Search NASA⌕ Search

SEARCH · Search NASA

Results for “MIKE SHE”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

STS-114: Post Launch Press Conference

Dean Acosta, Deputy Assistant Administrator for Public Affairs hosted this post launch press conference. Present were Mike Griffin, NASA Administrator; William Ready, Associate Administrator for Space Operations; Bill Parsons, Space Shuttle Program Manager; Mike Leinbach, NASA Launch Director; and Wayne Hill, Deputy Program Manager for Space Shuttle Program. Each expressed thanks to all of NASA Officials and employees, contractors, vendors and the crew for their hard work the past two and a half years that resulted the successful and pristine launch of Space Shuttle Discovery. The Panel emphasized that through extensive technical analysis, thorough planning and tremendous amount of public support brought them full circle again to return to flight. Flight safety, debris during rocket separation, sensors, observations from the mission control, launch conditions were some of the topics discussed with the News media.

Source record↗

STS-114: Discovery Post MMT Press Conference

Bruce Buckingham of NASA Public Affairs hosted this press conference. Wayne Hill, Space Shuttle Deputy Program Manager; John Muratore, Shuttle Systems and Integration Manager; Mike Wetmore, Director for Shuttle Processing were present. Wayne started with a video from Shuttle Logistics Depot showing details of a point sensor box commonly named the black box. Work with the trouble shooting continues on a day to day basis, no definite launching date is set. John reports that they are in a mission support mode all over the country until the sensor problem is solved. Mike reports his team will complete scrub and securing tasks through the next day, restore the facility to its normal mode, and will start to a four day process of getting back to launch once trouble shooting is completed. Tanking test, thermal environment, problem identification, engine cut-off sensor problems, sensors, risk, design reviews, test and analysis, correlation of the problem with Columbia, are some of the topics covered with the News media.

Source record↗

STS-121: Discovery Post Flight Readiness Review Briefing

This post Flight Readiness Review (FRR) briefing begins with NASA Press Secretary Dean Acosta, introducing the panel who consist of: NASA Administrator, Dr. Michael Griffin; Associate Administrator for Space Operations, Bill Gerstenmaier; Space Shuttle Program Manager, Wayne Hale; and NASA Launch director, Mike Leinbach. The discussion begins with Dr. Michael Griffin, who expresses his gladness to be a part of the FRR. Bill Gerstenmaier talks about how they were very thorough about the subjects reviewed and that they wanted to make sure that they were ready to fly. He discusses and presents two slides. The first slide is a description of the LO2 intertank and LH2 ice/frost ramps staging location and the second are the top ten LH2 Ice/Frost Ramp Foam Loss events. Wayne Hale gives his thoughts on the human element that came into play during the FRRs. He talks about the willingness of everyone to speak their mind, instead of giving short comments. He expressed that this element is a huge step forward for NASA. Mike Leinbach reports on the processing of the vehicle and expresses that everything is going well and there is nothing to prohibit the launch. He also gives a good report on Atlantis, in case there is a need to use the vehicle. This FRR briefing ends with a short question and answer period from the press on topics such as debris, foam loss, ice/frost ramp redesign, crew risks, and launch date.

Source record↗

STS-121: Discovery End of Mission Crew Briefing

The crew of the STS-121 Discovery mission is shown during this end of mission briefing. The crewmembers consist of: Stephanie Wilson, mission specialist; Steve Lindsey, commander; Lisa Nowak, mission specialist; Piers Sellers, mission specialist; Mike Fossum, mission specialist; and Mark Kelly, pilot. The briefing opens with Commander Lindsey describing the two major objectives of this mission, which are to accomplish the rest of the return to flight objectives started by STS-114, and to increase the ISS crew to three. He expresses that these objectives were fulfilled. A question and answer period from the news media follows. Lisa Nowak talks about robotics and her experiences during her first flight. Stephanie Wilson also discusses robotics and gives her thoughts about spaceflight. Steve Lindsey discusses the flying qualities of STS-121, spacecraft landing, and weather conditions while in space. Mark Kelly was responsible for the undocking of the Shuttle from the International Space Station, and he elaborates on this process. Spacewalkers Piers Sellers and Mike Fossum discuss testing of the Orbiter Boom Sensor System (OBSS). This system will be used as a platform to make repairs to the Space Shuttle.

Source record↗

STS-121: Discovery Post Landing Press Conference

On July 17, 2006 Dean Acosta (NASA Press Secretary), Mike Griffin (Administrator), Bill Gerstenmaier (Associate Administrator of Space Operations), and Mike Leinbach (NASA Launch Director) expressed how proud they were to be a part of the STS-121/ Discovery team. They also explained how flawlessly the mission performed and how it was the best mission ever flown. They proceeded to answer numerous questions from the press.

Source record↗

STS-121: Discovery Launch Postponement MMT Briefing

Bruce Buckingham from NASA Public Affairs introduces the panel who consist of: John Shannon, MMT chairman JSC; Mike Leinbach, NASA Launch Director; and 1st Lieutenant Kaleb Nordren, USAF 45th Weather Squadron. An opening statement is given from John Shannon on the postponement of the launch due to thunderstorms. Mike Leinbach also elaborates on the weather and talks about scrubbing two hours early, draining the vehicle, and reloading the hydrogen for the fuel cells for a possible launch attempt on Tuesday morning. Norden gives his weather forecast for Tuesday and Wednesday. Questions from the media on launch attempts, weather, and the cost of the scrub are addressed.

Source record↗

STS-121/Discovery: Launch Readiness Press Conference

Participants in the briefing included: Bruce Buckingham (NASA Public Affairs), John Shannon (Chairman, Mission Management Team), Mike Suffredini (ISS Program Manager), Mike Leinbach (Shuttle Launch Director), Alan Thirkettle (ISS Program Manager, ESA) and 1st Lt. Kaleb Nordgen (USAF 45th Weather Squadron). There are no constraints to launch except for questionable weather. The crew is ready to go. PROGRESS has provided logistics and is ready to be installed. No cryogenics have been loaded because of a Phase 1 lightning advisory. The shuttle crew is in good shape, just waiting for the weather to clear. ISS is making preparations for the Columbus Mission and future plans are to increase the crew from 3 to 6 people. The floor was opened to questions from the press.

Source record↗

Space Shuttle Program Update News Conference with Wayne Hale

Jessica Rye from NASA Public Affairs introduces: Wayne Hale, Space Shuttle Deputy Program Manager; Mike Leinbach, NASA Launch Director; and Tim Wilson, from the NASA Engineering and Safety Center. Hale begins the discussion with a video showing the following processes: 1) Changing of gap fillers at Orbiter Processing Facility; 2) The Orbiter Boom Sensor System (OBSS) being loaded into Discovery payload bay; 3) Engine installation; 4) Spacecrew at Michoud Assembly observing the area where the PAL ramps were removed; 5) Test being performed to mitigate liquid air forming underneath foam; and 6) Roll out of ET119 from New Orleans. Hale also presents a slide of the ET debris Mitigation Activities and ET Ice/Frost Ramps. Mike Leinbach says that Kennedy Space Center is ready to receive the tank and that he is ready to get on with the mission. Tim Wilson heads the team to resolve foam loss issues which is his primary goal before this flight. A question and answer period follows.

Source record↗

Space Shuttle Program Update

Bruce Buckingham, from NASA Public Affairs, introduces Wayne Hale, Space Shuttle Program Manager, and Mike Leinbach, NASA launch Director. Wayne Hale begins discussing the Flight Readiness Review (FRR) that has just occurred to see if they were ready to fly. He points out that the review was a debris verification review (DVR). This review was done to ascertain how well they have done to eliminate the potential for debris to come off of the External Tank (ET), or any other part of the launch vehicle. He expresses that they have made significant improvements to the ET. He gives a description of the ET that is presently on the launch pad. Mike Leinbach discusses hardware processing and the condition of the launch vehicle. Questions from the news media about possible modifications to the ice frost ramp, Solid Rocket Booster (SRB) electrical problems, ET foam loss, amount of debris loss expectation during ascent, and return to flight costs are all addressed.

Source record↗

STS-121: Discovery Mission Management Team Briefing

The briefing opened with Bruce Buckingham (NASA Public Affairs) introducing John Shannon (Chairman, Mission Management Team, JSC), John Chapman (External Tank Project Manager), Mike Leinbach (Shuttle Launch Director), and 1st Lt. Kaleb Nordgren (USAF 45th Weather Squadron). John Shannon reported that the team for hydrogen loading was proceeding well and the external tank detanking was completed. During detanking the inspection team cracked foam caused by condensation and ice formation as the tank expanded and contracted. Aerothermal analysis and analysis fro ice formation will be completed before launch. John Chapman explained the mechanics of the external tank design, the foam cracking, bracket design, etc. Mike Leinbach discussed the inspection teams and their inspection final inspection for ice formation before and after external tank filling. The inspection team of eight very experienced personnel also use telescopes with cameras to find any problems before launch. Kaleb Nordgren discussed weather and said there was a 40% chance of weather prohibiting launch. The floor was the opened for questions from the press.

Source record↗

An Acoustic Charge Transport Imager for High Definition Television

This project, over its term, included funding to a variety of companies and organizations. In addition to Georgia Tech these included Florida Atlantic University with Dr. William E. Glenn as the P.I., Kodak with Mr. Mike Richardson as the P.I. and M.I.T./Polaroid with Dr. Richard Solomon as the P.I. The focus of the work conducted by these organizations was the development of camera hardware for High Definition Television (HDTV). The focus of the research at Georgia Tech was the development of new semiconductor technology to achieve a next generation solid state imager chip that would operate at a high frame rate (I 70 frames per second), operate at low light levels (via the use of avalanche photodiodes as the detector element) and contain 2 million pixels. The actual cost required to create this new semiconductor technology was probably at least 5 or 6 times the investment made under this program and hence we fell short of achieving this rather grand goal. We did, however, produce a number of spin-off technologies as a result of our efforts. These include, among others, improved avalanche photodiode structures, significant advancement of the state of understanding of ZnO/GaAs structures and significant contributions to the analysis of general GaAs semiconductor devices and the design of Surface Acoustic Wave resonator filters for wireless communication. More of these will be described in the report. The work conducted at the partner sites resulted in the development of 4 prototype HDTV cameras. The HDTV camera developed by Kodak uses the Kodak KAI-2091M high- definition monochrome image sensor. This progressively-scanned charge-coupled device (CCD) can operate at video frame rates and has 9 gm square pixels. The photosensitive area has a 16:9 aspect ratio and is consistent with the "Common Image Format" (CIF). It features an active image area of 1928 horizontal by 1084 vertical pixels and has a 55% fill factor. The camera is designed to operate in continuous mode with an output data rate of 5MHz, which gives a maximum frame rate of 4 frames per second. The MIT/Polaroid group developed two cameras under this program. The cameras have effectively four times the current video spatial resolution and at 60 frames per second are double the normal video frame rate.

Hunt, William D.↗

Social Semantics for an Effective Enterprise

An evolution of the Semantic Web, the Social Semantic Web (s2w), facilitates knowledge sharing with "useful information based on human contributions, which gets better as more people participate." The s2w reaches beyond the search box to move us from a collection of hyperlinked facts, to meaningful, real time context. When focused through the lens of Enterprise Search, the Social Semantic Web facilitates the fluid transition of meaningful business information from the source to the user. It is the confluence of human thought and computer processing structured with the iterative application of taxonomies, folksonomies, ontologies, and metadata schemas. The importance and nuances of human interaction are often deemphasized when focusing on automatic generation of semantic markup, which results in dissatisfied users and unrealized return on investment. Users consistently qualify the value of information sets through the act of selection, making them the de facto stakeholders of the Social Semantic Web. Employers are the ultimate beneficiaries of s2w utilization with a better informed, more decisive workforce; one not achieved with an IT miracle technology, but by improved human-computer interactions. Johnson Space Center Taxonomist Sarah Berndt and Mike Doane, principal owner of Term Management, LLC discuss the planning, development, and maintenance stages for components of a semantic system while emphasizing the necessity of a Social Semantic Web for the Enterprise. Identification of risks and variables associated with layering the successful implementation of a semantic system are also modeled.

Berndt, Sarah↗

Pressure Drop

Mike Lawson briefly discussed pressure drop for aerospace applications and presented short stories about adventures experienced while working at NASA and General Dynamics, including exposure to technologies like the Crew and Equipment Translation Aid (CETA) cart and the SWME.

Lawson, Mike↗

Ensemble modeling of watershed-scale hydrologic effects of short-rotation woody crop production

Short-rotation woody crop (SRWC) production involves a set of silvicultural practices that aim to produce large volumes of biomass over relatively short time frames. The area over which these practices are employed is likely to increase in the coming decades as the demand for bioenergy increases, but the potential effects of this change in land management, including the hydrologic effects, are largely unknown. Here we outline the results from an ensemble modeling study that was developed to forecast the range of potential hydrological responses to the implementation of SRWC production over areas that are large (>1000 ha) relative to the size of individual clearcuts. The three models, SWAT, MIKE-SHE, and Envision-SRS, a physically based model designed to represent watersheds with dynamic land cover, represent a range of simulation tools that include hydrological response to landcover change. Results suggest that SRWC production will affect the hydrologic balance, primarily through changes in the volume of transpired water associated with the rapidly growing young stands. In particular, average annual actual evapotranspiration (ET) rates tend to decline under SRWC production in response to the less mature vegetation. These reductions in ET are balanced in the hydrological cycle through elevated groundwater recharge, expressed in the model results as elevated annual stream discharge.

09 BIOMASS FUELS↗

MCNP modelling of the Thermo SPA3 with Tungsten (Rees model) collimator

A Thermo Model SPA3 2”x2” NaI probe fitted with a Tungsten collimator has been modelled using MCNP6. The collimator was assumed to be machinable Tungsten which typically includes Ni and Fe. Various ratios of these additives are used in industry and for the purposes of these calculations the collimator was assumed to contain 7% Ni and 3% Fe with a density of 17.0 g/cm 3 . The dimensions of the collimator were based on measurements taken by Mike Fanning. The above detector model was used, in a manner similar to the approach described in LA-UR-19-32358, to calculate photopeak count rates per unit activity per unit area (i.e. cpm per pCi/cm 2 ) conversion factors for various contamination scenarios.

61 RADIATION PROTECTION AND DOSIMETRY↗

DOE Early Career Award # DE-SC0012152: Understanding the Roles of Cloud Microphysics and Land Surface Coupling Feedbacks in Multi-Scale Predictions of Central US Summer Hydroclimate (Final Report)

This summarizes technical highlights from the DOE Early Career Project entitled “Understanding the Roles of Cloud Microphysics and Land Surface Coupling Feedbacks in Multi-Scale Predictions of Central US Summer Hydroclimate” led by PI Mike Pritchard at the University of California. The project’s original aims were to investigate trade-offs of cloud superparameterization such as the effects of microphysical assumptions on mesoscale convective systems (Section I) and the representation of land-atmosphere coupling under explicit convection (Section II). Under the same broader theme of water cycle dynamics, superparameterization, and land interaction, the project evolved to further investigate the climate dynamics of irrigation, vegetation and streamflow (Section III), the dynamics of the Madden- Julian Oscillation (Section IV), as well as the use of modern machine learning to replace traditional sub grid approaches for climate simulation (Section V). Twenty peer-reviewed journal publications were produced as a result of this project (Section VI).

54 ENVIRONMENTAL SCIENCES↗