Search NASA⌕ Search

SEARCH · Search NASA

Results for “Job scheduling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Scheduling periodic jobs that allow imprecise results

The problem of scheduling periodic jobs in hard real-time systems that support imprecise computations is discussed. Two workload models of imprecise computations are presented. These models differ from traditional models in that a task may be terminated any time after it has produced an acceptable result. Each task is logically decomposed into a mandatory part followed by an optional part. In a feasible schedule, the mandatory part of every task is completed before the deadline of the task. The optional part refines the result produced by the mandatory part to reduce the error in the result. Applications are classified as type N and type C, according to undesirable effects of errors. The two workload models characterize the two types of applications. The optional parts of the tasks in an N job need not ever be completed. The resulting quality of each type-N job is measured in terms of the average error in the results over several consecutive periods. A class of preemptive, priority-driven algorithms that leads to feasible schedules with small average error is described and evaluated.

Chung, Jen-Yao↗

SMC 2021 Data Challenge: Analyzing Resource Utilization and User Behavior on Titan Supercomputer

Resource utilization statistics of submitted jobs on a supercomputer can help us understand how users from various scientific domains use HPC platforms and better design a job scheduler. We explore to generate insight regarding workload distribution and usage pattern domains from job scheduler trace, GPU failure information, and project-specific information collected from Titan supercomputer. Furthermore, we want to know how the scheduler performance varies over time and how the users' scheduling behavior changes following a system failure. These observations have the potential to provide valuable insight, which is helpful to prepare for system failures. These practices will help us develop and apply novel machine learning algorithms in understanding system behavior, requirement, and better scheduling of HPC systems. There are two datasets, RUR and GPU: RUR dataset is the job scheduler traces collected from the Titan supercomputer from 01/01/2015 to 07/31/2019 (2015.csv - 2019.csv). These were collected using resource Utilization Report (RUR), a Cray-developed resource-usage data collection and reporting system. It contains the usage information of its critical resources (CPU, Memory, GPU, and I/O) of each running job on Titan during that period (https://ieeexplore.ieee.org/abstract/document/8891001). It includes ProjectAreas as additional information, every job is associated with a project ID. TheProjectAreas.csv dataset provides a mapping of the project ID to its domain science. GPU dataset has information regarding GPU failure on Titan. There have been some hardware-related issues in the GPUs in Titan that caused some GPUs to fail, sometimes irrecoverably during some job runs. This dataset provides information regarding these failures during the execution of the submitted jobs. GPUs on Titan are uniquely identified by a serial number (SN), and they are installed in a location. A GPU can be installed in a location, then removed from that location following a failure, and then re-installed in a different location after fixing the problem. If the failure can't be recovered, the GPU might be removed entirely from Titan. There are two prominent types of failures that resulted in the removal of GPUs from Titan: Double Bit Error (DBE) and Out of the Bus (OTB). The dataset (gc_full.csv) has seven attributes, we provided a short description of these attributes in the ReadMe file. To learn more about this dataset, please refer to the git repository https://github.com/olcf/TitanGPULife and the related publication (https://ieeexplore.ieee.org/abstract/document/9355319).

42 ENGINEERING↗

Minimizing total energy cost and tardiness penalty for a scheduling-layout problem in a flexible job shop system: A comparison of four metaheuristic algorithms

Job scheduling and machine layout are interrelated in improving energy consumption (EC) and productivity measures such as tardiness and represent two important decisions that must be made by manufacturers. This interdependency can be explained by transportation time, which connects scheduling and layout. Scheduling and layout, however, have not been thoroughly studied in conjunction using an integrated model in the context of sustainable manufacturing. Hence, we propose an energy-aware optimization model in which scheduling is integrated with layout in a single-level framework. More specifically, a single objective function is defined to minimize the facility energy cost and the job tardiness penalty, which control EC and tardiness respectively in a flexible job shop system. In order to model machine EC more accurately, we also consider three different machine states: a processing state and two idle states. Our case studies show that the integrated model exhibits better performance in controlling manufacturing EC and job tardiness than a non-integrated model in which machine locations are uncontrollable and transportation times between machines are unchangeable. To deal with large-sized problems, we also introduce four new metaheuristics. The performances of these new metaheuristics are compared in terms of objective function values and CPU times using various case studies. The results indicate that a hybrid ant colony optimization and simulated annealing (ACO-SA) algorithm provides better performance than the other algorithms. Specifically, our case studies show that the integrated model using ACO-SA can improve the objective function value by around 5% when compared to the non-integrated model.

42 ENGINEERING↗

Quantum/AI Topology-Aware Latency-Adaptive HPC Workflow Scheduling Optimization

The growing demand for more powerful high-performance computing (HPC) systems has led to a steady rise in energy consumption by supercomputing worldwide. This study is focused on comparing our Application-Topology Mapper (ATMapper) to the popular Simple Linux Utility for Resource Management (SLURM) for the purpose of exploring methods that can further optimize job-scheduling within HPC systems. ATMapper is an Artificial-Intelligence based approach to job-scheduling that is currently being enhanced with quantum annealing (QA) to generate optimal schedules faster. We are applying QA to speedup our ATMapper process to achieve higher computing efficiency, thereby reducing HPC energy consumption. Here, we examine how four job-scheduling approaches perform in processor node assignment when using an example network architecture of 4 interconnected nodes. Using a specialized script, we are assessing the schedule of a computation flow with 11 interdependent tasks. The data movements among nodes were tracked to count for the number of interactions (network hops) between nodes needed to complete the tasks. The total number of hops and the job completion time were then used to quantify the efficiency of the different mapping approaches. In addition to SLURM, we also compare our ATMapper to the QA-enabled LBNL TIGER and the D-Wave Distributed Computing processor assignment approaches. The preliminary results showed that our topology-aware, latency-adaptive ATMapper is significantly more efficient when compared to the other scheduling approaches due to its load-imbalance network allocation. The scheduler displayed a computing efficiency of 53% by performing significantly fewer network hops than its alternatives. By reducing the number of hops, ATMapper was able to perform all 11 tasks by using only 3 nodes out of given 4. This research indicates the potential to use QA/AI for HPC job-scheduling. Later, we will test a SLURM simulator program to draw further comparisons on the effectiveness of ATMapper's scheduling approach. The results of this comparison will serve as a baseline for later improving SLURM's performance using a QA-enhanced ATMapper approach.

Caraveo, Braulio [University of Huston - Clear Lak↗

SMC 2021 : Analyzing Resource Utilization and User Behavior on Titan Supercomputer

Resource utilization statistics of submitted jobs on a supercomputer can help us understand how users from various scientific domains use HPC platforms and better design a job scheduler. We explore to generate insight regarding workload distribution and usage pattern domains from job scheduler trace, GPU failure information, and project-specific information collected from Titan supercomputer. Furthermore, we want to know how the scheduler performance varies over time and how the users' scheduling behavior changes following a system failure. These observations have the potential to provide valuable insight, which is helpful to prepare for system failures. These practices will help us develop and apply novel machine learning algorithms in understanding system behavior, requirement, and better scheduling of HPC systems. There are two datasets, RUR and GPU. RUR: This dataset is the job scheduler traces collected from the Titan supercomputerfrom 01/01/2015 to 07/31/2019 (2015.csv - 2019.csv). These were collected usingResource Utilization Report (RUR), a Cray-developed resource-usage data collectionand reporting system. It contains the usage information of its critical resources (CPU,Memory, GPU, and I/O) of each running job on Titan during that period [2]. ProjectAreas: Every job is associated with a project ID. TheProjectAreas.csvdatasetprovides a mapping of the project ID to its domain science. GPU: There have been some hardware-related issues in the GPUs in Titan that caused some GPUs to fail, sometimes irrecoverably during some job runs. This dataset provides information regarding these failures during the execution of the submitted jobs. GPUs on Titan are uniquely identified by a serial number (SN), and they are installed in a location. A GPU can be installed in a location, then removed from that location following a failure, and then re-installed in a different location after fixing the problem. If the failure can't be recovered, the GPU might be removed entirely from Titan. There are two prominent types of failures that resulted in the removal of GPUs from Titan: Double Bit Error (DBE) and Out of the Bus (OTB). The dataset (gc_full.csv) has the following fields: 1. SN : Serial number of a GPU 2. location : The location where it is installed 3. insert : The time when it was inserted into that location 4. remove : The time when it was removed from that location 5. duration : Amount of time the GPU spent in this location 6. out : If the device was taken out entirely w/o a re-installment into a new location. 7. event : If the GPU was taken out entirely, the reason for its removal. To learn more about this dataset, please refer to the git repositoryhttps://github.com/olcf/TitanGPULifeand the related publication [1]. References [1] George Ostrouchov, Don Maxwell, Rizwan A Ashraf, Christian Engelmann, MallikarjunShankar, and James H Rogers. Gpu lifetimes on titan supercomputer: Survival analysisand reliability. InSC20: International Conference for High Performance Computing,Networking, Storage and Analysis, pages 1-14. IEEE, 2020. [2] Feiyi Wang, Sarp Oral, Satyabrata Sen, and Neena Imam. Learning from five-yearresource-utilization data of titan system. In2019 IEEE International Conference onCluster Computing (CLUSTER), pages 1-6. IEEE, 2019.

42 ENGINEERING↗

Scheduling periodic jobs using imprecise results

One approach to avoid timing faults in hard, real-time systems is to make available intermediate, imprecise results produced by real-time processes. When a result of the desired quality cannot be produced in time, an imprecise result of acceptable quality produced before the deadline can be used. The problem of scheduling periodic jobs to meet deadlines on a system that provides the necessary programming language primitives and run-time support for processes to return imprecise results is discussed. Since the scheduler may choose to terminate a task before it is completed, causing it to produce an acceptable but imprecise result, the amount of processor time assigned to any task in a valid schedule can be less than the amount of time required to complete the task. A meaningful formulation of the scheduling problem must take into account the overall quality of the results. Depending on the different types of undesirable effects caused by errors, jobs are classified as type N or type C. For type N jobs, the effects of errors in results produced in different periods are not cumulative. A reasonable performance measure is the average error over all jobs. Three heuristic algorithms that lead to feasible schedules with small average errors are described. For type C jobs, the undesirable effects of errors produced in different periods are cumulative. Schedulability criteria of type C jobs are discussed.

Chung, Jen-Yao↗

Orchestration of materials science workflows for heterogeneous resources at large scale

In the era of big data, materials science workflows need to handle large-scale data distribution, storage, and computation. Any of these areas can become a performance bottleneck. We present a framework for analyzing internal material structures (e.g., cracks) to mitigate these bottlenecks. We demonstrate the effectiveness of our framework for a workflow performing synchrotron X-ray computed tomography reconstruction and segmentation of a silica-based structure. Our framework provides a cloud-based, cutting-edge solution to challenges such as growing intermediate and output data and heavy resource demands during image reconstruction and segmentation. Specifically, our framework efficiently manages data storage, scaling up compute resources on the cloud. The multi-layer software structure of our framework includes three layers. A top layer uses Jupyter notebooks and serves as the user interface. A middle layer uses Ansible for resource deployment and managing the execution environment. A low layer is dedicated to resource management and provides resource management and job scheduling on heterogeneous nodes (i.e., GPU and CPU). At the core of this layer, Kubernetes supports resource management, and Dask enables large-scale job scheduling for heterogeneous resources. The broader impact of our work is four-fold: through our framework, we hide the complexity of the cloud’s software stack to the user who otherwise is required to have expertise in cloud technologies; we manage job scheduling efficiently and in a scalable manner; we enable resource elasticity and workflow orchestration at a large scale; and we facilitate moving the study of nonporous structures, which has wide applications in engineering and scientific fields, to the cloud. While we demonstrate the capability of our framework for a specific materials science application, it can be adapted for other applications and domains because of its modular, multi-layer architecture.

97 MATHEMATICS AND COMPUTING↗

Award ER25750: Coordinated Infrastructure for Fault Tolerance Systems Indiana University Final Report

The main purpose of the Coordinated Infrastructure for Fault Tolerance in Systems initiative has been to conduct research with a goal of providing end-to-end fault tolerance on a systemwide basis for applications and other system software. While fault tolerance has been an integral part of most high-performance computing (HPC) system software developed over the past decade, it has been treated mostly as a collection of isolated stovepipes. Visibility and response to faults has typically been limited to the particular hardware and software subsystems in which they are initially observed. Little fault information is shared across subsystems, allowing little flexibility or control on a system-wide basis, making it practically impossible to provide cohesive end-to-end fault tolerance in support of scientific applications. As an example, consider faults such as communication link failures that can be seen by a network library but are not directly visible to the job scheduler, or consider faults related to node failures that can be detected by system monitoring software but are not inherently visible to the resource manager. If information about such faults could be shared by the network libraries or monitoring software, then other system software, such as a resource manager or job scheduler, could ensure that failed nodes or failed network links were excluded from further job allocations and that further diagnosis could be performed. As a founding member and one of the lead developers of the Open MPI project, our efforts over the course of this project have been focused on making Open MPI more robust to failures by supporting various fault tolerance techniques, and using fault information exchange and coordination between MPI and the HPC system software stack from the application, numeric libraries, and programming language runtime to other common system components such as jobs schedulers, resource managers, and monitoring tools.

97 MATHEMATICS AND COMPUTING↗

Frontier Job-Centric Telemetry Dataset

Comprehensive analysis of high-performance computing (HPC) systems requires linking workload execution to system behavior. This kind of analysis is vital for diagnosing performance issues, managing capacity, detecting anomalous workloads, and understanding how applications interact with system hardware. This job-centric telemetry dataset unifies scheduler job records with node-level measurements, enabling direct association between workloads and their corresponding power, thermal, and performance characteristics. It contains sanitized, scheduler related metadata for 152,400 individual jobs that ran on the Frontier supercomputer and ended on selected days throughout 2024 and 2025, a subpopulation of ~6.8% of the total number of allocated jobs with non-zero run time on the system over that same period. Each is linked with files that contain telemetry time series records of the power utilization and temperature behavior of its allocated nodes and their processors during the run time of the job. Where available, a portion of the job files also contain network performance time series. Jobs are sampled from select days that reflect normal levels of user activity and possess job size distributions with large numbers of leadership class jobs (>20% of Frontier nodes). Jobs in this dataset attempt to best represent successful user workflows.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Analysis of Application Power and Schedule Composition in a High Performance Computing Environment

As the capacity of high performance computing (HPC) systems continues to grow, small changes in energy management have the potential to produce significant energy savings. In this paper, we employ an extensive informatics system for aggregating and analyzing real-time performance and power use data to evaluate energy footprints of jobs running in an HPC data center. We look at the effects of algorithmic choices for a given job on the resulting energy footprints, and analyze application-specific power consumption, and summarize average power use in the aggregate. All of these views reveal meaningful power variance between classes of applications as well as chosen methods for a given job. Using these data, we discuss energy-aware cost-saving strategies based on reordering the HPC job schedule. Using historical job and power data, we present a hypothetical job schedule reordering that: (1) reduces the facility's peak power draw and (2) manages power in conjunction with a large-scale photovoltaic array. Lastly, we leverage this data to understand the practical limits on predicting key power use metrics at the time of submission.

97 MATHEMATICS AND COMPUTING↗

Adaptive job and resource management for the growing quantum cloud

As the popularity of quantum computing continues to grow, efficient quantum machine access over the cloud is critical to both academic and industry researchers across the globe. And as cloud quantum computing demands increase exponentially, the analysis of resource consumption and execution characteristics are key to efficient management of jobs and resources at both the vendor-end as well as the client-end. While the analysis and optimization of job / resource consumption and management are popular in the classical HPC domain, it is severely lacking for more nascent technology like quantum computing.This paper proposes optimized adaptive job scheduling to the quantum cloud taking note of primary characteristics such as queuing times and fidelity trends across machines, as well as other characteristics such as quality of service guarantees and machine calibration constraints. Key components of the proposal include a) a prediction model which predicts fidelity trends across machine based on compiled circuit features such as circuit depth and different forms of errors, as well as b) queuing time prediction for each machine based on execution time estimations. Altogether, this proposal is evaluated on simulated IBM machines across a diverse set of quantum applications and system loading scenarios, and is able to reduce wait times by over 3x and improve fidelity by over 40% on specific usecases, when compared to traditional job schedulers.

97 MATHEMATICS AND COMPUTING↗

Queue wait time prediction in high performance computing (HPC) systems

High Performance Computing (HPC) systems are critical enablers for groundbreaking scientific research across various domains. Efficient resource allocation, facilitated by job scheduling, is paramount for maximizing the utilization of HPC systems. However, the variability in wait times for queued jobs poses challenges for users, necessitating accurate job wait time estimation. This paper explores the influence of job characteristics, including job size (the number of nodes requested and walltime), the queue to which the job is submitted and other resource requirements, on job wait times in leadership-class HPC systems. Focusing on the Theta Cray XC40 and Polaris machines at Argonne National Laboratory, the study evaluates the performance of different supervised learning algorithms in predicting job wait times. It also evaluates the impact of data preprocessing, including outlier detection, Principal Component Analysis (PCA), and feature selection, on the performance of wait time prediction models. The findings reveal insights into the relationship between job characteristics and wait times, offering a foundation for optimizing resource allocation and enhancing user experience. The methodologies and tools developed in this study are adaptable to other leadership-class HPC systems, providing a valuable contribution to the broader HPC community aiming to improve job scheduling efficiency and user satisfaction.

Okafor, Nwamaka↗

Analysis of a Multiprocessor Guidance Computer

The design of the next generation of spaceborne digital computers is described. It analyzes a possible multiprocessor computer configuration. For the analysis, a set of representative space computing tasks was abstracted from the Lunar Module Guidance Computer programs as executed during the lunar landing, from the Apollo program. This computer performs at this time about 24 concurrent functions, with iteration rates from 10 times per second to once every two seconds. These jobs were tabulated in a machine-independent form, and statistics of the overall job set were obtained. It was concluded, based on a comparison of simulation and Markov results, that the Markov process analysis is accurate in predicting overall trends and in configuration comparisons, but does not provide useful detailed information in specific situations. Using both types of analysis, it was determined that the job scheduling function is a critical one for efficiency of the multiprocessor. It is recommended that research into the area of automatic job scheduling be performed.

Maltach, E. G.↗

Information logistics: A production-line approach to information services

Logistics can be defined as the process of strategically managing the acquisition, movement, and storage of materials, parts, and finished inventory (and the related information flow) through the organization and its marketing channels in a cost effective manner. It is concerned with delivering the right product to the right customer in the right place at the right time. The logistics function is composed of inventory management, facilities management, communications unitization, transportation, materials management, and production scheduling. The relationship between logistics and information systems is clear. Systems such as Electronic Data Interchange (EDI), Point of Sale (POS) systems, and Just in Time (JIT) inventory management systems are important elements in the management of product development and delivery. With improved access to market demand figures, logisticians can decrease inventory sizes and better service customer demand. However, without accurate, timely information, little, if any, of this would be feasible in today's global markets. Information systems specialists can learn from logisticians. In a manner similar to logistics management, information logistics is concerned with the delivery of the right data, to the ring customer, at the right time. As such, information systems are integral components of the information logistics system charged with providing customers with accurate, timely, cost-effective, and useful information. Information logistics is a management style and is composed of elements similar to those associated with the traditional logistics activity: inventory management (data resource management), facilities management (distributed, centralized and decentralized information systems), communications (participative design and joint application development methodologies), unitization (input/output system design, i.e., packaging or formatting of the information), transportations (voice, data, image, and video communication systems), materials management (data acquisition, e.g., EDI, POS, external data bases, data entry) and production scheduling (job, staff, and project scheduling).

Adams, Dennis↗

Predicting runtime and resource utilization of jobs on integrated cloud and HPC systems

Recent advances in virtualization technologies used in cloud computing offer performance that closely approaches bare-metal levels. Combined with specialized instance types and high-speed networking services for cluster computing, cloud platforms have become a compelling option for high-performance computing (HPC). However, most current batch job schedulers in HPC systems are designed for homogeneous clusters and make decisions based on limited information about jobs and system status. Scientists typically submit computational jobs to these schedulers with a requested runtime that is often over- or under-estimated. More accurate runtime predictions can help schedulers make better decisions and reduce job turnaround times. Here, they can also support decisions about migrating jobs to the cloud to avoid long queue wait times in HPC systems.

97 MATHEMATICS AND COMPUTING↗

Game-Theoretic Approach for Grace-Period Policy in Supercomputers

Job scheduling at supercomputing facilities is important for achieving high utilization of these valuable resources while ensuring effective execution of jobs submitted by users. The jobs are scheduled according to their specified resource demands such as expected job completion times, and the available resources based on allocations. Jobs that overrun their allocated times are terminated, for example, after a grace-period. It is non-trivial and often very complex for users to accurately estimate the completion times of their jobs, and consequently they face a dilemma: underestimate the job time to have a higher priority and risk job termination due to overrun, or overestimate it to ensure its completion and risk its delayed execution. In this paper, we investigate whether providing grace-period can benefit facility performance by developing a game- theoretic model between a facility provider and multiple users for a simplified scheduling scenario based on job execution times. We present closed-form expressions for the provider’s and user’s best-response strategies to maximize their respective utility functions. We describe conditions under which offering a grace-period is advantageous to both facility provider and users by deriving the Nash equilibrium of the game.

He, Fei↗