Search NASA⌕ Search

SEARCH · Search NASA

Results for “Jupiter/Saturn”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Maneuver strategies for the extended Pioneer 11 Jupiter/Saturn mission

The Jupiter-bound Pioneer 11 spacecraft was launched in April 1973, eight months before the Jupiter encounter of the front-running spacecraft, Pioneer 10. Near-Earth maneuvers placed Pioneer 11 on an interim flight path designed to retain a later retargeting capability to repeat the Pioneer 10 flyby geometry or encounter a wide variety of alternate Jupiter aimpoints, including one resulting in an extended five-year trajectory to Saturn. Pioneer 11 was retargeted to this aimpoint in April 1974, subsequent to the successful Pioneer 10 encounter in December 1973. This paper presents the retargeting and trimming maneuver strategies necessary to assure a productive Pioneer 11 Jupiter encounter in early December 1974, followed by a Saturn encounter in late 1979.

Frauenholz, R. B.↗

The Mariner Jupiter/Saturn IRIS experiment

After a schematic representation of the IRIS experiment, objectives of the program are outlined. Specifically data cover: (1) determination of energy balance for Jupiter and Saturn, (2) determination of methane, ammonia, hydrogen and water vapor quantities, (3) three dimensional temperature fields, (4) hydrogen-helium ratios and isotopic ratios of H/C, C/N, and C/O.

Burke, T. E.↗

The Mariner Jupiter/Saturn 1977 mission

A dual flyby mission to the planets and satellite systems of Jupiter and Saturn is being planned for Fall 1977 launch. Two Mariner spacecraft, fully attitude-stabilized and carrying about 90 kg of instruments to support some eleven experiments, will make interplanetary measurements for a minimum of about four years. They will spend several weeks investigating the planets and several of their satellites at close range, using TV cameras, ultraviolet and infrared spectrometers, and a variety of other scanning instruments, field and particle sensors, and radio devices. The mission and equipment designs are described in terms of the integrated plan for a thorough and coordinated scientific exploration of the two planetary systems.

Schurmeier, H. M.↗

Mariner Jupiter/Saturn LCSSE thruster/valve assembly and injection propulsion unit rocket engine assemblies: 0.2-lbf T/VA development and margin limit test report, addendum

Capillary tube plugging phenomena on the 0.2-lbf thruster/valve assembly was examined. Vibration tests were conducted in the nozzle up attitude. Failure to fire caused by blockage of the capillary tube by catalyst fines was observed after vibration. Water flushing and previbration hot firing were used to remove the fines.

Wilson, W. W.↗

Mariner Jupiter/Saturn 1977 mission design tradeoffs

The considered MJS77 project involves the launching of two spacecraft during a one-month launch period which opens on August 20, 1977. Each Mariner craft will perform a flyby mission through the Jupiter and Saturn planetary systems. The targets of the missions are discussed and a spacecraft description is presented. The mission design factors are considered, taking into account details concerning the trajectory selection process, the MJS77 mission module, the remote sensing capability of MJS77 science instruments, and the targeting option of a possible continuation of the mission to Uranus. Attention is given to the search for attractive trajectory candidates, the relationship between Saturn arrival data and Jupiter arrival dates of special interest, and observation sequences.

Kohlhase, C. E.↗

Outer planets mission television subsystem optics study

An optics study was performed to establish a candidate optical system design for the proposed NASA Mariner Jupiter/Saturn 77 mission. The study was performed over the 6-month period from January through June 1972. The candidate optical system contains both a wide angle (A) and a narrow angle (B) lens. An additional feature is a transfer mirror mechanism that allows image transfer from the B lens to the vidicon initially used for the A lens. This feature adds an operational redundancy to the optical system in allowing for narrow angle viewing if the narrow angle vidicon were to fail. In this failure mode, photography in the wide angle mode would be discontinued. The structure of the candidate system consists mainly of aluminum with substructures of Invar for athermalization. The total optical system weighs (excluding vidicons) approximately 30 pounds and has overall dimensions of 26.6 by 19.5 by 12.3 inches.

Source record↗

Titan/Centaur: NASA's newest launch vehicle

Titan/Centaur is NASA's last new expendable launch vehicle prior to the advent of the space shuttle. Titan/Centaur is an adaptation of the Air Force Titan 3 booster with an improved version of the Centaur stage and a new 4.2 meters payload fairing. Titan/Centaur is initially being used for high performance escape missions (Helios Solar Probe - 340 kilograms' Viking Mars Orbiter and Lander - 3,629 kilograms, and Mariner Jupiter/Saturn Fly-Bys at 771 kilograms, but is also particularly suited for larger spacecraft in synchronous orbits (transfer - 7,031 kilograms and equatorial, with three Centaur burns - 3,175 kilograms). The program which began in 1965 with internal NASA feasibility studies will culminate in a proof flight launch in early 1974. With the new payload fairing, which also encloses Centaur, payloads of nearly 8.5 meters long and 3.8 meters in diameter can be accommodated.

Stofan, A. J.↗

Probabilities for the peak flux and fluence of energetic solar protons incident on interplanetary spacecraft

Energetic protons injected into interplanetary space in solar particle events can interfere with spacecraft operations and experiments and can cause permanent degradation of some components. For future long term interplanetary and planetary missions, techniques were developed which use solar particle event data from 1956 through 1970 to predict the probability of exceeding any value of peak proton intensity or mission proton fluence. Dependences on proton energy (near 10 to 100 MeV), heliocentric distance, and phase of the solar cycle are included. The techniques are described and applied to the Mariner Jupiter/Saturn 1977 mission.

Divine, N.↗

Titan/Centaur - NASA's newest launch vehicle.

Titan/Centaur is NASA's last 'new-expendable' launch vehicle prior to the advent of the Space Shuttle. Titan/Centaur is an adaptation of the Air Force Titan III booster with an improved version of the Centaur stage and a new 4.2-meter payload fairing. Titan/Centaur is initially being used for high performance escape missions (Helios Solar Probe - 340 kilograms, Viking Mars Orbiter and Lander - 3,629 kilograms, and Mariner Jupiter/Saturn Fly-Bys at 771 kilograms), but is also particularly suited for larger spacecraft in synchronous orbits (transfer - 7,031 kilograms and equatorial, with three Centaur burns - 3,175 kilograms). The program which began in 1965 with internal NASA feasibility studies will culminate in a 'proof flight' launch in early 1974. With the new payload fairing, which also encloses Centaur, payloads nearly 8.5 meters long and 3.8 meters in diameter can be accommodated.

Stofan, A. J.↗

Demonstration of optical navigation measurements on Mariner 10

An experiment was performed on the Mariner 10 Venus/Mercury mission to assess the performance of the onboard television cameras and ground-based software used in the optical navigation measurement system. The elements of the system, calibration, and distortion are considered. The navigation technique requires detection of stars in the same field of view as the target body. The star detection capability is discussed with reference to required threshold, calibration factors, standard conditions, camera sensitivity, response uniformity, and the effect of image smearing. Tests conducted during the Mariner 10 encounters with Mercury demonstrated that a large bright planet can be imaged simultaneously with faint stars to provide accurate navigation data. Improvements are suggested in the system for the Mariner Jupiter/Saturn 1977 and later missions.

Stanton, R. H.↗

Pyrotechnic shock measurement and data analysis requirements

A study of laboratory measurement and analysis of pyrotechnic shock prompted by a discrepancy in preliminary Mariner Jupiter/Saturn shock test data is reported. It is shown that before generating shock response plots from any recorded pyrotechnic event, a complete review of each instrumentation and analysis system must be made. In addition, the frequency response capability of the tape recorder used should be as high as possible; the discrepancies in the above data were due to inadequate frequency response in the FM tape recorders. The slew rate of all conditioning amplifiers and input converters must be high enough to prevent signal distortion at maximum input voltage; amplifier ranges should be selected so that the input pulse is approximately 50% of full scale; the Bessel response type should be chosen for digital shock analysis if antialiasing filters are employed; and transducer selection must consider maximum acceleration limit, mounted resonance frequency, flat clean mounting surfaces, base bending sensitivity, and proper torque.

Albers, L.↗

Jovian system science issues and implications for a Mariner Jupiter Orbiter mission

Science goals for missions to Jupiter in the early 1980's are reviewed and a case is made for the science community to play the key role in assigning relative priorities for these goals. A reference set of measurement requirements and their priorities is established and those high priority goals that are most demanding on spacecraft and mission design are used to develop a reference mission concept. An orbiter mission is required to satisfy a majority of the measurements, and a spacecraft data handling capability as least equivalent to the Mariner Jupiter/Saturn spacecraft is the major system design driver. This reference Mission Concept is called Mariner Jupiter Orbiter. The remaining measurement requirements are reviewed in light of the potential science return of this mission, and certain options are developed to augment this science return. Two attractive options fulfill high priority objectives not achieved by the reference Mariner Jupiter Orbiter mission alone: an atmospheric entry probe, released prior to orbit insertion; and a daughter satellite dedicated to particle and fields measurements, ejected into an independent orbit about Jupiter.

Beckman, J. C.↗

The Outer Planet Mariner Spacecraft

The Mariner Jupiter/Saturn 1977 Spacecraft is designed to conduct a broad range of intensive investigations of the Jupiter and Saturn planetary systems, and of the interplanetary medium from earth to beyond Saturn. The spacecraft design has evolved from earlier Mariners, the Viking Orbiter, and the technology available for implementing long-life, reliable spacecraft designs. A description of the design is presented, and adaptations of that design for Jupiter/Uranus, Jupiter Orbiter, probe carrying, and mini-satellite carrying missions are discussed.

Draper, R. F.↗

Science planning and mission strategy for the 1979 Jupiter/Uranus opportunity

An intensive science and mission planning effort has been underway for several years to develop the next logical candidate mission to the outer planets following the Mariner Jupiter/Saturn 1977 Mission. The highest priority candidate that emerges from this effort is the launch of a MJS-derived Mariner spacecraft to Uranus during the 1979 Jupiter/Uranus opportunity. Since 1972 when the Outer Planets Science Advisory Group recommended MJU79 to follow MJS77, four other science groups have addressed this issue and arrived at the same recommendation. Currently, the planning effort is most intensive and the paper will report the past and present determinations of the various science and mission planning activities, emphasizing science value, technical factors and fiscal constraints.

Moore, J. W.↗

Reliability considerations in long-life outer planet spacecraft system design

A Mariner Jupiter/Saturn mission has been planned for 1977. System reliability questions are discussed, taking into account the actual and design lifetime, causes of mission termination, in-flight failures and their consequences for the mission, and the use of redundancy to avoid failures. The design process employed optimizes the use of proven subsystem and system designs and then makes the necessary improvements to increase the lifetime as required.

Casani, E. K.↗

A high-precision CdS photodetector for sun sensor applications

A sun detector developed for the Mariner Jupiter/Saturn mission is described. Redundant photopotentiometers for both pitch and yaw axes, positioned below slit apertures, provide spacecraft stabilization and biased operation over plus or minus 20-deg fields of view. The biased (off-sun) operation is required for pointing the 366-cm-diameter (spacecraft-fixed) radio antenna toward earth. Configuration and fabrication processes are presented, along with a summary of development history. Particular attention is given to the properties of cadmium sulfide as these affect adaptation to this application.

Chamberlain, F. R.↗