Search NASA⌕ Search

SEARCH · Search NASA

Results for “Life Cycle Analysis Options - Biomass”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

33 records · Page 2

Altair Lander Life Support: Design Analysis Cycles 1, 2, and 3

NASA is working to develop a new lunar lander to support lunar exploration. The development process that the Altair project is using for this vehicle is unlike most others. In Lander Design Analysis Cycle 1 (LDAC-1), a single-string, minimum functionality design concept was developed, including life support systems for different vehicle configuration concepts, first for a combination of an ascent vehicle and a habitat with integral airlocks, and then for a combined ascent vehicle-habitat with a detachable airlock. In LDAC-2, the Altair team took the ascent vehicle-habitat with detachable airlock and analyzed the design for the components that were the largest contributors to the risk of loss of crew (LOC). For life support, the largest drivers were related to oxygen supply and carbon dioxide control. Integrated abort options were developed at the vehicle level. Many life support failures were not considered to result in LOC because they had a long enough time to effect that abort was considered a feasible option to safely end the mission before the situation became life threatening. These failures were then classified as loss of mission (LOM) failures. Many options to reduce LOC risk were considered, and mass efficient solutions to the LOC problems were added to the vehicle design at the end of LDAC-2. In LDAC-3, the new design was analyzed for large contributors to the risk of LOM. To avoid ending the mission early or being unable to accomplish goals like performing all planned extravehicular activities (EVAs), various options were assessed for their combination of risk reduction and mass cost. This paper outlines the major assumptions, design features, and decisions related to the development of the life support system for the Altair project through LDAC-3.

Anderson, Molly↗

Imagine Moving Off the Planet

Moving off the planet will be a defining moment of this century as landing on the Moon was in the last. For that to happen for humans to go where humans cannot go-- simulation is the sole solution. NASA supports simulation for life-cycle activities: design, analysis, test, checkout, operations, review and training. We contemplate time spans of a century and more, teams dispersed to different planets and the need for systems that endure or adapt as missions, teams and technology change. Without imagination such goals are impossible. But with imagination we can go outside our present perception of reality to think about and take action on what has been, is and, especially, what might be. Consciously maturing an imagined, possibly workable, idea through framing it to optimization to design, and building the product provides us with a new approach to innovation and simulation fidelity. We address options, analyze, test and make improvements in how we think and work. Each step includes increasingly exact information about costs, schedule, who will be needed, where, when and how. NASA i integrating such thinking into its Exploration Product Realization Hierarchy for simulation and analysis, test and verification, and stimulus response goals. Technically NASA follows a timeline of studies, analysis, definition, design, development and operations with concurrent documentation. We have matched this Product Realization Hierarchy with a continuum from image to realization that incorporates commitment, current and needed research and communication to ensure superior and creative problem solving as well as advances in simulation. One result is a new approach to collaborative systems. Another is a distributed observer network prototyped using game engine technology bringing advanced 3-D simulation of a simulation to the desktop enabling people to develop shared consensus of its meaning. Much of the value of simulation comes from developing in people their ability to make good decisions and reflexes supporting impressive achievement. Synthesizing imagination systematically into our work - and thus our success - is a challenge. NASA engineers have inventive minds, and the task is determining how best to enable them to devise the simulation and other innovations that will make a story so clear and so intellectually sound that people can carry out the mission for 50-100 years. This demands skills and knowledge traditionally under-respected and under-represented in technology organizations. But we are beginning to see that the process encourages efficiency and enables us to attain more effective results. We have to elicit imaginative, intelligent and effective ways to make better use than ever of the minds we have and will have available. We have to accept the challenge to accomplish tasks among dispersed interdisciplinary teams who must overcome changing priorities and technology, time and distance in order to maximize interactivity and innovation as never before. Attention to the process of innovation is a practical means to increase the efficiency of our intelligence. We have an obligation to reexamine and improve the process by which we approach and exercise innovation as we accept the charge to move off the planet.

Elfrey, Priscilla R.↗

Business Intelligence Modeling in Launch Operations

This technology project is to advance an integrated Planning and Management Simulation Model for evaluation of risks, costs, and reliability of launch systems from Earth to Orbit for Space Exploration. The approach builds on research done in the NASA ARC/KSC developed Virtual Test Bed (VTB) to integrate architectural, operations process, and mission simulations for the purpose of evaluating enterprise level strategies to reduce cost, improve systems operability, and reduce mission risks. The objectives are to understand the interdependency of architecture and process on recurring launch cost of operations, provide management a tool for assessing systems safety and dependability versus cost, and leverage lessons learned and empirical models from Shuttle and International Space Station to validate models applied to Exploration. The systems-of-systems concept is built to balance the conflicting objectives of safety, reliability, and process strategy in order to achieve long term sustainability. A planning and analysis test bed is needed for evaluation of enterprise level options and strategies for transit and launch systems as well as surface and orbital systems. This environment can also support agency simulation .based acquisition process objectives. The technology development approach is based on the collaborative effort set forth in the VTB's integrating operations. process models, systems and environment models, and cost models as a comprehensive disciplined enterprise analysis environment. Significant emphasis is being placed on adapting root cause from existing Shuttle operations to exploration. Technical challenges include cost model validation, integration of parametric models with discrete event process and systems simulations. and large-scale simulation integration. The enterprise architecture is required for coherent integration of systems models. It will also require a plan for evolution over the life of the program. The proposed technology will produce long-term benefits in support of the NASA objectives for simulation based acquisition, will improve the ability to assess architectural options verses safety/risk for future exploration systems, and will facilitate incorporation of operability as a systems design consideration, reducing overall life cycle cost for future systems. The future of business intelligence of space exploration will focus on the intelligent system-of-systems real-time enterprise. In present business intelligence, a number of technologies that are most relevant to space exploration are experiencing the greatest change. Emerging patterns of set of processes rather than organizational units leading to end-to-end automation is becoming a major objective of enterprise information technology. The cost element is a leading factor of future exploration systems.

Bardina, Jorge E.↗

Optimizing spacecraft design - optimization engine development : progress and plans

At JPL and NASA, a process has been developed to perform life cycle risk management. This process requires users to identify: goals and objectives to be achieved (and their relative priorities), the various risks to achieving those goals and objectives, and options for risk mitigation (prevention, detection ahead of time, and alleviation). Risks are broadly defined to include the risk of failing to design a system with adequate performance, compatibility and robustness in addition to more traditional implementation and operational risks. The options for mitigating these different kinds of risks can include architectural and design choices, technology plans and technology back-up options, test-bed and simulation options, engineering models and hardware/software development techniques and other more traditional risk reduction techniques.

risk↗

Nuclear modules for space electric propulsion

Analysis of interplanetary cargo and piloted missions requires calculations of the performances and masses of subsystems to be integrated in a final design. In a preliminary and scoping stage the designer needs to evaluate options iteratively by using fast computer simulations. The Oak Ridge National Laboratory (ORNL) has been involved in the development of models and calculational procedures for the analysis (neutronic and thermal hydraulic) of power sources for nuclear electric propulsion. The nuclear modules will be integrated into the whole simulation of the nuclear electric propulsion system. The vehicles use either a Brayton direct-conversion cycle, using the heated helium from a NERVA-type reactor, or a potassium Rankine cycle, with the working fluid heated on the secondary side of a heat exchanger and lithium on the primary side coming from a fast reactor. Given a set of input conditions, the codes calculate composition. dimensions, volumes, and masses of the core, reflector, control system, pressure vessel, neutron and gamma shields, as well as the thermal hydraulic conditions of the coolant, clad and fuel. Input conditions are power, core life, pressure and temperature of the coolant at the inlet of the core, either the temperature of the coolant at the outlet of the core or the coolant mass flow and the fluences and integrated doses at the cargo area. Using state-of-the-art neutron cross sections and transport codes, a database was created for the neutronic performance of both reactor designs. The free parameters of the models are the moderator/fuel mass ratio for the NERVA reactor and the enrichment and the pitch of the lattice for the fast reactor. Reactivity and energy balance equations are simultaneously solved to find the reactor design. Thermalhydraulic conditions are calculated by solving the one-dimensional versions of the equations of conservation of mass, energy, and momentum with compressible flow.

Difilippo, F. C.↗

Multiple Restart Testing of a Stainless Steel Sodium Heat Pipe Module

A heat pipe cooled reactor is one of several candidate reactor cores being considered for space power and propulsion systems to support future space exploration activities. Long life heat pipe modules. with designs verified through a combination of theoretical analysis and experimental evaluations. would be necessary to establish the viability of this option. A hardware-based program was initiated to begin experimental testing of components to verify compliance of proposed designs. To this end, a number of stainless steel/sodium heat pipe modules have been designed and fabricated to support experimental testing of a Safe Affordable Fission Engine (SAFE) project, a 100-kWt core design pursued jointly by the Marshall Space Flight Center and the Los Alamos National Laboratory. One of the SAFE heat pipe modules was successfully subjected to over 200 restarts. examining the behavior of multiple passive freeze/thaw operations. Typical operation included a 1-hour startup to an average evaporator temperature of 1000 K followed by a 15 minute hold at temperature. Nominal maximum input power during the hold period was 1.9 kW. Between heating cycles the module was cooled to less than 325 K, returning the sodium to a frozen state in preparation fop the next startup cycle.

Martin, James↗

Advanced launch system. Advanced development oxidizer turbopump program

On May 19, 1989, Pratt & Whitney was awarded contract NAS8-37595 by the National Aeronautics and Space Administration, Marshall Space Flight Center, Huntsville Alabama for an Advanced Development Program (ADP) to design, develop and demonstrate a highly reliable low cost, liquid oxygen turbopump for the Advanced Launch System (ALS). The ALS had an overall goal of reducing the cost of placing payloads in orbit by an order of magnitude. This goal would require a substantial reduction in life cycle costs, with emphasis on recurring costs, compared to current launch vehicles. Engine studies supporting these efforts were made for the Space Transportation Main Engine (STME). The emphasis on low cost required design simplification of components and subsystems such that the ground maintenance and test operations was minimized. The results of the Oxygen Turbopump ADP technology effort would provide data to be used in the STME. Initially the STME baseline was a gas generator cycle engine with a vacuum thrust level of 580,000 lbf. This was later increased to 650,000 lbf and the oxygen turbopump design approach was changed to reflect the new thrust level. It was intended that this ADP program be conducted in two phases. Phase 1, a basic phase, would encompass the preliminary design effort, and Phase II, an optional contract phase to cover design, fabrication and test evaluation of an oxygen turbopump at a component test facility at the NASA John C. Stennis Space Center in Mississippi. The basic phase included preliminary design and analysis, evaluation of low cost concepts, and evaluation of fabrication techniques. The option phase included design of the pump and support hardware, analysis of the final configuration to ensure design integrity, fabrication of hardware to demonstrate low cost, DVS Testing of hardware to verify the design, assembly of the turbopump and full scale turbopump testing. In December 1990, the intent of this ADP to support the design and development was changed. The design effort for the oxygen turbopump became part of the STME Phase B contract. The status of the pump design funded through this ADP was presented at the Preliminary Design Review (PDR) at the MSFC on October 24, 1990. Advancements in the design of the pump were subsequently continued under the Phase B Contract. The emphasis of this ADP became the demonstration of individual technologies that would have the greatest potential for reducing the recurring cost and increasing reliability. In October of 1992, overall program funding was reduced and work on this ADP was terminated.

Source record↗

Building Operations Efficiencies into NASA's Ares I Crew Launch Vehicle Design

The U.S. Vision for Space Exploration guides the National Aeronautics and Space Administration's (NASA's) challenging missions that expand humanity's boundaries and open new routes to the space frontier. With the Agency's commitment to complete the International Space Station (ISS) and to retire the venerable Space Shuttle by 2010, the NASA Administrator commissioned the Exploration Systems Architecture Study (ESAS) in 2005 to analyze options for safe, simple, cost-efficient launch solutions that could deliver human-rated space transportation capabilities in a timely manner within fixed budget guidelines. The Exploration Launch Projects (ELP) Office, chartered by the Constellation Program in October 2005, has been conducting systems engineering studies and business planning to successively refine the design configurations and better align vehicle concepts with customer and stakeholder requirements, such as significantly reduced life-cycle costs. As the Agency begins the process of replacing the Shuttle with a new generation of spacecraft destined for missions beyond low-Earth orbit to the Moon and Mars, NASA is designing the follow-on crew and cargo launch systems for maximum operational efficiencies. To sustain the long-term exploration of space, it is imperative to reduce the $4 billion NASA typically spends on space transportation each year. This paper gives toplevel information about how the follow-on Ares I Crew Launch Vehicle (CLV) is being designed for improved safety and reliability, coupled with reduced operations costs. These methods include carefully developing operational requirements; conducting operability design and analysis; using the latest information technology tools to design and simulate the vehicle; and developing a learning culture across the workforce to ensure a smooth transition between Space Shuttle operations and Ares vehicle development.

Dumbacher, Daniel L.↗

Gear Crack Propagation Investigation

Reduced weight is a major design goal in aircraft power transmissions. Some gear designs incorporate thin rims to help meet this goal. Thin rims, however, may lead to bending fatigue cracks. These cracks may propagate through a gear tooth or into the gear rim. A crack that propagates through a tooth would probably not be catastrophic, and ample warning of a failure could be possible. On the other hand, a crack that propagates through the rim would be catastrophic. Such cracks could lead to disengagement of a rotor or propeller from an engine, loss of an aircraft, and fatalities. To help create and validate tools for the gear designer, the NASA Lewis Research Center performed in-house analytical and experimental studies to investigate the effect of rim thickness on gear-tooth crack propagation. Our goal was to determine whether cracks grew through gear teeth (benign failure mode) or through gear rims (catastrophic failure mode) for various rim thicknesses. In addition, we investigated the effect of rim thickness on crack propagation life. A finite-element-based computer program simulated gear-tooth crack propagation. The analysis used principles of linear elastic fracture mechanics, and quarter-point, triangular elements were used at the crack tip to represent the stress singularity. The program had an automated crack propagation option in which cracks were grown numerically via an automated remeshing scheme. Crack-tip stress-intensity factors were estimated to determine crack-propagation direction. Also, various fatigue crack growth models were used to estimate crack-propagation life. Experiments were performed in Lewis' Spur Gear Fatigue Rig to validate predicted crack propagation results. Gears with various backup ratios were tested to validate crack-path predictions. Also, test gears were installed with special crack-propagation gages in the tooth fillet region to measure bending-fatigue crack growth. From both predictions and tests, gears with backup ratios (rim thickness divided by tooth height) of 3.3 and 1.0 produced tooth fractures, whereas a backup ratio of 0.3 produced rim fractures. For a backup ratio of 0.5, the experiments produced rim fractures and the predictions produced both rim and tooth fractures, depending on the initial geometry of the crack. Good correlation between predicted and measured crack growth was achieved when the fatigue crack-closure concept was introduced into the analysis. As the gear rim thickness decreased, the compressive cyclic stress in the gear-tooth fillet region increased. This retarded crack growth and increased the number of crack-propagation cycles to failure.

Source record↗

Extreme Environments Solar Power Project For Use Near Jupiter

The Extreme Environment Solar Power (EESP) Project goal was to develop solar cell and solar array design concept technologies for space power applications in high radiation and low solar intensity, low temperature (LILT) environments. NASA missions focused on outer planets, such as Jupiter, are subjected to intense radiation while experiencing less than ten percent of the solar flux relative to a mission in the general vicinity of Earth. Under these conditions, present solar array technology is not as efficient in converting the sun’s energy, and the solar array performance degrades quickly due to the additional radiation exposure. The EESP Project objectives were accomplished through four competitively selected contracts. These contracts were awarded with a Base and two option periods of performance. The Base requirements included System Design and Component Test & Analysis with a duration of nine and one half (9.5) months. The Option I requirements involved the fabrication of test hardware that NASA would evaluate following its delivery, and this period of performance had a duration of thirteen (13) months. The Option II requirements involved the fabrication of a scalable system prototype that can be integrated into a system level application and be demonstrated in a relevant environment. Option II had a duration of fifteen (15) months. The Transformational Array (TA) is an array concept developed by JHU-APL with Deployable Space Systems (DSS), SolAero Technologies and NewForge Technologies that proceeded through all three contract periods. The TA combines the DSS Roll Out Solar Array (ROSA) with Flexible Array Concentrator Technology (FACT) and SolAero’s Inverted Metamorphic Multijunction (IMM) solar cells for operation in the EESP Project environment. To achieve the EESP Project goals, the JHU-APL team conducted several investigations to improve performance of the solar cells and increase their efficiency, reduce outgassing contamination of the concentrators from the solar cell assembly adhesives, and to test the robustness of a sample blanket during deployment and retraction. Additionally, the team performed vibration, thermal cycling, and performance tests at a Standard Power Module (SPM) level. At the end of Option II, the JHU-APL team achieved the following performance metrics: • 39% beginning of life (BOL) cell efficiency at 5 AU and -125 C • 29% end of life (EOL) efficiency at the blanket level at 50 W/m2, -125 C and 4x1015 1 MeV e/cm2 • Increased specific power to 8 W/kg at EOL for the entire array including structure, deployment, and pointing mechanisms • Demonstrated the ability to survive numerous deploy-retract cycles without degradation • Reached a current System-Level Technology Readiness Level, TRL5 This presentation will describe the Transformational Array and component technologies and will discuss future potential uses for the system.

Anna Maria Pal↗

Hardware Development Process for Human Research Facility Applications

The simple goal of the Human Research Facility (HRF) is to conduct human research experiments on the International Space Station (ISS) astronauts during long-duration missions. This is accomplished by providing integration and operation of the necessary hardware and software capabilities. A typical hardware development flow consists of five stages: functional inputs and requirements definition, market research, design life cycle through hardware delivery, crew training, and mission support. The purpose of this presentation is to guide the audience through the early hardware development process: requirement definition through selecting a development path. Specific HRF equipment is used to illustrate the hardware development paths. The source of hardware requirements is the science community and HRF program. The HRF Science Working Group, consisting of SCientists from various medical disciplines, defined a basic set of equipment with functional requirements. This established the performance requirements of the hardware. HRF program requirements focus on making the hardware safe and operational in a space environment. This includes structural, thermal, human factors, and material requirements. Science and HRF program requirements are defined in a hardware requirements document which includes verification methods. Once the hardware is fabricated, requirements are verified by inspection, test, analysis, or demonstration. All data is compiled and reviewed to certify the hardware for flight. Obviously, the basis for all hardware development activities is requirement definition. Full and complete requirement definition is ideal prior to initiating the hardware development. However, this is generally not the case, but the hardware team typically has functional inputs as a guide. The first step is for engineers to conduct market research based on the functional inputs provided by scientists. CommerCially available products are evaluated against the science requirements as well as modifications needed to meet program requirements. Options are consolidated and the hardware development team reaches a hardware development decision point. Within budget and schedule constraints, the team must decide whether or not to complete the hardware as an in-house, subcontract with vendor, or commercial-off-the-shelf (COTS) development. An in-house development indicates NASA personnel or a contractor builds the hardware at a NASA site. A subcontract development is completed off-site by a commercial company. A COTS item is a vendor product available by ordering a specific part number. The team evaluates the pros and cons of each development path. For example, in-bouse developments utilize existing corporate knowledge regarding bow to build equipment for use in space. However, technical expertise would be required to fully understand the medical equipment capabilities, such as for an ultrasound system. It may require additional time and funding to gain the expertise that commercially exists. The major benefit of subcontracting a hardware development is the product is delivered as an end-item and commercial expertise is utilized. On the other hand, NASA has limited control over schedule delays. The final option of COTS or modified COTS equipment is a compromise between in-house and subcontracts. A vendor product may exist that meets all functional requirements but req uires in-house modifications for successful operation in a space environment. The HRF utilizes equipment developed using all of the paths described: inhouse, subcontract, and modified COTS.

Bauer, Liz↗

Long-duration Operation of 2-micron Coherent Doppler Lidar in Space

The reliability and lifetime of laser remote sensing systems that can operate autonomously over a sufficiently long period are mainly constrained by the laser diode arrays (LDAs) used for pumping their laser transmitters. The lifetime of a 2-micron coherent lidar operating in space is particularly of concern in lieu of required pump pulse duration of Thulium and Holmium solid state lasers (approx. 1msec) that are considerably longer than those of more widely used 1-micron lasers (< 0.2 msec). A factor of 5 to 10 times longer pulse duration can easily translate to over an order of magnitude shorter lifetime for a typical commercially available high-power 2-D array. Therefore, it is imperative to address the lifetime and reliability of LDAs for pumping 2-micron lasers by exploring all the potential options that significantly prolong their life meeting the required operational lifetime of space-based coherent Doppler lidars. The leading causes of sudden failure and premature degradation of LDAs are intrinsic semiconductor defects, optical facet breakdown resulting from excessive localized heating, and thermo-mechanical stresses due to the extreme thermal cycling of the laser active regions1-2. Long pulse operation grossly amplifies the impact of these failure/degradation causes, particularly the thermo-mechanical stresses due to pulse-to-pulse thermal cycling. Therefore, several experimental setups have been developed to investigate each of the failure mechanisms and causes of premature degradation in order to evaluate various package designs, define the best operating parameters, and to guide the technology advancement, leading to highly reliable and very long lifetime LDAs5. Several areas of improvement in the packaging and fabrication process of laser diodes have already been identified and efforts towards implementing these improvements are well underway. These efforts include the use of advanced high thermal conductivity materials for packaging of laser diode arrays and new fabrication techniques for mechanically attaching laser diode bars and submounts. But even using the existing LDAs, it may be possible to increase the lifetime by careful selection of the package type, number of bars per package and their pitch, operational temperature, and operating parameters such repetition rate, pulsewidth, and applied current. Obviously, the LDA specification and operational parameters will involve a system level trade analysis to ensure that the lidar instrument meets its performance objectives. One goal of this work is to enable such trade analysis by evaluating LDAs from different suppliers in different package types and quantifying their performance as a function of their operational parameters.

Amzajerdian, Farzin↗

Space Based Solar Power

This study evaluates the potential benefits, challenges, and options for NASA to engage with growing global interest in space based solar power (SBSP). Utilizing SBSP entails in-space collection of solar energy, transmission of that energy to one or more stations on Earth, conversion to electricity, and delivery to the grid or to batteries for storage. Experts in both the aerospace and energy sectors are debating the benefits of SBSP as more organizations globally begin SBSP technology development programs. Proponents claim SBSP could deliver large amounts of electricity at competitive prices and with fewer greenhouse gas (GHG) emissions than terrestrial renewable electricity technologies while accelerating development of the space economy. Skeptics say SBSP has no clear development path and would divert billions of dollars from known terrestrial solutions while damaging the environment. While it is generally understood that SBSP is cost prohibitive and technically infeasible today, this study assesses operating SBSP systems in 2050. Part of NASA’s mission is to innovate for the benefit of humanity – it is through this lens that the Agency weighs whether and how to support SBSP development.

Space Based Solar Power↗

[Redesign of the Spacesuit Long Life Battery and the Personal Life Support System Battery]

This fall I was working on two different projects that culminated into a redesign of the spacesuit LLB (long life battery). I also did some work on the PLSS (personal life support system) battery with EC. My first project was redlining the work instruction for completing DPAs (destructive physical analysis) on battery cells in the department. The purpose of this document is to create a standard process and ensure that the data in the same way no matter who carries out the analysis. I observed three DPAs, conducted one with help, and conducted two on my own all while taking notes on the procedure. These notes were used to write the final work instruction that will become is the department standard. My second project continued the work of the summer co-op before me. I was testing aluminum heat sinks for their ability to provide good thermal conduction and structural support during a thermal runaway event. The heat sinks were designed by the summer intern but there was not much time for testing before he left. We ran tests with a heater on the bottom of a trigger cell to try to drive thermal runaway and ensure that it will not propagate to adjacent cells. We also ran heat-to-vent tests in an oven to see if the assembly provided structural support and prevented sidewall rupture during thermal runaway. These tests were carried out at ESTA (energy systems test area) and are providing very promising results that safe, high performing (greater than 180 Wh/kg) designs are possible. My main project was a redesign of the LLB battery. Another summer intern did some testing and concluded that there was no simple fix to mitigate thermal runaway propagation hazards in the current design. The only option was a clean sheet redesign of the battery. I was given a volume and ideal energy density and the rest of the design was up to me. First, I created new heat sink banks in Creo using the information gathered in the metal heat sink tests from the summer intern. After this, I made capture plates to hold the cells in place and I worked on nickel bussings for the electrical connections between the cells. Finally, I designed the test box enclosure that included sections for flame arresting materials. The battery brick design, which is the heart of the battery, promises to become the first for a manned spacecraft application to achieve greater than 180 Wh/kg. My work in redlining the DPA work instructions will also be used in selecting the cells for the battery. We had a few options of cells that would provide the necessary power output and needed to make a choice. We repeatedly charged and discharged cells for around a month until they went through 100 lifecycles. The plan is to compare the DPA results on fresh and cycled cells from each manufacturer to see if cycling introduces any differences. After the complete LLB design was approved, the parts were ordered and testing should begin the first week of December. Some of my side projects included working on the CAD data for the PLSS with EC and attending the NASA Aerospace Battery Workshop in Huntsville. I was also a member of the Tours and Lectures Committee for the USRA and Pathways interns. I coordinated Apollo Evening and was on the committee for touring KSC and seeing an Atlas 5 launch. I really enjoyed my time at JSC and I would like to continue working for NASA or another aerospace company in the future. I have worked other internships prior to this, but I think the heavy research and development focus is the best fit for me. I originally thought I would need to go to grad school to work in an environment like this, but I now see it is possible with a bachelor’s degree and hard work. I would like to go into the workforce and maybe continue my education with night classes.

Scharf, Stephanie↗

[Fall 2015 Abstract by Stephanie Scharf]

This Fall I worked on two different projects that culminated into a redesign of the spacesuit LLB (long life battery). I also did some work on the PLSS (personal life support system) battery with EC. My first project was redlining the work instruction for completing DPAs (destructive physical analysis) on battery cells in the Branch. The purpose of this document is to create a standard process and ensure that the data is collected in the same way, no matter who carries out the analysis. I observed three DPAs, conducted one with help, and conducted two on my own, all while taking notes on the procedure. These notes were used to write the final work instruction, which will become the Branch standard. My second project continued the work of the Summer co-op before me. I tested aluminum heat sinks for their ability to provide good thermal conduction and structural support during a thermal runaway event. The heat sinks had been designed by the previous Summer co-op, but there was not much time for testing before he left. We thus ran tests with a heater on the bottom of a trigger cell to try to drive thermal runaway and ensure that it will not propagate to adjacent cells. We also ran heat-to-vent tests in an oven to see if the assembly provided structural support and prevented sidewall rupture during thermal runaway. These tests were carried out at ESTA (Energy Systems Test Area) and are providing very promising results, indicating that safe, high performing (>180 Wh/kg) designs are possible. My main project was a redesign of the LLB (Lightweight Lithium Battery). Another summer intern had done some testing and concluded that there was no simple fix to mitigate thermal runaway propagation hazards in the existing design. The only option was a clean sheet redesign of the battery. I was given a volume and ideal energy density, and the rest of the design was up to me. First, I created new heat sink banks in CREO, using the information gathered in the metal heat sink tests from the summer intern. After this, I made capture plates to hold the cells in place, and I worked on nickel bussings for the electrical connections between the cells. Finally, I designed the test box enclosure that included sections for flame arresting materials. The battery brick design, which is the heart of the battery, promises to become the first for a manned spacecraft application to achieve > 180 Wh/kg. My work in redlining the DPA work instructions will also be used in selecting the cells for the battery. We had a few options for cells that would provide the necessary power output and needed to make a choice. We repeatedly charged and discharged cells for around a month until they went through 100 lifecycles. The plan was to compare the DPA results on fresh and cycled cells from each manufacturer to see if cycling introduces any differences. After the complete LLB design was approved, the parts were ordered and testing should begin the first week of December. Cutting open a cell for DPA After photo from oven heat-to-vent test

Scharf, Stephanie↗