminating the dependence of mechanical performance on interfacial adhesion. The AERoBOND joint is equivalent to the interlaminar region obtained during a co-cure process, so joint performance depends on the cohesive properties of the matrix resin. Conventional co-cured structures, although too costly and complex for large-scale manufacturing, are trusted by manufacturers and regulators, and are certified for flight with few or no redundant fasteners.Systems analysis performed on a composite wing model at the scale of a single-aisle commercial transport aircraft indicated that >20,000 redundant fasteners per wing could be eliminated by implementing the AERoBOND joining method. A total weight reduction of 15% was predicted in a wing box by eliminating fasteners and thinning components that must no longer support localized fastener loads and accommodate fastener dimensions. Interlaminar shear fracture toughness measured by the end-notched flexure test was greater than 1 kJ/m2 (nearly 140% of the co-cured benchmark property), which is greatly in excess of the project goals for mechanical properties. Testing was planned to measure interlaminar tensile fracture toughness as well as interlaminar tensile and shear strengths using the same AERoBOND configuration, but was delayed due to closure of LaRC facilities during the COVID-19 pandemic. The AERoBOND process model is partially validated and available for experimental use. It allows the user to input AERoBOND process parameters such as material composition, laminate configuration, and cure cycle to predict the final cure state of the AERoBOND joint. A preliminary, multi-scale material model was developed to predict AERoBOND joint mechanical properties (stiffness and strength) based on the cure state of the joint provided by the process model. The timing for transition of this technology within NASA is excellent as NASA initiates new enduring projects to address composites manufacturing rate challenges. AERoBOND technology is well suited to AAVP/AATT objectives for rapid manufacturing of a composite wing. A minimal effort (1 FTE/$15k procurement/0 WYE) is proposed in FY21 to continue a minor mechanical testing effort and maintain a SAA with ASX composites to develop commercial quality prepreg material. An RFI with the composites industry is suggested to quantify the technology gap between the current TRL and the TRL needed for transition to industry. A moderate effort [3-4 FTE/$150k/1 WYE (~$115k)] is proposed in FY22 for the “high rate composites manufacturing” project currently in planning. The partnership with ASX Composites will be expanded to produce material for sub-element/element-scale “panel-off” activities. Industry partnerships with airframe manufacturers is an expected component to explore damage tolerance and environmental stability. Further development of multi-scale modeling tools (process model, meso-scale model, and molecular model) is planned to enhance and deliver tools for rapid manufacturing infusion.

Frank Louis Palmieri↗

[FeFe]‐Hydrogenase In Vitro Maturation

Abstract The [FeFe]‐hydrogenase H‐cluster is a complex organometallic cofactor whose assembly and installation requires three dedicated accessory proteins referred to as HydE, HydF, and HydG. The roles of these maturases and the precise mechanisms by which they synthesize and insert the H‐cluster are not fully understood. This Minireview will focus on new insights into the [FeFe]‐hydrogenase maturation process that have been provided by in vitro approaches in which the biosynthetic pathway has been partially or fully reconstructed using semisynthetic and enzyme‐based approaches. Specifically, the application of these in vitro, semisynthetic, and fully defined approaches has shed light on the roles of individual maturation enzymes, the nature of H‐cluster assembly intermediates, the molecular precursors of H‐cluster ligands, and the sequence of steps involved in [FeFe]‐hydrogenase maturation.

Pagnier, Adrien↗