Search NASA⌕ Search

SEARCH · Search NASA

Results for “Logistics Analysis”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

An Alternative Flight Software Trigger Paradigm: Applying Multivariate Logistic Regression to Sense Trigger Conditions using Inaccurate or Scarce Information

In late 2014, NASA will fly the Orion capsule on a Delta IV-Heavy rocket for the Exploration Flight Test-1 (EFT-1) mission. For EFT-1, the Orion capsule will be flying with a new GPS receiver and new navigation software. Given the experimental nature of the flight, the flight software must be robust to the loss of GPS measurements. Once the high-speed entry is complete, the drogue parachutes must be deployed within the proper conditions to stabilize the vehicle prior to deploying the main parachutes. When GPS is available in nominal operations, the vehicle will deploy the drogue parachutes based on an altitude trigger. However, when GPS is unavailable, the navigated altitude errors become excessively large, driving the need for a backup barometric altimeter. In order to increase overall robustness, the vehicle also has an alternate method of triggering the drogue parachute deployment based on planet-relative velocity if both the GPS and the barometric altimeter fail. However, this velocity-based trigger results in large altitude errors relative to the targeted altitude. Motivated by this challenge, this paper demonstrates how logistic regression may be employed to automatically generate robust triggers based on statistical analysis. Logistic regression is used as a ground processor pre-flight to develop a classifier. The classifier would then be implemented in flight software and executed in real-time. This technique offers excellent performance even in the face of highly inaccurate measurements. Although the logistic regression-based trigger approach will not be implemented within EFT-1 flight software, the methodology can be carried forward for future missions and vehicles.

Smith, Kelly M.↗

An Alternative Flight Software Trigger Paradigm: Applying Multivariate Logistic Regression to Sense Trigger Conditions Using Inaccurate or Scarce Information

In late 2014, NASA will fly the Orion capsule on a Delta IV-Heavy rocket for the Exploration Flight Test-1 (EFT-1) mission. For EFT-1, the Orion capsule will be flying with a new GPS receiver and new navigation software. Given the experimental nature of the flight, the flight software must be robust to the loss of GPS measurements. Once the high-speed entry is complete, the drogue parachutes must be deployed within the proper conditions to stabilize the vehicle prior to deploying the main parachutes. When GPS is available in nominal operations, the vehicle will deploy the drogue parachutes based on an altitude trigger. However, when GPS is unavailable, the navigated altitude errors become excessively large, driving the need for a backup barometric altimeter to improve altitude knowledge. In order to increase overall robustness, the vehicle also has an alternate method of triggering the parachute deployment sequence based on planet-relative velocity if both the GPS and the barometric altimeter fail. However, this backup trigger results in large altitude errors relative to the targeted altitude. Motivated by this challenge, this paper demonstrates how logistic regression may be employed to semi-automatically generate robust triggers based on statistical analysis. Logistic regression is used as a ground processor pre-flight to develop a statistical classifier. The classifier would then be implemented in flight software and executed in real-time. This technique offers improved performance even in the face of highly inaccurate measurements. Although the logistic regression-based trigger approach will not be implemented within EFT-1 flight software, the methodology can be carried forward for future missions and vehicles.

Smith, Kelly M.↗

An Alternative Flight Software Paradigm: Applying Multivariate Logistic Regression to Sense Trigger Conditions using Inaccurate or Scarce Information

In late 2014, NASA will fly the Orion capsule on a Delta IV-Heavy rocket for the Exploration Flight Test-1 (EFT-1) mission. For EFT-1, the Orion capsule will be flying with a new GPS receiver and new navigation software. Given the experimental nature of the flight, the flight software must be robust to the loss of GPS measurements. Once the high-speed entry is complete, the drogue parachutes must be deployed within the proper conditions to stabilize the vehicle prior to deploying the main parachutes. When GPS is available in nominal operations, the vehicle will deploy the drogue parachutes based on an altitude trigger. However, when GPS is unavailable, the navigated altitude errors become excessively large, driving the need for a backup barometric altimeter to improve altitude knowledge. In order to increase overall robustness, the vehicle also has an alternate method of triggering the parachute deployment sequence based on planet-relative velocity if both the GPS and the barometric altimeter fail. However, this backup trigger results in large altitude errors relative to the targeted altitude. Motivated by this challenge, this paper demonstrates how logistic regression may be employed to semi-automatically generate robust triggers based on statistical analysis. Logistic regression is used as a ground processor pre-flight to develop a statistical classifier. The classifier would then be implemented in flight software and executed in real-time. This technique offers improved performance even in the face of highly inaccurate measurements. Although the logistic regression-based trigger approach will not be implemented within EFT-1 flight software, the methodology can be carried forward for future missions and vehicles

Smith, Kelly↗

Mars outpost - System and operations challenges

The paper addresses the challenges inherent in establishing an outpost on the planet Mars. For background purposes, the unique, remote Martian environment and the developmental phases of a settlement in such an environment are discussed. Challenges are identified in terms of surface systems and operations. Due to its importance to habitability, the life support system (LSS) is highlighted with various options identified. Operations for the Mars outpost, earth-based and local, are characterized by a decentralized concept. The challenge of integrating logistics analysis early in system design and operations strategy is also addressed. In order to understand and reduce the system and operations challenges, the application of terrestrial and lunar testbeds is explained.

Roberts, Barney↗

SSF growth concepts and configurations

There are three primary objectives for the Space Station Freedom (SSF) Growth concepts and configuration study task. The first objective is the development of evolutionary SSF concept consistent with user requirements and program constraints. The second primary objective is to ensure the feasibility of the proposed SSF evolution concepts as the systems level. This includes an assessment of SSF evolution flight control analysis, logistics assessment, maintainability, and operational considerations. The final objective is to ensure compatibility of the baseline SSF design with the derived evolution requirements at both the system and element (habitat modules, power generation equipment, etc.) levels.

Cirillo, William M.↗

Mass and Reliability Source (MaRS) Database

The Mass and Reliability Source (MaRS) Database consolidates components mass and reliability data for all Oribital Replacement Units (ORU) on the International Space Station (ISS) into a single database. It was created to help engineers develop a parametric model that relates hardware mass and reliability. MaRS supplies relevant failure data at the lowest possible component level while providing support for risk, reliability, and logistics analysis. Random-failure data is usually linked to the ORU assembly. MaRS uses this data to identify and display the lowest possible component failure level. As seen in Figure 1, the failure point is identified to the lowest level: Component 2.1. This is useful for efficient planning of spare supplies, supporting long duration crewed missions, allowing quicker trade studies, and streamlining diagnostic processes. MaRS is composed of information from various databases: MADS (operating hours), VMDB (indentured part lists), and ISS PART (failure data). This information is organized in Microsoft Excel and accessed through a program made in Microsoft Access (Figure 2). The focus of the Fall 2017 internship tour was to identify the components that were the root cause of failure from the given random-failure data, develop a taxonomy for the database, and attach material headings to the component list. Secondary objectives included verifying the integrity of the data in MaRS, eliminating any part discrepancies, and generating documentation for future reference. Due to the nature of the random-failure data, data mining had to be done manually without the assistance of an automated program to ensure positive identification.

Valdenegro, Wladimir↗

Logistics Rates and Assumptions for Future Human Spaceflight Missions Beyond LEO

As NASA prepares for future human spaceflight missions with extended crew duration in destinations beyond low Earth orbit (LEO), the Agency has focused itself on understanding the drivers to sustainably support human life beyond Earth’s atmosphere. Future missions to deep space, the lunar surface, and eventually the Martian surface pose new challenges in ensuring the crew is sufficiently supplied with all necessary materials. To mitigate the risk of not delivering sufficient consumables and logistics for human spaceflight missions, NASA has examined past human space mission data and developed metabolic modeling to determine estimates for the crew consumption rates of fluids, solid consumables, and additional equipment needed. This paper is a compilation of guidelines, rates, and assumptions necessary to evaluate the logistics needs for future human exploration conceptual missions beyond LEO, providing a starting point and resource of information regarding usage rates and overall logistics supply planning for crewed exploration missions. Logistics represent all equipment and supplies not installed as part of the vehicle that are needed to support mission activities. Logistics can be further divided into specific categories, including consumables, maintenance items, spares, utilization, outfitting, as well as any packaging required. This paper will also provide use case examples of logistics needs to support human missions in deep space, including a conceptual lunar surface mission. The paper provides information necessary to calculate the mass and volume of known logistics for conceptual future human exploration missions beyond LEO. The assumptions in the paper are updated versions of previous assumptions made by the Agency and were derived from a number of sources, including International Space Station (ISS) historical usage and resupply rates, the Life Support Baseline Values and Assumptions Document (BVAD) 2022, Human Integration Design Handbook (HIDH) 2014, and data gathered from NASA human spaceflight programs and projects. The primary goal of the paper is to establish a set of consistent reference rates that multiple teams and groups can utilize to conduct logistics analysis and compare cases. This methodology is for initial estimates of conceptual human missions and does not take the place of detailed analysis for programs, nor does it provide requirements for programs.

Human Spaceflight↗

Logistics Rates and Assumptions for Future Human Spaceflight Missions Beyond LEO

As NASA prepares for future human spaceflight missions with extended crew duration in destinations beyond low Earth orbit (LEO), the Agency has focused itself on understanding the drivers to sustainably support human life beyond Earth’s atmosphere. Future missions to deep space, the lunar surface, and eventually the Martian surface pose new challenges in ensuring the crew is sufficiently supplied with all necessary materials. To mitigate the risk of not delivering sufficient consumables and logistics for human spaceflight missions, NASA has examined past human space mission data and developed metabolic modeling to determine estimates for the crew consumption rates of fluids, solid consumables, and additional equipment needed. This paper is a compilation of guidelines, rates, and assumptions necessary to evaluate the logistics needs for future human exploration conceptual missions beyond LEO, providing a starting point and resource of information regarding usage rates and overall logistics supply planning for crewed exploration missions. Logistics represent all equipment and supplies not installed as part of the vehicle that are needed to support mission activities. Logistics can be further divided into specific categories, including consumables, maintenance items, spares, utilization, outfitting, as well as any packaging required. This paper will also provide use case examples of logistics needs to support human missions in deep space, including a conceptual lunar surface mission. The paper provides information necessary to calculate the mass and volume of known logistics for conceptual future human exploration missions beyond LEO. The assumptions in the paper are updated versions of previous assumptions made by the Agency and were derived from a number of sources, including International Space Station (ISS) historical usage and resupply rates, the Life Support Baseline Values and Assumptions Document (BVAD) 2022, Human Integration Design Handbook (HIDH) 2014, and data gathered from NASA human spaceflight programs and projects. The primary goal of the paper is to establish a set of consistent reference rates that multiple teams and groups can utilize to conduct logistics analysis and compare cases. This methodology is for initial estimates of conceptual human missions and does not take the place of detailed analysis for programs, nor does it provide requirements for programs.

Human Spaceflight↗

Preliminary analysis of an integrated logistics system for OSSA payloads. Volume 4: Supportability analysis of the 1.8m centrifuge

Supportability issues for the 1.8 meter centrifuge in the Life Science Research Facility are addressed. The analysis focuses on reliability and maintainability and the potential impact on supportability and affordability. Standard logistics engineering methodologies that will be applied to all Office of Space Science and Applications' (OSSA) payload programs are outlined. These methodologies are applied to the 1.8 meter centrifuge.

Palguta, T.↗

NASA Supportability Engineering Implementation Utilizing DoD Practices and Processes

The Ares I design and development program made the determination early in the System Design Review Phase to utilize DoD ILS and LSA approach for supportability engineering as an integral part of the system engineering process. This paper is to provide a review of the overall approach to design Ares-I with an emphasis on a more affordable, supportable, and sustainable launch vehicle. Discussions will include the requirements development, design influence, support concept alternatives, ILS and LSA planning, Logistics support analyses/trades performed, LSA tailoring for NASA Ares Program, support system infrastructure identification, ILS Design Review documentation, Working Group coordination, and overall ILS implementation. At the outset, the Ares I Project initiated the development of the Integrated Logistics Support Plan (ILSP) and a Logistics Support Analysis process to provide a path forward for the management of the Ares-I ILS program and supportability analysis activities. The ILSP provide the initial planning and coordination between the Ares-I Project Elements and Ground Operation Project. The LSA process provided a system engineering approach in the development of the Ares-I supportability requirements; influence the design for supportability and development of alternative support concepts that satisfies the program operability requirements. The LSA planning and analysis results are documented in the Logistics Support Analysis Report. This document was required during the Ares-I System Design Review (SDR) and Preliminary Design Review (PDR) review cycles. To help coordinate the LSA process across the Ares-I project and between programs, the LSA Report is updated and released quarterly. A System Requirement Analysis was performed to determine the supportability requirements and technical performance measurements (TPMs). Two working groups were established to provide support in the management and implement the Ares-I ILS program, the Integrated Logistics Support Working Group (ILSWG) and the Logistics Support Analysis Record Working Group (LSARWG). The Ares I ILSWG is established to assess the requirements and conduct, evaluate analyses and trade studies associated with acquisition logistic and supportability processes and to resolve Ares I integrated logistics and supportability issues. It established a strategic collaborative alliance for coordination of Logistics Support Analysis activates in support of the integrated Ares I vehicle design and development of logistics support infrastructure. A Joint Ares I - Orion LSAR Working Group was established to: 1) Guide the development of Ares-I and Orion LSAR data and serve as a model for future Constellation programs, 2) Develop rules and assumptions that will apply across the Constellation program with regards to the program's LSAR development, and 3) Maintain the Constellation LSAR Style Guide.

Smith, David A.↗

Trades Between Opposition and Conjunction Class Trajectories for Early Human Missions to Mars

Candidate human missions to Mars, including NASA's Design Reference Architecture 5.0, have focused on conjunction-class missions with long crewed durations and minimum energy trajectories to reduce total propellant requirements and total launch mass. However, in order to progressively reduce risk and gain experience in interplanetary mission operations, it may be desirable that initial human missions to Mars, whether to the surface or to Mars orbit, have shorter total crewed durations and minimal stay times at the destination. Opposition-class missions require larger total energy requirements relative to conjunction-class missions but offer the potential for much shorter mission durations, potentially reducing risk and overall systems performance requirements. This paper will present a detailed comparison of conjunction-class and opposition-class human missions to Mars vicinity with a focus on how such missions could be integrated into the initial phases of a Mars exploration campaign. The paper will present the results of a trade study that integrates trajectory/propellant analysis, element design, logistics and sparing analysis, and risk assessment to produce a comprehensive comparison of opposition and conjunction exploration mission constructs. Included in the trade study is an assessment of the risk to the crew and the trade offs between the mission duration and element, logistics, and spares mass. The analysis of the mission trade space was conducted using four simulation and analysis tools developed by NASA. Trajectory analyses for Mars destination missions were conducted using VISITOR (Versatile ImpulSive Interplanetary Trajectory OptimizeR), an in-house tool developed by NASA Langley Research Center. Architecture elements were evaluated using EXploration Architecture Model for IN-space and Earth-to-orbit (EXAMINE), a parametric modeling tool that generates exploration architectures through an integrated systems model. Logistics analysis was conducted using NASA's Human Exploration Logistics Model (HELM), and sparing allocation predictions were generated via the Exploration Maintainability Analysis Tool (EMAT), which is a probabilistic simulation engine that evaluates trades in spacecraft reliability and sparing requirements based on spacecraft system maintainability and reparability.

Mattfeld, Bryan↗

Preliminary analysis of an integrated logistics system for OSSA payloads

The results of studies of the Office of Space Science and Applications' (OSSA) need for an integrated logistics system to support OSSA payloads, whether attached to the Space Station or free-flying are detailed. An executive summary, the integrated logistics support strategy, preparation of planning documents and a supportability analysis of the 1.8 meter centrifuge are discussed.

Palguta, T.↗

The Space Superhighway: A Cost Analysis of an In-Space Logistics Resupply Network

The Space Superhighway is a concept for an in-space logistics network for payload delivery and propellant resupply within the Earth-Moon system. It is expected that in the next several years the number of spacecraft in cislunar space will increase significantly. Commercial launch service providers have significantly reduced the cost of access to space and reduced the barrier to entry for private companies to build and operate their own satellites. Many of these newer satellites are being designed to take advantage of future In-space Servicing, Assembly, and Manufacturing (ISAM) capabilities. In addition, the National Aeronautics and Space Administration (NASA) intends to develop and maintain a sustained human presence in cislunar space and on the surface of the Moon. The sustained lunar presence will then serve as a steppingstone for human missions to Mars. The combined demand for propellant resupply and payload delivery in cislunar space for NASA's Moon to Mars campaign in addition to commercial ventures will likely exceed 1,000 t in the upcoming decades. This work presents a concept for an in-space logistics network to fulfill that demand. The network consists of commercial launch vehicles, propellant tankers, orbital depots, and in-space electric propulsion tugs. This work specifically analyzes the cost of developing, producing, and operating such a network at varying levels of customer demand.

nrho↗

Upgrade Summer Severe Weather Tool

The goal of this task was to upgrade to the existing severe weather database by adding observations from the 2010 warm season, update the verification dataset with results from the 2010 warm season, use statistical logistic regression analysis on the database and develop a new forecast tool. The AMU analyzed 7 stability parameters that showed the possibility of providing guidance in forecasting severe weather, calculated verification statistics for the Total Threat Score (TTS), and calculated warm season verification statistics for the 2010 season. The AMU also performed statistical logistic regression analysis on the 22-year severe weather database. The results indicated that the logistic regression equation did not show an increase in skill over the previously developed TTS. The equation showed less accuracy than TTS at predicting severe weather, little ability to distinguish between severe and non-severe weather days, and worse standard categorical accuracy measures and skill scores over TTS.

Watson, Leela↗

Developing a Logistics Data Process for Support Equipment for NASA Ground Operations

The United States NASA Space Shuttle has long been considered an extremely capable yet relatively expensive rocket. A great part of the roughly US $500 million per launch expense was the support footprint: refurbishment and maintenance of the space shuttle system, together with the long list of resources required to support it, including personnel, tools, facilities, transport and support equipment. NASA determined to make its next rocket system with a smaller logistics footprint, and thereby more cost-effective and quicker turnaround. The logical solution was to adopt a standard Logistics Support Analysis (LSA) process based on GEIA-STD-0007 http://www.logisticsengineers.org/may09pres/GEIASTD0007DEXShortIntro.pdf which is the successor of MIL-STD-1388-2B widely used by U.S., NATO, and other world military services and industries. This approach is unprecedented at NASA: it is the first time a major program of programs, Project Constellation, is factoring logistics and supportability into design at many levels. This paper will focus on one of those levels NASA ground support equipment for the next generation of NASA rockets and on building a Logistics Support Analysis Record (LSAR) for developing and documenting a support solution and inventory of resources for. This LSAR is actually a standards-based database, containing analyses of the time and tools, personnel, facilities and support equipment required to assemble and integrate the stages and umbilicals of a rocket. This paper will cover building this database from scratch: including creating and importing a hierarchical bill of materials (BOM) from legacy data; identifying line-replaceable units (LRUs) of a given piece of equipment; analyzing reliability and maintainability of said LRUs; and therefore making an assessment back to design whether the support solution for a piece of equipment is too much work, i.e., too resource-intensive. If one must replace or inspect an LRU too much, perhaps a modification of the design of the equipment can make such operational effort unnecessary. Finally, this paper addresses processes of tying resources to a timeline of tasks performed in ground operations: this enables various overarching analyses, e.g., a summarization of all resources used for a given piece of equipment. Quality Control of data will also be discussed: importing and exporting data from product teams, including spreadsheets-todatabase or data exchange between databases.

Chakrabarti, Suman↗

Analysis of cryogenic propellant logistics.

Large launch vehicle cryogenic propellant logistics including storage and production capacity optimization, cost and heat loss analyses by computer simulation

PROPELLANT STORAGE↗