Search NASA⌕ Search

SEARCH · Search NASA

Results for “Nuclear Procurement”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Corrosion Testing of Refractory in Contact with Molten Glasses Designed for Waste Vitrification - APPS1 Matrix Glasses

It is known that the predictive life of the refractory ceramic liner of nuclear waste glass melters is conservative, as demonstrated by performance of these materials such as in the Defense Waste Processing Facility (DWPF). The motivation for this task is to maximize the useful life of the melters that will be operated at the Waste Treatment and Immobilization Plant (WTP), which will in turn minimize procurement and disposal costs and melter outage times, as well as to identify maximum loadings in the waste glass of those species that corrode melter components. This task was initiated jointly with Pacific Northwest National Laboratory (PNNL) with the objective to develop a methodology and model to enable more accurate prediction of refractory service life under prototypic conditions from laboratory-scale material corrosion tests.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Corrosion Testing of Refractory in Contact with Molten Glasses Designed for Waste Vitrification - HAL24 M1 Matrix Glasses

It is known that the predictive life of the refractory ceramic liner of nuclear waste glass melters is conservative, as demonstrated by performance of these materials such as in the Defense Waste Processing Facility (DWPF). The motivation for this task is to maximize the useful life of the melters that will be operated at the Waste Treatment and Immobilization Plant (WTP), which will in turn minimize procurement and disposal costs and melter outage times, as well as to identify maximum loadings in the waste glass of those species that corrode melter components. This task was initiated jointly with Pacific Northwest National Laboratory (PNNL) with the objective to develop a methodology and model to enable more accurate prediction of refractory service life under prototypic conditions from laboratory-scale material corrosion tests.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Corrosion Testing of Refractory in Contact with Molten Glasses Designed for Waste Vitrification – VSL Touchpoint Matrix Glasses (Revision 1)

It is known that the predictive life of the refractory ceramic liner of nuclear waste glass melters is conservative, as demonstrated by performance of these materials such as in the Defense Waste Processing Facility (DWPF).[1] The motivation for this task is to maximize the useful life of the melters that will be operated at the Waste Treatment and Immobilization Plant (WTP), which will in turn minimize procurement and disposal costs and melter outage times, as well as to identify maximum loadings in the waste glass of those species that corrode melter components. This task was initiated jointly with Pacific Northwest National Laboratory (PNNL) with the objective to develop a methodology and model to enable more accurate prediction of refractory service life under prototypic conditions from laboratory-scale material corrosion tests.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Fuel Fabrication Specification Impact Analysis for NBSR LEU Conversion

As part of a national initiative to enhance nuclear security and reduce proliferation risks, significant efforts have been undertaken by the National Nuclear Security Administration Material Management and Minimization Office of Reactor Conversion Program to convert U.S. high performance research reactors (USHPRRs) from the use of highly enriched uranium (HEU) to low-enriched uranium (LEU), including the National Bureau of Standards Reactor (NBSR). The current plan is to procure LEU fuel assemblies from commercial fabricators according to fuel specifications tailored for each USHPRR. The analysis conducted at Brookhaven National Laboratory was part of an effort to identify the sources of uncertainty in the fuel specifications that may impact the performance of the NBSR core after its conversion and, in particular, to assess the range of acceptable tolerance limits from the perspective of core safety and reactor performance. Using the stochastic neutronics code MCNP 6.2, the variations in important NBSR neutronics characteristics were analyzed as a function of the specification parameters independently and in combination. The important NBSR specification parameters analyzed were the fuel isotopic composition, the amount of impurity content in cladding, the fuel plate thickness, and the fuel element 235U mass loading. The range of variation of each specification parameter was based on the technical specification limit or available as-fabricated assay data and uncertainties. The NBSR neutronics characteristics selected for analysis were the reactor reactivity characteristics at equilibrium and the equilibrium fuel cycle length. Results show that with variations in the fabrication parameters of the as-fabricated U-10Mo fuel within the specification limitations, the excess reactivity of the NBSR LEU core remains well below the 15% Δk/k technical specification limit, and the shutdown margin is always significantly greater than the required 0.68% Δk/k. This ensures that the NBSR can be operated safely and reliably shut down for all analyzed cases within the specified fabrication limits after the LEU conversion. In the prototypic case, the fuel cycle length was 1.5 days longer than the targeted 38.5 days. In a credible worst-case scenario, where all low-reactivity parameters were combined, the fuel cycle length was reduced to 35.5 days, which is still considered manageable for reactor operations. Variations in cycle length are primarily driven by changes in 235U loading, with other parameters having secondary effects.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Corrosion Testing of Refractory inContact with Molten Glasses Designed for Waste Vitrification - VSL Touchpoint Matrix Glasses

It is known that the predictive life of the refractory ceramic liner of nuclear waste glass melters is conservative, as demonstrated by performance of these materials such as in the Defense Waste Processing Facility (DWPF). The motivation for this task is to maximize the useful life of the melters that will be operated at the Waste Treatment and Immobilization Plant (WTP), which will in turn minimize procurement and disposal costs and melter outage times, as well as to identify maximum loadings in the waste glass of those species that corrode melter components. This task was initiated jointly with Pacific Northwest National Laboratory (PNNL) with the objective to develop a methodology and model to enable more accurate prediction of refractory service life under prototypic conditions from laboratory-scale material corrosion tests. Refractory corrosion is generally reported as physical material loss, measured in units of distance (e.g., inch) or as physical material loss rate, measured in units of distance per time (e.g., inch/day). In post-operational melters, the refractory corrosion is measured directly, sometimes reported as corrosion depth. Crucible tests are used in the laboratory to accelerate the refractory corrosion to facilitate a meaningful measurement in a commensurate amount of time. Crucible tests are particularly useful in understanding refractory corrosion across a large glass composition space, where operational testing would be prohibitive. Some of the critical parameters that are known to influence refractory corrosion by molten glass in a crucible test are temperature, system redox, molten salt phases, glass chemistry, and test duration. The majority of data collected for Monofrax® K-3 (hereafter referred to as K-3) corrosion is from crucible tests, but a small amount comes directly from scaled and production melters. Crucible test data has been collected under varying conditions, whereas data collected from operational melters is relatively fewer and represents conditions specific to the melter campaign. The result is that the published data can be grouped and analyzed in multiple ways, not all of which are readily comparable. The Standard Test Method for Isothermal Corrosion Resistance of Refractories to Molten Glass (ASTM C621) outlines the general guidelines used across industry. That method describes a sealed, static test in which the surface area of the refractory coupon and the volume of glass are fixed. A significant portion of the crucible data pertaining to nuclear waste glasses has been collected in a modified configuration; the most notable differences being the surface area of the refractory coupon to volume of the glass and use of a method for bubbling the melt. To our knowledge, the influence of those parameters on the refractory corrosion has not been quantified. In this work, it was determined that static tests and bubbled tests would be performed. Savannah River National Laboratory (SRNL) was tasked with setting up and performing static testing while PNNL was tasked with setting up and performing bubbled testing. Initial activities were performed to establish laboratory methods that reproduce data comparable to existing data sets of K-3 refractory corrosion by low activity waste (LAW) and high-level waste (HLW) glass compositions. Later activities were focused on refining the test parameters to establish a standard test practice to be used between Laboratories and collecting additional data to be used in the enhanced waste glass model development. This document serves primarily to convey the refractory loss measurement results from corrosion testing of K-3 refractory with waste glass compositions developed for use in the WTP melters. The data will be used in the enhanced property/composition models being developed for waste glass vitrification and melter operations.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Quantifying Capital Cost Reduction Pathways for Advanced Nuclear Reactors

The framework developed in this study is provided both as an excel sheet (https://inl.gov/content/uploads/2023/11/Nuclear-Reactor-Cost-Reduction-Pathway-Spreadsheet-Tool.xlsx) and a Python (Jupyter) Notebook (link: https://github.com/accert-dev/ACCERT/tree/main/Cost%20Reduction). Capital cost considerations are one of the primary inhibitors to the large-scale deployment of nuclear power plants. While it is widely accepted that first units will likely be expensive and relatively uncompetitive, it is reasonable to expect that subsequent units, built in relative quick succession, will be cheaper as they benefit from the so-called “learning effects”. However, the large degree of uncertainty associated with this parameter renders it challenging for first movers to invest in the first few expensive units. To resolve this impasse, the U.S. Department of Energy’s Advanced Nuclear Liftoff study advocated for the formation of large, committed order books of plants of the same technology to spread the costs across several units and kickstart the nuclear supply chain. The study also advocated best practices for avoiding overruns and keeping reactors on budget. This report builds on these key recommendations by attempting to quantify specific pathways toward cost reduction for nuclear energy. A capital cost estimation framework was built to untangle the effect of learning into a subset of key cost drivers, referred to as “levers”. Collectively, the choice of these levers is intended to reflect the decision-making of high-level stakeholders like plant owners and the government. In addition to the size of the firm orderbook, these levers included (a) cost drivers that are most often attributed to cost overruns such as architect/engineering (A/E) proficiency, construction proficiency, procurement service proficiency, design completion prior to the start of construction, and design maturity, and (b) cost reduction strategies such as modular construction, cross-site standardization, safety classification of the reactor building, and of the balance of plant. Two advanced reactor designs were leveraged as use cases and bottom-up cost estimates made with assumptions consistent with a well-executed first-of-a-kind project (WE-FOAK, i.e., almost no overruns) were used as baselines for the models. Cost correlations were surveyed from the literature to determine the impact of important variables on projected timelines and costs.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Initial Operation of the Nuclear Thermal Rocket Element Environmental Simulator

The Nuclear Thermal Rocket Element Environmental Simulator (NTREES) facility is designed to perform realistic non-nuclear testing of nuclear thermal rocket (NTR) fuel elements and fuel materials. Although the NTREES facility cannot mimic the neutron and gamma environment of an operating NTR, it can simulate the thermal hydraulic environment within an NTR fuel element to provide critical information on material performance and compatibility. The NTREES facility has recently been upgraded such that the power capabilities of the facility have been increased significantly. At its present 1.2 MW power level, more prototypical fuel element temperatures nay now be reached. The new 1.2 MW induction heater consists of three physical units consisting of a transformer, rectifier, and inverter. This multiunit arrangement facilitated increasing the flexibility of the induction heater by more easily allowing variable frequency operation. Frequency ranges between 20 and 60 kHz can accommodated in the new induction heater allowing more representative power distributions to be generated within the test elements. The water cooling system was also upgraded to so as to be capable of removing 100% of the heat generated during testing In this new higher power configuration, NTREES will be capable of testing fuel elements and fuel materials at near-prototypic power densities. As checkout testing progressed and as higher power levels were achieved, several design deficiencies were discovered and fixed. Most of these design deficiencies were related to stray RF energy causing various components to encounter unexpected heating. Copper shielding around these components largely eliminated these problems. Other problems encountered involved unexpected movement in the coil due to electromagnetic forces and electrical arcing between the coil and a dummy test article. The coil movement and arcing which were encountered during the checkout testing effectively destroyed the induction coil in use at the time and resulted in NTREES being out of commission for a couple of months while a new stronger coil was procured. The new coil includes several additional pieces of support structure to prevent coil movement in the future. In addition, new insulating test article support components have been fabricated to prevent unexpected arcing to the test articles. Additional activities are also now underway to address ways in which the radial temperature profiles across test articles may be controlled such that they are more prototypical of what they would encounter in an operating nuclear engine. The causes of the temperature distribution problem are twofold. First, the fuel element test article is isolated in NTREES as opposed to being in the midst of many other mostly identical fuel elements in a nuclear engine. As a result, the fuel element heat flux boundary conditions in NTREES are far from adiabatic as would normally be the case in a reactor. Second, induction heating skews the power distribution such that power is preferentially deposited near the outside of the fuel element. Nuclear heating, conversely, deposits its power much more uniformly throughout the fuel element. Current studies are now looking at various schemes to adjust the amount of thermal radiation emitted from the fuel element surface so as to essentially vary the thermal boundary conditions on the test article. It is hoped that by properly adjusting the thermal boundary conditions on the fuel element test article, it may be possible to substantially correct for the inappropriate radial power distributions resulting from the induction heating so as to yield a more nearly correct temperature distribution throughout the fuel element.

Emrich, William J., Jr.↗

A cost and utility analysis of NIM/CAMAC standards and equipment for shuttle payload data acquisition and control systems. Volume 1: Summary

The cost effectiveness of utilizing the Nuclear Instrumentation Modular (NIM) and the Computer Automated Measurement Control (CAMAC) equipment for Spacelab payload instrumentation was determined. Representative shuttle sortie payloads were analyzed for applicability and commonality. Modification of NIM/CAMAC equipment was analyzed for its suitability in Spacelab environments and to determine the cost. NIM/CAMAC equipment usage requirements for Spacelab payloads were converted to pool size requirements and time-phased equipment procurement requirements. A programmatic estimate of the pool equipment costs and a management plan were prepared for the pool concept. The implementation and impact of CAMAC software were assessed.

Source record↗

SPC-70791 Rev 0 MARVEL Inert Gas Subsystem, Secondary Coolant Management Subsystem, and Secondary Coolant Cover Gas Subsystem Tubing and Valve Specification

This specification covers the requirements and details for the selection, testing, cleaning, marking, shipping, inspection and installation (including welding) of the Inert Gas Subsystem, Secondary Coolant Management Subsystem, and Secondary Cover Gas Management Subsystem from the Valve Panel up to the classification division, the patch panel of the upper confinement. Including NaK, argon, eutectic gallium indium tin (eGaInSn), and helium fill tubing, valves, and hangers. These systems consist of the necessary straight lengths, elbows, reducers, fittings, tube connections, instrument taps, and valves called for by applicable drawings. All components shall be procured as ASME Section III Class 2 unless otherwise modified hereinafter. Pressure relief valves have been sized to prevent overpressure in the event there is full regulator flow. This is documented in ECAR-7365.

21 - SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLAN↗

Development and Assessment of Deployed Sensors and Technologies Supporting Molten Salt Loop Operations

During FY24, Argonne conducted a variety of activities to develop and assess new monitoring and control technologies towards enabling long-duration operations of molten salt reactor systems. The first objective of the work completed this year was to deploy technologies capable of reliably and rapidly monitoring the operational health of a molten salt loop. To achieve this, the project focused on specific tasks, including: (1) electroanalytical technique development for use in deployed sensors, and (2) operations of sensors on the Facility to Alleviate Salt Technology Risks (FASTR) loop at Oak Ridge National Laboratory. The second objective of the work this year focused on creating a pumped actinide flow loop to enable long-duration salt chemistry and corrosion studies using uranium-bearing fuel salts. Toward that end, we designed and procured a loop capable of being installed into a radiological glovebox at Argonne. A corrosion control system was also designed for integration into this loop. These combined systems will enable the feasibility of corrosion control and management systems to be investigated with complex chloride fuel salt mixtures.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Rescue of Unique Liquid IP-2 Portable Tanks at Savannah River Site

Introduction • Savanah River Site procured six large IP-2 portable tanks capable of transporting liquids in 2003 to support layup of F Canyon at SRS. • Tanks are being rescued and recertified to support eventual disposition of up to 171,000 L of contaminated solvent solutions from H Canyon at SRS and to potentially transport Depleted Uranium solutions to support the ABD Program.

Fee, Nathaniel C. [Savannah River Nuclear Solution↗

Results of an In-Field Validation Exercise in Support of Wide-Area Environmental Sampling

The National Nuclear Security Administration’s (NNSA) Office of Nonproliferation and Arms Control (NA-24) is evaluating Wide-Area Environmental Sampling (WAES) as an additional safeguards verification tool for the International Atomic Energy Agency to detect undeclared nuclear activities. The NNSA is evaluating strategies for conducting a generic WAES campaign, the cost of a WAES campaign, and the effect of technological advancements that have occurred since the last major WAES review in 1999. Until now, the NNSA effort has focused on tabletop exercises (TTXs) in which high-performance computing allows for advanced modeling and simulation efforts to be applied to the WAES question. Although the modeling and simulations used in the TTXs are extremely valuable, field campaigns are still needed to validate the assumptions that underpin the models and the modeling process itself. During a 7 week period beginning in May 2023 and ending in June 2023, which included 4 weeks of active field collections, a multilaboratory team conducted its first in-field validation exercise. Prior to the in-field exercise, abbreviated TTXs were conducted to estimate the performance of all collection systems to be used during the field test. These TTXs guided the selection of materials to be released and the placement of the collection system. Based on these determinations, materials were procured to use in the field test, and an injection/release system was designed, built, and installed at the test facility. Background samples were collected during weeks one and four, and environmental collections against active releases were conducted during weeks two and three. The goals of this validation exercise included a demonstration of (1) the ability to provide controlled releases of particulates of surrogate materials, (2) the fielding and operation of collection systems (including deposition and active air collectors), and (3) the flexibility to revise equipment and campaign plans in the field. This paper presents the results and preliminary conclusions for this initial validation test. Based on these results, subsequent field campaigns are anticipated and will include the addition of other released materials.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

A cost and utility analysis of NIM/CAMAC standards and equipment for shuttle payload data acquisition and control systems. Volume 3: Tasks 3 and 4

The modifications for the Nuclear Instrumentation Modular (NIM) and Computer Automated Measurement Control (CAMAC) equipment, designed for ground based laboratory use, that would be required to permit its use in the Spacelab environments were determined. The cost of these modifications were estimated and the most cost effective approach to implementing them were identified. A shared equipment implementation in which the various Spacelab users draw their required complement of standard NIM and CAMAC equipment for a given flight from a common equipment pool was considered. The alternative approach studied was a dedicated equipment implementation in which each of the users is responsible for procuring either their own NIM/CAMAC equipment or its custom built equivalent.

Source record↗

Surveillance LANL-ASMT-2026-0059 Procurement – NNSS Supplier Review

The Institutional Quality and Performance Assurance Division's Quality Support Services Group conducted a surveillance of IQPA-IQ Supplier Evaluation group's required assessments of suppliers providing items and services relevant to the Nevada National Security Site. Based upon records examined, the surveillance team has determined that all supplier evaluation/oversight requirements are being met, and no Findings or Opportunities for Improvement are noted.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Final Design for Thermal/Epithermal eXperiments (TEX) with Lithium Absorbers to Provide Validation Benchmarks for Y-12 Electrorefining Facility

One of the main goals of the Thermal/Epithermal eXperiments (TEX) project is to use existing Nuclear Criticality Safety Program (NCSP) assets to create critical experiment plutonium and uranium test beds for materials important to criticality safety that have insufficient benchmark evaluations. The plutonium test bed experiments were completed in 2018 and are published in the 2020 edition of the International Criticality Safety Benchmark Evaluation Project (ICSBEP) Handbook. The uranium test bed assemblies were completed in 2023 and accepted in the 2024 edition of the ICSBEP Handbook. The Nuclear Criticality Safety (NCS) group at Y-12 National Security Complex has identified programmatic need for validation cases for uranium electrorefining operations at Y-12. The electrorefining operation credits lithium enriched in 6 Li in addition to 35 Cl as absorbers in the design criticality safety evaluation for precluding criticality under upset conditions in the large and geometrically unfavorable electro-refiner. There is, however, inadequate experimental validation for the 6 Li absorbers. As an extension of the TEX uranium test bed, TEX-Cl critical experiments were performed with sodium chloride salt to address the 35 Cl thermal absorption as well as other validation needs at Los Alamos National Laboratory (LANL). These experiments were completed in 2024 and accepted into the 2025 ICSBEP Handbook. To continue the methodology used in TEX-Cl, TEX-Li aims to accomplish the same. The overall design of both experiments was to use commercially available, high purity, salts with polyethylene moderator and HEU plates to configure a critical assembly. Three experiments are planned for TEX-Li using encapsulated lithium carbonate (Li 2 CO 3 ), with natural 6 Li abundance. For all experiments, the highly enriched uranium (HEU) Jemima plates will be used as fissile material. Multiple layers will be stacked together with encapsulated Li 2 CO 3 alternated with polyethylene in standard configurations. Standard stacking was found to be optimal in matching the different sensitivity profiles provided by the Y-12 models. Three configurations are proposed with varying polyethylene moderation and a constant 1/4” absorber thickness. The first uses 11 layers of 5/4” polyethylene, the second uses 9 layers of 3/4” polyethylene, and the third uses 10 layers of 1/2” polyethylene. Calculations showed that some alternative forms of lithium-based materials provided slightly less-optimal sensitivity profiles when compared to lithium carbonate but come with other drawbacks. These alternatives included lithium aluminate (LiAlO 2 ), Aluminum-2050 alloy, Aluminum-8090, Aluminum-2095, lithium hydride (LiH), and lithium fluoride (LiF). Lithium aluminate and aluminum-2050 provided comparable sensitivity profiles when compared to lithium carbonate and can be used instead if lithium carbonate cannot be readily procured. After a broad material study, lithium carbonate outperformed any alternative material with a balance in affordability and workability. The assessment of experimental uncertainties of the non-absorber and absorber components was predicted to be 0.00089 and 0.00093 Δk eff , respectively. The largest uncertainties may be reduced with precision dimensional inspection of the components. Many of the parts and equipment for IER 575 have already been fabricated or procured for previous projects and therefore do not contribute significantly to the overall cost of this experiment. This includes the Jemima plates and Comet critical assembly machine, which are existing NCSP assets, as well as the aluminum platen and polyethylene reflector rings, which were fabricated and authorized for the TEX experiment involving HEU with polyethylene. Lithium carbonate containers will be procured by LANL and will be filled by LLNL. The total material costs for TEX-Li experiments are estimated to be on the order of $\$$47,400. Precision inspection, including dimensional, mass, density, and impurity, is recommended for all components for an estimated cost of $\$$12,000.

35Cl↗

MICROREACTOR APPLICATIONS, RESEARCH, VALIDATION, AND EVALUATION (MARVEL) REACTOR ? STATUS, CONSTRUCTION, AND TESTING

The paper presents the current status of the Microreactor Applications, Research, Validation, and Evaluation (MARVEL) microreactor design, qualification testing, fabrication, and high-level construction schedule. An overview of initial criticality, low power physics testing, and start-up testing is included, as well as an overview of the envisioned processes in which end-users can engage the project for access to operational data or specific demonstrations. Designed by the Idaho National Laboratory (INL) under the auspices of the US Department of Energy’s Microreactor Program for construction and operation at the INL, MARVEL is a small, fully functional advanced reactor with UZrH fuel and thermal output of 85 kW. It offers a unique opportunity for scaled demonstrations that can dramatically accelerate the design, licensing, and deployment of commercial microreactors for power production or process heat applications. MARVEL’s objective is to build a small liquid-metal thermal reactor at the INL to demonstrate design and operating processes for microreactors, microgrid integration, and process heat applications. MARVEL finished 90%-final-design in September 2023 and completed an independent project assessment in early 2024. Fabrication of long-lead components and fuel, safety analysis review, and procurement for construction are underway. MARVEL assembly and construction will start in 2025 and fuel loading is expected in mid- 2027. Initial criticality will be performed in a dry condition in late 2027, followed by loading of NaK coolant and start-up testing. Approximately six months later, release for unrestricted operations will enable subsequent testing of microreactor characteristics, microgrid integration and select heat extraction applications.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Requirements for a network storage service

Sandia National Laboratories provides a high performance classified computer network as a core capability in support of its mission of nuclear weapons design and engineering, physical sciences research, and energy research and development. The network, locally known as the Internal Secure Network (ISN), comprises multiple distributed local area networks (LAN's) residing in New Mexico and California. The TCP/IP protocol suite is used for inter-node communications. Scientific workstations and mid-range computers, running UNIX-based operating systems, compose most LAN's. One LAN, operated by the Sandia Corporate Computing Computing Directorate, is a general purpose resource providing a supercomputer and a file server to the entire ISN. The current file server on the supercomputer LAN is an implementation of the Common File Server (CFS). Subsequent to the design of the ISN, Sandia reviewed its mass storage requirements and chose to enter into a competitive procurement to replace the existing file server with one more adaptable to a UNIX/TCP/IP environment. The requirements study for the network was the starting point for the requirements study for the new file server. The file server is called the Network Storage Service (NSS) and its requirements are described. An application or functional description of the NSS is given. The final section adds performance, capacity, and access constraints to the requirements.

Kelly, Suzanne M.↗

Mark-18A Cold Runs

The Savannah River National Laboratory (SRNL) is tasked by the National Nuclear Security Administration (NNSA) to recover highly valued isotopes from irradiated Mark-18A (Mk-18A) targets. The Savannah River Site (SRS) has sixty-five Mk-18A targets available for the recovery of the high valued materials. The sixty-five Mk-18A targets are currently stored in the L-Area Basin and will be removed one at a time and individually transported to SRNL. Upon receipt at SRNL, the Mk-18A target material will be removed from the confinement, dissolved, chemically separated, and calcined to a stable oxide. The flowsheet is designed to recover the plutonium as well as the trivalent actinides. The remaining unrecovered material will be discarded to the high activity drain (HAD) system in SRNL. A specially designed cask was procured for transport of the targets from L-Area to SRNL. Once received at SRNL, the targets will be loaded into the back of Cell 7 and resized as they enter the cell. The resized targets (1/4 lengths) will then be processed one at a time through the following processes: caustic dissolution and filtration; acidic dissolution and filtration, Reillex anion exchange, diglycolamide (DGA) cation exchange; and DGA calcination. This processing will result in two product streams. The first is an aqueous plutonium solution which will be removed from the shielded cells and taken to a glovebox for further purification and conversion to an oxide. The second is a calcined oxide containing the Am and Cm as well as other lanthanide fission products which will be removed from the shielded cells using a bagless transfer system. Both materials will be packaged for shipment to Oak Ridge National Laboratory (ORNL). All equipment to carry out this process was designed, procured or fabricated, and installed in a mock-up facility (716-4A) at SRS to allow for simulation testing in a non-radioactive area. This equipment was then dismantled and transferred from 716-4A to 773-A and installed in the SRNL Shielded Cells. After installation in the shielded cells facility testing was performed using water followed by surrogates and cold chemicals. Issues were identified during these evaluations, including equipment issues as well as technical challenges. Many of the issues were rectified during performance of the cold runs, and the remaining have a resolution identified. Table ES-1 provides a summary of all issues identified during the cold run operations, as well as the status and identified resolutions to outstanding issues.

07 ISOTOPE AND RADIATION SOURCES↗