Search NASA⌕ Search

SEARCH · Search NASA

Results for “LCLS II”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Commissioning plan for LCLS II 2 K cold box

Commissioning of the LCLS II cryogenic plant has been planned with respect to electrical and mechanical systems checkout, equipment cleanup, cool-down, and individual performance evaluation. This plant consists of warm and cold storage, helium compressors, 4.5 K and 2 K cold boxes, and all auxiliaries typical for helium refrigeration processes. The 2 K cold box, consisting of five cold compressors in series to produce the flow and pressures necessary for 2K operation, will be the last equipment installed and, along with an additional 10,000 L helium dewar, will allow the entire plant to be commissioned as a single entity. The pre-commissioning stages, commissioning plan for 2 K cold box without connecting to the LCLS II LINAC, additional test equipment needed to simulate the loads, all process studies and associated results are described herein.

36 MATERIALS SCIENCE↗

Operational Experience of a Cryomodule Test Stand for LCLS-II Cryomodules

CMTS1 (cryomodule test stand 1) at Fermilab was built to test cryomodules built for the LCLS-II beamline at SLAC and is currently testing cryomodules for LCLS-II-HE, the high energy upgrade to LCLS-II. The first cryomodule test was in 2016 and to date over 30 cryomodules have been tested here. This talk will highlight operational experience of the vacuum systems including insulating, coupler, and a low particulate beamline vacuum system. It will focus on the problems that have come up over the years, their solutions, and mitigations put in place to prevent further issues.

43 PARTICLE ACCELERATORS↗

LCLS-II MPS Link Node

LCLS-II MPS Link Node EPICS IOC developed by SLAC National Accelerator Laboratory.

Vasquez, Jesus↗

Tests Of The Extended Range SRF Cavity Tuners For The LCLS-II-HE Project*

The LCLS-II HE superconducting linac can produce multi-energy beams by supporting multiple undulator lines simultaneously. This could be achieved by using the cavity SRF tuner in the off-frequency detune mode. This off-frequency operation method was tested in the verification cryomodule (vCM) and CM 1 at Fermilab at 2 K. In both cases, the tuners achieved a frequency shift of -565$\pm$80 kHz. This study will discuss cavity frequency during each step as it is being assembled in the cryomodule string and finally when it is being tested at 2 K. Tracking the cavity frequency helped enable the tuners to reach this large frequency shift. The specific procedures of tuner setting during assembly will be presented.

43 PARTICLE ACCELERATORS↗

The dynamic synthesis time-lag control for the 1.3 GHz LCLS-II Cryomodule test at Fermilab

The 1.3GHz LCLS-II Cryomodule (CM) has 8 cavities and each cavity has 9 RF cells and 80W heater. The 1.3GHz LCLS-II CM is 12.2-meter-long and contains a total 241.3 liters (equivalent liquid) of liquid helium, which is filling up by the 4KW@2.0K cryogenic plant at the Fermilab Cryomodule Test Facility (CMTF). The dynamic synthesis 2K cryogenic control system is built to control the long time-lag, unstable CM cryogenic system, under different modes operations. A report on the results obtained from the dynamic synthesis long time-lag control in the CMTF 1.3GHz CM test will be presented.

43 PARTICLE ACCELERATORS↗

Accelerated Lifetime Test of the SRF Dressed Cavity/Tuner System for LCLS II HE Project

The off-frequency detune method is being considered for application in the LCLS-II-HE superconducting linac to produce multi-energy electron beams for supporting multiple undulator lines simultaneously [1]. Design of the tuner has been changed to deliver roughly 3 times larger frequency tuning range. Working requirements for off-frequency operation (OFO) state that cavities be tuned at least twice a month. This specification requires the in-crease of the tuner longevity by 20 times compared with LCLS-II demands. Accelerated longevity tests of the LCLS-II HE dressed cavity with tuner were conducted at FNAL's HTS. Detail analysis of wearing and impacts on performances of the tuner's piezo and stepper motor actuators will be presented. Additionally, results of longevity testing of the dressed cavity bellow, when cooled down to 2 K and compressed by 2.6 mm for roughly 2000 cycles, will be presented.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

LCLS-II helium cryoplant and cryo distribution system installation

The helium cryoplant and cryo distribution system (CDS) are key elements of the new superconducting Linac Coherent Light Source (LCLS-II) and will provide superfluid helium to the accelerator. The cryoplant consists of two helium refrigerators with an equivalent 4.5 K refrigeration capacity of 18 kW each. The 37 cryomodules of the LINAC will be operated at a temperature of 2.0 K to accelerate a 4 GeV electron beam that will generate extremely bright X-ray laser light. Two five-stage cold compressor cold boxes will be utilized to provide superfluid helium II for the superconducting cavity structures with a total cooling capacity of 8 kW at 2.0 K. This paper describes the installation of the LCLS-II cryoplant and CDS. The LCLS-II cryoplant was designed and contributed by Jefferson Lab. To expedite the project completion the reuse of proven design and technology from the Jefferson Lab CHL-2 cryoplant was the preferred strategy. The CDS consists of ~260 m thermally shielded and vacuum super insulated transfer lines, two distribution boxes and eight feed and end caps, and was designed and contributed by Fermilab. SLAC installed the cryoplant components into a newly erected building and the CDS components into the existing accelerator tunnel and klystron gallery with strong engineering support from both partner labs.

43 PARTICLE ACCELERATORS↗

Design Status of BCC Cryomodule for LCLS-II HE

A Buncher or Capture Cavity (BCC) Cryomodule is currently in development at Fermilab for use in a second injector for LCLS-II-HE. The BCC Cryomodule is designed to contain one 1.3 GHz cavity and one solenoid magnet as part of a 100MeV low emittance injector. The design considerations for the Cryomodule are similar to the LCLS-II cryomodule with additional requirements to account for additional vacuum loading at the end of this vessel due to the termination of the insulating vacuum. To accomplish this design, the cryomodule is being developed using the experience gained during the development of the LCLS-II cryomodule. The design, analysis, and status of the Cryomodule will be discussed.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Design Status of BCC Cryomodule for LCLS-II HE

A Buncher or Capture Cavity (BCC) Cryomodule is currently in development at Fermilab for use in a second injector for LCLS-II-HE. The BCC Cryomodule is designed to contain one 1.3 GHz cavity and one solenoid magnet as part of a 100MeV low emittance injector. The design considerations for the Cryomodule are similar to the LCLS-II cryomodule with additional requirements to account for additional vacuum loading at the end of this vessel due to the termination of the insulating vacuum. To accomplish this design, the cryomodule is being developed using the experience gained during the development of the LCLS-II cryomodule. The design, analysis, and status of the Cryomodule will be discussed.

43 PARTICLE ACCELERATORS↗

SRF Cavity Tuners for 3.9 GHz Cryomodules for LCLS-II Project

Fermilab conducted testing of three 3.9 GHz cryomodules for the LCLS-II project that will operate in continuous wave mode. A fast/fine tuning component was added to the LCLS-II 3.9 GHz tuner design due to the cavity bandwidth of 130 Hz which consists of two encapsulated piezos. Several cavities faced problems with fast-tuner operations after cooldown to 2 K and tuning the cavities to 3.9 GHz in cryomodule 2. All the piezo actuators were in working conditions but the slow tuner ranges required to stretch some of the cavities to the operational 3.9 GHz frequency were too small to deliver the required preload on the piezos. This behavior can be attributed to several factors: setting the initial warm cavity frequency during production too high, pressure tests of the warm cryomodule could have changed cavity frequency; and the small bending and twisting of the cavity-tuner system during the cooldown and warmup of the cavities. A decision was made to inelastically retune the warm cavities to decrease the unrestrained frequency by 200-300 kHz, this was done via the slow tuner. The results for this retuning method of three 3.9GHz cryomodules will be discussed.

43 PARTICLE ACCELERATORS↗

LCLS-II and HE Cryomodule Microphonics at CMTF at Fermilab

Microphonics causes the cavity to detune. This study discusses the microphonics of 16 cryomodules, 14 for LCLS-II and 2 for LCLS-II HE tested at CMTF. The peak detuning, as well as the RMS detuning for each cryomodule, will be discussed. For each cryomodule, the data was taken with enough soaking time to prevent any thermalization effects which can show up in the detuning. Each data capture taken was 30 minutes or longer and sampled at 1 kHz.

43 PARTICLE ACCELERATORS↗

Measurement of the LCLS-II dark current using the LDMX Trigger Scintillator Prototype

The Light Dark Matter eXperiment (LDMX) is a proposed fixed-target missing momentum search for sub-GeV thermal relic dark matter. LDMX aims to probe thermal dark matter targets with 1016 electrons on target. Such an approach requires a high-repetition rate, low-current beam, with an average of one electron on target per event. These requirements are well-suited to the DArk Sector Experiments at LCLS-II (DASEL) facility, which will take advantage of the unused RF buckets between LCLS-II bunches to produce a well-defined low-current beam with a 26.9 ns bunch spacing. This document describes the results of a measurement of dark current in the Sector 30 transfer line (S30XL) of the LCLS-II beam, using a prototype of the LDMX trigger scintillator (TS) subsystem.

Berzin, Elizabeth [SLAC]↗

LCLS-II Helium Refrigeration System : A comprehensive overview of the project

SLAC National Accelerator Laboratory has upgraded to LCLS-II, featuring a 4 GeV superconducting accelerator composed of 37 cryomodules and two large helium refrigeration systems with a total cooling capacity of 8 kW at 2.0 K. The cryogenic system at SLAC is the successful outcome of a nine-year partnership between SLAC, Fermilab, and Jefferson Lab. This paper highlights the joint efforts between Jefferson Lab and SLAC in the development and implementation of the LCLS-II Cryogenic Plants. It details the project organization, schedule, budget, staffing profile and procurement strategy.

42 ENGINEERING↗

SIMS CHARACTERIZATION OF NITROGEN DOPING OF LCLS-II-HE PRODUCTION CAVITIES

The thermal diffusion of nitrogen into the surface of niobium has been shown to yield superior low-loss SRF performance. An effective solution was identified and promptly employed in the production of cryomodules for LCLS-II. With added experience and R&D, a modified process was chosen for use in the upgrade for LCLS-II-HE. Largely motivated by this circumstance, supporting research has significantly refined the technique for making calibrated secondary ion mass spectrometry (SIMS) measurements of the N concentration depth profiles produced by production processes. Standardized reference samples were included with four HE production cavities in their N-doping furnace runs. We report the calibrated dynamic SIMS depth profiles of N, C, and O for these samples, together with the cryogenic acceptance test performance of the associated cavities. Interpretation and comparison with similar samples acquired in other furnaces highlights the importance of intentional process quality control of furnace conditions.

Reece, Charles↗

SIMS CHARACTERIZATION OF NITROGEN DOPING OF LCLS-II-HE PRODUCTION CAVITIES

The thermal diffusion of nitrogen into the surface of niobium has been shown to yield superior low-loss SRF performance. An effective solution was identified and promptly employed in the production of cryomodules for LCLS-II. With added experience and R&D, a modified process was chosen for use in the upgrade for LCLS-II-HE. Largely motivated by this circumstance, supporting research has significantly refined the technique for making calibrated secondary ion mass spectrometry (SIMS) measurements of the N concentration depth profiles produced by production processes. Standardized reference samples were included with four HE production cavities in their N-doping furnace runs. We report the calibrated dynamic SIMS depth profiles of N, C, and O for these samples, together with the cryogenic acceptance test performance of the associated cavities. Interpretation and comparison with similar samples acquired in other furnaces highlights the importance of intentional process quality control of furnace conditions.

Reece, Charles↗

LCLS-II-HE Cavity Qualification Testing

Acceptance testing of the LCLS-II-HE production cavities is approximately 65% complete. In this report, we present details of the test results, including summaries of the quench fields, intrinsic quality factors, and experience with field emission. We also offer an outlook on the remaining tests to be performed.

43 PARTICLE ACCELERATORS↗

Commissioning of the LCLS-II Prototype HOM Detectors with Tesla-Type Cavities at Fast

Experiments at the Fermilab Accelerator Science and Technology* (FAST) facility detected electron beam-induced high order mode (HOM) signals from Tesla superconducting cavities. This paper describes some of the signal detection hardware used in this experiment, as well as measurements of the HOM signal magnitude versus beam trajectory. These measurements were made both with a single bunch and with a train of 50 bunches at bunch charges from 400 pC/b down to 10 pC/b. The detection hardware is designed for use with the Tesla superconducting cavities of LCLS-II at SLAC** and is based on a prototype already in use at Fermilab. The HOM signal passes through a bandpass filter that is centered on several cavity dipole modes and a zero bias Schottky diode detects its magnitude. Direct comparisons were made between the FNAL chassis and the SLAC prototype for identical beam steering conditions. To support measurements with bunch charges as low as 10 pC, the SLAC detector has RF amplification between the bandpass filter and the diode detector. With this hardware, usable HOM signal measurements are obtained with a single bunch of 10 pC in cryomodule cavities as will be needed for LCLS-II.

43 PARTICLE ACCELERATORS↗