Radio Frequency Properties of a 3D Printed Klystron Circuit

The manufacturing of active RF devices like klystrons is dominated by expensive and time-consuming cycles of machining and brazing. In this article, we characterize the RF properties of X-band klystron cavities and an integrated circuit manufactured with a novel additive manufacturing process. Parts are 3D printed in 316 L stainless steel with direct metal laser sintering, electroplated in copper, and brazed in one simple braze cycle. Stand-alone test cavities and integrated circuit cavities were measured throughout the manufacturing process. The un-tuned cavity frequency varies by less than 5% of the intended frequency, and Q factors reach above 1200. A tuning study was performed, and unoptimized tuning pins achieved a tuning range of 138 MHz without compromising Q. Klystron system performance was simulated with as-built cavity parameters and realistic tuning. Together, these results show promise that this process can be used to cheaply and quickly manufacture a new generation of highly integrated high power vacuum devices.

3D printing↗

Potential Impacts of Liquid-Metal Plasma-Facing Components on Heating and Current Drive Actuators for a Fusion Nuclear Science Facility

This paper addresses the potential impact of liquid metal (LM) plasma-facing components (PFCs) for the heating and current drive (H&CD) actuators on the Fusion Nuclear Science Facility (FNSF) fusion reactor. Fulfilling the high neutron fluence mission of the FSNF requires steady-state operation for extremely long pulses (months to years) between maintenance opportunities. The use of LM as a surface material is one strategy for extending the lifetime of the PFCs for long pulse operation in a high heat flux, high neutron flux environment like that of the FNSF. Liquid metal PFCs provide possible pathways forward on many difficult aspects of a fusion reactor; however, the LM PFCs also bring new challenges and unknowns with respect to the H&CD actuators needed to provide steady-state operation. The development of LM-compatible materials for radio-frequency (RF) antennas will be critical, as well as strategies for minimizing contamination of antenna surfaces and the core plasma. Successful deployment of LM PFCs on the FNSF will require operational experience with RF in a LM environment both on test stands and in an integrated toroidal environment.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Potential impacts of liquid metal plasma facing components on heating and current drive actuators for a Fusion Nuclear Science Facility

This paper addresses the potential impact of liquid metal (LM) plasma facing components (PFCs) for the heating and current drive actuators (H&CD) on the Fusion Nuclear Science Facility (FNSF) fusion reactor. Fulfilling the high neutron fluence mission of the FSNF requires steady-state operation for extremely long pulses (months to years) between maintenance opportunities. The use of liquid metal as a surface material is one strategy for extending the lifetime of the PFCs for long pulse operation in a high heat flux, high neutron flux environment like that of the FNSF. Liquid metal PFCs provide possible pathways forward on many difficult aspects of a fusion reactor, however the LM PFCs also bring new challenges and unknowns with respect to the H&CD actuators needed to provide steady-state operation. The development of LM compatible materials for RF antennas will be critical, as well as strategies for minimizing contamination of antenna surfaces and the core plasma. Successful deployment of LM PFCs on the FNSF will require operational experience with RF in a liquid metal environment both on test stands and in an integrated toroidal environment.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Superconducting Magnet Qualification Methodology for the Material Plasma Exposure Experiment

The Material Plasma Exposure eXperiment (MPEX), currently under design, is a new linear plasma device to advance the understanding of plasma-material interactions through the generation and delivery of plasmas as they are expected in future fusion reactor divertors. MPEX will be a steady-state device to study high-fluence exposures of plasma-facing materials and components. The requirements for the magnetic field at the target and the heating stages make the application of superconducting coils necessary. Conceptual designs for the superconducting magnets have been developed, and multiple cryostats with warm bore diameters of either 65 cm or 156 cm are envisioned to facilitate their integrated and timely assembly with other systems such as vacuum, water cooling, and RF power. Although design, fabrication, and testing for the magnets as stand-alone units are straightforward, challenges will arise during the integration of the system. Two different field profiles will be used during operation. The magnetic field where the electron cyclotron heating occurs needs to operate at both 1.25 and 2.5 T. It is critical that the magnets all share the same magnetic axis and alignment. The mutual inductance between cryostats will affect the quench behavior of the system. Also, cryostat-to-cryostat forces can be as large as 700 kN, and the magnitude and direction will change depending on which coils are energized. The design of the system must take those characteristics into account along with the quench scenarios. This paper describes the qualification approach that will be used to determine whether stand-alone tests can be used to ensure the success of the integrated system. Fiducials will be used to define the location of the magnetic axis for each cryostat to ensure proper alignment. Quench tests of a single magnet will be performed at a current above the normal operating current to account for additional stored energy from the mutual inductance to adjacent cryostats. Also, a 1018 steel plate will be mounted on either end of a cryostat to simulate the cryostat-to-cryostat forces. Requirements for the size and location of the steel plates are described.

Burkhardt, Earle↗

High temperature ceramic heat exchanger for solid oxide fuel cell

A ceramic heat exchanger with high effectiveness and low-pressure drop has been developed for application as a cathode air preheater for a Solid Oxide Fuel Cell (SOFC). At the operating conditions of SOFCs, typical metallic alloys as those used in commercial heat exchangers may undergo chromium volatilization, which is a known cathode degradation mechanism that reduces SOFC performance and life. Use of ceramics such as alumina or alumina-silicate instead of chromium-containing metal is one approach to eliminate the effects of chromium on the SOFC cathode. This project leverages the geometric design of a heat exchanger previously prototyped and tested [1] to fabricate a novel heat exchanger made from a ceramic material. All calculations of heat exchanger performance requirements are based on state of the art SOFC operating conditions. The alumina-silicate material selected to fabricate the modular prototype heat exchanger was made via a heat transfer based trade-off analysis that shows that for low pressure-drop devices, flow convection is the limiting heat transfer mechanism, and therefore wall conductivity becomes less relevant to heat transfer effectiveness. The modular design presented allows for incremental aggregation of modules to target a broad range of operating conditions typical of present and upcoming SOFC applications (e.g., 25 to 400 kWe). The completed prototype was subjected to a series of static leak/pressure tests, dynamic pressure drop tests both at ambient and realistic service temperature conditions, and finally to a matrix of heat transfer experiments to fully characterize its heat transfer effectiveness (including tests at hot gas temperatures up to 1033 K or 1400oF). The stand-alone system was demonstrated in the laboratory to successfully satisfy the design criteria at realistic operating conditions, showing a total pressure drop at the design flow of 8 g/sec of 6 kPa (vs. 3.45 kPa approximate requirement). It was also shown to have heat transfer effectiveness of 76% (with 73% being the design requirement). Moreover, the unit was shown to operate leak-free, and the ceramic elements and seals were capable of withstanding the thermal cycling resulting from the testing procedure. The heat exchanger was then integrated into a modified fuel cell test stand and tested at steady state operation. Unfortunately, the level of performance achieved was lower than expected based on laboratory performance tests. This appears to have been the result of an unforeseen loosening of a heat exchanger structural component, which resulted into a leak that prevented proper supply of hot gas to the heat exchanger. However, in general terms, the heat exchanger/fuel cell integration process provides confidence that a future application of the unit with a SOFC is feasible, assuming structural issues are addressed. It is considered that the difficulties encountered at the last stage of the program provided invaluable input in locating shortcomings of the mechanical design and integration approach. A portion of this work was presented at the ASME Power & Energy Conference, in Charlotte, NC, on June 28th 2016 in a paper entitled “Development of a Ceramic Heat Exchanger for Application as Solid Oxide Fuel Cell Cathode Air Preheater” and the corresponding paper was published in the Proceedings of the ASME 2016 Power & Energy Conference, Paper No.: PowerEnergy2016-59333 [8].

20 FOSSIL-FUELED POWER PLANTS↗

Commissioning of the Low Energy Electron Gun Test Stand at the University of Chicago

We built a test stand for evaluating the performance of the thermionic electron sources for the electron lens project at the Integrable Optics Test Accelerator (IOTA) in Fermilab. The lens will be used to study nonlinear dynamics and electron cooling of 2.5 MeV protons with strong space charge. The test stand will validate the characteristics of the thermionic sources and the main parameters of the generated beams. In this paper we present the results of the commissioning of the UChicago test stand and validation of the hollow beam source.

43 PARTICLE ACCELERATORS↗

Powertrain Test Procedure Development for EPA GHG Certification of Medium- and Heavy-Duty Engines and Vehicles

xiii ABSTRACT The goal of this project is to develop and evaluate powertrain test procedures that can accurately simulate real-world operating conditions, and to determine greenhouse gas (GHG) emissions of advanced medium- and heavy-duty engine and vehicle technologies. ORNL used their Vehicle System Integration Laboratory to evaluate test procedures on a stand-alone engine as well as two powertrains. Those components where subjected to various drive cycles and vehicle conditions to evaluate the validity of the results over a broad range of test conditions. Overall, more than 1000 tests were performed. The data are compiled and analyzed in this report.

33 ADVANCED PROPULSION SYSTEMS↗

Tuner Testing of a Dressed 3.9 GHz Cavity for LCLS-II at Fermilab

Fermilab is responsible for the design of the 3.9 GHz cryomodule for LCLS-II. Integrated acceptance testing of a dressed 3.9 GHz cavity for the LCLS-II project has been done at the Fermilab Horizontal Test Stand. This test included a slim blade tuner (based on INFN & XFEL designs) with integrated piezoelectric fast/fine tuner. This paper will present results of the mechanical setup, cold testing, and cold function of this tuner including fast and slow tuner range, sensitivity, and hysteresis.

43 PARTICLE ACCELERATORS↗

VERA 3.6 Release

CASL has developed a formalized process to release the Virtual Environment for Reactor Applications (VERA) to non-CASL users through the Radiation Shielding Information Computational Center (RSICC). This milestone represents a major release of VERA with updates that significantly reduce computational resources required and introduce new capabilities related to fuel performance integration. This release will also be used by CASL Test Stands and training activities. VERA 3.6 represents an incremental release, with improvements to core component capabilities, significant performance improvements, and updated documentation. This release followed a significantly revised release process, with formal documentation, testing, readiness reviews, and release authorization. The major tasks that were completed as part of this milestone were: 1) Revision of the VERA RSICC Release Process and Procedures; 2) Identification of the VERA release components; 3) Creation of a Release Candidate; 4) Independent evaluation of the Release Candidate by the Advanced Modeling Applications (AMA) Focus Area; 5) A Release Candidate Readiness Review; 6) Development and execution of a System Test Plan; 7) Updates of manuals and other required documentation; 8) Export Control reviews; 9) A Release Readiness Review; and 10) Delivery of the release package to RSICC. Synopses of the work done to complete each of these major tasks are summarized in Section 2 below. Supporting details are provided in the PHI Kanban ticket #4424 Support VERA 3.6 Release Activities and its child tickets.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

US HL-LHC cryo-assemblies at FNAL - testing and lessons learned

The U.S. High-Luminosity LHC Accelerator Upgrade Project (AUP) is fabricating ten cryogenic assemblies for the HL-LHC Q1/Q3 quadrupole optics at CERN, each integrating two Nb_{3}Sn-based magnets. Fermilab has tested three assemblies (LQXFA/B01–03) at its upgraded horizontal test stand under 1.9 K conditions. Overview of the test stand and the cryo-assembly tests is given along with main results. Challenges met and lessons learned are discussed. Successful testing validates the design and integration of U.S.-produced cryo-assemblies, keeping the project on track for timely delivery to CERN.

Stoynev, Stoyan [Fermilab] (ORCID:0000000345637702↗

The status of the SNS external antenna ion source and spare RFQ test facility

The Oak Ridge National Laboratory operates the Spallation Neutron Source, consisting of a H{sup −} ion source, a 1 GeV linac and an accumulator ring. The accumulated <1 μs-long, ∼35 A beam pulses are extracted from the ring at 60 Hz and directed onto a liquid Hg target. Spalled neutrons are directed to ∼20 world class instruments. Currently, the facility operates routinely with ∼1.2 MW of average beam power, which soon will be raised to 1.4 MW. A future upgrade with a second target station calls for raising the power to 2.8 MW. This paper describes the status of two accelerator components expected to play important roles in achieving these goals: a recently acquired RFQ accelerator and the external antenna ion source. Currently, the RFQ is being conditioned in a newly constructed 2.5 MeV Integrated Test Facility (ITF) and the external antenna source is also being tested on a separate test stand. This paper presents the results of experiments and the testing of these systems.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

CIME, Common Infrastructure for Modeling the Earth v. 5.0

CIME is the software infrastructure for configuring, building, running, and testing an Earth system model. It can be developed and tested as stand-alone software, but its main role is to be integrating into the CESM and ACME Earth system models.

Foucar, JamesG.↗

Hybrid monitor for both beam position and tilt of pulsed high-current beams

A Hybrid beam monitor, integrated with both azimuthal and axial B-dot probes, was designed for simultaneous measurement of both beam position and beam angle for pulsed high-current beams at the same location in beam pipe. The output signals of axial B-dot probes were found to be mixed with signals caused by transverse position deviation. In order to eliminate the unwanted signals, an elimination method was developed and its feasibility tested on a 50-Ω coaxial line test stand. By this method, a waveform, shape-like to that of input current and proportional to the tilt angle, was simulated and processed by following integration step to achieve the tilt angle. The tests showed that the measurement error of displacement and tilt angle less than 0.3 mm and 1.5 mrad, respectively. The latter error could be reduced with improved probes by reducing the inductance of the axial B-dot probe, but the improvement reached a limit due to some unknown systemic mechanism.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

The Cold Dark Matter Search test stand warm electronics card

A card which does the signal processing for four SQUID amplifiers and two charge sensitive channels is described. The card performs the same functions as is presently done with two custom 9U x 280mm Eurocard modules, a commercial multi-channel VME digitizer, a PCI to GPIB interface, a PCI to VME interface and a custom built linear power supply. By integrating these functions onto a single card and using the power over Ethernet standard, the infrastructure requirements for instrumenting a Cold Dark Matter Search (CDMS) detector test stand are significantly reduced.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

Development of Performance Validation Tool for the NPCS for APR1400

Availability of nuclear power plant is highly dependent on the quality of major control systems including NSSS Control Systems. It has been experienced that a small flaw hidden among the control functions resulted in large operational transient or even reactor trip. The proactive quality control of these systems is not easy because of the dynamical characteristics of control algorithms. In a stand-alone or open loop state, it is not possible to perform integral system tests because they need control loads to form an appropriate closed control loop. In the construction plant, Power Ascension Test (PAT) is the first chance to witness the overall performance of the control systems. Because the PAT is the last activity of plant construction schedule, the cost of corrective actions is very high if any functional defect is found in this stage. To minimize risk caused by late detection of control system defects, we developed a validation tool as a proactive test device for the NSSS Process Control System (NPCS) for the SKN Unit 3 which is the first APR1400 plant in Korea. In this paper, the features of the dynamic performance test tool, test methodology, and the test results are described.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Combined Heat and Power Systems Technology Development and Demonstration 370 kW High Efficiency Microturbine

The C370 Program was awarded in October 2010 with the ambitious goal of designing and testing the most electrically efficient recuperated microturbine engine at a rated power of less than 500 kW. The aggressive targets for electrical efficiency, emission regulatory compliance, and the estimated price point make the system state-of-the-art for microturbine engine systems. These goals will be met by designing a two stage microturbine engine identified as the low pressure spool and high pressure spool that are based on derivative hardware of Capstone’s current commercially available engines. The development and testing of the engine occurred in two phases. Phase I focused on developing a higher power and more efficient engine, that would become the low pressure spool which is based on Capstone’s C200 (200kW) engine architecture. Phase II integrated the low pressure spool created in Phase I with the high pressure spool, which is based on Capstone’s C65 (65 kW) commercially available engine. Integration of the engines, based on preliminary research, would allow the dual spool engine to provide electrical power in excess of 370 kW, with electrical efficiency approaching 42%. If both of these targets were met coupled with the overall CHP target of 85% total combined heating and electrical efficiency California Air Resources Board (CARB) level emissions, and a price target of $600 per kW, the system would represent a step change in the currently available commercial generation technology. Phase I of the C370 program required the development of the C370 low pressure spool. The goal was to increase the C200 engine power by a minimum of 25% — 250 kW — and efficiency from 32% to 37%. These increases in the C200 engine output were imperative to meet the power requirements of the engine when both spools were integrated. An additional benefit of designing and testing the C370 low pressure spool was the possibility of developing a stand-alone product for possible commercialization. The low pressure spool design activity focused on an aeropath derivative of the current C200 engine. The aeropath derivative included changes to the compressor section —compressor and inducer — and to the turbine nozzle. The increased power also necessitated a larger, more powerful generator and generator controller to support the increased power requirements. These two major design changes were completed by utilizing both advanced 3D modeling and computational fluid dynamics modelling. After design, modeling, and analysis, the decision was made to acquire and integrate the components for testing. The second task of Phase I was to integrate and test the components of the low pressure spool to validate power and efficiency. Acquisition of the components for the low pressure spool was completed utilizing Capstone’s current supplier base. Utilization of Capstone’s supply base for integration of the test article would allow — if the decision was made —expedited commercialization of the product. After integration of the engine components, the engine was tested and evaluated for performance and emissions. Test data analysis confirmed that the engine met all power and efficiency requirements and did so while maintaining CARB level emissions. The emissions were met without the use of any post processing or catalyst. After testing was completed, the DOE authorized — via a milestone review — proceeding to Phase II: the development of the integrated C370 engine. The C370 high pressure spool design activity required significant changes to the C65 engine architecture. The engine required a high power density generator, completely redesigned compressor stage, turbine section, recuperator, controls architecture, and intercooler stage asThe two most critical design challenges were the turbine section (the nozzle and turbine) and the controls architecture. The design and analysis of all of the components was completed and integrated into a system model. The system model — after numerous iterations — indicated that, once integrated, the engine will meet or exceed all system requirements. Unfortunately, the turbine section’s life requirements remain a technical challenge and will require continued refinement of the bi-metallic turbine wheel design and manufacturing approach to meet the life requirement at theses high temperatures. The current controls architecture requires substantial effort to develop a system capable of handling the high-speed, near real-time controls requirement, but it was determined not to be a technical roadblock for the project. The C370 Program has been a significant effort with state-of-the-art technical targets. The targets have pushed Capstone’s designers to the limits of current technology. The program has been fortunate to see many successes: the successful testing of the low pressure spool (C250), the development of new material processes, and the implementation of new design practices. The technology and practices learned during the program will be utilized in Capstone’s current product lines and future products. The C370 Program has been a resounding success on many fronts for the DOE and for Capstone.

none↗

Automating Testing of DUNE Electronics via a Finite State Machine

The Deep Underground Neutrino Experiment (DUNE) is a flagship international collaboration designed to study neutrinos tiny, nearly massless particles that may hold answers to fundamental questions about the Universe. Fermilab s Robotic Test Stand (RTS) plays a critical role in ensuring the quality of approximately 50,000 Application-Specific Integrated Circuit (ASIC) chips that will be used in DUNE s massive liquid argon detectors. These electronics will be inside the cryostat; therefore, they will need to have a high yield of working chips and low noise. To improve the automation and reliability of the RTS, this project focused on designing and implementing a Python-based finite state machine (FSM) to manage chip handling workflows. The FSM was developed as a modular software framework to coordinate robotic arm movements, manage chip tray positions, and monitor system states during testing. Key features include robust error handling routines, a pause/resume system for safe mid-cycle interruptions, and a simulation mode for iterative testing without hardware dependencies. The system was designed to prepare for seamless integration with RTS hardware components such as the robotic arm and vision system. This integration will streamline collaboration and enable efficient deployment of updates across the six total institutions performing testing. The outcomes of this internship contribute to Fermilab s mission to advance high-energy physics and support the DOE s national goals by directly improving the testing of equipment to be used in DUNE. The project also provided valuable experience in software design and contributing to the success of DUNE.

Kang, Caleb [William Rainey Harper Coll.]↗

Automating Testing of DUNE Electronics via a Finite State Machine

The Deep Underground Neutrino Experiment (DUNE) is a flagship international collaboration designed to study neutrinos—tiny, nearly massless particles that may hold answers to fundamental questions about the Universe. Fermilab’s Robotic Test Stand (RTS) plays a critical role in ensuring the quality of approximately 50,000 Application-Specific Integrated Circuit (ASIC) chips that will be used in DUNE’s massive liquid argon detectors. These electronics will be inside the cryostat; therefore, they will need to have a high yield of working chips and low noise. To improve the automation and reliability of the RTS, this project focused on designing and implementing a Python-based finite state machine (FSM) to manage chip handling workflows. The FSM was developed as a modular software framework to coordinate robotic arm movements, manage chip tray positions, and monitor system states during testing. Key features include robust error handling routines, a pause/resume system for safe mid-cycle interruptions, and a simulation mode for iterative testing without hardware dependencies. The system was designed to prepare for seamless integration with RTS hardware components such as the robotic arm and vision system. This integration will streamline collaboration and enable efficient deployment of updates across the six institutions performing testing. The outcomes of this internship contribute to Fermilab’s mission to advance high-energy physics and support the DOE’s national goals by directly improving the testing of equipment to be used in DUNE. The project also provided valuable experience in software design and contributing to the success of DUNE.