Search NASA⌕ Search

SEARCH · Search NASA

Results for “Maintenance engineering”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Predictive-Maintenance Practices: For Operational Safety of Battery Energy Storage Systems

Changes in the Demand Profile and a growing role for renewable and distributed generation are leading to rapid evolution in the electric grid. These changes are beginning to considerably strain the transmission and distribution infrastructure. Utilities are increasingly recognizing that the integration of energy storage in the grid infrastructure will help manage intermittency and improve grid reliability. This recognition, coupled with the proliferation of state-level renewable portfolio standards and rapidly declining lithium-ion (Li-ion) battery costs, has led to a surge in the deployment of battery energy storage systems (BESSs). Additionally, although BESSs represented less than 1% of grid-scale energy storage in the United States in 2019, they are the preferred technology to meet growing demand because they are modular, scalable, and easy to deploy across diverse use cases and geographic locations.

25 ENERGY STORAGE↗

An Investigation on the Pollen-Induced Soiling Losses in Utility-Scale PV Plants

Soiling, the accumulation of dust and other contaminants on the surface of photovoltaic (PV) modules, is a common factor that can negatively impact the performance of PV systems. In this study, the authors aim to analyze the impact of pollen on soiling losses in PV systems located in North Carolina, USA, particularly during the spring season. The performance data of two utility-scale PV plants was collected and analyzed using the two soiling extraction methods. Environmental data, including croplands and vegetation was also collected and analyzed to identify correlations with soiling losses. The results of the study may help improve understanding of necessary operation and maintenance activities for PV plants and provide new insights into the phenomenon of pollen deposition on PV systems.

correlation↗

Power System Resilience Enhancement in Typhoons Using a Three-Stage Day-Ahead Unit Commitment

In this work, we propose a three-stage resilient unit commitment model which considers uncertain typhoon paths and line outages to improve the power system resilience against typhoon events. The proposed solution coordinates resources in response to the worst-case scenario for each possible typhoon path. The optimal decision is based on the characterization of the power system schedule into three stages of preventive control, emergency control, and restoration. Preventive control is performed before the typhoon occurs by quickly adjusting the three-stage resilient unit commitment schedule; emergency control is conducted during the typhoon by shedding local loads to meet the power balance, while other control strategies are assumed to be unavailable due to possible interruptions in the communication system; restoration is realized after the typhoon, when resources are optimally dispatched to repair the outages of critical devices and recover the normal operation state of the power system quickly. Considering the typhoon path uncertainty, we have introduced a stochastic model for possible typhoon paths where all possible affected lines along each typhoon path are assumed to be on outage during the typhoon. Accordingly, we explore the strategy for co-optimizing the three stages in unit commitment. The proposed model is tested on the IEEE 118-bus system and the real-world provincial system to verify its effectiveness.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Resilience-Motivated Distribution System Restoration Considering Electricity-Water-Gas Interdependency

A major outage in the electricity distribution system may affect the operation of water and natural gas supply systems, leading to an interruption of multiple services to critical customers. Therefore, enhancing resilience of critical infrastructures requires joint efforts of multiple sectors. In this paper, a distribution system service restoration method considering the electricity-water-gas interdependency is proposed. The objective is maximizing the supply of electricity, water, and gas to critical customers after an extreme event. The operational constraints of electricity, water, and natural gas networks are considered. Additionally, the characteristics of electricity-driven coupling components, including water pumps and gas compressors, are also modeled. Relaxation techniques are applied to non convex constraints posed by physical laws of those networks. Consequently, the restoration problem is formulated as a mixed-integer second-order cone program, which can readily be solved by the off-the-shelf solvers. The proposed method is validated by numerical simulations on an electricity-water-gas integrated system, developed based on benchmark models of the subsystems. The results indicate that considering the interdependency refines the allocation of limited generation resources and demonstrate the exactness of the proposed convex relaxation

24 POWER TRANSMISSION AND DISTRIBUTION↗

An Architectural Survey of the Area 25 Nuclear Rocket Development Station, Nevada National Security Site, Nye County, Nevada, Volume 2 Of 3

The purpose of the current architectural survey is to record the Nuclear Rocket Development Station (NRDS) district, which is recommended eligible for listing to the NRHP under all four criteria as the testing center for the Rover/NERVA (Nuclear Engine for Rocket Vehicle Application) program from the initial boundary survey in 1956 to the end of nuclear rocket development on January 5, 1973. Resources within the boundary of the NRDS district were evaluated to determine if they are eligible for listing to the National Register as district contributors. Subdistricts within the larger NRDS district were defined to provide a temporal, spatial, and functional framework for organizing the resources involved in the NRDS operations. However, developing contexts for the individual subdistricts was beyond the scope of the NRDS survey. Therefore, the potentially eligible subdistricts were not individually evaluated under any of the Secretary of Interior’s Significance Criteria for eligibility to the National Register.

54 ENVIRONMENTAL SCIENCES↗

An Architectural Survey of the Area 25 Nuclear Rocket Development Station, Nevada National Security Site, Nye County, Nevada, Volume 3 Of 3

The purpose of the current architectural survey is to record the Nuclear Rocket Development Station (NRDS) district, which is recommended eligible for listing to the NRHP under all four criteria as the testing center for the Rover/NERVA (Nuclear Engine for Rocket Vehicle Application) program from the initial boundary survey in 1956 to the end of nuclear rocket development on January 5, 1973. Resources in the NRDS district were evaluated to determine if they are eligible for listing to the National Register as district contributors. The current survey identified the Reactor Control Point subdistrict to provide a temporal, spatial, and functional framework for organizing the resources involved in the NRDS operations. However, the subdistrict was not evaluated as a potential historic district against the Secretary of Interior’s Significance Criteria.

54 ENVIRONMENTAL SCIENCES↗

Bridging Equipment Reliability Data and Risk Informed Decisions in a Plant Operation Context

Industry equipment reliability and asset management programs are essential elements that help ensure the safe and economical operation of nuclear power plants. The effectiveness of these programs is addressed in several industry-developed and regulatory programs. The Risk-Informed Asset Management (RIAM) project is tasked to develop tools in support of the equipment reliability and asset management programs at nuclear power plants. These tools are designed to create a direct bridge between component health/lifecycle data and decision making (e.g., maintenance scheduling and project prioritization). The goal of this article is to provide a guide for specific use cases that the RIAM project is targeting. We have grouped uses cases into three main areas. The first area focuses on the analysis of equipment reliability data with a particular emphasis on condition-based data, such as test/surveillance reports and component monitoring data. The second area focuses on the integration of equipment reliability into system/plant reliability models to determine system/plant health and identify the components that are critical to maintain an operational system. Lastly, the third area manages plant resources, such as maintenance activities and replacement scheduling using optimization methods. Here the primary focus is on supporting typical system engineer decisions regarding maintenance activity scheduling and component aging management. This is performed in a risk-informed context where the term “risk” is broadly constructed to include both plant reliability and economics. This framework combines data analytics tools to analyze equipment reliability data with risk-informed methods designed to support system engineer decisions (e.g., maintenance and replacement schedules, optimal maintenance posture) in a customizable workflow.

97 - MATHEMATICS AND COMPUTING↗

Sequential Bayesian inference of transition rates in the hidden Markov model for multi-state system degradation

The more easily available system performance data and advances in data analytics have provided us with opportunities to optimize maintenance programs for engineered systems, for example nuclear power plants. One key task in maintenance optimization is to obtain an accurate model for system degradation. Here, in this research, we propose a Bayesian method to address this problem. Noting that systems usually exhibit multiple states and that the actual state of a system usually is not directly observable, in the method we first model the system degradation process and the observation process based on a hidden Markov model. Then we develop a sequential Bayesian inference algorithm based on importance sampling and the forward algorithm to infer the posterior distributions of the transition rates in the hidden Markov model based on available observations. The proposed Bayesian method allows us to take advantage of evidence from multiple sources, and also allows us to perform Bayesian inference sequentially, without the need to use the entire history of observations every time new observations are collected. We demonstrate the proposed method using both synthetic data for a nuclear power plant feedwater pump and realistic data for a nuclear power plant chemistry analytical device.

42 ENGINEERING↗

An Architectural Survey of the REECo Maintenance Compound, Area 6, Nevada National Security Site, Nye County, Nevada

The U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Field Office (NNSA/NFO) plans to install a 26.45-mile-long 138-kilovolt (kV) transmission line on the Nevada National Security Site (NNSS) in Nye County, Nevada. This new transmission line will upgrade the electrical transmission system and provide reliable power between Mercury Switching Station in Area 23 and the U1a Facility in Area 1. The proposed upgrade to the power transmission system constitutes an undertaking subject to review under Section 106 of the National Historic Preservation Act (NHPA) (54 United States Code [USC] § 306101) and its implementing regulations, 36 Code of Federal Regulations (CFR) Part 800. A portion of this new transmission line will cross the western perimeter of the Reynolds Electrical and Engineering Company (REECo) Maintenance Compound located in Area 6 of the NNSS. This compound with its trade shops, storage sheds, and yards served as a general construction facility that supported nuclear testing activities on the NNSS from 1967 to 1992. Although three architectural resources in the compound have previously been recorded and evaluated for the National Register of Historic Places (NRHP), other resources within it have not, nor has the compound been recorded and evaluated as a potential district. The State Historic Preservation Officer (SHPO) concurred with NNSA/NFO’s determination that the unevaluated REECo Maintenance Compound will be adversely affected by the proposed undertaking (Reed 2021). The NNSA/NFO, in consultation with the SHPO, then developed the Memorandum of Agreement DE-GM58-22NA25553 between the U.S. Department of Energy and the Nevada State Historic Preservation Officer Regarding Installation of a 138-kilovolt Transmission Line from the Mercury Switching Station to the U1a Facility and the Removal of the Historic 138-kilovolt Transmission Line from the Mercury Switching Station to the U1a Facility in Areas 1, 3, 5, 6, and 23 of the Nevada National Security Site, Nye County, hereafter referred to as the MOA. This architectural survey report was prepared in accordance with MOA Stipulation III.B. It describes the origins, history, layout, and functions of the REECo Maintenance Compound during the Cold War and identifies contributing and noncontributing resources. The report defines a district boundary based on archival research and the field survey and concludes with an appendix that presents digital color images of the compound with descriptions and a map key showing image viewpoints and directions. Although none of the architectural resources are recommended individually eligible, the district evaluation concludes the REECo Maintenance Compound is eligible as a historic district for listing in the NRHP under the Secretary of the Interior’s Significance Criteria A and C at the local level. The historic district retains all seven aspects of integrity and conveys its significance under the abovementioned criteria.

138 kV↗

Storing Co 2 in Built Infrastructure: Co 2 Carbonation of Precast Concrete Products

The overall objective of the proposed study was to advance the technical understanding of CO 2 incorporation into novel cementitious materials for the development of high value products that provide a net reduction in carbon emissions. This project combined two primary phases of research that addressed technical barriers related to (i) optimizing CO 2 storage capability of cementitious materials, (ii) evaluating and enhancing physical properties of novel carbonated materials, and (iii) assessing the reductions in life cycle CO 2 emissions attributed to CO 2 carbonation of precast cementitious materials. Engineered cementitious composites (ECC) are a class of highly ductile concrete composites that have been shown to be very durable when used in the built environment. CO 2 carbonation of ECC was examined in this study and it was found that precast ECC specimens could sequester up to 35% CO 2 by cement mass after 24 hours of curing at a CO 2 pressure of 0.5 MPa and 23°C and had a strain capacity of 3%. Carbonation conditions were optimized at the bench-scale and then utilized to create full-scale CO 2 -cured ECC railroad ties that were field tested on a train track. Rail ties were selected for this initial assessment of CO 2 storage in precast concrete materials due to the large market for concrete ties in the railroad industry. Although the full-scale rail ties passed all of the required American Railway Engineering and Maintenance-of-Way Association qualifying mechanical tests, on-track testing of the CO 2 -cured ECC rail ties was unsuccessful due to fiber alignment in the ECC the during the rail tie casting process which prevented the material from achieving the expected level of strain capacity. This result highlights the challenge in scaling up bench-scale processes to full-scale product manufacturing and requires additional investigation into the casting process of large-scale infrastructure elements using ECC combined with carbonation curing. Life cycle assessment of a CO 2 -cured ECC rail tie versus a traditional concrete rail tie indicates that the ECC tie can have lifecycle carbon savings of between 11% and 51% depending on how much longer its useful lifetime is compared to traditional concrete rail ties. Both carbon and cost savings are driven by a reduction in the need to replace broken rail ties, so the key factor is the extent to which a CO 2 -cured ECC rail tie will have increased lifetime durability compared to alternative rail ties.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Systems Engineering and Analysis in Support of a US Federal Staging Facility for UNF

The US Department of Energy Office of Nuclear Energy (DOE-NE) Office of Spent Fuel and High-Level Waste Disposition is examining a set of system options and conducting supporting analyses to inform the development of an integrated waste management system, which may include one or more federal staging facilities (FSFs) for used nuclear fuel (UNF ) sited using a collaborative siting process. This paper focuses on the ongoing activities in two systems engineering and analysis work areas: (1) data and tools development, validation, and maintenance and (2) systems engineering execution. Within the first work area, the STANDARDS 5.0 UNF data and analysis tool, formerly known as UNF-ST&DARDS, is being developed as a foundational resource to assist in the management of UNF data. It has the key capability to model UNF throughout the entire back end of the fuel cycle. STANDARDS also includes several compatible analysis tools for the time-dependent characterization of UNF and related systems by interfacing with the SCALE code system for nuclear analysis and COBRA-SFS for thermal analysis. Also, within the data and tools area is the Next Generation System Analysis Model (NGSAM), which is an agent-based simulation software tool expressly designed to be capable of modeling the waste management system, including the transportation of UNF to and from a FSF. NGSAM has been developed to enable informed decision-making by providing the capability to analyze various potential system options for the management of UNF and high-level radioactive waste. Finally, in the systems engineering execution area, the team has begun to apply a disciplined systems engineering approach at the system level along with supporting analysis to guide the development of the FSF project requirements (including associated transportation infrastructure). Systems engineering principles and practices and their adaptation/application to design and development activities will ensure that the waste management system is effectively implemented as work proceeds. Other activities include investigating the implications of changes in various assumptions and parameters related to waste management systems, such as UNF acceptance rates, receipt logic, facility capacities and capabilities, use of standardized canisters, and different assumed facility operation start dates. Keywords: federal staging facility (FSF), used nuclear fuel (UNF), integrated waste management (IWM) system, Next Generation System Analysis Model (NGSAM), STANDARDS, systems engineering

Joseph, Robert↗

Streamlined Approach for Environmental Restoration (SAFER) Plan for Corrective Action Unit 114: Area 25 EMAD Facility Nevada National Security Site, Nevada, (Rev.0, with ROTC 1)

This Streamlined Approach for Environmental Restoration (SAFER) Plan addresses the actions needed to achieve closure for Corrective Action Unit (CAU) 114, Area 25 EMAD Facility, identified in the Federal Facility Agreement and Consent Order (FFACO). CAU 114 comprises the following corrective action sites (CASs) located in Area 25 of the Nevada National Security Site (formerly, the Nevada Test Site): 25-41-03, EMAD Facility; 25-99-23, Manned Control Car (MCC) and Engine Installation Vehicle (EIV); and 25-33-05, Building 3901, Engine Transport System Maintenance Building. This plan provides the methodology for field activities needed to gather the necessary information for closing CAU 114. There is sufficient information and process knowledge from historical documentation and investigations of similar sites regarding the expected nature and extent of potential contaminants to recommend closure of CAU 114 using the SAFER process. Additional information will be obtained by conducting a field investigation before selecting the appropriate corrective actions for CAU 114. It is anticipated that the results of the field investigation and implementation of corrective actions will support a defensible recommendation that no further corrective action is necessary. The purpose of the corrective action investigation will be to document and verify the adequacy of existing information; to affirm the decision for either clean closure, closure in place, or no further action; and to provide sufficient data to implement the corrective action. The actual corrective action selected will be based on characterization activities implemented under this SAFER Plan. If specific conditions or findings fall outside the bounds of the SAFER Plan, the Nevada Division of Environmental Protection (NDEP) will be consulted to determine the path forward before proceeding. Upon completion of SAFER activities, a closure report will be prepared and submitted to NDEP for review and approval. The schedule for completion of the closure report will be established at the FFACO annual meeting.

54 ENVIRONMENTAL SCIENCES↗

Streamlined Approach for Environmental Restoration (SAFER) Plan for Corrective Action Unit 114: Area 25 EMAD Facility Nevada National Security Site, Nevada

This Streamlined Approach for Environmental Restoration (SAFER) Plan addresses the actions needed to achieve closure for Corrective Action Unit (CAU) 114, Area 25 EMAD Facility, identified in the Federal Facility Agreement and Consent Order (FFACO). CAU 114 comprises the following corrective action sites (CASs) located in Area 25 of the Nevada National Security Site: • 25-41-03, EMAD Facility (Building 3900) • 25-99-23, Manned Control Car (MCC) and Engine Installation Vehicle (EIV) • 25-33-05, Building 3901, Engine Transport System Maintenance Building (Train Shed) This plan provides the methodology for field activities needed to gather the necessary information for closing CAU 114. There is sufficient information and process knowledge from historical documentation and investigations of similar sites regarding the expected nature and extent of potential contaminants to recommend closure of CAU 114 using the SAFER process. Additional information will be obtained by conducting a field investigation before selecting the appropriate corrective actions for CAU 114. It is anticipated that the results of the field investigation and implementation of corrective actions will support a defensible recommendation that no further corrective action is necessary. The purpose of the corrective action investigation will be to document and verify the adequacy of existing information; to affirm the decision for either clean closure, closure in place, or no further action; and to provide sufficient data to implement the corrective action. The actual corrective action selected will be based on characterization activities implemented under this SAFER Plan. If specific conditions or findings fall outside the bounds of the conceptual site model, such as an unanticipated release, the Nevada Division of Environmental Protection (NDEP) will be consulted to determine the path forward before proceeding. Upon completion of SAFER activities, a closure report (CR) will be prepared and submitted to NDEP for review and approval. The schedule for completion of the CR will be established in consultation with NDEP.

54 ENVIRONMENTAL SCIENCES↗

Coalition for Community-Supported Affordable Geothermal Energy Systems (C2SAGES)

The C2SAGES project evaluated the feasibility of a community geothermal system for the planned Windy Ridge affordable housing development in Hinesburg, Vermont. Led by GTI Energy with Vermont Gas Systems, LN Consulting, NREL, and Frontier Energy, the work assessed technical design, energy performance, costs, business models, community engagement, maintenance, workforce development, and permitting. The proposed system was designed to serve 100% of the development’s heating, cooling, and domestic hot water loads. Compared with a baseline using air-source heat pumps and natural gas water heating, the geothermal system was estimated to reduce HVAC and domestic hot water energy use by about 45% to 48%, lower operating and maintenance costs, and reduce 30-year life-cycle costs by 37% for Phase 1 and 10% for Phase 2. Technical testing and modeling indicated that the Windy Ridge site is suitable for a community-scale geothermal system. The project also developed borehole field layouts, piping concepts, pump house designs, controls, maintenance plans, and supporting engineering drawings. The business model analysis found that first cost, ownership structure, and customer affordability remain major deployment challenges. Utility-led maintenance and operation were viewed favorably, but traditional utility cost-recovery models may require subsidy or revised financing structures to be practical for affordable housing. Community engagement highlighted the need for clear public education, transparent financing, reliable long-term maintenance, trained technicians, and the potential to pair geothermal systems with weatherization. Overall, the report concludes that community geothermal is technically feasible and offers meaningful energy, emissions, and life-cycle cost benefits, but broader deployment will depend on workable financing models and workforce readiness.

15 GEOTHERMAL ENERGY↗

Development of Analysis Methods that Integrate Numeric and Textual Equipment Reliability Data

Within the Light Water Reactor Sustainability (LWRS) program, the Risk-Informed Systems Analysis (RISA) Pathway is performing collaborative research on the development and deployment of technologies designed to assist operating nuclear power plants (NPPs) to reduce operating costs improve plant reliability and availability. One of the RISA research areas is focusing on the development of methods and tools designed to optimize plant operations (e.g., maintenance/replacement schedules, optimal maintenance postures for plant structures, systems, and components [SSCs]) in a manner that is more cost effective than current approaches and makes better use of available SSC health data. The Risk-Informed Asset Management (RIAM) project targets this research area by creating a direct bridge between component equipment reliability (ER) data and system engineer decision making regarding maintenance activity scheduling and component aging management. In this respect, one challenge that NPP system engineers are facing is that the amount of ER data being continuously generated is not only extremely large in size, but it comes in different forms: textual (e.g., condition or maintenance reports) and numeric (e.g., generated by monitoring systems). All these data elements provide them with valuable insights and information regarding: 1) the discovery of anomalous behaviors or degradation trends, 2) the identification of the possible causes behind such behaviors/trends, and 3) the prediction of their direct consequences. However, several challenges have proved to be roadblocks to this process. While some of these challenges are technical in nature (i.e., data are often distributed over several physical servers/databases), others are conceptual in nature: data elements come in different formats (e.g., numeric or textual), and measured values have different scales (e.g., vibration spectra and oil temperature). The activities performed by the RIAM project during FY23 directly tackles the need to simultaneously integrate the analysis of ER data in all its forms, numeric and textual. Note that such task has never been performed before due to the complexity of the systems under consideration but, most importantly, because of the technical challenges behind the harmonization of ER data formats and the lack of adequate computational methods to analyze them. Our approach borrows ideas and concepts from the medical field where integration of several data sources is vital to assist medical practitioners to perform correct diagnosis and indicate optimal treatments. In our view a NPP asset is equivalent to a patient in a medical context. The main difference is the complexity of a human body is a magnitude more complex when compared to typical assets commonly present in NPPs (e.g., centrifugal pumps, or motor operated valves). This simplifies our first requirement when analyzing heterogenous ER data formats: to put data into “context”. Context is here intended as the additional piece of information that is needed by ER data analysis tools to understand what these data elements are referring to, i.e., which king of knowledge they are generating. In our context, this knowledge can be translated into models that capture the form and functional architecture of assets/systems, their dependencies, and how they interact. These models actually emulate the knowledge that that NPP system engineers possess about assets and systems; this is their key of success when analyzing ER data, their challenge is ability to handle large amount of data. Here, we employ model-based system engineering (MBSE) models of systems and assets to represent and capture their architecture and functional, i.e. cause-effect, relations. Then, ER data elements are processed by identifying first of all which elements of the developed MBSE elements they are referring to. For numeric ER data this task is fairly easy since it is possible to precisely pinpoint what MBSE elements the corresponding sensor are observing (e.g., bearing temperature of a centrifugal pump). Task is much harder for textual data since the information contained in issue or maintenance reports needs to “be understood” by a computational tool. Here we called this process as “knowledge extraction”. Once again, we borrow the experience in the medical field where methods to extract knowledge from textual data have been developed in the past decade. The missing element for us is the availability of a complete dictionary of NPP related concepts (in addition to the MBSE models presented earlier) that can put “text into context”. In FY23, such dictionary has been developed along with all the computational elements required for knowledge extraction. Lastly, once numeric and textual ER data elements have been processed and “understood”, then the last step is the discovery of possible cause-effect relations among them. This is performed by observing if a logical connection through the MBSE models exists, and if the

97 MATHEMATICS AND COMPUTING↗

Integrated Risk-Informed Condition Based Maintenance Capability and Automated Platform: Technical Report 1

Due to continuing global energy market trends, driven heavily by the abundant preserves of natural gas, there is an immediate need to reduce costs associated with operation and maintenance (O&M) for the current domestic nuclear power industry and for future reactor developments. This is to ensure that nuclear power generation remains an economically competitive and viable option in the energy market. O&M costs include labor-intensive preventive maintenance (PM) programs, which involve manually-performed inspection, calibration, testing, and maintenance of plant assets at periodic frequency and time-based replacement of assets, irrespective of their condition. This has resulted in an expensive, labor-centric business model to achieve high capacity factors. Fortunately, there are technologies (advanced sensors, data analytics, and risk assessment methodologies) that can enable the transition from a labor-centric business model to a technology-centric business model. The technology-centric business model will result in a significant reduction of PM activities, laying the foundation for real-time condition assessment of plant assets, reducing overall labor and part costs. To enable this transition, PKMJ Technical Services LLC is partnering with the U.S. Department of Energy’s Idaho National Laboratory (operated by the Battelle Energy Alliance, LLC) and the Public Services Enterprise Group (PSEG) Nuclear, LLC in the Integrated Risk-Informed Condition-Based Maintenance Capability and Automated Platform Project. In this report, the configuration of a digital cloud platform using Microsoft Azure is discussed, data from the PSEG Salem Nuclear Generating Station Units 1 & 2 are imported into a digital cloud platform, and the data is used for an evaluation of several key areas: cost impact analysis, risk-informed model development, and preventive maintenance strategy optimization. First, the cost impact analysis reviews which plant assets are potential good candidates for condition-based monitoring. Next, INL utilized the data in their local environment to develop the risk-informed model; which provides estimates of failure rates and probability of failures of assets based upon their past performance. The developed model is performed on assets selected from the cost impact analysis. Lastly, engineers assess the preventive maintenance strategy for the selected assets at PSEG against maintenance strategies in the nuclear industry for similar assets to potentially identify acceptable justification for the extension of current maintenance frequencies.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Electric Vehicle Charging for Residential and Commercial Energy Codes: Technical Brief

Numerous studies show that sales of electric vehicles (EVs) have grown consistently over recent years in the U.S. The U.S. Energy Information Administration (EIA) estimated 3 million EVs were on the road in 2022, and the Edison Electric Institute (EEI) forecasts a total of 26.4 million EVs on the road by 2030. Based on this forecast, EEI projects the need for an additional 12.9 million EV charge ports by 2030. If EV charging infrastructure fails to keep pace with sales of EVs it could result in consumers stranded without options to power their vehicles. EVs are capable of providing substantial benefits to the consumers. EVs are less expensive to operate than conventional internal combustion engine vehicles, have lower maintenance costs, and have the convenience of fueling (charging) at home or work. Studies conducted in California show that costs associated with installing EV charging infrastructure can be substantially more expensive for retrofit scenarios compared to new construction, making inclusion of EV infrastructure in new construction codes a cost-effective policy option to increase infrastructure to meet growing demands. PNNL tracks adoption of mandatory EV provisions across the U.S. As of December 20, 2024, 12 states (California, Oregon, Washington, Colorado, New Mexico, Illinois, Maryland, Delaware, New Jersey, Rhode Island, Massachusetts and Vermont) and 53 local governments have added EV provisions to their building codes, local ordinances and zoning requirements. Originally published in 2022, this tech brief has been revised to align with recent model energy code committee discussions and published EV infrastructure code language. This technical brief summarizes market trends, costs and benefits, and provides sample code language for EV charging infrastructure for consideration to be included in model codes, such as the International Energy Conservation Code (IECC) and ANSI/ASHRAE/IES Standard 90.1, as well as directly by states and local governments in their building codes. The technical brief summarizes related efforts undertaken by states and local governments, and builds upon language considered during the 2021 and 2024 IECC development cycles.

2021 IECC↗