Assessment of the hydromechanical higher-order MPM for the simulation of geotechnical problems
The Material Point Method (MPM) has been increasingly used to simulate large strain deformations. Linear interpolation functions are commonly used to perform the spatial integration. It is well-known that the discontinuities in the interpolation function derivatives induce shock-like artifacts known as ‘cell-crossing’ error. These errors compound with volumetric locking errors when used with hydromechanical formulations for porous media, where different velocity fields are used for each phase. The capabilities of higher-order MPM frameworks have not been explored for real-scale geotechnical problems. As such, this paper aims to assess, validate, and further discuss a higher-order B-spline MPM (BS-MPM) framework. First, the BS-MPM framework is verified against the large-strain oedometer consolidation problem. Second, the framework is validated against a real-scale slope failure experiment triggered by pore water pressure recharge. Landslide features that are captured using the higher-order framework are specifically highlighted, and results (e.g., pore water pressure and deformation) are validated with field measurements. A generally convergent numerical solution is observed when using cubic interpolation functions. Third, a footing penetration problem is simulated using the multi-patch BS-MPM. Trends are examined with respect to penetration velocity and variation in hydraulic conductivity. The BS-MPM framework ultimately presents a stabilized numerical solution that captures plausible hydromechanical interaction trends important in geotechnical engineering applications.