Search NASA⌕ Search

SEARCH · Search NASA

Results for “Mars rovers guidance”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Mars Science Laboratory Entry Guidance Improvements for Mars 2018 (DRAFT)

In 2011, the Mars Science Laboratory (MSL) will be launched in a mission to deliver the largest and most capable rover to date to the surface of Mars. A follow on MSL-derived mission, referred to as Mars 2018, is planned for 2018. Mars 2018 goals include performance enhancements of the Entry, Descent and Landing over that of its predecessor MSL mission of 2011. This paper will discuss the main elements of the modified 2018 EDL preliminary design that will increase performance on the entry phase of the mission. In particular, these elements will increase the parachute deploy altitude to allow for more time margin during the subsequent descent and landing phases and reduce the delivery ellipse size at parachute deploy through modifications in the entry reference trajectory design, guidance trigger logic design, and the effect of additional navigation hardware.

Garcia-Llama, Eduardo↗

Mars exploration in the 1990's

Science objectives for a Mars exploration program in the 1990s, set forth by NASA's Committee on Planetary Exploration, are presented. They include: an intensive study of the Martian surface, the exploration of the structure and general circulation of the atmosphere, the exploration of the nature and dynamics of the planet's interior, the nature of Mars's magnetic field, the character of the upper atmosphere and its interaction with the solar wind, and the establishment of the global chemical and physical characteristics of the Martian surface. Several low cost missions, which have been suggested by the Committee for NASA's CORE program, such as the Mars Geoscience Climatology Observer, the Mars Aeronomy Orbiter, and the Mars Surface Network and Surface Probing missions are also covered. Direct Entry-Direct Return and Out-of-Orbit Entry-Orbital Rendezvous and Docking are two versions of a Mars Rover and Sample Return (MRSR) mission discussed in detail. It is concluded that a MRSR mission will require the combination of full Centaur capability, aerocapture at Mars and earth, and direct return to earth to meet major scientific goals. Further studies should be made in orbit assembly, fuel transfer technology, aeromaneuvering, terminal guidance, rover technology, and robotics.

Albee, A. L.↗

Navigation and EDL for the Mars Exploration Rovers

A viewgraph presentation on Deep Space Navigation, and Entry, Decent, and Landing (EDL) for Mars Exploration Rovers is shown. The contents include: 1) JPL Spacecraft Operating across the Solar System; 2) 2003 - 2004: The Busiest Period in JPL's History; 3) Deep Space Navigation Will Enable Many of the New NASA Missions; 4) What Exactly is Navigation vs. GNC for Deep Space?; 5) Cruise and Approach: Why is Deep Space Navigation So Difficult?; 6) Project Importance of GNC: Landing Site Selection; 7) Planetary Communications and Tracking; 8) Tracking Data Types; 9) Delta Differential One-Way Range (deltaDOR); 10) All Solutions Leading up to TCM-4 Design; 11) Entry Flight Path Sensitivities; 12) MER Navigation Results; 13) Atmospheric Entry Targeting and Delivery; 14) Landing Ellipse Orientation; 15) MER Landing Site Trade Example; 16) Entry, Descent and Landing: Entry Guidance or What Things Do We NOT do for MER Landings (but we will later...); 17) Entering Martian Space 8:29 p.m. PST (ERT); 18) Entry, Descent and Landing; 19) Entry, Descent and Landing: Terminal Guidance; 20) The Challenge Going from 12,000 mph to Zero in Less Than Six Minutes; 21) Spirit Landing Location; 22) Entry, Descent and Landing: The Future; 23) Powered Descent Time-Line; and 24) Updated Sky Crane Maneuver Description. A short summary is also given on planetary guidance, navigation and control as it pertains to EDL systems

Mars Exploration Rover (MER)↗

Post-Flight EDL Entry Guidance for the Mars 2020 Mission

Like its predecessor Mars Science Laboratory, the Mars 2020 mission successfully utilized a derivative of the Apollo Entry Terminal Point Controller guidance algorithm, whereby bank angle controls range flown along a trajectory. The flight performance of this algorithm in conjunction with a range-trigger for parachute deploy delivered the Perseverance rover to 1.7 km from the expected touchdown location within an ellipse of 7.5 x 5.2 km. This miss distance is largely attributed to atmospheric and aerodynamic modeling uncertainties between the design and as-flown trajectory. This algorithm for guided entry continues to provide a solid basis for Mars missions to improve upon.

Guidance↗

Entry Guidance Design and Post-Flight Performance of the Mars 2020 Mission

Like its predecessor Mars Science Laboratory, the Mars 2020 mission successfully utilized a derivative of the Apollo Entry Terminal Point Controller guidance algorithm, whereby bank angle controls range flown along a trajectory. The flight performance of this algorithm in conjunction with a range-trigger for parachute deploy delivered the Perseverance rover to 1.7 km from the expected touchdown location within an ellipse of 7.5 x 5.2 km. This miss distance is largely attributed to atmospheric and aerodynamic modeling uncertainties between the design and as-flown trajectory. This algorithm for guided entry continues to provide a solid basis for Mars missions to improve upon.

Guidance↗

Mission and Navigation Design for the 2009 Mars Science Laboratory Mission

NASA s Mars Science Laboratory mission will launch the next mobile science laboratory to Mars in the fall of 2009 with arrival at Mars occurring in the summer of 2010. A heat shield, parachute, and rocket-powered descent stage, including a sky crane, will be used to land the rover safely on the surface of Mars. The direction of the atmospheric entry vehicle lift vector will be controlled by a hypersonic entry guidance algorithm to compensate for entry trajectory errors and counteract atmospheric and aerodynamic dispersions. The key challenges for mission design are (1) develop a launch/arrival strategy that provides communications coverage during the Entry, Descent, and Landing phase either from an X-band direct-to-Earth link or from a Ultra High Frequency link to the Mars Reconnaissance Orbiter for landing latitudes between 30 deg North and 30 deg South, while satisfying mission constraints on Earth departure energy and Mars atmospheric entry speed, and (2) generate Earth-departure targets for the Atlas V-541 launch vehicle for the specified launch/arrival strategy. The launch/arrival strategy employs a 30-day baseline launch period and a 27-day extended launch period with varying arrival dates at Mars. The key challenges for navigation design are (1) deliver the spacecraft to the atmospheric entry interface point (Mars radius of 3522.2 km) with an inertial entry flight path angle error of +/- 0.20 deg (3 sigma), (2) provide knowledge of the entry state vector accurate to +/- 2.8 km (3 sigma) in position and +/- 2.0 m/s (3 sigma) in velocity for initializing the entry guidance algorithm, and (3) ensure a 99% probability of successful delivery at Mars with respect to available cruise stage propellant. Orbit determination is accomplished via ground processing of multiple complimentary radiometric data types: Doppler, range, and Delta-Differential One-way Ranging (a Very Long Baseline Interferometry measurement). The navigation strategy makes use of up to five interplanetary trajectory correction maneuvers to achieve entry targeting requirements. The requirements for cruise propellant usage and atmospheric entry targeting and knowledge are met with ample margins.

Mission design↗

Planetary lander guidance using binary phase-only filters

We demonstrate the use of binary phase-only filters (BPOFs) in a closed loop guidance system for a laboratory lander mockup. Images of a 3-D terrain board taken by the lander's video camera are preprocessed to produce 128 x 128 binary intensity contour maps of the simulated planetary surface. A BPOF is made from a section of the current preprocessed image centered on the exact desired landing site. After the lander has descended to a lower altitude, the BPOF is correlated with a new image. The position of the correlation peak is used in making the next filter and to guide the lander so as to recenter the landing site in the camera's view. We present results of the accuracy with which a site may be tracked from orbit to landing, and the maximum scale, translation, and rotation which can be tolerated between subsequent images. The tolerable scale distortion is quite critical, as it determines the maximum filter update time available at a given descent rate. Application of the results to NASA's proposed Mars Rover Sample Return (MRSR) and Mars Environmental Survey (MESUR) missions is discussed. In both cases, electronic implementations of the algorithm may be sufficient to provide the required guidance system performance.

Reid, Max B.↗

Sleuthing the MSL EDL Performance from an X Band Carrier Perspective

During the Entry, Descent, and Landing (EDL) of NASA's Mars Science Laboratory (MSL), or Curiosity, rover to Gale Crater on Mars on August 6, 2012 UTC, the rover transmitted an X-band signal composed of carrier and tone frequencies and a UHF signal modulated with an 8kbps data stream. During EDL, the spacecraft's orientation is determined by its guidance and mechanical subsystems to ensure that the vehicle land safely at its destination. Although orientation to maximize telecom performance is not possible, antennas are especially designed and mounted to provide the best possible line of sight to Earth and to the Mars orbiters supporting MSL's landing. The tones and data transmitted over these links are selected carefully to reflect the most essential parameters of the vehicle's state and the performance of the EDL subsystems for post-EDL reconstruction should no further data transmission from the vehicle be possible. This paper addresses the configuration of the X band receive system used at NASA / JPL's Deep Space Network (DSN) to capture the signal spectrum of MSL's X band carrier and tone signal, examines the MSL vehicle state information obtained from the X band carrier signal only and contrasts the Doppler-derived information against the post-EDL known vehicle state. The paper begins with a description of the MSL EDL sequence of events and discusses the impact of the EDL maneuvers such as guided entry, parachute deploy, and powered descent on the frequency observables expected at the DSN. The range of Doppler dynamics possible is derived from extensive 6 Degrees-Of-Freedom (6 DOF) vehicle state calculations performed by MSL's EDL simulation team. The configuration of the DSN's receive system, using the Radio Science Receivers (RSR) to perform open-loop recording for both for nominal and off-nominal EDL scenarios, is detailed. Expected signal carrier power-to-noise levels during EDL are shown and their impact on signal detection is considered. Particular attention is given to the selection of the appropriate RSR processing bandwidths and to its configuration for real-time signal detection. The X-band carrier frequency obtained through post-processing of the open-loop recorded spectrum is given. Detection of spacecraft status and completion of key vehicle events through their Doppler signature is discussed and illustrated. This Doppler-derived information is compared against the very accurate vehicle data obtained post-EDL via MSL's UHF radio subsystem. The paper concludes with a discussion on the advantages and disadvantages of transmitting the X-band carrier and tone signal in the general context of EDL communications and lessons learned for future missions with EDL sequences are given

Mars Science Laboratory (MSL)↗

Mars Science Laboratory Entry Descent and Landing Simulation Using DSENDS

The most recent planetary science mission to Mars is Mars Science Laboratory (MSL) with the Curiosity rover, launched November 26, 2011 and landed at Gale Crater on August 6, 2012. This spacecraft was the first use at Mars of a complete closed-loop Guidance Navigation and Control (GN&C) system, including guided entry with a lifting body that greatly reduces dispersions during the Entry, Descent and Landing (EDL) phase to achieve a 25 km x 20 km landing error relative to the selected Gale Crater landing target. In order to confirm meeting the above landing criteria, high-fidelity simulation of the EDL phase is required. The tool used for 6DOF EDL trajectory verification analysis is Dynamics Simulator for Entry, Descent and Surface landing (DSENDS), which is a high-fidelity simulation tool from JPLs Dynamics and Real-Time Simulation Laboratory for the development, test and operations of aero-flight vehicles. DSENDS inherent capability is augmented for MSL with project-specific models of atmosphere, aerodynamics, sensors and thrusters along with GN&C flight software to enable high-fidelity trajectory simulation. This paper will present the model integration and independent verification experience of the JPL EDL trajectory analysis team.

Mars↗

Mars Science Laboratory Entry Descent and Landing Simulation Using DSENDS

The most recent planetary science mission to Mars was Mars Science Laboratory (MSL) with the Curiosity rover, launched November 26, 2011 and landed at Gale Crater on August 6, 2012. This spacecraft was the first use at Mars of a complete closed-loop Guidance Navigation and Control (GN&C) system, including guided entry with a lifting body that greatly reduces dispersions during the Entry, Descent and Landing (EDL) phase to achieve a 25 km X 20 km landing error relative to the selected Gale Crater landing target. In order to confirm meeting the above landing criteria, high-fidelity simulation of the EDL phase is required. The tool used for 6DOF EDL trajectory verification analysis is Dynamics Simulator for Entry, Descent and Surface landing (DSENDS), which is a high-fidelity simulation tool from JPLs Dynamics and Real-Time Simulation Laboratory for the development, test and operations of aero-flight vehicles. DSENDS inherent capability is augmented for MSL with project-specific models of atmosphere, aerodynamics, sensors and thrusters along with GN&C flight software to enable high-fidelity trajectory simulation. This paper will present the model integration and independent verification experience of the JPL EDL trajectory analysis team.

Burkhart, P. Daniel↗

Rovers for Mars Polar Exploration

Mobility is a generic capability needed for Mars exploration. Requirements for mobility range from those to get observations of individual rocks all the way to getting high resolution observations of regional areas. Table 1 shows the required-range of mobility to achieve various tasks. The Pathfinder mission and field experiments simulating rover missions [1, 2, 3, 4, 5] provide guidance as to rover capabilities that can reasonably be expected in the next decade. Rover mobility can be accomplished in a variety of ways, the most common being wheels or tracks and legged-walkers. Wheeled vehicles can traverse over rocks smaller than 1/2 wheel diameter, and with path planning to avoid larger rocks, can traverse terrains comparable to those seen on Mars in the Viking and Pathfinder landing sites. Slopes of 45 deg can be easily negotiated by wheeled rovers. Walking vehicles can negotiate even more complex terrain but requires computation capability to select each leg placement. Extremely complex terrain was traversed by the Nomad II walker which descended into (and most of the way out of) an active volcanic caldera (Mount Spur, AK) in 1995, although a slope failure eventually resulted in broken legs. The traverse range of a rover is limited by its science objectives, performance capabilities, and operational lifetime. The speed of rover traverse is a relative minor factor. With a different communication system, and no stops for science experiments, Sojourner could probably have traveled a kilometer. But, achieving land speed records is not a major objective of a science mission. Achieving science objectives requires targeting particular objects and studying them in detail, and the associated operational requirements will likely limit rover traverse range significantly. Traversing from target to target requires relatively few command cycles provided the traverse is over a short enough distance that it can be adequately planned. An operational goal of 100 m traverse per command cycle, arriving at a predetermined target, seems achievable. Investigating science targets requiring manipulator or instrument placement and sample collection will likely take several command cycles per target. Mission simulations [6] have demonstrated that traverse dI stances of 100-300 m, with detailed investigation of 5-10 targets take 50-100 command cycles, not unlike the Pathfinder experience in spite of the use of larger, faster, more capable rovers. Significant advances in rover autonomy will be needed to improve this Situation and it is not clear how much improvement will be brought to flight programs in the next decade. Dust accumulation on solar panels degrades power over time and, without dust removal, rover operational lifetimes may be limited to 90 sols.

Stoker, Carol↗

Orion Exploration Flight Test-1 Contingency Drogue Deploy Velocity Trigger

As a backup to the GPS-aided Kalman filter and the Barometric altimeter, an "adjusted" velocity trigger is used during entry to trigger the chain of events that leads to drogue chute deploy for the Orion Multi-Purpose Crew Vehicle (MPCV) Exploration Flight Test-1 (EFT-1). Even though this scenario is multiple failures deep, the Orion Guidance, Navigation, and Control (GN&C) software makes use of a clever technique that was taken from the Mars Science Laboratory (MSL) program, which recently successfully landing the Curiosity rover on Mars. MSL used this technique to jettison the heat shield at the proper time during descent. Originally, Orion use the un-adjusted navigated velocity, but the removal of the Star Tracker to save costs for EFT-1, increased attitude errors which increased inertial propagation errors to the point where the un-adjusted velocity caused altitude dispersions at drogue deploy to be too large. Thus, to reduce dispersions, the velocity vector is projected onto a "reference" vector that represents the nominal "truth" vector at the desired point in the trajectory. Because the navigation errors are largely perpendicular to the truth vector, this projection significantly reduces dispersions in the velocity magnitude. This paper will detail the evolution of this trigger method for the Orion project and cover the various methods tested to determine the reference "truth" vector; and at what point in the trajectory it should be computed.

Gay, Robert S.↗

Mars Science Laboratory Navigation Results

The Mars Science Laboratory (MSL), carrying the Curiosity rover to Mars, was launched on November 26, 2011, from Cape Canaveral, Florida. The target for MSL was selected to be Gale Crater, near the equator of Mars, with an arrival date in early August 2012. The two main interplanetary navigation tasks for the mission were to deliver the spacecraft to an entry interface point that would allow the rover to safely reach the landing area, and to tell the spacecraft where it entered the atmosphere of Mars, so it could guide itself accurately to close proximity of the landing target. MSL used entry guidance as it slowed down from the entry speed to a speed low enough to allow for a successful parachute deployment, and this guidance allowed shrinking the landing ellipse to a 99% conservative estimate of 7 by 20 kilometers. Since there is no global positioning system in Mars, achieving this accuracy was predicated on flying a trajectory that closely matched the reference trajectory used to design the guidance algorithm, and on initializing the guidance system with an accurate Mars-relative entry state that could be used as the starting point to integrate the inertial measurement unit data during entry and descent. The pre-launch entry flight path angle (EFPA) delivery requirement was +/- 0.20 deg, but after launch a smaller threshold of +/- 0.05 deg was used as the criteria for late trajectory correction maneuver (TCM) decisions. The pre-launch requirement for entry state knowledge was 2.8 kilometers in position error and 2 meters per second in velocity error, but also smaller thresholds were defined after launch to evaluate entry state update opportunities. The biggest challenge for the navigation team was to accurately predict the trajectory of the spacecraft, so the estimates of the entry conditions could be stable, and late trajectory correction maneuvers or entry parameter updates could be waved off. As a matter of fact, the prediction accuracy was such that the last TCM performed was a small burn executed eight days before landing, and the entry state that was calculated just 36 hours after that TCM, and that was uploaded to the spacecraft the same day, did not need to be updated. The final EFPA was 0.013 deg shallower than the -15.5 deg target, and the on-board entry state was just 200 meters in position and 0.11 meters per second in velocity from the post-landing reconstructed entry state. Overall the entry delivery and knowledge requirements were fulfilled with a margin of more than 90% with respect to the pre-launch thresholds. This excellent accuracy contributed to a very successful and accurate entry, descent, and landing, and surface mission.

navigation↗

A preliminary study of Mars rover/sample return missions

The Solar System Exploration Committee (SSEC) of the NASA Advisory Council recommends that a Mars Sample Return mission be undertaken before the year 2000. Comprehensive studies of a Mars Sample Return mission have been ongoing since 1984. The initial focus of these studies was an integrated mission concept with the surface rover and sample return vehicle elements delivered to Mars on a single launch and landed together. This approach, to be carried out as a unilateral U.S. initiative, is still a high priority goal in an Augmented Program of exploration, as the SSEC recommendation clearly states. With this background of a well-understood mission concept, NASA decided to focus its 1986 study effort on a potential opportunity not previously examined; namely, a Mars Rover/Sample Return (MRSR) mission which would involve a significant aspect of international cooperation. As envisioned, responsibility for the various mission operations and hardware elements would be divided in a logical manner with clearly defined and acceptable interfaces. The U.S. and its international partner would carry out separately launched but coordinated missions with the overall goal of accomplishing in situ science and returning several kilograms of surface samples from Mars. Important considerations for implementation of such a plan are minimum technology transfer, maximum sharing of scientific results, and independent credibility of each mission role. Under the guidance and oversight of a Mars Exploration Strategy Advisory Group organized by NASA, a study team was formed in the fall of 1986 to develop a preliminary definition of a flight-separable, cooperative mission. The selected concept assumes that the U.S. would undertake the rover mission with its sample collection operations and our international partner would return the samples to Earth. Although the inverse of these roles is also possible, this study report focuses on the rover functions of MRSR because rover operations have not been studied in as much detail as the sample return functions of the mission.

Source record↗

Mars Rover and Sample Return Mission design

The current reference Mars Rover and Sample Return mission is described. Technical issues are outlined, including high-resolution image acquisition and reconstruction, approach navigation, ground and flight systems operational complexity, rover autonomy, autonomous rendezvous and docking in Mars orbit, aerocapture and aeromaneuver, estimating the probability of mission success, and end-to-end information system design. Focus is placed on lander hazard identification and avoidance, pinpoint landing guidance and control, Mars ascent vehicle guidance and control, planetary protection and quarantine, sample acquisition and preservation, project management and control, systems requirements and interface control, and costing. In addition, program issues such as international participation, fiscal constraints, and launch-vehicle availability are considered.

Kwok, Johnny H.↗

Mars Science Laboratory Interplanetary Navigation Analysis

The Mars Science Laboratory (MSL) is a NASA rover mission that will be launched in late 2011 and will land on Mars in August of 2012. This paper describes the analyses performed to validate the navigation system for launch, interplanetary cruise, and approach. MSL will use guidance during its descent into Mars in order to minimize landing dispersions, and therefore will be able to use smaller landing zones that are closer to terrain of high scientific interest. This will require a more accurate delivery of the spacecraft to the atmospheric entry interface, and a late update of the state of the spacecraft at entry. During cruise and approach the spacecraft may perform up to six trajectory correction maneuvers (TCMs), to target to the desired landing site with the required flight path angle at entry. Approach orbit determination covariance analyses have been performed to evaluate the accuracy that can be achieved in delivering the spacecraft to the entry interface point, and to determine how accurately the state of the spacecraft can be predicted to initialize the guidance algorithm. In addition, a sensitivity analysis has been performed to evaluate which factors most contribute to the improvement or degradation of the navigation performance, for both entry flight path angle delivery and entry state knowledge.

orbit determination↗

Comparison of the Effects of Velocity and Range Triggers on Trajectory Dispersions for the Mars 2020 Mission

Mars 2020, the next planned U.S. rover mission to land on Mars, is based on the design of the successful 2012 Mars Science Laboratory (MSL) mission. Mars 2020 retains most of the entry, descent, and landing (EDL) sequences of MSL, including the closed-loop entry guidance scheme based on the Apollo guidance algorithm. However, unlike MSL, Mars 2020 will trigger the parachute deployment and descent sequence on range trigger rather than the previously used velocity trigger. This difference will greatly reduce the landing ellipse sizes. Additionally, the relative contribution of each models to the total ellipse sizes have changed greatly due to the switch to range trigger. This paper considers the effect on trajectory dispersions due to changing the trigger schemes and the contributions of these various models to trajectory and EDL performance.

Dutta, Soumyo↗