Search NASA⌕ Search

SEARCH · Search NASA

Results for “Marginal price”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

CERF: IM3 Projected Western US Power Plant Locations

Overview The Capacity Expansion Regional Feasibility (CERF) model is an open-source geospatial python package that provides new power plant locations at a 1km resolution. The model ingests U.S. state or regional-scale electricity system capacity expansion plans, such as those produced by the Global Change Analysis Model (GCAM-USA), and identifies feasible, site-specific locations for individual new power plants (renewable and non-renewable). CERF combines high-resolution geospatial suitability analyses with an economic algorithm that selects individual plant siting locations based on grid interconnection costs and the locational marginal value of new generation. The model incorporates a wide range of dynamic constraints and opportunities, such as protected lands, population density, existing infrastructure, and water availability. This dataset provides CERF power plant siting results for IM3 Phase 2 simulations across eight different scenarios for the Western US through 2055. The scenarios include combinations of two Shared Socioeconomic Pathways (SSP3 and SSP5) with four high-resolution climate projections specific to the United States (see, https://tgw-data.msdlive.org/). These climate projections include "hotter" and "cooler" variants for two Representative Concentration Pathways (RCP4.5 and RCP8.5). The resulting eight simulations are: rcp45cooler_ssp3 rcp45cooler_ssp5 rcp45hotter_ssp3 rcp45hotter_ssp5 rcp85cooler_ssp3 rcp85cooler_ssp5 rcp85hotter_ssp3 rcp85hotter_ssp5 CERF siting results in this dataset correspond to capacity expansion plans in the GCAM-USA IM3 Phase 2 simulation data and are available for each of the above scenarios. Data Details Temporal Range: 2015-2055 in 5-year timesteps. Note that 2015 is the experiment base year and 2020 and beyond represent model simulation years. Spatial Range: Plant locations are provided for the eleven states in the Western US including Arizona, California, Colorado, Idaho, Montana, New Mexico, Nevada, Oregon, Utah, Washington, and Wyoming. Spatial Resolution: 1 km-squared, provided in x and y coordinates Geospatial Projection: Albers Equal Area Conic (ESRI:102003) File Type: csv The dataset contains subdirectories for each of the eight scenarios described in the overview. Each scenario folder contains two subfolders with the following information: 1. Power Plant Data This directory contains a single .csv file of power plant locations for both pre-existing (non-CERF sited plants in operation in 2015) and new (CERF-sited) power plants across the temporal range along with additional CERF model output parameters for CERF-sited plants. Plant with a siting year earlier than 2020 correspond to facilities that are operational leading into the first timestep CERF simulation. For a more detailed description of CERF model output parameters, see the CERF model documentation. Note that the cerf_plant_id parameter is unique within each scenario file but not across scenario files. Parameter Descriptions scenario - Name of scenario cerf_plant_id - Unique siting identifier cerf_sited - If True, indicates that plant was sited by CERF model. If False, indicates pre-existing facility region_name - Name of region (state) tech_id - Technology ID tech_name - Full generation technology name inclusive of cooling type (if applicable) and additional characteristics tech_simple - Simplified generation technology type unit_size_mw - Power plant unit size (MW) xcoord - X coordinate in the default CRS (meters) ycoord - Y coordinate in the default CRS (meters) index - Index position in the flattend 2D array buffer_in_km - Exclusion buffer around site (km) sited_year - Year of siting retirement_year - Year of retirement lmp_zone - Locational marginal price (LMP) zone ID locational_marginal_price_usd_per_mwh - Locational marginal price ($/MWh) generation_mwh_per_year - Generation output (MWh/yr) operating_cost_usd_per_year - Cost of plant operations ($/yr) net_operational_value - Net operational value based on LMP and and operating costs ($/yr) interconnection_cost - Cost of interconnection for transmission & gas pipeline (if applicable) net_locational_cost -- Difference of interconnection cost and operating value ($/yr) capacity_factor_fraction - Capacity factor (fraction) carbon_capture_rate_fraction - Carbon capture rate (fraction) fuel_co2_content_tons_per_btu - Fuel CO2 content (tons/Btu) fuel_price_usd_per_mmbtu - Fuel price ($/MMBtu) fuel_price_esc_rate_fraction - Fuel price escalation rate (fraction) heat_rate_btu_per_kWh - Heat rate (Btu/kWh) lifetime_yrs - Technology lifetime for annuity (years) operational_life_yrs - Operational lifetime for retirement (years) variable_om_usd_per_mwh - Variable operation and maintenance costs of yearly capacity use ($/MWh) variable_om_esc_rate_fraction - Variable operation and maintenance costs escalation rate (fraction) carbon_tax_usd_per_ton - Carbon tax ($/ton) carbon_tax_esc_rate_fraction - Carbon tax escalation rate (fraction) 2. Storage Data This directory contains information on new and pre-existing energy storage facilities operational in each timestep along with various storage operational parameters. The 2015 timestep provides pre-existing energy storage data and corresponds with facilities that are operational leading into the first model simulation timestep. Note that coordinates in the storage files correspond to the interconnection point on the grid (substation location), not individual energy storage locations. Energy storage is added in a cumulative process at each given interconnection point. That is, each individual file provides the total operational storage capacity interconnected to the specified substation for the given timestep, inclusive of previously installed storage at that location and new storage installed in that timestep at that location. Parameters scenario - Name of scenario timestep - Simulation timestep name - Unique storage identifier s_typ - Type of energy storage technology (battery or pumped storage hydro) s_node - Node ID of interconnecting substation xcoord - X coordinate in the default CRS (meters) ycoord - Y coordinate in the default CRS (meters) charge_rate - Maximum charge rate (power capacity) of storage system (MW) discharge_rate - Maximum discharge rate (power capacity) of storage system (MW) duration - Duration of storage system (hours) max_SoC - Allowed maximum state of charge (energy capacity) of storage system (MWh) min_SoC -Allowed minimum state of charge (energy capacity) of storage system (MWh) charge_eff - Efficiency of charge (fraction between 0 and 1) discharge_eff - Efficiency of discharge (fraction between 0 and 1) Acknowledgment IM3 is a multi-institutional effort led by Pacific Northwest National Laboratory and supported by the U.S. Department of Energy's Office of Science as part of research in MultiSector Dynamics, Earth and Environmental Systems Modeling Program.

CERF↗

Evaluation of the Super ESPC Program: Level 2 -- Recalculated Cost Savings

This report presents the results of Level 2 of a three-tiered evaluation of the U.S. Department of Energy Federal Energy Management Program's Super Energy Savings Performance Contract (Super ESPC) Program. Level 1 of the analysis studied all of the Super ESPC projects for which at least one Annual Measurement & Verification (M&V) Report had been produced by April 2006. For those 102 projects in aggregate, we found that the value of cost savings reported by the energy service company (ESCO) in the Annual M&V Reports was 108% of the cost savings guaranteed in the contracts. We also compared estimated energy savings (which are not guaranteed, but are the basis for the guaranteed cost savings) to the energy savings reported by the ESCO in the Annual M&V Report. In aggregate, reported energy savings were 99.8% of estimated energy savings on the basis of site energy, or 102% of estimated energy savings based on source energy. Level 2 focused on a random sample of 27 projects taken from the 102 Super ESPC projects studied in Level 1. The objectives were, for each project in the sample, to: repeat the calculations of the annual energy and cost savings in the most recent Annual M&V Report to validate the ESCO's results or correct any errors, and recalculate the value of the reported energy, water, and operations and maintenance (O&M) savings using actual utility prices paid at the project site instead of the 'contract' energy prices - the prices that are established in the project contract as those to be used by the ESCO to calculate the annual cost savings, which determine whether the guarantee has been met. Level 3 analysis will be conducted on three to five projects from the Level 2 sample that meet validity criteria for whole-building or whole-facility data analysis. This effort will verify energy and cost savings using statistical analysis of actual utility use, cost, and weather data. This approach, which can only be used for projects meeting particular validity criteria, is described in Shonder and Florita (2003) and Shonder and Hughes (2005). To address the first objective of the Level 2 analysis, we first assembled all the necessary information, and then repeated the ESCOs' calculations of reported annual cost savings. Only minor errors were encountered, the most common being the use of incorrect escalation rates to calculate utility prices or O&M savings. Altogether, our corrected calculations of the ESCO's reported cost savings were within 0.6% of the ESCOs' reported cost savings, and errors found were as likely to favor the government as they were the ESCO. To address the second objective, we gathered data on utility use and cost from central databases maintained by the Department of Defense and the General Services Administration, and directly from some of the sites, to determine the prices of natural gas and electricity actually paid at the sites during the periods addressed by the annual reports. We used these data to compare the actual utility costs at the sites to the contract utility prices. For natural gas, as expected, we found that prices had risen much faster than had been anticipated in the contracts. In 17 of the 18 projects for which the comparison was possible, contract gas prices were found to be lower than the average actual prices being paid. We conclude that overall in the program, the estimates of gas prices and gas price escalation rates used in the Super ESPC projects have been conservative. For electricity, it was possible to compare contract prices with the actual (estimated) marginal prices of electricity in 20 projects. In 14 of these projects, the overall contract electricity price was found to be lower than the marginal price of electricity paid to the serving utility. Thus it appears that conservative estimates of electricity prices and escalation rates have been used in the program as well. Finally we calculated the value of the reported energy savings using the prices of utilities actually paid by the sites instead of the contract prices. In 16 of the 22 projects (where this calculation was possible), the recalculated annual cost savings were greater than the annual cost savings reported by the ESCO. In the aggregate for the 22 projects analyzed, the annual cost savings calculated using actual energy prices were found to be 111% of the ESCO-reported savings. Using statistical methods to expand this estimate to the entire 102-project population of Super ESPC projects, we estimate that the total annual cost savings calculated using actual energy prices instead of contract energy prices are about 110% of the reported annual cost savings. We can combine the results of the Level 1 and Level 2 studies to estimate overall cost savings realized by the government for the entire 102-project population of Super ESPC projects examined in Level 1.

03 NATURAL GAS↗

Mean-Variance Optimization-Based Energy Storage Scheduling Considering Day-Ahead and Real-Time LMP Uncertainties

In this letter, a new mean-variance optimization-based energy storage scheduling method is proposed with the consideration of both day-ahead (DA) and real-time (RT) energy markets price uncertainties. It considers the locational marginal price (LMP) forecast uncertainties in the DA and RT markets. The energy storage arbitrage risk associated with the LMP forecast uncertainty is explicitly modeled through the variance component in the objective function. The quadratic term of this variance is transformed into a second-order cone constraint using the charging and discharging power complementarity of the energy storage system. Finally, the proposed model is formulated as a mixed-integer conic programming problem. Numerical case studies demonstrate the effectiveness of the proposed model for energy storage scheduling considering price uncertainty.

25 ENERGY STORAGE↗

Energy Infrastructure Futures: A Multiscale Evaluation of Projected Power Plant Siting Across the Western Interconnection

Energy Infrastructure Futures: A Multiscale Evaluation of Projected Power Plant Siting Across the Western Interconnection Description This dataset contains input and output data for the manuscript Mongird, K. et al. (under review) titled "Energy Infrastructure Futures: A Multiscale Evaluation of Projected Power Plant Siting Across the Western Interconnection". Input data corresponds to gridded spatial siting attributes that are necessary to conduct a random forest machine learning analysis of siting feature importance. Output data includes SHAP feature analysis outputs, and classification report values. For data on power plant siting results referred to in the manuscript, please refer to the CERF: IM3 Projected Western US Power Plant Locations data download page. The downloadable data includes values for eight different future scenarios for the Western US. The scenarios include combinations of two Shared Socioeconomic Pathways (SSP3 and SSP5) with four high-resolution climate projections specific to the United States (see, https://tgw-data.msdlive.org/). These climate projections include "hotter" and "cooler" variants for two Representative Concentration Pathways (RCP4.5 and RCP8.5). The resulting eight simulations are: rcp45cooler_ssp3 rcp45cooler_ssp5 rcp45hotter_ssp3 rcp45hotter_ssp5 rcp85cooler_ssp3 rcp85cooler_ssp5 rcp85hotter_ssp3 rcp85hotter_ssp5 Technical Information The dataset includes two sets of data files: (1) CERF gridded siting parameters and (2) Feature analysis outputs and classification reports. All downloadable data is in csv file format. Files with x/y coordinate information use the Albers Equal Area Conic projection (ESRI:102003). 1. CERF Gridded Siting Parameters This directory provides a balanced sample of gridded CERF siting parameters data for eight different scenarios for the Western US through 2055, seven different technologies, and eight timesteps. This data serves as input to the feature analysis. It contains the following parameters. region_name - name of region (i.e., state) sited - binary value representing whether the grid cell received a siting of that technology type (1=True) rcp - binary value representing scenario resource concentration pathway (0 = RCP4.5, 1 = RCP8.5) ssp - binary value representing scenario shared socioeconomic pathway (0 = SSP3, 1 = SSP5) climate - binary value representing cooler (0) or hotter (1) GCM forcing tech_name - generation technology name sited_year - year that values correspond to transmission_cost - cost of transmission interconnection pipeline_cost - cost of natural gas pipeline interconnection interconnection_cost - total interconnection cost (sum of transmission cost and gas pipeline cost) lmp - associated locational marginal value ($/MWh) associated with the grid cell, timestep, scenario, and technology xcoord - x-coordinate of location ycoord - y-coordinate of location 2a. Feature Analysis Output The dataset includes the feature analysis shap output for locational marginal price and interconnection cost. It contains the following parameters. technology - generator technology name scenario - name of scenario feature - name of feature, either locational_marginal_price or interconnection_cost value - the mean of absolute value of SHAP values for given feature 2b. Feature Analysis Classification Report This download includes the classification report associated with each random forest model. The dataset contains the following parameters. technology - generation technology name scenario - name of scenario test - one of precision (the proportion of predicted positives that are actually correct), recall (the proportion of actual positives that were correctly identified), f1-score (the harmonic mean of precision and recall) 0.0 - value of test for classification of 0 (grid cell not chosen for siting) 1.0 - value of test for classification of 1 (grid cell chosen for siting) accuracy - accuracy of model (i.e., fraction of all predictions that were right) macro avg - Simple average of test values for all classes weighted avg - Weighted average of test values for all classes, weighted based on Acknowledgment IM3 is a multi-institutional effort led by Pacific Northwest National Laboratory and supported by the U.S. Department of Energy's Office of Science as part of research in MultiSector Dynamics, Earth and Environmental Systems Modeling Program. License This data is made available under a CCBY4 License Disclaimer This material was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor the United States Department of Energy, nor the Contractor, nor any or their employees, nor any jurisdiction or organization that has cooperated in the development of these materials, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness or any information, apparatus, product, software, or process disclosed, or represents that its use would not infringe privately owned rights. Reference herein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise does not necessarily constitute or imply its endorsement, recommendation, or favoring by the United States Government or any agency thereof, or Battelle Memorial Institute. The views and opinions of authors expressed herein do not necessarily state or reflect those of the United States Government or any agency thereof. PACIFIC NORTHWEST NATIONAL LABORATORYoperated byBATTELLEfor theUNITED STATES DEPARTMENT OF ENERGYunder Contract DE-AC05-76RL01830

Mongird, Kendall [Pacific Northwest National Labor↗

Decentralized Voltage optimization Method for Distribution Networks with Distributed PVs

In order to solve the voltage violations caused by high penetration distributed photovoltaics (PVs), this paper proposes a decentralized voltage optimization method for distribution networks. Through the optimal dispatch of distributed PVs and reactive power resources, it realizes the voltage security and economic operation of distribution systems and facilitates the integration of massive distributed PVs. The proposed method is inspired by the idea of locational marginal price (LMP) and feasible cutting plane. It separates the optimization of boundary bus voltage and power flow in adjacent regions and uses the interaction of boundary variables’ marginal prices to obtain the optimal solution. The effectiveness and accuracy of the proposed method are demonstrated via simulation test on a practical l0kV feeder in China.

Xue, Yaosuo↗

Distribution Market-Clearing and Pricing Considering Coordination of DSOs and ISO: An EPEC Approach

Distribution-level electricity market provides a platform for trading energy and grid services from large-amount of small-scale distributed energy resources (DERs) located on distribution grids. The behavior of the DERs in the distribution electricity market may ultimately impact the market-clearing and locational marginal prices (LMPs) in the wholesale market. This paper proposes a bi-level optimization model for distribution market clearing and distribution locational marginal pricing (DLMP) considering the interactions between distribution and transmission wholesale markets. In the proposed model, the upper-level model represents the distribution system operator (DSO) market-clearing and the lower-level model represents the wholesale market-clearing by the independent system operator (ISO). The LMP at the substation will impact the DER dispatch and power demands of the DSO as well as the DLMP. In turn, the power demands of the DSO will further impact the ISO market and its LMPs. The equilibrium problem with equilibrium constraints (EPEC) approach is applied to find the equilibria of multiple DSOs and the ISO. The EPEC problem is transformed into a single-level mixed-integer convex problem in order to allow for efficient solving. Finally, the effectiveness of the proposed model and solution method are demonstrated through case studies.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Robust Unit Commitment Considering Uncertain Demand Response

Although price responsive demand response has been widely accepted as playing an important role in the reliable and economic operation of power system, the real response from demand side can be highly uncertain due to limited understanding of consumers' response to pricing signals. To model the behavior of consumers, the price elasticity of demand has been explored and utilized in both research and real practice. However, the price elasticity of demand is not precisely known and may vary greatly with operating conditions and types of customers. To accommodate the uncertainty of demand response, alternative unit commitment methods robust to the uncertainty of the demand response require investigation. In this paper, a robust unit commitment model to minimize the generalized social cost is proposed for the optimal unit commitment decision taking into account uncertainty of the price elasticity of demand. By optimizing the worst case under proper robust level, the unit commitment solution of the proposed model is robust against all possible realizations of the modeled uncertain demand response. Numerical simulations on the IEEE Reliability Test System show the e ectiveness of the method. Finally, compared to unit commitment with deterministic price elasticity of demand, the proposed robust model can reduce the average Locational Marginal Prices (LMPs) as well as the price volatility.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

AC Power Flow Based DLMP Calculation and Decomposition Method to Smooth Power Fluctuation of Distributed Renewable Energy Sources

As the penetration of renewable energy sources increases, the growing renewable power variability brings ramping issues to power systems. Meanwhile, the development of distributed energy resources (DERs) makes the distribution systems to provide both energy and ancillary services. To incentivise individual resources and customers to alleviate ramping issues on the demand side, a two-stage distribution locational marginal price (DLMP) calculation and decomposition method is developed to formulate the marginal power ramping price for DERs. In the first stage of the proposed method, a distribution system operator market scheduling model based on AC optimal power flow is designed to estimate the optimal operating point of the distribution system. Subsequently, the voltage and power flow constraints are linearised in stage two to calculate DLMP. Finally, based on the Lagrange function and sensitivity factors, DLMP is decomposed to the marginal costs for active/reactive power, voltage management, power loss and power variability. Case studies demonstrate that the proposed model can effectively smooth the power fluctuation and reduce the ramping flexibility requirements of distribution systems.

AC optimal power flow↗

Evaluating the Feasibility of Transactive Approach for Voltage Management Using Inverters of a PV Plant

This article evaluates the feasibility of a double-auction-based Transactive Energy System (TES) for engaging the reactive power (Var) capability of inverters in a utility-scale pho¬tovoltaic (PV) plant for voltage management in distribution feed¬ers. In this approach, a PV plant owner (seller) provides Var supply curves in terms of price-quantity pairs consider¬ing the inverters’ P-Q capability, efficiency, opportunity cost for real power curtail¬ment, losses, etc. At the same time, the utility (buyer) proposes Var demand curves in price-quantity pairs exhibiting the marginal price of Var. Then, market clearing points are obtained from the intersection points of supply and demand curves which are then used to create Var dispatch sig-nals from the PV plant. To conduct a fea¬sibility study of this approach, an Australian distribution network with a utility-scale PV plant (capacity 3.275 MWP) is modeled in RSCAD and simu¬lated in real-time on MATLAB, RSCAD-RTDS co-simulation platform using real historical data. Consid¬ering a use case, namely, conservation voltage reduction (CVR), the operational feasibility along with cost-benefit analysis is demonstrated in software-in-the-loop (SIL) and hardware-in-the-loop (HIL) platform. Another use case, exploring the benefit from tap-change reduction of step-voltage-regulator, is investigated. These studies explore further use cases, e.g., PV hosting capacity, network reconfiguration, etc., to be incorporated in TES for experiencing substantial economic benefits.

Alam, Mollah Rezaul↗

Deliverable Flexible Ramping Products Considering Spatiotemporal Correlation of Wind Generation and Demand Uncertainties

Flexible ramping products (FRPs) have been implemented by several independent system operators (ISOs) to procure adequate flexible resources. Currently, system operators estimate the system level ramping requirements ignoring the spatiotemporal correlations among various uncertainty sources. This leads to overestimates/underestimates of ramping requirements. In addition, the explicit FRPs model considers only the generation ramping limitation. Other security constraints, such as the transmission limits, are not considered, which leads to deliverability issues of FRPs. To deal with these shortcomings of current FRPs models, this paper proposes a deliverable FRPs based on a distributionally-robust chance constrained multi-interval optimal power flow (DRCC-MIOPF) considering the spatiotemporal correlation of wind power and demand uncertainties endogenously. Furthermore, an asymmetrical affine policy (AAP) is proposed to leverage generation flexibility and mitigate the uncertainty in different directions. The pricing mechanism of the FRPs is proposed using a novel uncertainty-contained locational marginal price (U_LMP) which is derived from the proposed AAP-DRCC-MIOPF model. New components representing the price of FRPs are added into the traditional LMP formulation. Finally, the PJM 5-bus, IEEE 39-bus and IEEE 118-bus systems case studies validate the proposed FRPs approach. The payment of uncertain demand and wind power on FRPs are analyzed.

electricity market↗

Enhanced deep neural networks with transfer learning for distribution LMP considering load and PV uncertainties

As the flexibility of generation and demand increases in distribution systems, the residential loads are emerging as a promising means to participate in demand response and the transactive energy market. Market pricing is an instrumental mechanism for the distribution system operator to exploit the full potential of the flexible resources. The distribution locational marginal price (DLMP) can be used to guide the residential load consumption. This type of market signal helps the distribution system operator to optimize the scheduling of all resources while satisfying related network constraints through a day-ahead market. However, solving the optimization problem for large-scale systems can be computationally expensive. To address the scalability and practicability limitations of the DLMP framework, a learning-based approach is proposed in this paper to complement the day-ahead distribution market framework. Here, the proposed approach combines long short-term memory and transfer learning to develop deep neural network that can capture the spatial–temporal correlation of the input data. The model can determine the optimal DLMP for each node in a distribution system without the system parameters required to formulate the optimization problem. Testing results on IEEE 33-bus and 123-bus systems show that the proposed approach can generate a comparable DLMP against the optimization solutions.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Optimal Demand Response Incorporating Distribution LMP with PV Generation Uncertainty

The utilization of aggregated demand-side flexibility via demand response (DR) has become a promising pathway for the integration of renewable energy resources in power systems. Nowadays, there are several management strategies for DR such as the price-based transactive control strategies. However, many of such existing price-based control strategies neglect the physics and operational constraints of the underlying distribution networks when computing the price, raising concerns regarding their theoretical and practical values. This paper studies this issue and investigates optimal DR (ODR) by incorporating the distribution locational marginal price (DLMP). In particular, we discuss DR in connection with DLMPs and propose a multiperiod bilevel optimization problem to find the ODR strategy. Here, the objective is to minimize the peak load, load fluctuation, and payments of load aggregators. In addition, a robust bilevel ODR model is formulated to provide a robust ODR strategy while minimizing operating costs under the worst-case realization of uncertainties; this mitigates the impact of forecasting errors on renewable energy resources. Then, we propose an efficient solution approach by employing the Karush-Kuhn-Tucker conditions and strong duality. Simulation results are presented to illustrate the mutual impacts of the interaction between DR and DLMP and the benefits of the robust ODR strategy.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Geographic market delineation in LMP electric power markets

The Federal Energy Regulatory Commission has jurisdiction over sales of electric generation assets in the United States, and it has found that generation on the high-priced side of transmission constraints provides competition for generators on the low-priced side. This article shows that this reasoning is correct in locational marginal price (LMP) electric power markets now prevalent in the U.S. (author)

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

DLMP of Competitive Markets in Active Distribution Networks: Models, Solutions, Applications, and Visions

Traditionally, the electric distribution system operates with uniform energy prices across all system nodes. However, as the adoption of distributed energy resources (DERs) propels a shift from passive to active distribution network (ADN) operation, a distribution-level electricity market has been proposed to manage new complexities efficiently. In addition, distribution locational marginal price (DLMP) has been established in the literature as the primary pricing mechanism. The DLMP inherits the LMP concept in the transmission-level wholesale market but incorporates characteristics of the distribution system, such as high $R/X$ ratios and power losses, system imbalance, and voltage regulation needs. The DLMP provides a solution that can be essential for competitive market operation in future distribution systems. This article first provides an overview of the current distribution-level market architectures and their early implementations. Next, the general clearing model, model relaxations, and DLMP formulation are comprehensively reviewed. The state-of-the-art solution methods for distribution market clearing are summarized and categorized into centralized, distributed, and decentralized methods. Then, DLMP applications for the operation and planning of DERs and distribution system operators (DSOs) are discussed in detail. Finally, visions of future research directions and possible barriers and challenges are presented.

42 ENGINEERING↗

Data-Driven Probabilistic Anomaly Detection for Electricity Market under Cyber Attacks

Information and communication technologies have been widely used in smart grid for efficient operation. However, these technologies are vulnerable to malicious cyber attacks, which may lead to severe reliability and economic issues. Recently, a variety of data-driven anomaly detection approaches have been explored to detect potential cyber attacks in smart grids. In this paper, we researched on the electricity market data aiming to identify anomalies from the locational marginal prices (LMPs) and provide a new indicator for potential cyber attacks in power grids. Specifically, a novel data-driven probabilistic anomaly detection framework is proposed for electricity market, which consists of three major components: long short-term memory (LSTM) based deterministic electricity price forecasting, probabilistic electricity price forecasting and anomaly detection. This framework is tested on a model-based electricity market simulator under two types of cyber attacks, i.e., load redistribution attack (LRA) and price responsive attack (PRA). Numerical results on the simulated LMPs show that the proposed framework is capable of detecting data anomalies over these attacks.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Tri-Level Scheduling Model Considering Residential Demand Flexibility of Aggregated HVACs and EVs Under Distribution LMP

Residential loads, especially heating, ventilation and air conditioners (HVACs) and electric vehicles (EVs), have great potentials to provide demand flexibility which is an attribute of grid-interactive efficient buildings (GEB). Under this new paradigm, first, EV and HVAC aggregator models are developed in this paper to represent the fleet of GEBs, in which the aggregated parameters are obtained based on a new approach of data generation and least squares parameter estimation (DG-LSPE), which can deal with heterogeneous HVACs. Then, a tri-level bidding and dispatching framework is established based on competitive distribution operation with distribution locational marginal price (DLMP). Furthermore, the first two levels form a bilevel model to optimize the aggregators’ payment and to represent the interdependency between load aggregators and the distribution system operator (DSO) using DLMP, and the third level is to dispatch the optimal load aggregation to all residents by the proposed priority list-based demand dispatching algorithm. Finally, case studies on a modified IEEE 33-Bus system illustrate three main technical reasons of payment reduction due to demand flexibility: load shift, DLMP step changes, and power losses. They can be used as general guidelines for better decision-making for future planning and operation of demand response programs.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Bi-Level Arbitrage Potential Evaluation for Grid-Scale Energy Storage Considering Wind Power and LMP Smoothing Effect

Our paper deals with extended-term energy storage (ES) arbitrage problems to maximize the annual revenue in deregulated power systems with high penetration wind power. The conventional ES arbitrage model takes the locational marginal prices (LMP) as an input and is unable to account for the impacts of ES operations on system LMPs. This paper proposes a bi-level ES arbitrage model, where the upper level maximizes the ES arbitrage revenue and the lower level simulates the market clearing process considering wind power and ES. The bi-level model is formulated as a mathematical program with equilibrium constraints (MPEC) and then recast into a mixed-integer linear programming (MILP) using strong duality theory. Wind power fluctuations are characterized by the GARCH forecast model and the forecast error is modeled by forecast-bin based Beta distributions. Case studies are performed on a modified PJM 5-bus system and an IEEE 118-bus system with a weekly time horizon over an annual term to show the validity of the proposed bi-level model. The results from the conventional model and the bi-level model are compared under different ES power and energy ratings, and also various load and wind penetration levels.

17 WIND ENERGY↗

Hierarchical Transactive Control of Flexible Building Loads Under Distribution LMP

With grid modernization efforts, future distribution networks, which consist of various distributed generators and flexible loads, will be more flexible and active. All new network components of distributed energy resources (DERs) drive and enable the transition towards a market-based distribution net-work that seeks the optimal allocation of all DERs. To address challenges associated with DERs, one promising solution is to utilize demand-side flexibility of building loads facilitated by demand response (DR) programs and provide ancillary grid services through distribution-level markets. Under this new paradigm, this paper proposes an efficient DR management strategy incorporating emerging price signals of distribution markets, i.e., distribution locational marginal price (DLMP), based on a hierarchical transactive control approach. The proposed approach establishes a two-layer decision-making framework; the upper layer formulates a bilevel model to obtain an optimal demand response (ODR) under DLMP, and the lower layer employs model-free control to dispatch the (aggregated) ODR to individual end users. Numerical case studies using a modified IEEE 33 test network are performed to verify the effectiveness of the proposed approach; load shifting and peak shaving for the distribution system operator and payments’ reduction for end users while maintaining their comfort.

Park, Byungkwon↗