Search NASA⌕ Search

SEARCH · Search NASA

Results for “LOCATION CLOSURE”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Post-Closure Strategy for Use-Restricted Sites on the Nevada National Security Site, Nevada Test and Training Range, and Tonopah Test Range, Nevada

The purpose of this Post-Closure Strategy is to provide a consistent methodology for continual evaluation of post-closure requirements for use-restricted areas on the Nevada National Security Site (NNSS), Nevada Test and Training Range (NTTR), and Tonopah Test Range (TTR) to consolidate, modify, or streamline the program. In addition, this document stipulates the creation of a single consolidated Post-Closure Plan that will detail the current post-closure requirements for all active use restrictions (URs) and outlines its implementation and subsequent revision. This strategy will ensure effective management and control of the post-closure sites. There are currently over 200 URs located on the NNSS, NTTR, and TTR. Post-closure requirements were initially established in the Closure Report for each site. In some cases, changes to the post-closure requirements have been implemented through addenda, errata sheets, records of technical change, or letters. Post-closure requirements have been collected from these multiple sources and consolidated into several formats, such as summaries and databases. This structure increases the possibility of inconsistencies and uncertainty. As more URs are established and the post-closure program is expanded, the need for a comprehensive approach for managing the program will increase. Not only should the current requirements be obtainable from a single source that supersedes all previous requirements, but the strategy for modifying the requirements should be standardized. This will enable more effective management of the program into the future. This strategy document and the subsequent comprehensive plan are to be implemented under the assumption that the NNSS and outlying sites will be under the purview of the U.S. Department of Energy, National Nuclear Security Administration for the foreseeable future. This strategy was also developed assuming that regulatory control of the sites remains static. The comprehensive plan is not intended to be a permanent long-term stewardship plan. However, it is intended to clarify requirements and identify components to effectively manage the sites until regulatory requirements are met or management of the site changes. The Environmental Management Program is required to manage these sites until the NNSS Environmental Restoration program is completed, currently planned for 2030. Prior to completion of the Environmental Restoration program, additional planning will be conducted to ensure that long-term stewardship of the sites is maintained. A comprehensive post-closure plan can be transitioned effectively into any future site-wide long-term stewardship program that may be developed. Therefore, the post-closure plan will include current aspects of the post-closure program that are also important aspects of long-term stewardship, including the following: • Management of physical and engineering controls such as fences, signs, and soil covers • Management of institutional and administrative controls such as use restrictions and real estate systems • Management of monitoring and maintenance programs • Management of information related to the sites such as geographic information system data and related documentation The strategy will also allow for periodic review and modification of any aspect of the program to ensure continued effectiveness.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Groundwater Remediation with Pump-and-Treat Technology

Pump-and-treat (P&T) is a widely used remediation technology that involves pumping groundwater from extraction wells in the subsurface, removing contaminants of concern from the groundwater in an aboveground treatment system, reintroducing treated water into the environment – often by injection back into the groundwater aquifer or by discharge to the surface–, and groundwater monitoring to evaluate performance. In this chapter we explore how the Hanford Site uses the P&T remediation approach to treat contaminated groundwater. Six P&T facilities currently operate at the Hanford Site; however, this chapter uses the 100 Area DX and HX P&T facilities' treatment of hexavalent chromium as a case study to discuss this remediation approach. Located in the River Corridor, HX and DX P&T facilities are much closer to reaching closure than the younger 200W P&T facility located in the Central Plateau’s 200W Area. As such, one can follow the historical design, operation, and optimization steps that have led these facilities closer to closure.

Saslow, Sarah A.↗

Sweat collection capsule

A sweat collection capsule permitting quantitative collection of sweat is described. The device consists of a frame held immobile on the skin, a closure secured to the frame and absorbent material located next to the skin in a cavity formed by the frame and the closure. The absorbent material may be removed from the device by removing the closure from the frame while the frame is held immobile on the skin.

Greenleaf, J. E.↗

Soil temperature and soil moisture raw data, permafrost table depths, and accompanying environmental variable data, Kenai Wildlife Refuge, 2019-2022

Data package purpose: This data package was created to contain all data used in an upcoming article, "Canopy Cover and Microtopography Control Precipitation-Enhanced Thaw of Ecosystem-Protected Permafrost." In review.This data package includes: Raw output from 19 distributed temperature profilers with a thermistor every 10 cm along a 160 cm length at a measurement interval of 15 minutes (.CSV). Raw output from two soil moisture and temperature profilers (90 cm length and 120 cm length) that took composite soil moisture readings every 15 cm along the sensor length at a measurement interval of 30 minutes (.CSV). Permafrost depths were measured annually in mid-September at DTP sensor locations (.CSV) and along an across-site transect (.CSV). Environmental variables (snow depth, canopy closure, moss depth, and elevation) for all sensor locations. Real-time kinetic (RTK) GPS points showing site microtopography (.CSV).Analysis software: Our analysis was done in Matlab. File types can be used with any software.

54 ENVIRONMENTAL SCIENCES↗

Aerosol–Ice Formation Closure: A Southern Great Plains Field Campaign

Prediction of ice formation in clouds presents one of the grand challenges in the atmospheric sciences. Immersion freezing initiated by ice-nucleating particles (INPs) is the dominant pathway of primary ice crystal formation in mixed-phase clouds, where supercooled water droplets and ice crystals coexist, with important implications for the hydrological cycle and climate. However, derivation of INP number concentrations from an ambient aerosol population in cloud-resolving and climate models remains highly uncertain. We conducted an aerosol-ice formation closure pilot study using a field-observational approach to evaluate the predictive capability of immersion freezing INPs. The closure study relies on co-located measurements of the ambient size-resolved and single-particle composition and INP number concentrations. The acquired particle data serve as input in several immersion freezing parameterizations, that are employed in cloud-resolving and climate models, for prediction of INP number concentrations. We discuss in detail one closure case study in which a front passed through the measurement site, resulting in a change of ambient particle and INP populations. We achieved closure in some circumstances within uncertainties, but we emphasize the need for freezing parameterization of potentially missing INP types and evaluation of the choice of parameterization to be employed. Overall, this closure pilot study aims to assess the level of parameter details and measurement strategies needed to achieve aerosol-ice formation closure. The closure approach is designed to accurately guide immersion freezing schemes in models, and ultimately identify the leading causes for climate model bias in INP predictions.

ice formation↗

On the variation in crack-opening stresses at different locations in a three-dimensional body

Crack propagation and closure behavior of thin, and thick middle crack tension specimens under constant amplitude loading were investigated using a three dimensional elastic plastic finite element analysis of fatigue crack propagation and closure. In the thin specimens the crack front closed first on the exterior (free) surface and closed last in the interior during the unloading portion of cyclic loading; a load reduced displacement technique was used to determine crack opening stresses at specified locations in the plate from the displacements calculated after the seven cycle. All the locations were on the plate external surface and were located near the crack tip, behind the crack tip, at the centerline of the crack. With this technique, the opening stresses at the specified points were found to be 0.52, 0.42, and 0.39 times the maximum applied stress.

Chermahini, R. G.↗

Post-Closure Report for Closed Resource Conservation and Recovery Act Corrective Action Units, Nevada National Security Site, Nevada, for Fiscal Year 2014

This report serves as the combined annual report for post-closure activities for several Corrective Action Units (CAUs). The locations of the sites are shown in Figure 1. This report covers fiscal year 2014 (October 2013–September 2014). The post-closure requirements for these sites are described in Resource Conservation and Recovery Act Permit Number NEV HW0101 and summarized in each CAU-specific section in Section 1.0 of this report. The results of the inspections, a summary of maintenance activities, and an evaluation of monitoring data are presented in this report. Site inspections are conducted semiannually at CAUs 90 and 91 and quarterly at CAUs 92, 110, 111, and 112. Additional inspections are conducted at CAU 92 if precipitation occurs in excess of 0.50 inches (in.) in a 24-hour period and at CAU 111 if precipitation occurs in excess of 1.0 in. in a 24-hour period. Inspections include an evaluation of the condition of the units, including covers, fences, signs, gates, and locks. In addition to visual inspections, soil moisture monitoring, vegetation evaluations, and subsidence surveys are conducted at CAU 110. At CAU 111, soil moisture monitoring, vegetation evaluations, subsidence surveys, direct radiation monitoring, air monitoring, radon flux monitoring, and groundwater monitoring are conducted. The results of the vegetation surveys and an analysis of the soil moisture monitoring data at CAU 110 are presented in this report. Results of additional monitoring at CAU 111 are documented annually in the Nevada National Security Site Waste Management Monitoring Report Area 3 and Area 5 Radioactive Waste Management Sites and in the Nevada National Security Site Data Report: Groundwater Monitoring Program Area 5 Radioactive Waste Management Site, which will be prepared in approximately June 2015. All required inspections, maintenance, and monitoring were conducted in accordance with the post-closure requirements of the permit. It is recommended to continue inspections and monitoring as scheduled.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Reconstruction of the Room D, B, G, and Q Closure Histories at the Waste Isolation Pilot Plant

Experimental measurements of room closure in salt repositories are valuable for understanding the evolution of the underground and for validating geomechanical models. Room closure was measured during a number of experiments at the Waste Isolation Pilot Plant (WIPP) during the 1980's and 1990's. Most rooms were excavated using a multi-pass mining sequence, where each pass necessarily destroyed some of the mining sequence closure measurement points. These destroyed points were promptly reinstalled to capture the closure after the mining pass. After the room was complete, the mining sequence closure measurement stations were supplemented with remotely read closure measurement stations. Although many aspects of these experiments were thoroughly documented, the digital copies of the closure data were inadvertently destroyed, the non-trivial process of zeroing and shifting the raw closure measurements after each mining pass was not precisely described, the various closure measurements within a given room were not directly compared on the same plot, and the measurements were collected for several years longer than previously reported. Consequently, the hand-written mining sequence closure measurements for Rooms D, B, G, and Q were located in the WIPP archives, digitized, and reanalyzed for this report. The process of reconstructing the mining sequence closure histories was documented in detail and the raw data can be found in the appendices. Within the mid-section of a given room, the reconstructed closure histories were largely consistent with other mining sequence and remotely read closure histories, which builds confidence in the experiments and suggests that plane strain is an appropriate modeling assumption. The reconstructed closure histories were also reasonably consistent with previously published results, except in one notable case: the reconstructed Room Q closure histories 30 days after excavation were about 45 % less than the corresponding closures reported in Munson's 1997 capstone paper.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Three Dimensional Constraint Effects on the Estimated (Delta)CTOD during the Numerical Simulation of Different Fatigue Threshold Testing Techniques

Variation in constraint through the thickness of a specimen effects the cyclic crack-tip-opening displacement (DELTA CTOD). DELTA CTOD is a valuable measure of crack growth behavior, indicating closure development, constraint variations and load history effects. Fatigue loading with a continual load reduction was used to simulate the load history associated with fatigue crack growth threshold measurements. The constraint effect on the estimated DELTA CTOD is studied by carrying out three-dimensional elastic-plastic finite element simulations. The analysis involves numerical simulation of different standard fatigue threshold test schemes to determine how each test scheme affects DELTA CTOD. The American Society for Testing and Materials (ASTM) prescribes standard load reduction procedures for threshold testing using either the constant stress ratio (R) or constant maximum stress intensity (K(sub max)) methods. Different specimen types defined in the standard, namely the compact tension, C(T), and middle cracked tension, M(T), specimens were used in this simulation. The threshold simulations were conducted with different initial K(sub max) values to study its effect on estimated DELTA CTOD. During each simulation, the DELTA CTOD was estimated at every load increment during the load reduction procedure. Previous numerical simulation results indicate that the constant R load reduction method generates a plastic wake resulting in remote crack closure during unloading. Upon reloading, this remote contact location was observed to remain in contact well after the crack tip was fully open. The final region to open is located at the point at which the load reduction was initiated and at the free surface of the specimen. However, simulations carried out using the constant Kmax load reduction procedure did not indicate remote crack closure. Previous analysis results using various starting K(sub max) values and different load reduction rates have indicated DELTA CTOD is independent of specimen size. A study of the effect of specimen thickness and geometry on the measured DELTA CTOD for various load reduction procedures and its implication in the estimation of fatigue crack growth threshold values is discussed.

Seshadri, Banavara R.↗

Riparian and Upland Restoration at the U.S. Department of Energy Rocky Flats, Colorado, Site - 12360

Remedial investigation and cleanup at the Rocky Flats, Colorado, Site was completed in 2005. Uplands, riparian, and wetland habitat were disturbed during cleanup and closure activities and required extensive revegetation. Unavoidable disturbances to habitat of the Preble's meadow jumping mouse (a federally listed species) and wetlands required consultation with regulatory agencies and mitigation. Mitigation wetlands were constructed in two drainages, and a third developed naturally where a soil borrow area intercepted the groundwater table. During the 50-plus years of site operations, 12 ponds were constructed in three drainages to manage and retain runoff and sewage treatment plant discharges prior to release off site. A batch-release protocol has been used for the past several decades at the terminal ponds, which has affected the riparian communities downstream. To return the hydrologic regime to a more natural flow-through system similar to the pre-industrial-use conditions, seven interior dams (of 12) have been breached, and the remaining five dams are scheduled for breaching between 2011 and 2020. At the breached dams, the former open water areas have transformed to emergent wetlands, and the stream reaches have returned to a flow-through system. Riparian and wetland vegetation has established very well. The valves of the terminal ponds were opened in fall 2011 to begin flow-through operations and provide water to the downstream plant communities while allowing reestablishment of vegetation in the former pond bottoms prior to breaching. A number of challenges and issues were addressed during the revegetation effort. These included reaching an agreement on revegetation goals, addressing poor substrate quality and soil compaction problems, using soil amendments and topsoil, selecting seeds, determining the timing and location of revegetation projects relative to continuing closure activities, weed control, erosion control, revegetation project field oversight, and contractual limitations. A variety of ecological restoration techniques were conducted at the site to meet these challenges. These efforts have resulted in vegetation becoming well established in most locations. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Post-Closure Inspection Report for the Tonopah Test Range and Nevada Test and Training Range, Nevada for Calendar Year 2020 (Rev. 0)

This report provides the results of the annual post-closure use restriction (UR) inspections at corrective action sites (CASs) located on the Tonopah Test Range (TTR) and Nevada Test and Training Range (NTTR). This report covers post-closure UR inspections for calendar year 2020, and includes visual inspections and repair activities completed at the following corrective action units (CAUs): • CAU 407, Roller Coaster RadSafe Area (TTR) • CAU 424, Area 3 Landfill Complexes (TTR) • CAU 453, Area 9 UXO Landfill (TTR) • CAU 487, Thunderwell Site (TTR). Note: CAU 400, Bomblet Pit and Five Points Landfill (TTR) (CASs TA-19-001-05PT, Ordnance Disposal Pit; and TA-55-00-TAB2, Ordnance Disposal Pit) no longer requires inspection and reporting, as described in the Post-Closure Inspection Report for the Tonopah Test Range and Nevada Test and Training Range, Nevada for Calendar Year 2019. Site figures are included in Appendix A. The Post-Closure Inspection Plans and Record of Technical Change modifying the requirements for each UR are included in Appendix B. The Post-Closure Inspection Checklists are included in Appendix C. Field Notes are included in Appendix D. Appendix E, Inspection Photographs, does not include photographs because none were taken during the 2020 post-closure inspections. Appendix F, Post-Closure Vegetation Monitoring Report, does not include any data because vegetation monitoring was not conducted or required at any CAU in 2020. Visual inspections were conducted according to the post-closure requirements outlined in specific CAU and CAS URs, and approved by NDEP. The annual post-closure inspections for CASs associated with CAUs 407, 424, 453, and 487 were conducted on May 20, 2020. No maintenance or repair issues were noted at CAUs 487, or at CASs associated with CAU 424 (except CASs 03-08-002-A304 and 03-08-002-A308). Maintenance items and subsequent repairs include the following: • CAU 407, CAS TA-23-001-TARC (Roller Coaster RadSafe Area): A UR sign was loose and was rehung during the inspection. • CAU 424, CAS 03-08-002-A304 (Landfill Cell A3-4): The northeast monument needed a UR sign. The UR sign was attached to the monument on August 11, 2020. • CAU 424, CAS 03-08-002-A308 (Landfill Cell A3-8): The southeast monument needed additional lava rock. The lava rock was added during the inspection. • CAU 453, CAS 09-55-001-0952 (Area 9 Landfill): Two animal burrows were noted in the western portion of the northern and southern trenches (one burrow per trench). The animal burrows were repaired on August 11, 2020.

54 ENVIRONMENTAL SCIENCES↗

A careful examination of closure models in Euler–Lagrange Simulations of compressible multiphase flow in a planar shock particle curtain problem

In this work we present a comprehensive investigation of state-of-the-art closure models employed to represent interphase momentum, thermal, and work exchange between the gas and particulate phases for Euler–Lagrange (EL) simulations in shock-driven flows. A complete list of closures for the force, torque, heat transfer, and work exchange models is provided. In particular, the present work includes a stochastic closure for the particle-to-particle variation in the quasi-steady force and a deterministic closure for particle-to-particle variation in the added mass force in an EL framework. These variations arise due to the presence of neighboring particles and particle–particle interactions. To investigate the importance of each closure term, we carry out fully three-dimensional simulations for a planar shock propagating over a random bed of inert particles. The primary goal is to evaluate the role of each closure term on the gas dynamic features (such as transmitted and reflected shock locations) and particle curtain features (such as upstream and downstream curtain locations). To this end, thirteen cases are considered, with each case progressively including a closure model with the goal to identify and quantify its contribution to the simulated dynamics. We show that the volume fraction dependence of the mean force models plays an important role in generating wave-like instabilities that lead to concentration bands. In addition, fluctuations in quasi-steady and added mass forces primarily decrease the internal instabilities that tend to enhance local volume fraction variations. Particle rotation is primarily due to inter-particle collisions, is generally weak, and does not play an important role in the translational dynamics for the present configuration. Inter-phase heat transfer has a strong effect on gas phase temperature, slows down the transmitted and reflected shocks, and decreases the width of the curtain. Furthermore, the absence of a work-coupling model fails to conserve the total energy, greatly under-predicts the gas temperature which in turn affects the particle dynamics.

Compressible flow↗

Assessing Impacts on Pressure Stabilization and Leasing Acreage for CO 2 Storage Utilizing Oil Migration Concepts

Favorable geological storage for CO 2 has long been pictured as large anticlines with thick sandstones, similar to oil reservoirs in the petroleum system. Unlike oil, however, stored CO 2 does not need to be recoverable, which raises the possibility of using dissolution and residual trapping to augment the capacity of buoyant traps and tap more of the bulk rock volume. The work presented builds on that idea, asking the following question: If we inject CO 2 down to a syncline – analogous to the carrier bed in the petroleum system – how would this injection mechanism impact storage capacity and plume shape, migration, and stabilization? To address this question, we built a reservoir model, based on seismic interpretation of Middle Miocene strata, offshore Galveston, Texas. 3-D seismic and well logs were used to characterize key intervals. Reservoirs chosen for modeling are progradational-aggradational sands with mud intercalation. They have a higher degree of heterogeneity than the more conventional reservoirs commonly targeted for CO 2 storage. Modeling investigated how far the CO 2 plume would migrate under two scenarios: (1) injecting CO 2 at the base of the salt withdrawal basin (syncline scenario) and (2) injecting CO 2 at the base of the structural closure, similar to a common injection well location for EOR purposes (base scenario). For each scenario, we separately simulated injection of 30 MT of CO 2 and 60 MT of CO 2 continuously for 30 years and observe the plume and pressure evolution for 100 years after the injection stops. The simulation shows that injecting the CO 2 into a syncline limits the vertical migration of CO 2 , thus making synclinal injection more secure. In the syncline scenario, the geological layer around the injection point is more heterogeneous than the layer in the base scenario; thus, the CO 2 tends to migrate laterally. Additionally, in the syncline scenario, the plume does not even reach the upper part of the anticline, allowing us to safely store an additional amount of CO 2 into the reservoir. Furthermore, the simulation also shows that in the syncline scenario, the times needed for the reservoir to reach its stabilized pressure after the end of injections are faster. To summarize, CO 2 injection at the base of a syncline could provide additional storage, increase the safety of the project from the limited vertical plume migration, and expedite plume stabilization, which could result in the decrease of monitoring frequency as the project runs, thus lowering the operating cost of the project in the long run.

58 GEOSCIENCES↗

Final Monitoring Plan for Site Closure at Inman, Kansas

Inman, Kansas, is a rural town located in southwest McPherson County, in sections 8, 9, 16, and 17, Township 21 South, Range 4 West (Figure 1.1). There are 1,377 people in 513 households, as of the census of 2010. The Commodity Credit Corporation of the U.S. Department of Agriculture (CCC/USDA), operated a grain storage facility at the southern edge of the city of Inman, Kansas, from 1954 to 1965. During this time, commercial grain fumigants containing carbon tetrachloride were in common use by the grain storage industry to preserve grain in their facilities. In 1997, trace to low levels of carbon tetrachloride (below the maximum contamination level [MCL] of 5.0 μg/L) were detected in three private wells near the former grain storage facility at Inman, as part of a statewide USDA private well sampling program that was implemented by the Kansas Department of Health and Environment (KDHE) near former CCC/USDA facilities. No public water supply wells were identified within 1 mi of the town by the KDHE in 1998. Carbon tetrachloride is the contaminant of primary concern at sites associated with grain storage operations. To determine whether the former CCC/USDA facility at Inman is a potential contaminant source and its possible relationship to the carbon tetrachloride contamination in groundwater, the CCC/USDA agreed to conduct a multi-phase investigation at Inman. The investigation was performed by the Environmental Science Division of Argonne National Laboratory in accordance with the Intergovernmental Agreement between the KDHE and the Farm Service Agency of the USDA.

54 ENVIRONMENTAL SCIENCES↗

Fatigue Life Analysis of Tapered Hybrid Composite Flexbeams

Nonlinear-tapered flexbeam laminates from a full-size composite helicopter rotor hub flexbeam were tested under combined constant axial tension and cyclic bending loads. The two different graphite/glass hybrid configurations tested under cyclic loading failed by delamination in the tapered region. A 2-D finite element model was developed which closely approximated the flexbeam geometry, boundary conditions, and loading. The analysis results from two geometrically nonlinear finite element codes, ANSYS and ABAQUS, are presented and compared. Strain energy release rates (G) obtained from the above codes using the virtual crack closure technique (VCCT) at a resin crack location in the flexbeams are presented for both hybrid material types. These results compare well with each other and suggest that the initial delamination growth from the resin crack toward the thick region of the flexbeam is strongly mode II. The peak calculated G values were used with material characterization data to calculate fatigue life curves and compared with test data. A curve relating maximum surface strain to number of loading cycles at delamination onset compared reasonably well with the test results.

Murri, Gretchen B.↗

Chemical Waste Landfill Annual Post-Closure Care Report Calendar Year 2014

The CWL is a 1.9-acre remediated interim status landfill located in the southeastern corner of SNL/NM Technical Area III (Figures 2-1 and 2-2) undergoing post-closure care in accordance with the PCCP (NMED October 2009 and subsequent revisions). From 1962 until 1981, the CWL was used for the disposal of chemical and solid waste generated by SNL/NM research activities. Additionally, a small amount of radioactive waste was disposed of during the operational years. Disposal of liquid waste in unlined pits and trenches ended in 1981, and after 1982 all liquid waste disposal was terminated. From 1982 through 1985, only solid waste was disposed of at the CWL, and after 1985 all waste disposal ended. The CWL was also used as a hazardous waste drum-storage facility from 1981 to 1989. A summary of the CWL disposal history is presented in the Closure Plan (SNL/NM December 1992) along with a waste inventory based upon available disposal records and information.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Heritage Center Cleanup, Closure, and Revitalization - 17426

For the past 20 years, Heritage Center, located at the East Tennessee Technology Park (ETTP), has been undergoing re-industrialization (RI) at the same time that legacy contamination from the Manhattan Project has been cleaned up. The DOE Oak Ridge Office of Environmental Management (OREM), cleanup contractor URS - CH2M Oak Ridge LLC (UCOR), and the Community Reuse Organization of East Tennessee (CROET) have developed a roadmap to achieve the desired end state for the site. The plan builds on ETTP cleanup, which will complete remediation to regulatory requirements, followed by closure activities that have identified all of the activities necessary to fully transition the site from closure to Heritage Center Revitalization. The ultimate goal is to eliminate or minimize DOE's long-term financial responsibility by transferring ownership of all of the property within the former ETTP site. DOE OREM is in the unique position of nearing the completion of cleanup scope at ETTP, planned for fiscal year (FY) 2020, and finalizing closure of the site (minimizing DOE's long-term liability and responsibility). In tandem, CROET is revitalizing and transforming the site into a unique end state, including a private industrial park and a National Historical Park with conservation activities integrated around and through the site. The closure and revitalization planning efforts were initiated during FY 2016 and will be finalized in FY 2017. The Closure Plan identifies all of the potential gaps between environmental cleanup of the site per the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) and the ultimate preferred end state. CROET, involved throughout the development of the closure strategy, is building upon the Closure Plan by completing the Revitalization Plan. The Revitalization Plan takes advantage of the Heritage Center's diverse amenities and uniqueness while maximizing its economic development potential, including a private-sector industrial park, conservation area, National Historical Park, and proposed regional airport. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗