Search NASA⌕ Search

SEARCH · Search NASA

Results for “JAXA”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Evaluating Lunar Water Processing System Model Configurations for Small Scale Oxygen and Hydrogen Production Within JAXA'S ISRU Technology

Introduction: In-Situ Resource Utilization (ISRU) refers to novel methods of extracting and processing local resources for use in life support and propulsion systems, reducing or eliminating the required consumables to be transferred from Earth. Current estimates of water-ice availability embedded in regolith within the Moon’s permanently shadowed regions (PSR’s) range between 1-5% by weight. However, the composition and characteristics of the “wet” regolith is unknown. Alternate ISRU excavation techniques and Concept of Operations (ConOps) must be explored to optimize surface system operations based on these factors. To assess the feasibility of different ISRU subsystem technologies and compare system architecture configurations, an interchangeable system model was generated to incorporate technologies spanning excavation of raw materials to storage of products and determine optimal arrangement of total system processing needs. Total Mass, Volume, and Power (M/V/P) requirements were computed for 168 design iterations of this water processing plant. System Model: In FY24, the System Engineering and Integration (SE&I) ISRU Modeling and Analysis (SIMA) team developed a lunar water processing system model using the Mission Analysis and Integration Tool (MAIT) to estimate the M/V/P for ISRU subsystems operating under a wide range of Hydrogen (H2) and Oxygen (O2) production targets for the Space Technology Mission Directorate (STMD) [1]. Based on Japan Aerospace Exploration Agency’s (JAXA) surface operational requirements, this system architecture was modified to include the ability to excavate consolidated icy regolith (versus granular ice excavation using Kennedy Space Center’s (KSC) ISRU Pilot Excavator, IPEx) and explore the feasibility of processing the lunar water both inside and outside of the PSR. For the consolidated icy regolith case study, excavation was performed via a mobility transport chassis outfitted with The Regolith Ice Drill for Exploring New Terrain (TRIDENT) for drilling [2] and the Cold Operable Lunar Deployable Arm (COLDArm) [3] for regolith transfer. The system model determines the required rover and payload. M/V/P to handle the required regolith processing rates. The regolith is then sorted and heated to sublimate the ice (via an auger dryer). The exiting high temperature, low pressure vapor is cleaned of volatiles (via cold trap) and electrolyzed to produce H2 and O2. These products are then dried, liquified with 20 K and 90 K cryocoolers (for H2 and O2, respectively), and stored in cylindrical tanks. Study Goals: Due to the different ConOps options of regolith transport to the ridge for processing versus processing it directly inside the PSR, as well as the unknown regolith/water-ice composition, new excavation techniques and their power configurations are being evaluated within a ISRU system architecture for production targets less than NASA’s pilot plant (1 mT). This analysis investigates the feasibility of numerous excavation techniques, power architectures, and logistical operations and determines an optimal system configuration with regards to M/V/P. It aims to investigate which parameters, both locally and globally, have the greatest effect on each subsystem within the plant. This can be used to identify the most critical components of the plant, and guide future decisions on allocating funding for research and development. The results from this study may provide subsystem developers with appropriate interfaces with excavation subsystems and downstream processes, and assessing the overall feasibility of each excavation technique, power architecture, and logistical timeframe. References: [1] Carlson, A. et. al. (2024) ICES. [2] Zacny, K., et. al. (2024) “ASCE Earth and Space”. [3] McCormick, R., et. Al. (2024) IEEE Xplore.

ISRU↗

Proposal for a Comparison of Reliability and Maintainability Activities Across ESA, JAXA, and NASA

NASA has developed an objectives based hierarchy for guiding Reliability and Maintainability activities. This presentation overviews the hierarchy and proposes to the international trilateral partners to formulate a task force to consider the elements of the NASA RM framework, as captured in the hierarchy of RM considerations, to identify commonalities and differences in the way reliability and maintainability is addressed by the flight projects among the partners.

JAXA↗

Visit from JAXA to NASA MSFC: The Engines Element & Ideas for Collaboration

System Design, Development, and Fabrication: Design, develop, and fabricate or procure MB-60 component hardware compliant with the imposed technical requirements and in sufficient quantities to fulfill the overall MB-60 development effort. System Development, Assembly, and Test: Manage the scope of the development, assembly, and test-related activities for MB-60 development. This scope includes engine-level development planning, engine assembly and disassembly, test planning, engine testing, inspection, anomaly resolution, and development of necessary ground support equipment and special test equipment. System Integration: Provide coordinated integration in the realms of engineering, safety, quality, and manufacturing disciplines across the scope of the MB-60 design and associated products development Safety and Mission Assurance, structural design, fracture control, materials and processes, thermal analysis. Systems Engineering and Analysis: Manage and perform Systems Engineering and Analysis to provide rigor and structure to the overall design and development effort for the MB-60. Milestone reviews, requirements management, system analysis, program management support Program Management: Manage, plan, and coordinate the activities across all portions of the MB-60 work scope by providing direction for program administration, business management, and supplier management.

Greene, William D.↗

Evaluating Lunar Water Processing System Model Configurations for Small Scale Oxygen and Hydrogen Production Within JAXA’s ISRU Technology Demonstration Plant

In-Situ Resource Utilization (ISRU) refers to novel methods of extracting and processing local resources for use in life support and propulsion systems, reducing or eliminating the required consumables to be transferred from Earth. Current estimates of water-ice availability embedded in regolith within the Moon’s permanently shadowed regions (PSR’s)range between 1-5% by weight. However, the composition and characteristics of the “wet” regolith is unknown. Alternate ISRU excavation techniques and Concept of Operations (ConOps) must be explored to optimize surface system operations based on these factors. To assess the feasibility of different ISRU subsystem technologies and compare system architecture configurations, an interchangeable system model was generated to incorporate technologies spanning excavation of raw materials to storage of products and determine optimal arrangement of total system processing needs. Total Mass, Volume, and Power (M/V/P) requirements were computed for 168 design iterations of this water processing plant.

ISRU↗

Desert Research and Technology Studies (D-RATS) 2022 Quicklook Report

This report summarizes the Desert Research and Technology Studies (D-RATS) 2022 analog tests. BACKGROUND - Artemis Challenges – NASA’s concept of operations (ConOps) for the Artemis mission architecture brings new challenges for human exploration of the lunar surface, including: (1) Low-angle, natural lighting at lunar poles; and (2) Exploration sites that challenge communication with Earth. - International Partner Involvement – NASA is working with the Japan Aerospace Exploration Agency (JAXA) to scope mission & functional requirements for an Artemis Pressurized Rover (PR), which JAXA may provide. - Charter – HQ Exploration Systems Development Mission Directorate (ESDMD) Moon to Mars Architecture Development Office (M2MADO) Strategy and Architectures (SA) chartered the Human-in-the-Loop (HITL) test team to investigate Artemis architectural questions related to pressurized rover ConOps. - Rationale – to inform the NASA/JAXA pressurized rover study-agreement. PLAN - Objectives – Analog tests conducted in October 2022 by the D-RATS team addressed three high-level objectives: 1. Investigate pressurized rover (PR) ConOps and capabilities for Artemis exploration 2. Integrate with JAXA engineers & astronauts and incorporate JAXA PR design elements into testing. 3. Re-establish analog field-testing skills & capabilities with rovers to investigate Artemis architecture ConOps. - Secondary Objectives – Work with other groups to leverage D-RATS field test for additional objectives. 4. Work with the Public Affairs Office (PAO) to perform D-RATS public outreach activities. 5. Coordinate with the Human Physiology Performance Protection & Operations (H-3PO) team to facilitate in-field evaluation of human health and performance (HHP) objectives. 6. Share D-RATS field-site and assets with Lunar LTE Studies (Lunar LiTES) team, to aid their study of the use of 4G/LTE communication protocols and devices for astronauts and robotic nodes on the lunar surface. - Team – Fully integrated test team comprised of members from 5 NASA centers, JAXA, and the United States Geological Survey (USGS) - Location – Black Point Lava Flow, ~40 miles north of Flagstaff, AZ HIGH-LEVEL OBJECTIVES ACCOMPLISHED - Investigated Pressurized Rover ConOps & Capabilities for Artemis Exploration (Objective 1) - Completed testing with 4 crew pairs, each spending 3 days and 2 nights in the rover conducting Artemis PR dayin-the-life activities (2 JAXA astronauts, 2 JAXA engineers, 1 NASA astronaut, 3 NASA engineers). - Collected detailed objective & subjective data supporting 10 strategic questions related to Artemis PR operations. - Field geologists present in field observed rover operations & EVAs. - Science team in Houston MCC communicated directly with crew. - Demonstrated crew-led and MCC-led PR teleoperation use cases during EVAs. - Integrated with JAXA Engineers & Astronauts and Incorporated JAXA PR Design Elements into Testing (Objective 2) - NASA & JAXA engineers, flight controllers, scientists, roboticists, and astronauts directly participated in and/or observed testing both in field and in MCC-Houston. - Incorporated JAXA PR design elements into both integrated and standalone testing at JSC and in the field. - Re-established Analog Field-Testing Skills & Capabilities with Rovers to Investigate Artemis Architecture ConOps (Objective 3) - Multiple teams successfully worked to establish and manage field-test base camp, monitor and maintain the rover, and plan and execute 2 weeks of consecutive field-testing with little to no breaks between crews. TEST OUTCOMES - Results will inform Artemis architecture ConOps & capabilities related to pressurized rover operations (see sections 2 for more details) - Summary and team detailed reports will be posted on the D-RATS 2022 wiki

Analog↗

Astrobee's Multi-year Activities at the International Space Station's Japanese Experimental Module

The Astrobee free-flying robots recently completed their third successful year of operations, housed in the Japanese Experimental Module (JEM) on the International Space Station. We summarize the three years of operation, giving special attention to JAXA's 1st and 2nd Kibo Robot Programming Challenge (RPC) and the mapping processes and tools that make Astrobees' autonomous operation possible. The JEM is an ever changing, dynamic environment where light settings, cargo, payloads, and crew members constantly move and interact with one another. The 1st JAXA Kibo RPC event, a collaboration between JAXA and NASA, was held in 2020. Students from several countries in the Asia-Pacific region competed in programming challenges with a simulated Astrobee. The finalists were then invited to run their code on an actual Astrobee in the JEM. For the final round, students programmed Astrobee to visit three different locations to obtain data that would instruct the robot to complete a final task with the participation of ISS crew. The first competition was a tremendous success, leading to an equally successful 2nd JAXA Kibo RPC in 2021 with even larger participation. The 3rd JAXA Kibo RPC will occur in 2022 expanding further to incorporate US participants. These activities led to several firsts in Astrobee’s history: operation of an Astrobee free-flying robot without crew supervision in preparation for on-orbit operations, autonomous image acquisition towards updates of the navigation map, non-NASA code running on the robot (both from JAXA and participating students), two heterogeneous free-flying robots from two different space agencies working together (Int-Ball and Astrobee) during the final event in 2020, the first payload using Astrobee, and having Astrobee controlled from a non-NASA location (Tsukuba Space Center). The preparation towards these activities involved constant evaluation of the different components of Astrobee's systems, specially mapping and localization. The paper describes the evolution of these systems such as the improvements made in localization to reduce localization drift by using graph-based optimization instead of the extended Kalman Filter localizer. Additionally, it reports on the mapping process and analysis tools created to validate map consistency across different activities in the constantly changing JEM environment. These enhancements have enabled the Astrobee facility to successfully execute over 100 ISS activities supporting over a dozen researchers and partners around the world.

Astrobee↗