C1Po2D-04: Cryogenic Testing of the First HL-LHC Q1/Q3 Cryo-Assembly at

In early 2023, Fermilab is conducting horizontal cryogenic testing of the first Q1/Q3 Cryo-Assembly for the high-luminosity LHC upgrade (HL-LHC). The Cryo-Assembly was installed on the upgraded Fermilab horizontal test stand previously used for testing the LHC inner triplet quadrupoles. The cryogenic process requirements of this test include controlled cool-down and warm-up with a 100 K maximum temperature differential between the two ends of the cold mass, operation of a 1.3 bar, 1.9 K bath of subcooled superfluid helium during power testing and magnetic measurements, and operation at pressure up to 18 bar with full helium recovery after a quench.

Rabehl, R.↗

Target fabrication fields first NIF shot with new 3D-printed microfluidic target design

Capable of producing ultrafine features, two-photon polymerization (2PP) 3D printing made it possible to field a first-of-its-kind leak-proof liquid-filled diffraction target. These targets are used for shots aimed at using laser pressure instead of low temperatures turn water into ice. The shot is the product of months of design, assembly, and installation work by LSEO’s target fabrication team, in collaboration with 3D printing experts Widi Moestopo (MED) and Xiaoxing Xia (MED) and PLS researcher Neal Bhandarkar.

42 ENGINEERING↗

Cryogenic Testing of HL-LHC Q1/Q3 Cryo-Assemblies at Fermilab

Fermilab is conducting horizontal cryogenic testing of Q1/Q3 Cryo-Assemblies for the high-luminosity LHC upgrade (HL-LHC). Cryo-Assemblies are installed on the upgraded Fermilab horizontal test stand previously used for testing the LHC inner triplet quadrupoles. The cryogenic process requirements of these tests include controlled cool-down and warm-up with a 100 K maximum temperature differential between the two ends of the cold mass, operation of a 1.3 bar, 1.9 K bath of subcooled superfluid helium during power testing and magnetic measurements, and operation at pressures up to 18 bar with full helium recovery after a quench. This paper presents the operational experience gained from the first tests as well as improvements for subsequent tests.

Rabehl, R. [Fermilab]↗

Cryogenic testing of the first HL-LHC Q1/Q3 cryo-assembly at Fermilab

In early 2023, Fermilab is conducting horizontal cryogenic testing of the first Q1/Q3 cryo-assembly for the high-luminosity LHC upgrade (HL-LHC). The cryo-assembly was installed on the upgraded Fermilab horizontal test stand previously used for testing the LHC inner triplet quadrupoles. The cryogenic process requirements of this test include controlled cool-down and warm-up with a 100 K maximum temperature differential between the two ends of the cold mass, operation of a 1.3 bar, 1.9 K bath of subcooled superfluid helium during power testing and magnetic measurements, and operation at pressure up to 18 bar with full helium recovery after a quench. This paper presents the operational experience gained from this first test.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Cryogenic testing of HL-LHC Q1/Q3 cryo-assemblies at Fermilab

Fermilab is conducting horizontal cryogenic testing of Q1/Q3 cryo-assemblies for the high-luminosity LHC upgrade (HL-LHC). Cryo-assemblies are installed on the upgraded Fermilab horizontal test stand previously used for testing the LHC inner triplet quadrupoles. The cryogenic process requirements of these tests include controlled cool-down and warm-up with a 100 K maximum temperature differential between the two ends of the cold mass, operation of a 1.3 bar, 1.9 K bath of subcooled superfluid helium during power testing and magnetic measurements, and operation at pressure up to 18 bar with full helium recovery after a quench. This paper presents the operational experience gained from the first tests as well as improvement for subsequent tests.

Rabehl, R. [Fermilab] (ORCID:0000000311130030)↗

Bolt installation and tensioning system

A bolt installation and removal (BIR) system is used for assembling and disassembling a nuclear vessel. The BIR system includes a platform with a stand for supporting the nuclear vessel. A track extends around an outside perimeter of the platform and multiple tool carts include wheels that roll on the track. Tool towers are located on the carts and include tool assemblies configured to install and remove bolts on the nuclear reactor vessel. Magazine towers also extend up from the tool carts next to the tool towers and include magazines that hold bolts for exchanging with the tool assemblies. Drive mechanisms move tool heads in the tool assemblies around a first vertical axis, vertically up and down, and laterally to more simply and reliably install and remove the bolts in a radioactive underwater environment.

Shaw, Steven W.↗

Fabrication of the Fermilab Pre-Series Cold Mass for the HL-LHC Accelerator Upgrade Project

Fermilab is fabricating ten full length cold masses for the high-luminosity Large Hadron Collider Accelerator Upgrade Project (HL-LHC AUP). One practice assembly and one pre-series assembly have been completed. Here this paper summarizes the construction details. Topics include incoming inspection, bus assembly, component machining, shell forming, beam tube insertion, bus expansion loop installation, instrumentation installation, electrical testing, heat exchanger installation and final assembly welding. In-process surveys, alignment measurements and testing are presented and explained. Problems encountered during construction and their solutions are discussed.

43 PARTICLE ACCELERATORS↗

Force-triggered, Bio-based, Sealants for Prefabricated Building Components: Towards Improved Efficiency, Performance and Sustainability

The prefabricated building construction industry has made extensive progress in expediting the manufacture of prefabricated components at offsite plants. However, this progress has not translated to the assembly of the prefabricated components at the construction site. Case in point, sealing the joints between components to prevent air leaks requires the manual application of tape, caulk, or spray foam at the jobsite, and performance is highly dependent on the skills of the installer. To reduce assembly time and improve assembly quality of prefabricated components, we developed a sealant that can be installed at the plant and triggered at the jobsite. Additionally, we used this opportunity to lower the use of fossil fuel derived feedstocks and introduced bio-based alternatives to decrease the embodied carbon of the new sealant. We evaluated a series of force-triggered, bio-based, high strength, and fast curing sealants, consisting of a one-part heterogeneous system. These sealants are derived from formulations with ≥80% of biogenic carbon, consisting of a cardanol derived diepoxy that is microencapsulated in a polymer shell and embedded in a cardanol derived amine curing agent. The microcapsule shell allows separation of the reactive species in the one part sealant allowing shelf stability to an otherwise fast curing system. When the microcapsules are broken and activated by force, the highly reactive species mix and cure, exhibiting peel strengths up to 143 ppi. The shelf stability of these sealants and the on-demand triggering of the curing reactions enable installation on prefabricated components and storage prior to delivery and assembly at a jobsite, which could result in consistent sealant application with lower installation time than tapes and caulks at the construction site.

Cortes Guzman, Karen [ORNL] (ORCID:000000028793468↗

Force-triggered, Bio-based, Sealants for Prefabricated Building Components: Towards Improved Efficiency, Performance and Sustainability

The prefabricated building construction industry has made extensive progress in expediting the manufacture of prefabricated components at offsite plants. However, this progress has not translated to the assembly of the prefabricated components at the construction site. Case in point, sealing the joints between components to prevent air leaks requires the manual application of tape, caulk, or spray foam at the jobsite, and performance is highly dependent on the skills of the installer. To reduce assembly time and improve the airtightness and waterproofness of prefabricated components, we developed a sealant that can be installed at the plant and have its curing reaction triggered at the jobsite. Additionally, we used this opportunity to explore the use of bio-based feedstocks that are abundant and not used for food. We evaluated a series of force-triggered, bio-based, high strength, and fast curing sealants, consisting of a one-part heterogeneous system. These sealants are derived from formulations with ≥80% of bio-based components, consisting of a cardanol derived diepoxy that is microencapsulated in a polymer shell and embedded in a cardanol derived amine curing agent. The microcapsule shell allows separation of the reactive species in the one-part sealant allowing a fast-curing system to remain unreacted until the right trigger is applied. When the microcapsules are activated and broken by force, the highly reactive species mix and cure, exhibiting peel strengths up to 143 ppi. The open-air shelf stability of the sealant complexes was demonstrated by peel strength values of ~16 ppi when triggering the curing reaction even after being exposed for 8 months to open air and humidity. The successful on-demand triggering of curing reactions and the shelf stability provide efficacy of these force-triggered sealants for installation on prefabricated components, storage for months prior to delivery, and assembly at the jobsite. These force-triggered bio-based sealants for prefabricated buildings could result in lower installation time and cost as well as better performance than tapes and caulks at the jobsite.

Cortes Guzman, Karen [ORNL] (ORCID:000000028793468↗

Parabolic Trough Collector Cost Update for Industrial Process Heat In The United States

Despite great potential, the worldwide adoption of concentrating solar thermal (CST) collectors for solar industrial process heat (SIPH) is modest. Industrial process heat (IPH) demands for heat and steam are typically below 300 degrees C, where CST collectors can provide the needed heat. Parabolic trough collectors (PTCs) are the most deployed CST technology for SIPH applications. This paper is focused on the United States, and a summary of known operating parabolic trough plants is shown. A previous analysis of a modern PTC in 2016 found that for SIPH applications, the installed solar field cost could be $200/m2 (2016$). Recent advances in PTC design and manufacturing have led to reduced cost per square meter of aperture area, and for a field of 510 solar collector assemblies (SCAs), the installed cost was $120/m2 (2020$). On one hand, the results from this study showed that the solar field cost for large solar fields (510 SCAs or ~804,000 m2) would increase to $184/m2 (2023$) due to post pandemic inflation and increase in metal prices. On the other hand, medium SIPH sized fields (90 SCAs or ~142,000 m2) cost analysis indicated an installed cost could be $197/m2 (2023$). When small SIPH fields (12 SCAs or ~19,000 m2) are considered, this jumps to $297/m2 (2023$). These are cost estimates for the Installed Cost of the solar fields using the United States 2023$ steel prices. When Chinese steel is used for comparison, the installed cost could be between $162 - $210/m2 for the range of SIPH sizes.

concentrating solar thermal↗

Development and construction status of the Mu2e electromagnetic calorimeter mechanical structures

Abstract The Mu2e experiment at Fermilab will search for the CLFV neutrino-less coherent conversion of a muon into an electron in the field of an aluminum nucleus. The observation of this process would be the evidence of physics beyond the Standard Model. Mu2e comprises a straw-tracker, an electromagnetic calorimeter and an external veto for cosmic rays. The calorimeter provides electron identification, a fast trigger and aids track reconstruction. It is a state-of-the-art crystal calorimeter and employs 1340 pure CsI crystals readout by UV-extended SiPM and fast electronics. The design consists of two identical annular disks positioned at the relative distance of 70 cm downstream the target.The hostile Mu2e conditions (total ionizing dose of 12 krad and a neutron fluence of 5 × 10 10 n/cm 2 @ 1 MeVeq (Si)/y, 1 T magnetic field and vacuum level of 10 −4 Torr) posed tight constraints on the mechanical structures and materials choice. The support structure of the two crystal matrices employs two aluminum hollow rings and parts made of open-cell vacuum-compatible carbon fiber. SiPMs and front-end electronics for each crystal are assembled in one mechanical unit inserted in a machined copper holder. The units are supported by a plate made of vacuum-compatible material. The plate integrates the cooling system made of a network of copper lines flowing a low temperature fluid and placed in thermal contact with the copper holders. The DAQ is hosted in aluminum crates positioned on the lateral surface of the disks. The crates also integrate the DAQ electronics cooling system. We review the constraints on the calorimeter structures design, the development of all the structural components, including the simulations that have determined the materials and technological choices and the specifications of the cooling station, components production and quality assurance tests, the procedures for detector assembly, transportation and installation in the experimental area.

Instruments & Instrumentation↗

Summary of Results for Idaho Accelerator Center (IAC) Experiments with Compact Electron Permanent Magnet Spectrometer (CEPMS)

The Compact Electron Permanent Magnet Spectrometer (CEPMS) shown in Figure 2 consists of collimation at the electron beam entrance, a vacuum chamber for beam transport and a removable 60 degree sector magnet constructed by SABR Enterprises (Ref 2) that is used to momentum analyze the incoming electron beam. There are electron detection planes located perpendicular to straight through and the 60 degree trajectory ports. The planes are designed to accept phosphor screens for time integrated measurements. The screens can be replaced by scintillator for time resolved measurements using gated or streak cameras. The length of the spectrometer along the beamline without the collimator is about 400mm (14”). The spectrometer requires no power supply with controls for cycling or cooling for the magnet. The entire assembly, with magnet installed, weighs about 35kg (75lbs) Figure 3 depicts central and extreme trajectories through the spectrometer for various electron energies. The chamber accommodates a +/-50mm wide detection field relative to the center trajectory. Trajectories with larger momentum (energy) are bent the least. Since the permanent magnet slides off and on with reference to the upstream edge of the vacuum chamber, it can be adjusted to various positions to slightly increase or decrease the central energy thereby changing the range of available energies. Figure 4 shows the effect of changing the location of the permanent magnet on the electron trajectory. A small inward change in r produces a longer trajectory in the magnet therefore, the same energy trajectory is bent more.

43 PARTICLE ACCELERATORS↗

First Annual Report on Development of Microwave Resonant Cavity Transducer for Fluid Flow Sensing: Development of Sensor Performance Model of Microwave Cavity Flow Meter for Advanced Reactor High Temperature Fluids

We are investigating a microwave cavity-based transducer for in-core high-temperature fluid flow sensing in molten salt cooled reactors (MSCR) and sodium fast reactors (SFR). This sensor is a hollow metallic cylindrical cavity, which can be fabricated from stainless steel, and as such is expected to be resilient to radiation, high temperature and corrosive environment of MSCR and SFR. The principle of sensing consists of making one wall of the cylindrical cavity flexible enough so that dynamic pressure, which is proportional to fluid velocity, will cause membrane deflection. Membrane deflection causes cavity volume change, which leads to a shift in the resonant frequency. Feasibility of the sensor was initially investigated with analytical derivations and with COMSOL RF Module computer simulations of resonant frequency spectral shift due to uniform load. We also investigated the mechanical integrity of the flowmeter’s membrane through analytical modelling and COMSOL Structural Mechanics Module computer simulations. Both the analytic model and COMSOL model showed that maximum stresses on the plate, which are at the radial boundary of the plate, are three orders of magnitude smaller than the material’s yield strength and ultimate tensile strength. This indicates that the sensor is at a low risk of mechanical failure. Using results from models, we have developed an initial design for a microwave K-band sensor. A cylindrical resonator prototype was fabricated from brass for the initial tests. The external dimensions of the cavity are matched to the flange of a standard WR-42 waveguide. Microwave field is coupled into the resonant cavity through a subwavelength-size aperture. A test article was developed consisting of a piping Tee with a bulkhead WR-42 microwave waveguide installed in a leak-proof assembly. A microwave waveguide circulator was installed in the setup to suppress the effect of reflections at the cavity entrance by increasing the isolation between the input and the output port. Preliminary spectral characterization of cavity spectral response was performed with a portable PXIe chassis microwave VNA with a custom GUI. Preliminary dry tests of the transducer response were conducted with a set of calibrated weights. Transducer frequency shift was shown to be monotonically increasing with increasing pressure. The next steps will involve investigation of the transducer performance for water flow sensing.

42 ENGINEERING↗

Production and installation of wavelength-shifting reflective light enhancers for the Short-Baseline Near Detector

We report on the design, production, and installation of a wavelength-shifting reflective system on the cathode of the Short-Baseline Near Detector (SBND), a liquid argon time projection chamber located along the Fermilab Booster Neutrino Beam. To increase and homogenize scintillation-light collection, 64 double-sided plates were fabricated from FR4, laminated with specular reflector film and coated with 300 $μ$g/cm$^2$ of tetraphenyl butadiene (TPB) wavelength shifter using controlled physical vapor deposition. The coating uniformity was validated through dedicated measurements of deposited mass and profilometry studies. Because exposure to ambient blue/UV light could degrade the TPB, protective filtering and controlled storage conditions were implemented during handling and installation. The coated plates were assembled between conductive meshes for high-voltage compatibility and installed in situ during detector integration. This system constitutes the largest TPB-coated area deployed in a neutrino detector. It operates in conjunction with SBND's photon detection system, which consists of photomultiplier tubes and X-ARAPUCAs. Early light-collection measurements show high uniformity and light response across the detector, supporting improved triggering, calorimetry, and position reconstruction in SBND.

Acciarri, R. [Fermilab]↗

Automated Fissile Mass Estimation Python Script for the Advanced Experimental Fuel Counter (AEFC)

The Advanced Experimental Fuel Counter (AEFC) is a non-destructive assay (NDA) instrument developed to quantify the residual fissile mass in research reactor spent fuel assemblies. The system is installed in a spent fuel pool and measurements are acquired underwater. A calibration curve relates the totals and coincidence counting signal from active interrogation of the spent fuel assemblies to the fissile mass remaining in the fuel.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Test Stand Functional Requirements for Testing MQXFA Magnets and Q1/Q3 Cryostat Assemblies (Rev.3)

This document specifies test stand requirements for testing the High Luminosity LHC (HL-LHC, or HiLumi LHC) MQXFA magnets and LQXFA/B cryostat assemblies. Total of 12 (3 pre-series, 7 series production and 2 re-work) of these cryostat assemblies are expected to be fabricated and delivered to CERN by the U.S. HL-LHC Accelerator Upgrade Project (US HL-LHC AUP) as part of the U.S. contributions to the LHC High Luminosity Upgrade. These cryostat assemblies are the quadrupole magnetic components of the HL-LHC Q1 (LQXFA) and Q3 (LQXFB) inner triplet optical elements in front of the interactions points 1 (ATLAS) and 5 (CMS). One LMQXFA cold mass is installed in each cryostat assembly and each cold mass consists of two MQXFA quadrupole magnets. MQXFA, LMQXFA and LQXFA/B functional requirements are specified in [1,2,3].MQXFA magnets will be tested at BNL Vertical Magnet Test Facility (VMTF) and 12 cryostat assembly tests planned at Fermilab’s Horizontal Magnet Test Facility (HMTF). This document specifies the test stand functional requirements for testing MQXFA magnets and LQXFA/B cryostat assemblies.

43 PARTICLE ACCELERATORS↗

Next generation retrofit wall panels with integrated vacuum insulation panels

Approximately two-thirds of residential buildings in the United States were constructed before the Department of Energy established energy conservation measures. These buildings present major opportunities for improving energy efficiency, though retrofitting them remains technically and economically challenging. This study presents the development and the durability evaluation of an innovative retrofit panel system that integrates vacuum insulation panels (VIP) with a nail-base panel (called a retrofit insulated panel) to enhance thermal performance with minimal disruption to occupants and without altering standard nail-based panel installation practices. Hygrothermal simulations were conducted to assess the moisture behavior of wall assemblies before and after retrofit installation under varying water vapor control strategies and climate conditions. Results indicate that, with appropriate moisture control strategy, the retrofit system effectively prevents moisture accumulation, keeping mold index values and relative humidity levels below critical thresholds. Additionally, Guarded Hot Box testing was performed to compute the effective R-value of the panel under different coverage areas that demonstrates its effectiveness in enhancing both thermal and moisture performance in existing residential buildings.

Iffa, Emishaw [ORNL]↗

The ProtoDUNE-SP LArTPC electronics production, commissioning, and performance

The ProtoDUNE-SP detector is a large-scale prototype of the Single-Phase (SP) Liquid Argon Time Projection Chamber (LArTPC) design proposed for the Deep Underground Neutrino Experiment (DUNE). 15,360 LArTPC wires are instrumented with low electronic noise pre-amplifier and digitization ASICs integrated into Front End Motherboards (FEMBs) operating at cryogenic temperature within the cryostat. The large number of electronics channels and high performance specifications required a large-scale production electronics quality control effort, careful installation into Anode Plane Assemblies (APAs), and rigorous detector commissioning. This successful collaboration-wide effort achieved a working LArTPC electronics channel percentage of 99.7% (15,318 of 15,360 channels in total), whose operating performance exceeded expectations. We summarize the ProtoDUNE-SP cold electronics design and quality control, installation, and commissioning efforts that enabled this excellent electronics performance.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗