Search NASA⌕ Search

SEARCH · Search NASA

Results for “MONITOR PROGRAM”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Integrated Status and Effectiveness Monitoring Program - Entiat River Rotary Screw Traps,Snorkel Surveys, and Steelhead Redd Surveys, 2008.

The USFWS Mid-Columbia River Fishery Resource Office (MCRFRO) operated two rotary screw traps on the Entiat River as part of the Integrated Status and Effectiveness Monitoring Program from March through November of 2008. Along with the smolt traps, juvenile emigrants were also captured at remote locations throughout the Entiat watershed and its major tributary, the Mad River. A total of 16,782 wild salmonids were PIT tagged during the study period. Of this, 3,961(23.6%) were wild Oncorhynchus mykiss, 6,987 (41.6%) were wild spring run O. tshawytscha, and 5,591 (33.3%) were identified as wild O. tshawytscha of unknown run. Rotary screw trap efficiencies averaged 40.3% at the upper (Rkm 11.0) trap and 7.8% for the lower (Rkm 2.0) trap. These efficiencies were pooled for emigrant O. tshawytscha and O. mykiss. The MCRFRO conducted effectiveness monitoring snorkel surveys at 24 sites during the winter period and 30 sites during the summer and fall periods of 2008 as part of the Integrated Status and Effectiveness Monitoring Program in the Entiat River. The 2008 steelhead spawning grounds surveys were conducted weekly in the main Entiat River from rkm 1.1 to 44.2. A total of 222 steelhead redds were identified over the period from February 28 to June 16 2008 with April being the peak spawning month. Approximately 80% of the steelhead redds were located downstream of the rkm 26.

13 HYDRO ENERGY↗

Integrated Status and Effectiveness Monitoring Program - Entiat River Rotary Screw Traps, Snorkel Surveys, and Steelhead Redd Surveys, 2008-2009.

The USFWS Mid-Columbia River Fishery Resource Office (MCRFRO) operated two rotary screw traps on the Entiat River as part of the Integrated Status and Effectiveness Monitoring Program from March through November of 2008. Along with the smolt traps, juvenile emigrants were also captured at remote locations throughout the Entiat watershed and its major tributary, the Mad River. A total of 16,782 wild salmonids were PIT tagged during the study period. Of this, 3,961(23.6%) were wild Oncorhynchus mykiss, 6,987 (41.6%) were wild spring run O. tshawytscha, and 5,591 (33.3%) were identified as wild O. tshawytscha of unknown run. Rotary screw trap efficiencies averaged 40.3% at the upper (Rkm 11.0) trap and 7.8% for the lower (Rkm 2.0) trap. These efficiencies were pooled for emigrant O. tshawytscha and O. mykiss. The MCRFRO conducted effectiveness monitoring snorkel surveys at 24 sites during the winter period and 30 sites during the summer and fall periods of 2008 as part of the Integrated Status and Effectiveness Monitoring Program in the Entiat River. The 2008 steelhead spawning grounds surveys were conducted weekly in the main Entiat River from rkm 1.1 to 44.2. A total of 222 steelhead redds were identified over the period from February 28 to June 16 2008 with April being the peak spawning month. Approximately 80% of the steelhead redds were located downstream of the rkm 26.

13 HYDRO ENERGY↗

BLAZARS IN THE FERMI ERA: THE OVRO 40 m TELESCOPE MONITORING PROGRAM

The Large Area Telescope (LAT) aboard the Fermi Gamma-ray Space Telescope provides an unprecedented opportunity to study gamma-ray blazars. To capitalize on this opportunity, beginning in late 2007, about a year before the start of LAT science operations, we began a large-scale, fast-cadence 15 GHz radio monitoring program with the 40 m telescope at the Owens Valley Radio Observatory. This program began with the 1158 northern ({delta} > -20{sup 0}) sources from the Candidate Gamma-ray Blazar Survey and now encompasses over 1500 sources, each observed twice per week with about 4 mJy (minimum) and 3% (typical) uncertainty. Here, we describe this monitoring program and our methods, and present radio light curves from the first two years (2008 and 2009). As a first application, we combine these data with a novel measure of light curve variability amplitude, the intrinsic modulation index, through a likelihood analysis to examine the variability properties of subpopulations of our sample. We demonstrate that, with high significance (6{sigma}), gamma-ray-loud blazars detected by the LAT during its first 11 months of operation vary with almost a factor of two greater amplitude than do the gamma-ray-quiet blazars in our sample. We also find a significant (3{sigma}) difference between variability amplitude in BL Lacertae objects and flat-spectrum radio quasars (FSRQs), with the former exhibiting larger variability amplitudes. Finally, low-redshift (z < 1) FSRQs are found to vary more strongly than high-redshift FSRQs, with 3{sigma} significance. These findings represent an important step toward understanding why some blazars emit gamma-rays while others, with apparently similar properties, remain silent.

79 ASTRONOMY AND ASTROPHYSICS↗

In Vivo Monitoring Program Manual, PNL-MA-574

An overview of the administration for the In Vivo Monitoring Program (IVMP) for Hanford. This includes organizational structure and program responsibilities; coordination of in vivo measurements; scheduling measurements; performing measurements; reporting results; and quality assurance. Overall responsibility for the management of the IVMP rests with the Program Manager (PM). The PM is responsible for providing the required in vivo counting services for Hanford Site contractor employees in accordance with Department of Energy (DOE) requirements and the specific statements of work.

61 RADIATION PROTECTION AND DOSIMETRY↗

A Study of a Monitoring Program for Intermediate Depth Disposal of Low- Level Radioactive Waste - 20167

This study investigated a monitoring program for intermediate depth disposal of low-level radioactive waste. At first, it extracted monitoring targets, such as the status of cracks in the low diffusion layer after closure of the facility. Secondly, it focused on distributed optical fiber sensors which can minimize the amount of cable, and measurement positions and methods were specifically determined to propose the monitoring method. Finally, conformity to regulatory requirements was verified to clarify key points and issues to be addressed in performing monitoring. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

2015 Long-Term Hydrologic Monitoring Program Sampling and Analysis Results at Rio Blanco, Colorado

The U.S. Department of Energy (DOE) Office of Legacy Management conducted annual sampling at the Rio Blanco, Colorado, Site for the Long-Term Hydrologic Monitoring Program (LTHMP) on May 20–21, 2015. This report documents the analytical results of the Rio Blanco annual monitoring event, the trip report, and the data validation package. The groundwater and surface water monitoring samples were shipped to the GEL Group Inc. laboratories for conventional analysis of tritium and analysis of gamma-emitting radionuclides by high-resolution gamma spectrometry. A subset of water samples collected from wells near the Rio Blanco site was also sent to GEL Group Inc. for enriched tritium analysis. All requested analyses were successfully completed. Samples were collected from a total of four onsite wells, including two that are privately owned. Samples were also collected from two additional private wells at nearby locations and from nine surface water locations. Samples were analyzed for gamma-emitting radionuclides by high-resolution gamma spectrometry, and they were analyzed for tritium using the conventional method with a detection limit on the order of 400 picocuries per liter (pCi/L). Four locations (one well and three surface locations) were analyzed using the enriched tritium method, which has a detection limit on the order of 3 pCi/L. The enriched locations included the well at the Brennan Windmill and surface locations at CER-1, CER-4, and Fawn Creek 500 feet upstream.

54 ENVIRONMENTAL SCIENCES↗

Gasbuggy, New Mexico Long-Term Hydrologic Monitoring Program Evaluation Report

This report summarizes an evaluation of the Long-Term Hydrologic Monitoring Program (LTHMP) that has been conducted since 1972 at the Gasbuggy, New Mexico underground nuclear detonation site. The nuclear testing was conducted by the U.S. Atomic Energy Commission under the Plowshare program, which is discussed in greater detail in Appendix A. The detonation at Gasbuggy took place in 1967, 4,240 feet below ground surface, and was designed to fracture the host rock of a low-permeability natural gas-bearing formation in an effort to improve gas production. The site has historically been managed under the Nevada Offsites Project. These underground nuclear detonation sites are within the United States but outside of the Nevada Test Site where most of the experimental nuclear detonations conducted by the U.S. Government took place. Gasbuggy is managed by the U.S. Department of Energy (DOE) Office of Legacy Management (LM ).

54 ENVIRONMENTAL SCIENCES↗

Importance of Data Management in a Long-term Biological Monitoring Program

The long-term Biological Monitoring and Abatement Program (BMAP) has always needed to collect and retain high-quality data on which to base its assessments of ecological status of streams and their recovery after remediation. Its formal quality assurance, data processing, and data management components all contribute to this need. The Quality Assurance Program comprehensively addresses requirements from various institutions, funders, and regulators, and includes a data management component. Centralized data management began a few years into the program. An existing relational database was adapted and extended to handle biological data. Data modeling enabled the program's database to process, store, and retrieve its data. The data base's main data tables and several key reference tables are described. One of the most important related activities supporting long-term analyses was the establishing of standards for sampling site names, taxonomic identification, flagging, and other components. There are limitations. Some types of program data were not easily accommodated in the central systems, and many possible data-sharing and integration options are not easily accessible to investigators. The implemented relational database supports the transmittal of data to the Oak Ridge Environmental Information System (OREIS) as the permanent repository. From our experience we offer data management advice to other biologically oriented long-term environmental sampling and analysis programs.

54 ENVIRONMENTAL SCIENCES↗

In Vivo Monitoring Program Manual, PNL-MA-574, Rev 5.1

The following sections provide an overview of the administration for the In Vivo Monitoring Program (IVMP) for Hanford. This includes the organizational structure and program responsibilities; coordination of in vivo measurements; scheduling measurements; performing measurements; reporting results; and quality assurance.

99 GENERAL AND MISCELLANEOUS↗

Annual Report of the Integrated Status and Effectiveness Monitoring Program: Fiscal Year 2008

This document was created as an annual report detailing the accomplishments of the Integrated Status and Effectiveness Monitoring Program (ISEMP) in the Upper Columbia Basin in fiscal year 2008. The report consists of sub-chapters that reflect the various components of the program. Chapter 1 presents a report on programmatic coordination and accomplishments, and Chapters 2 through 4 provide a review of how ISEMP has progressed during the 2008 fiscal year in each of the pilot project subbasins: the John Day (Chapter 2), Wenatchee/Entiat (Chapter 3) and Salmon River (Chapter 4). Chapter 5 presents a report on the data management accomplishments in 2008.

13 HYDRO ENERGY↗

Implementation of a Risk-Informed Monitoring Program for the Saltstone Disposal Facility - 19374

Section 3116(b) of the Ronald W. Reagan National Defense Authorization Act for Fiscal Year 2005 (NDAA) requires the US NRC, in coordination with the appropriate State agency, to monitor certain disposal actions of the US DOE to assess compliance with the performance objectives in Subpart C of Part 61 of Title 10 of the Code of Federal Regulations (CFR). Under Section 3116(b), the US NRC monitors the US DOE disposal of salt waste at the Saltstone Disposal Facility (SDF) at the Savannah River Site (SRS) in South Carolina. Since the first US NRC monitoring plan for the SDF was issued in 2007, the US NRC staff has made the risk-significant areas of interest more specific. Following the US DOE issuance of the 2009 performance assessment for the SDF and the US NRC review of that document, the US NRC issued its second monitoring plan for the SDF in 2013. The 2013 US NRC monitoring plan included 11 monitoring areas, which were broken down into 40 specific monitoring factors. The US NRC prioritized those monitoring factors (i.e., low, medium, high) based on the sensitivity of model results to the assumptions or processes covered by the monitoring factor and the uncertainty in those assumptions or processes. Those monitoring factors can be opened, closed, revised, and re-prioritized based on new information or changes in the US DOE activities and plans. For example, the list of US NRC high-priority monitoring factors has changed in response to changing information. The flexibility of this approach allows the US NRC to remain focused on risk-significant areas of interest. The US NRC staff has made changes to the NDAA monitoring program at the SDF since the issuance of the 2007 monitoring plan. First, the development of more specific monitoring factors and the prioritization of those monitoring factors has been successful in focusing the US NRC and the US DOE resources on risk-significant issues and providing transparency to stakeholders. Second, the US NRC reviews have become more focused on addressing specific monitoring factors, which has made the process for updating the monitoring plan more transparent. Finally, periodic management meetings and monthly telephone calls maintain open communications between the US NRC, US DOE, South Carolina Department of Health and Environmental Control (SCDHEC), and US EPA. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Data Quality Objectives Supporting the Environmental Soil Monitoring Program for the Idaho National Laboratory Site

This document describes the process used to develop data quality objectives for the Idaho National Laboratory (INL) Environmental Soil Monitoring Program in accordance with U.S. Environmental Protection Agency guidance. This document also develops and presents the logic that was used to determine the specific number of soil monitoring locations at the INL Site, at locations bordering the INL Site, and at locations in the surrounding regional area. The monitoring location logic follows the guidance from the U.S. Department of Energy for environmental surveillance of its facilities.

54 ENVIRONMENTAL SCIENCES↗

Data Quality Objectives Supporting the Environmental Direct Radiation Monitoring Program for the Idaho National Laboratory

This document presents the development of the data quality objectives (DQOs) for the Idaho National Laboratory (INL) Environmental Direct Radiation Monitoring Program and follows the Environmental Protection Agency (EPA) DQO process (EPA 2006). This document also develops and presents the logic to determine the specific number of direct radiation monitoring locations around INL facilities on the desert west of Idaho Falls and in Idaho Falls, at locations bordering the INL Site, and in the surrounding regional area. The selection logic follows the guidance from the Department of Energy (DOE) (2015) for environmental surveillance of DOE facilities.

54 ENVIRONMENTAL SCIENCES↗

2015 Long-Term Hydrologic Monitoring Program Sampling and Analysis Results Report for Project Rulison, Co

The U.S. Department of Energy (DOE) Office of Legacy Management conducted annual sampling at the Rulison, Colorado, Site for the Long-Term Hydrologic Monitoring Program (LTHMP) on May 20–22 and 27, 2015. Several of the land owners were not available to allow access to their respective properties, which created the need for several sample collection trips. This report documents the analytical results of the Rulison monitoring event and includes the trip report and the data validation package (Appendix A). The groundwater and surface water monitoring were shipped to the GEL Group Inc. laboratories for analysis. All requested analyses were successfully completed. Samples were analyzed for gamma-emitting radionuclides by high- resolution gamma spectrometry. Tritium was analyzed using two methods, the conventional tritium method, which has a detection limit on the order of 400 picocuries per liter (pCi/L), and the enriched method (for selected samples), which has a detection limit on the order of 3 pCi/L.

54 ENVIRONMENTAL SCIENCES↗

Long-Term Hydrologic Monitoring Program Sampling and Analysis Results for 2010

The U.S. Department of Energy (DOE) Office of Legacy Management conducted annual sampling at the Rulison, Colorado, Site for the Long-Term Hydrologic Monitoring Program (LTHMP) on May 10 and 11, 2010. The U.S. Environmental Protection Agency (EPA) Radiation and Indoor Environments National Laboratory in Las Vegas, Nevada, analyzed the samples. Samples were analyzed for gamma-emitting radionuclides by high-resolution gamma spectroscopy and for tritium using the conventional and enriched methods.

54 ENVIRONMENTAL SCIENCES↗

Long-Term Hydrologic Monitoring Program Sampling and Analysis Results for 2009

The U.S. Department of Energy (DOE) Office of Legacy Management conducted annual sampling at the Rulison, Colorado, Site for the Long-Term Hydrologic Monitoring Program (LTHMP) on May 11 and 12, 2009. Samples were analyzed by the U.S. Environmental Protection Agency (EPA) Radiation&Indoor Environments National Laboratory in Las Vegas, Nevada. Samples were analyzed for gamma-emitting radionuclides by high-resolution gamma spectroscopy and for tritium using the conventional and enriched methods.

54 ENVIRONMENTAL SCIENCES↗

Long-Term Hydrologic Monitoring Program Sampling and Analysis Results for 2008

The U.S. Department of Energy (DOE) Office of Legacy Management conducted annual sampling at the Rulison, Colorado site, for the Long-Term Hydrologic Monitoring Program (LTHMP) on May 12, and 13, 2008. Samples were analyzed by the U.S. Environmental Protection Agency (EPA) Radiation&Indoor Environments National Laboratory in Las Vegas, Nevada. Samples were analyzed for gamma-emitting radionuclides by high-resolution gamma spectroscopy and tritium using the conventional and enriched methods

54 ENVIRONMENTAL SCIENCES↗