Search NASA⌕ Search

SEARCH · Search NASA

Results for “Mars architecture”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Key Mars Architecture Decisions

As noted in the 2022 Architecture Concept Review Systems Analysis of Architecture Drivers white paper, exploration architectures are heavily influenced by the order in which driving questions are answered. Decisions in one part of the architecture will ripple through other parts of the architecture and beyond, often in ways that are not intuitively obvious.

Michelle A Rucker↗

Updated Mars Mission Architectures Featuring Nuclear Thermal Propulsion

Nuclear thermal propulsion (NTP) can potentially enable routine human exploration of Mars and the solar system. By using nuclear fission instead of a chemical combustion process, and using hydrogen as the propellant, NTP systems promise rocket efficiencies roughly twice that of the best chemical rocket engines currently available. The most recent major Mars architecture study featuring NTP was the Design Reference Architecture 5.0 (DRA 5.0), performed in 2009. Currently, the predominant transportation options being considered are solar electric propulsion (SEP) and chemical propulsion; however, given NTP's capabilities, an updated architectural analysis is needed. This paper provides a top-level overview of several different architectures featuring updated NTP performance data. New architectures presented include a proposed update to the DRA 5.0 as well as an investigation of architectures based on the current Evolvable Mars Campaign, which is the focus of NASA's current analyses for the Journey to Mars. Architectures investigated leverage the latest information relating to NTP performance and design considerations and address new support elements not available at the time of DRA 5.0, most notably the Orion crew module and the Space Launch System (SLS). The paper provides a top level quantitative comparison of key performance metrics as well as a qualitative discussion of improvements and key challenges still to be addressed. Preliminary results indicate that the updated NTP architectures can significantly reduce the campaign mass and subsequently the costs for assembly and number of launches.

Rodriguez, Mitchell A.↗

Mars Exploration Architecture

The architecture of NASA's program of robotic Mars exploration missions received an intense scrutiny during the summer months of 1998. We present here the results of that scrutiny, and describe a list of Mars exploration missions which are now being proposed by the nation's space agency.

Mars↗

A Summary of NASA Architecture Studies Utilizing Fission Surface Power Technology

Beginning with the Exploration Systems Architecture Study in 2005, NASA has conducted various mission architecture studies to evaluate implementation options for the U.S. Space Policy (formerly the Vision for Space Exploration). Several of the studies examined the use of Fission Surface Power (FSP) systems for human missions to the lunar and Martian surface. This paper summarizes the FSP concepts developed under four different NASA-sponsored architecture studies: Lunar Architecture Team, Mars Architecture Team, Lunar Surface Systems/Constellation Architecture team, and International Architecture Working Group-Power Function team. The results include a summary of FSP design characteristics, a compilation of mission-compatible FSP configuration options, and an FSP concept-of-operations that is consistent with the overall mission objectives.

Mason, Lee↗

A Summary of NASA Architecture Studies Utilizing Fission Surface Power Technology

Beginning with the Exploration Systems Architecture Study in 2005, NASA has conducted various mission architecture studies to evaluate implementation options for the U.S. Space Policy. Several of the studies examined the use of Fission Surface Power (FSP) systems for human missions to the lunar and Martian surface. This paper summarizes the FSP concepts developed under four different NASA-sponsored architecture studies: Lunar Architecture Team, Mars Architecture Team, Lunar Surface Systems/Constellation Architecture Team, and International Architecture Working Group-Power Function Team.

Mason, Lee S.↗

Mars Surface Habitat Concept Design

An initial Mars Surface Habitat (MSH) concept design study was conducted as part of the National Aeronautics and Space Administration (NASA) Habitation Systems Development Office’s effort to inform NASA crewed Mars architecture decisions. The study assessed the unique challenges, risks, and benefits of a surface habitation element within the Mars architecture trade space. The goal of the study was to identify unique functional capabilities necessary to support a crewed mission on the Martian surface, the unique challenges and risks associated with such an architecture, and the areas of further analysis required to make such a mission possible. Continuing NASA’s development and execution of the Moon to Mars lunar surface missions, attention will continue progressing toward the initial crewed Mars mission. To prepare for this, NASA’s Exploration Systems Development Mission Directorate (ESDMD) has established a strategic analysis cycle (SAC) where an architectural trade space is identified and evaluated. Given that the Mars architecture and mission profile are still in this trade space, the architecture and mission considered for this study is SAC21. In addition, reference conceptual designs are being refined for the Mars Transit Habitat (TH) and MSH systems which will enable crew to safely travel to and inhabit the surface of Mars. The NASA Mars architectures trade space includes the use of a Pressurized Rover (PR) to address both crew habitation and mobility needs. This study assesses the use of a dedicated habitat via the MSH and an unpressurized terrain vehicle for crew mobility and exploration in lieu of the PR. Determining the optimum mission architecture will require continued analysis by ESDMD teams and this study is intended to support of such a study. The MSH concept design team aims to explore this area of the Mars habitation trade space, and in doing so, inform and highlight the considerations associated with a MSH in the surface architecture. It is not the intention of this study to make specific habitation or architecture decisions, but instead to provide a habitation element concept compatible with the Mars architecture trade space.

Mars Surface Habitat↗

Mars Surface Habitat (MSH) Concept Design

An initial Mars Surface Habitat (MSH) concept design study was conducted as part of the National Aeronautics and Space Administration (NASA) Habitation Systems Development Office’s effort to inform NASA crewed Mars architecture decisions. The study assessed the unique challenges, risks, and benefits of a surface habitation element within the Mars architecture trade space. The goal of the study was to identify unique functional capabilities necessary to support a crewed mission on the Martian surface, the unique challenges and risks associated with such an architecture, and the areas of further analysis required to make such a mission possible. Continuing NASA’s development and execution of the Moon to Mars lunar surface missions, attention will continue progressing toward the initial crewed Mars mission. To prepare for this, NASA’s Exploration Systems Development Mission Directorate (ESDMD) has established a strategic analysis cycle (SAC) where an architectural trade space is identified and evaluated. Given that the Mars architecture and mission profile are still in this trade space, the architecture and mission considered for this study is SAC21. In addition, reference conceptual designs are being refined for the Mars Transit Habitat (TH) and MSH systems which will enable crew to safely travel to and inhabit the surface of Mars. The NASA Mars architectures trade space includes the use of a Pressurized Rover (PR) to address both crew habitation and mobility needs. This study assesses the use of a dedicated habitat via the MSH and an unpressurized terrain vehicle for crew mobility and exploration in lieu of the PR. Determining the optimum mission architecture will require continued analysis by ESDMD teams and this study is intended to support of such a study. The MSH concept design team aims to explore this area of the Mars habitation trade space, and in doing so, inform and highlight the considerations associated with a MSH in the surface architecture. It is not the intention of this study to make specific habitation or architecture decisions, but instead to provide a habitation element concept compatible with the Mars architecture trade space.

Ryan Hughes↗

Using an Integrated Distributed Test Architecture to Develop an Architecture for Mars

The creation of a crew-rated spacecraft architecture capable of sending humans to Mars requires the development and integration of multiple vehicle systems and subsystems. Important new technologies will be identified and matured within each technical discipline to support the mission. Architecture maturity also requires coordination with mission operations elements and ground infrastructure. During early architecture formulation, many of these assets will not be co-located and will required integrated, distributed test to show that the technologies and systems are being developed in a coordinated way. When complete, technologies must be shown to function together to achieve mission goals. In this presentation, an architecture will be described that promotes and advances integration of disparate systems within JSC and across NASA centers.

Othon, William L.↗

Near-Earth Phase Risk Comparison of Human Mars Campaign Architectures

A risk analysis of the launch, orbital assembly, and Earth-departure phases of human Mars exploration campaign architectures was completed as an extension of a probabilistic risk assessment (PRA) originally carried out under the NASA Constellation Program Ares V Project. The objective of the updated analysis was to study the sensitivity of loss-of-campaign risk to such architectural factors as composition of the propellant delivery portion of the launch vehicle fleet (Ares V heavy-lift launch vehicle vs. smaller/cheaper commercial launchers) and the degree of launcher or Mars-bound spacecraft element sparing. Both a static PRA analysis and a dynamic, event-based Monte Carlo simulation were developed and used to evaluate the probability of loss of campaign under different sparing options. Results showed that with no sparing, loss-of-campaign risk is strongly driven by launcher count and on-orbit loiter duration, favoring an all-Ares V launch approach. Further, the reliability of the all-Ares V architecture showed significant improvement with the addition of a single spare launcher/payload. Among architectures utilizing a mix of Ares V and commercial launchers, those that minimized the on-orbit loiter duration of Mars-bound elements were found to exceed the reliability of no spare all-Ares V campaign if unlimited commercial vehicle sparing was assumed

Manning, Ted A.↗

Grading NASA's Solar System Exploration Program: A Midterm Report

The Committee on Assessing the Solar System Exploration Program has reviewed NASA's progress to date in implementing the recommendations made in the National Research Council's (NRC's) solar system exploration decadal survey covering the period 2003-2013, New Frontiers in the Solar System, and in its Mars Architecture report, Assessment of NASA s Mars Architecture 2007-2016. The committee assessed NASA's progress with respect to each individual recommendation in these two reports, assigning an academic-style grade, explaining the rationale for the grade and trend, and offering recommendations for improvement. The committee generally sought to develop recommendations in cases where it determined that the grade, the trend, or both were worrisome and that the achievement of a decadal survey recommendation would require some kind of corrective action on NASA's part. This usually meant that the committee sought to offer a recommendation when the grade was a "C" or lower. However, the committee did offer recommendations in connection with some higher grades when it believed that minor corrective action was possible and desirable. More importantly, the committee did not offer recommendations for some of the activities given lower grades, particularly in the enabling technologies area (Chapter 6), because the committee determined that only the restoration of funding and the development of a strategic technology development program would solve these problems.

Source record↗

Mars Exploration Architecture

The architecture of NASA's program of robotic Mars exploration missions received an intense scrutiny during the summer months of 1998. We present here the results of that scrutiny, and describe a list of Mars exploration missions which are now being proposed by the nation's space agency. The heart of the new program architecture consists of missions which will return samples of Martian rocks and soil back to Earth for analysis. A primary scientific goal for these missions is to understand Mars as a possible abode of past or present life. The current level of sophistication for detecting markers of biological processes and fossil or extant life forms is much higher in Earth-based laboratories than possible with remotely deployed instrumentation, and will remain so for at least the next decade. Hence, bringing Martian samples back to Earth is considered the best way to search for the desired evidence. A Mars sample return mission takes approximately three years to complete. Transit from Earth to Mars requires almost a single year. After a lapse of time of almost a year at Mars, during which orbital and surface operations can take place, and the correct return launch energy constraints are met, a Mars-to-Earth return flight can be initiated. This return leg also takes approximately one year. Opportunities to launch these 3-year sample return missions occur about every 2 years. The figure depicts schedules for flights to and from Mars for Earth launches in 2003, 2005, 2007 and 2009. Transits for less than 180 deg flight angle, measured from the sun, and more than 180 deg are both shown.

Jordan, James F.↗