Search NASA⌕ Search

SEARCH · Search NASA

Results for “Mixed integer optimization”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

A method for nonlinear optimization with discrete design variables

A numerical method is presented for the solution of nonlinear discrete optimization problems. The applicability of discrete optimization to engineering design is discussed, and several standard structural optimization problems are solved using discrete design variables. The method uses approximation techniques to create subproblems suitable for linear mixed-integer programming methods. The method employs existing software for continuous optimization and integer programming.

Olsen, Gregory R.↗

Rolling Horizon with K-Position Search Method for Strategic Deconfliction of Package Delivery UAS

In this research, the strategic deconfliction of unmanned aircraft systems for an urban package delivery environment with two depots and multiple drop-off locations is studied. This research aims to formulate a mathematical model to compute both the departure sequence and scheduled time of departure for each unmanned aircraft system at a depot, considering temporal constraints at en-route crossing waypoints and depots for strategic deconfliction. However, the problem formulation results in an NP-hard mixed-integer nonlinear programming problem for the global optimal solution, so instead, a "rolling horizon with𝑘-position search"heuristic method is developed. The simulation studies show that an increase in the value of𝑘(the parameter used to determine the size of the local neighborhood) reduces the average ground delay at the cost of an increase in the computation time for a given problem size. The study also shows an order of magnitude increase in the maximum number of flights scheduled with the integration of rolling horizon (time decomposition) compared to those without the integration of rolling horizon in the heuristic algorithm for a given computation time cut off.

UTM↗

Next Generation Aircraft Design Considering Airline Operations and Economics

Traditional approaches to design and optimization of a new system often use a system-centric objective and do not take into consideration how the operator will use this new system alongside other existing systems. When the new system design is incorporated into the broader group of systems, the performance of the operator-level objective can be sub-optimal due to the unmodeled interaction between the new system and the other systems. Among the few available references that describe attempts to address this disconnect, most follow an MDO (Multidisciplinary Design Optimization)-motivated sequential decomposition approach of first designing a very good system and then providing this system to the operator who, decides the best way to use this new system along with the existing systems. This paper addresses this issue by including aircraft design, airline operations, and revenue management "subspaces"; and presents an approach that could simultaneously solve these subspaces posed as a monolithic optimization problem rather than the traditional approach described above. The monolithic approach makes the problem an expensive Mixed Integer Non-Linear Programming problem, which are extremely difficult to solve. To address the problem, we use a recently developed optimization framework that simultaneously solves the subspaces to capture the "synergy" in the problem that the previous decomposition approaches did not exploit, addresses mixed-integer/discrete type design variables in an efficient manner, and accounts for computationally expensive analysis tools. This approach solves an 11-route airline network problem consisting of 94 decision variables including 33 integer and 61 continuous type variables. Simultaneously solving the subspaces leads to significant improvement in the fleet-level objective of the airline when compared to the previously developed sequential subspace decomposition approach.

Roy, Satadru↗

An Approach to Reasoning Service Migration in Data and Reasoning Fabric (DRF) Implementation

In this paper we consider service migration problem for Data and Reasoning Fabric (DRF) enabled airspace operations assuming a fixed cloud/edge infrastructure with allocated computing, storage and power resources, where cloud/edge servers, and communication stations are in a wired connected network, while vehicles use a wireless network for communication. The objective is to automatically select the best location for the requested service execution, which achieves minimum cost while satisfying the user quality of service (QoS) and available resources constraints. To this end, estimates of the response time, consumed energy and total cost are defined for each potential compute location. A mixed-integer linear program is then formulated and solved to identify optimal compute locations given QoS constraints, network infrastructure limitations, with worst-case vehicle positioning. The approach is applied to trajectory re-planning use case to avoid a collision with an emergency vehicle in real time.

Air mobility↗

Comparison of First-Come First-Served and Optimization Based Scheduling Algorithms for Integrated Departure and Arrival Management

Korea Aerospace Research Institute (KARI) and National Aeronautics and Space Administration (NASA) are investigating scheduling algorithms that will be a part of an integrated arrival and departure management system. Inha University, one of the Korean collaborators of KARI, developed an Extended First-Come First-Served (EFCFS) algorithm that is robust and efficient. However, since the EFCFS algorithm sequentially computes the schedule based on priority, the end results may not be optimal for system efficiency. The approach based on Mixed Integer Linear Programming (MILP) originally developed by NASA and modified by KARI is known to produce better schedules at the expense of computational cost. In this paper, the two different scheduling approaches are compared using common traffic scenarios and constraints at Incheon International Airport. Capabilities to apply weight class based wake turbulence runway separation minima and Miles-in-Trail (MIT) restrictions at selected meter fixes are added to the previously developed EFCFS scheduler. Based on historic data, 40 departures and 20 arrivals are chosen in a one-hour period and 100 scenarios were created by randomly assigning gate numbers, gate departure times, and runway landing times. With the current runway separation requirements, MILP resulted in about ten to twenty percent smaller average delays depending on the constraints. With artificially increased separation minima, the difference between MILP and EFCFS became more noticeable. However, the EFCFS was about ten times faster with smaller variations among different scenarios and constraints. The comparison suggests that the MILP-based algorithm has a small advantage at the current traffic level; however, has potential to be more effective in higher demand or severe weather situations. The EFCFS algorithm may be better suited for real-time applications or investigating larger scale scheduling problems.

air traffic optimization↗

Multi-Robot Assembly Scheduling for the Lunar Crater Radio Telescope on the Far-Side of the Moon

The Lunar Crater Radio Telescope (LCRT) is a pro- posed ultra-long-wavelength radio telescope to be constructed on the far side of the moon. The proposed telescope will be constructed by deploying a 1km wire mesh in a 3-5km crater using a team of wall-climbing DuAxel robots. In this work, we consider the problem of generating minimum-time assembly sequences for LCRT, using realistic models of travel speed and lighting. Specifically, we pose the assembly sequencing problem as a mixed-integer linear program (MILP), which we solve to global optimality using commercial solvers. We present methods for modeling time-varying travel and assembly times, based on variable lighting conditions (including crater shadowing), and show how such time-varying parameters can be incorporated into the MILP. Finally, we present numerical studies of our method, showing how makespan varies with the number of assembly robots.

Schwager, Mac↗

Foraging with MUSHROOMS: A Mixed-integer Linear Programming Scheduler for Multimessenger Target of Opportunity Searches with the Zwicky Transient Facility

Electromagnetic follow-up of gravitational-wave detections is very resource intensive, taking up hours of limited observation time on dozens of telescopes. Creating more efficient schedules for follow-up will lead to a commensurate increase in counterpart location efficiency without using more telescope time. Widely used in operations research and telescope scheduling, mixed-integer linear programming is a strong candidate to produce these higher-efficiency schedules, as it can make use of powerful commercial solvers that find globally optimal solutions to provided problems. We detail a new target-of-opportunity scheduling algorithm designed with Zwicky Transient Facility in mind that uses mixed-integer linear programming. We compare its performance to gwemopt, the tuned heuristic scheduler used by the Zwicky Transient Facility and other facilities during the third LIGO–Virgo gravitational-wave observing run. This new algorithm uses variable-length observing blocks to enforce cadence requirements and to ensure field observability, along with having a secondary optimization step to minimize slew time. We show that by employing a hybrid method utilizing both this scheduler and gwemopt, the previous scheduler used, in concert, we can achieve an average improvement in detection efficiency of 3%–11% over gwemopt alone for a simulated binary neutron star merger data set consistent with LIGO–Virgo's third observing run, highlighting the potential of mixed-integer target of opportunity schedulers for future multimessenger follow-up surveys.

B Parazin↗

A Bell-Curved Based Algorithm for Mixed Continuous and Discrete Structural Optimization

An evolutionary based strategy utilizing two normal distributions to generate children is developed to solve mixed integer nonlinear programming problems. This Bell-Curve Based (BCB) evolutionary algorithm is similar in spirit to (mu + mu) evolutionary strategies and evolutionary programs but with fewer parameters to adjust and no mechanism for self adaptation. First, a new version of BCB to solve purely discrete optimization problems is described and its performance tested against a tabu search code for an actuator placement problem. Next, the performance of a combined version of discrete and continuous BCB is tested on 2-dimensional shape problems and on a minimum weight hub design problem. In the latter case the discrete portion is the choice of the underlying beam shape (I, triangular, circular, rectangular, or U).

Kincaid, Rex K.↗

Mixed Integer Programming and Heuristic Scheduling for Space Communication Networks

In this paper, we propose to solve the constrained optimization problem in two phases. The first phase uses heuristic methods such as the ant colony method, particle swarming optimization, and genetic algorithm to seek a near optimal solution among a list of feasible initial populations. The final optimal solution can be found by using the solution of the first phase as the initial condition to the SQP algorithm. We demonstrate the above problem formulation and optimization schemes with a large-scale network that includes the DSN ground stations and a number of spacecraft of deep space missions.

Communication Network Scheduling↗

Planning Satellite Swarm Measurements for Climate Models: Comparing Dynamic Constraint Processing and MILP Methods

We present D-SHIELD, a challenging climate science application to plan coordinated measurements (observations) for a constellation of satellites, each containing two different sensors, each with 61 pointing angle options. The L-band and P-band radar sensors collect data fed into a soil moisture model which tracks and predicts soil moisture across 1.67 million Ground Positions (GP). Soil moisture is an important predictor of wildfires, and then a predictor of floods, landslides and debris flow after a fire. Each measurement covers multiple GP due to the sensor footprint. Each GP has a "model error" which represents the uncertainty of the the soil moisture state prediction. Model error changes at different rates for each GP as the time since last observation increases and after significant events like rain. The planner's goal is to select measurements which maximize soil moisture model improvement (reduce model uncertainty). This problem is combinatorically explosive, involving many degrees of freedom for planner choices. Good domain heuristics can find solutions within a reasonable time for our application needs but cannot be proven optimal. In this paper we compare two different planning approaches to this problem: Dynamic Constraint Processing (DCP) and Mixed Integer Linear Programming (MILP). We match inputs and metrics for both DCP and MILP algorithms to enable a direct apples-to-apples comparison. We demonstrate and discuss the trades between DCP flexibility and performance vs. MILP's promise of provable optimality.

Rich Levinson↗

Optimizing Integrated Arrival, Departure and Surface Operations Under Uncertainty

In airports and surrounding terminal airspaces, the integration of arrival, departure and surface scheduling and routing have the potential to improve the operations efficiency. Recent research had developed mixed-integer-linear programming algorithm-based scheduler for integrated arrival and departure operations in the presence of uncertainty. This paper extends to the surface previous research performed by the authors to integrate taxiway and runway operations. The developed algorithm is capable of computing optimal aircraft schedules and routings that reflects the integration of air and ground operations. A preliminary study case is conducted for a set of thirteen aircraft evolving in a model of the Los Angeles International airport and surrounding terminal areas. Using historical data, a representative traffic scenario is constructed and probabilistic distributions of pushback delay and arrival gate delay are obtained. To assess the benefits of optimization, a First- Come-First-Serve algorithm approach comparison is realized. Evaluation results demonstrate that the optimization can help identifying runway sequencing and schedule that reduce gate waiting time without increasing average taxi times.

Bosson, Christabelle↗

The role of service areas in the optimization of FSS orbital and frequency assignments

A relationship is derived, on a single-entry interference basis, for the minimum allowable spacing between two satellites as a function of electrical parameters and service-area geometries. For circular beams, universal curves relate the topocentric satellite spacing angle to the service-area separation angle measured at the satellite. The corresponding geocentric spacing depends only weakly on the mean longitude of the two satellites, and this is true also for alliptical antenna beams. As a consequence, if frequency channels are preassigned, the orbital assignment synthesis of a satellite system can be formulated as a mixed-integer programming (MIP) problem or approximated by a linear programming (LP) problem, with the interference protection requirements enforced by constraints while some linear function is optimized. Possible objective-function choices are discussed and explicit formulations are presented for the choice of the sum of the absolute deviations of the orbital locations from some prescribed ideal location set. A test problem is posed consisting of six service areas, each served by one satellite, all using elliptical antenna beams and the same frequency channels. Numerical results are given for the three ideal location prescriptions for both the MIP and LP formulations. The resulting scenarios also satisfy reasonable aggregate interference protection requirements.

Levis, C. A.↗

A Mixed Integer Linear Program for Solving a Multiple Route Taxi Scheduling Problem

Aircraft movements on taxiways at busy airports often create bottlenecks. This paper introduces a mixed integer linear program to solve a Multiple Route Aircraft Taxi Scheduling Problem. The outputs of the model are in the form of optimal taxi schedules, which include routing decisions for taxiing aircraft. The model extends an existing single route formulation to include routing decisions. An efficient comparison framework compares the multi-route formulation and the single route formulation. The multi-route model is exercised for east side airport surface traffic at Dallas/Fort Worth International Airport to determine if any arrival taxi time savings can be achieved by allowing arrivals to have two taxi routes: a route that crosses an active departure runway and a perimeter route that avoids the crossing. Results indicate that the multi-route formulation yields reduced arrival taxi times over the single route formulation only when a perimeter taxiway is used. In conditions where the departure aircraft are given an optimal and fixed takeoff sequence, accumulative arrival taxi time savings in the multi-route formulation can be as high as 3.6 hours more than the single route formulation. If the departure sequence is not optimal, the multi-route formulation results in less taxi time savings made over the single route formulation, but the average arrival taxi time is significantly decreased.

Montoya, Justin Vincent↗

Engineering calculations for communications satellite systems planning

Observed solution times were analyzed for the extended gradient and cyclic coordinate search procedures. The times used in the analysis come from computer runs made during a previously-reported experiment conducted to assess the quality of the solutions to a BSS synthesis problem found by the two search methods. The results of a second experiment with a Fixed Satellite Service (FSS) test problem are also presented. Computational results are summarized for mixed integer programming approaches for solving FSS synthesis problems. A promising heuristic algorithm is described. A synthesis model is discussed for orbital arc allotment optimization. Research plans for the near future are also presented.

Reilly, C. H.↗

Aerial Vehicle Routing and Scheduling for UAS Traffic Management: A Hybrid Monte Carlo Tree Search Approach

We present the Multi-Route Weighted Package Delivery Problem (MRWPDP) and a scalable solution methodology as a major step towards enabling an airspace deconfliction service for drone delivery operations. The problem is motivated by Strategic deconfliction under the FAA’s “Unmanned Aircraft Systems Traffic Management” Concept of Operations. MRWPDP falls under a class of vehicle routing and scheduling problems, and as such is NP-Hard. In MRWPDP, a graph network is given which consists of depots, drop-off sites, and multiple routes connecting the two. In addition, routes are weighted by the associated ground risk and total travel distance for package delivery. The goal is to optimally schedule the departure time and assign routes to a known set of vehicles at the depot. We propose a heuristic solution to the problem by borrowing techniques from Mixed Integer Linear Programming (MILP), Constraint Programming, and Monte Carlo Tree Search (MCTS). The resulting hybrid framework is MCTS with Bound-and-Prune (BP) and rapid simulated updates (U), or MCTS-BP-U. This approach is able to quickly provide a feasible solution for MRWPDP, even for large problem instances up to 1000 vehicles. We provide a MILP formulation of MRWPDP and compare its performance against MCTS-BP-U in terms of solution quality. An agent-based model simulation is conducted as a final step to validate the efficacy of our approach.

air traffic scheduling↗

Aerial Vehicle Routing and Scheduling for UAS Traffic Management: A Hybrid Monte Carlo Tree Search Approach

We present the Multi-Route Weighted Package Delivery Problem (MRWPDP) and a scalable solution methodology as a major step towards enabling an airspace deconfliction service for drone delivery operations. The problem is motivated by Strategic deconfliction under the FAA’s “Unmanned Aircraft Systems Traffic Management” Concept of Operations. MRWPDP falls under a class of vehicle routing and scheduling problems, and as such is NP-Hard. In MRWPDP, a graph network is given which consists of depots, drop-off sites, and multiple routes connecting the two. In addition, routes are weighted by the associated ground risk and total travel distance for package delivery. The goal is to optimally schedule the departure time and assign routes to a known set of vehicles at the depot. We propose a heuristic solution to the problem by borrowing techniques from Mixed Integer Linear Programming (MILP), Constraint Programming, and Monte Carlo Tree Search (MCTS). The resulting hybrid framework is MCTS with Bound-and-Prune (BP) and rapid simulated updates (U), or MCTS-BP-U. This approach is able to quickly provide a feasible solution for MRWPDP, even for large problem instances up to 1000 vehicles. We provide a MILP formulation of MRWPDP and compare its performance against MCTS-BP-U in terms of solution quality. An agent-based model simulation is conducted as a final step to validate the efficacy of our approach.

air traffic scheduling↗

A decomposition-based design optimization method with applications

A two-level design optimization metholology is described. A progress report of its application to Printed Wiring Board (PWB) assembly examples is given. The design of PWB assemblies is a complex task which is generally conducted as a sequential process. Individual PWBs are usually designed first, followed by the composition of the PWBs into an assembly. As a result, optimizing design considerations such as assembly reliability cannot be accomplished. This study showed that a two-level decomposition method can be employed to optimize for reliability at both the PWB- and the assembly-level in a coupled manner. The two-level decomposition method also resolved the mixed-integer nonlinear programming nature of the problem rather easily.

Azarm, Shapour↗

Mathematical programming formulations for satellite synthesis

The problem of satellite synthesis can be described as optimally allotting locations and sometimes frequencies and polarizations, to communication satellites so that interference from unwanted satellite signals does not exceed a specified threshold. In this report, mathematical programming models and optimization methods are used to solve satellite synthesis problems. A nonlinear programming formulation which is solved using Zoutendijk's method and a gradient search method is described. Nine mixed integer programming models are considered. Results of computer runs with these nine models and five geographically compatible scenarios are presented and evaluated. A heuristic solution procedure is also used to solve two of the models studied. Heuristic solutions to three large synthesis problems are presented. The results of our analysis show that the heuristic performs very well, both in terms of solution quality and solution time, on the two models to which it was applied. It is concluded that the heuristic procedure is the best of the methods considered for solving satellite synthesis problems.

Bhasin, Puneet↗