Search NASA⌕ Search

SEARCH · Search NASA

Results for “Office practice.”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Reliability analysis in the Office of Safety, Environmental, and Mission Assurance (OSEMA)

The technical personnel in the SEMA office are working to provide the highest degree of value-added activities to their support of the NASA Langley Research Center mission. Management perceives that reliability analysis tools and an understanding of a comprehensive systems approach to reliability will be a foundation of this change process. Since the office is involved in a broad range of activities supporting space mission projects and operating activities (such as wind tunnels and facilities), it was not clear what reliability tools the office should be familiar with and how these tools could serve as a flexible knowledge base for organizational growth. Interviews and discussions with the office personnel (both technicians and engineers) revealed that job responsibilities ranged from incoming inspection to component or system analysis to safety and risk. It was apparent that a broad base in applied probability and reliability along with tools for practical application was required by the office. A series of ten class sessions with a duration of two hours each was organized and scheduled. Hand-out materials were developed and practical examples based on the type of work performed by the office personnel were included. Topics covered were: Reliability Systems - a broad system oriented approach to reliability; Probability Distributions - discrete and continuous distributions; Sampling and Confidence Intervals - random sampling and sampling plans; Data Analysis and Estimation - Model selection and parameter estimates; and Reliability Tools - block diagrams, fault trees, event trees, FMEA. In the future, this information will be used to review and assess existing equipment and processes from a reliability system perspective. An analysis of incoming materials sampling plans was also completed. This study looked at the issues associated with Mil Std 105 and changes for a zero defect acceptance sampling plan.

Kauffmann, Paul J.↗

NGSI: FUNCTION REQUIREMENTS FOR A CYLINDER TRACKING SYSTEM

While nuclear suppliers currently track uranium hexafluoride (UF{sub 6}) cylinders in various ways, for their own purposes, industry practices vary significantly. The NNSA Office of Nonproliferation and International Security's Next Generation Safeguards Initiative (NGSI) has begun a 5-year program to investigate the concept of a global monitoring scheme that uniquely identifies and tracks UF{sub 6} cylinders. As part of this effort, NGSI's multi-laboratory team has documented the 'life of a UF{sub 6} cylinder' and reviewed IAEA practices related to UF{sub 6} cylinders. Based on this foundation, this paper examines the functional requirements of a system that would uniquely identify and track UF{sub 6} cylinders. There are many considerations for establishing a potential tracking system. Some of these factors include the environmental conditions a cylinder may be expected to be exposed to, where cylinders may be particularly vulnerable to diversion, how such a system may be integrated into the existing flow of commerce, how proprietary data generated in the process may be protected, what a system may require in terms of the existing standard for UF{sub 6} cylinder manufacture or modifications to it and what the limiting technology factors may be. It is desirable that a tracking system should provide benefit to industry while imposing as few additional constraints as possible and still meeting IAEA safeguards objectives. This paper includes recommendations for this system and the analysis that generated them.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Best Practices for Equitable Solar Workforce Development

The Midwest Renewable Energy Association (MREA) was selected to serve as a lead organization for the U.S. Department of Energy Solar Energy Technology Office’s Equitable Solar Communities of Practice initiative. This project, facilitated through a partnership with ENERGYWERX, aimed to develop strategies to support the expansion of equitable benefits in solar adoption across the U.S. Specifically, the MREA was chosen to lead the solar workforce development community of practice, focusing on scaling the U.S. solar workforce, to meet growing industry demands and ensure that these opportunities are accessible and beneficial to all communities. For the purpose of this initiative, we define the solar workforce in line with the National Solar Jobs Census, which defines a solar worker as someone who spends a majority of their time on solar-related work. This also includes workers who spend a plurality of their time on solar tasks. It’s important to note that manufacturing jobs were not included in this research, as the focus is primarily on solar installation, development, and related roles. To achieve the goals of the Equitable Solar Communities of Practice initiative, the MREA leveraged existing resources and engaged a diverse core team and group of stakeholders including industry professionals, educators, policymakers, and community leaders. The MREA began with a literature review and gap analysis to identify existing best practices and gaps in the solar workforce. This was followed by a community convening to gather insights from a wide range of stakeholders. The findings informed the best practices and pathways to scale the benefits of solar workforce development, focusing on training programs, workforce services, apprenticeship, and justice, inclusion, and sustainability. This report outlines the background, methodology, findings, and conclusions drawn from the landscape and gap analysis, providing valuable insights into workforce needs and training program capacities across the U.S. The outcomes of this research are presented in this report and contain recommendations for optimizing workforce development and training funding to support the equitable growth of the solar industry, ensuring that the transition to solar energy is inclusive and beneficial for all communities.

14 SOLAR ENERGY↗

Implementation of Benchmarking Transportation Logistics Practices and Future Benchmarking Organizations

The purpose of the Office of Civilian Radioactive Waste Management's (OCRWM) Logistics Benchmarking Project is to identify established government and industry practices for the safe transportation of hazardous materials which can serve as a yardstick for design and operation of OCRWM's national transportation system for shipping spent nuclear fuel and high-level radioactive waste to the proposed repository at Yucca Mountain, Nevada. The project will present logistics and transportation practices and develop implementation recommendations for adaptation by the national transportation system. This paper will describe the process used to perform the initial benchmarking study, highlight interim findings, and explain how these findings are being implemented. It will also provide an overview of the next phase of benchmarking studies. The benchmarking effort will remain a high-priority activity throughout the planning and operational phases of the transportation system. The initial phase of the project focused on government transportation programs to identify those practices which are most clearly applicable to OCRWM. These Federal programs have decades of safe transportation experience, strive for excellence in operations, and implement effective stakeholder involvement, all of which parallel OCRWM's transportation mission and vision. The initial benchmarking project focused on four business processes that are critical to OCRWM's mission success, and can be incorporated into OCRWM planning and preparation in the near term. The processes examined were: transportation business model, contract management/out-sourcing, stakeholder relations, and contingency planning. More recently, OCRWM examined logistics operations of AREVA NC's Business Unit Logistics in France. The next phase of benchmarking will focus on integrated domestic and international commercial radioactive logistic operations. The prospective companies represent large scale shippers and have vast experience in safely and efficiently shipping spent nuclear fuel and other radioactive materials. Additional business processes may be examined in this phase. The findings of these benchmarking efforts will help determine the organizational structure and requirements of the national transportation system. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Evaluating Energy Performance and Improvement Potential of China Office Buildings in the Hot Humid Climate Against U.S. Reference Buildings: Preprint

This study compares the building code standards for office buildings in hot humid climates of China and the USA. A benchmark office building model is developed for Guangzhou, China that meets China's minimum national and regional building codes with incorporation of common design and construction practices for the area. The Guangzhou office benchmark model is compared to the ASHRAE standard basedUS model for Houston, Texas which has similar climate conditions. The research further uses a building energy optimization tool to optimize the Chinese benchmark with existing US products to identify the primary areas for potential energy savings. The most significant energy-saving options are then presented as recommendations for potential improvements to current China building codes.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Report on July 2015 Additional Protocol Coordinators Best Practices Workshop

After 10 years of implementation experience, the Office of Nonproliferation and Arms Control (NPAC) within the Department of Energy/National Nuclear Security Administration (DOE/NNSA) conducted the Additional Protocol (AP) Coordinators Best Practices Workshop at Oak Ridge National Laboratory from July 29-30, 2015. The goal of this workshop was to identify implementation best practices, lessons learned, and compliance challenges from the various Additional Protocol Coordinators (APCs) at each laboratory in the DOE/NNSA complex and associated sites. The workshop provided the opportunity for participants to share their insights and establish networks that APCs can utilize to continue to discuss challenges (new and old), identify best practices, and enhance communication and coordination for reporting multi-lab research projects during review activities. Workshop participants included DOE/NNSA HQ, laboratory and site APCs, seasoned experts, members of the original implementation outreach team, and Field Element and site security representatives.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

Department of Energy Nanoscale Science Research Centers: Approach to Nanomaterial ES&H

The following non-mandatory guidance is intended for the Nanoscale Science Research Centers (NSRCs) funded by the Basic Energy Sciences program office under the U.S. Department of Energy's Office of Science. It describes practices thought appropriate to the management of environmental, safety and health (ES&H) concerns associated with laboratory-scale operations involving the design, synthesis, or characterization of engineered nanomaterials, In general, it is intended to apply to precursors, intermediates, and wastes used during, or resulting from synthesizing such nanomaterials. In general, it is not intended to apply to materials for which an occupational exposure limit has been established.

Source record↗

Tough Stuff: Extreme Materials for Extreme Challenges

Bombs that work reliably are important to U.S. national security. That requires knowing how the materials in a bomb behave under extreme conditions. Several decades of fundamental research supported by the DOE Basic Energy Sciences office created new understanding and practical tools to predict how metals deform, how they age, how they fail, and how to make them stronger. The impact of that knowledge has transformed not just the management of the U.S. nuclear weapons stockpile, but also virtually every sector that uses metal—steel and aluminum, energy, automotive, aircraft, and other industries.

36 MATERIALS SCIENCE↗

Spectroscopic Characterization of Tc(I) Tricarbonyl Species Relevant to the Hanford Tank Waste - 17379

Technetium-99 (Tc) generated from the fission of {sup 235}U and {sup 239}Pu in high yields is one of the most difficult contaminants to be addressed at the U.S. Department of Energy (DOE) Hanford Site. Among radioactive contaminants, Tc presents a unique challenge in that it has a long half-life (T{sub 1/2} = 2.11x10{sup 5} y), exhibits diverse chemical properties and typically highly mobile in the environment leading to several uncertainties regarding treatment and disposition options. The complex behavior of Tc under storage, treatment, and immobilization conditions significantly affects its management options. The overall objective of the Technetium Management program at Pacific Northwest National Laboratory is to provide the DOE Office of Environmental Management with practical solutions to Tc needs encountered in the processing of Hanford tank waste and vadose zone remediation; and technical activities are being performed in the areas of Tc characterization, treatment, and disposition. One specific task is focused on elucidation of the identity and properties of non-pertechnetate species in the liquid Hanford tank waste. Previous analysis of the tank waste samples provided strong evidence that non-pertechnetate species can be comprised of Tc(CO)3+ complexes containing Tc in oxidation state +1. This paper describes our current results on the development of spectroscopic library of Tc(I) tricarbonyl species for their characterization and identification in the Hanford tank wastes. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Technetium Management for Hanford Tank Waste Processing and Disposition - 16399

Technetium-99 (Tc) generated from the fission of {sup 235}U and {sup 239}Pu in high yields is one of the most difficult contaminants to be addressed at the U.S. Department of Energy (DOE) Hanford Site. Among radioactive constituents in the tank waste, Tc presents a unique challenge in that it is radio-toxic (β = 292 keV), has a long half-life (T{sub 1/2} = 2.11x10{sup 5} y), and exists predominantly in the liquid fraction of the alkaline tank waste, generally in the anionic form of pertechnetate TcO{sub 4}{sup -}, which is highly volatile at low-activity waste vitrification melter temperatures and mobile in the subsurface environment. This makes immobilization of Tc into high-durability waste forms a critical technical challenge for nuclear waste management. The complex behavior of Tc under storage, treatment, and immobilization conditions significantly affects its management options. The overall objective of the Technetium Management program is to provide the DOE Office of Environmental Management with practical solutions to Tc needs encountered in the processing of Hanford tank waste. To reduce the technical uncertainty associated with the long-term environmental impact of Tc, a systems-based approach is needed to address Tc management needs by evaluating and developing science and engineering options for treatment, immobilization, and disposition of Tc contained in Hanford tank wastes. This paper describes major elements of Technetium Management program, including: - Identifying the chemical forms of Tc in tank waste through analytical speciation of low-valent Tc(I) species in alkaline solutions. - Performing proof-of-concept demonstration for detection of low-valent Tc(I) by fluorescence spectroscopy. - Identifying alternative non-glass Tc immobilization methods. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

HAP Best Practice Catalog (Revision 2.0)

This document is a compilation of best practices guides for hydropower facility component operation and maintenance. The component documents were originally authored primarily by hydropower engineering experts of Mesa and Associates under sub-contract to UT-Battelle as part of the Hydropower Advancement Project (HAP) funded by the Department of Energy Wind and Waterpower Technologies Office in 2012-2013. The best practices guides were disseminated informally during that time and have been shared informally since that time but were never published by ORNL through its Resolution or Pulication Tracking System processes because the HAP was terminated abruptly by DOE. This compilation represents a formal document and publication of the HAP Best Practices Guides. The information they contain was intended from the beginning of the project to be disseminated publicly for the benefit of U.S. and worldwide hydropower operation and maintenance practices.

13 HYDRO ENERGY↗

Program and Project Management Framework

The primary objective of this project was to develop a framework and system architecture for integrating program and project management tools that may be applied consistently throughout Kennedy Space Center (KSC) to optimize planning, cost estimating, risk management, and project control. Project management methodology used in building interactive systems to accommodate the needs of the project managers is applied as a key component in assessing the usefulness and applicability of the framework and tools developed. Research for the project included investigation and analysis of industrial practices, KSC standards, policies, and techniques, Systems Management Office (SMO) personnel, and other documented experiences of project management experts. In addition, this project documents best practices derived from the literature as well as new or developing project management models, practices, and techniques.

Butler, Cassandra D.↗

Augmenting Parametric Optimal Ascent Trajectory Modeling with Graph Theory

It has been well documented that decisions made in the early stages of Conceptual and Pre-Conceptual design commit up to 80% of total Life-Cycle Cost (LCC) while engineers know the least about the product they are designing [1]. Once within Preliminary and Detailed design however, making changes to the design becomes far more difficult to enact in both cost and schedule. Primarily this has been due to a lack of detailed data usually uncovered later during the Preliminary and Detailed design phases. In our current budget-constrained environment, making decisions within Conceptual and Pre-Conceptual design which minimize LCC while meeting requirements is paramount to a program's success. Within the arena of launch vehicle design, optimizing the ascent trajectory is critical for minimizing the costs present within such concerns as propellant, aerodynamic, aeroheating, and acceleration loads while meeting requirements such as payload delivered to a desired orbit. In order to optimize the vehicle design its constraints and requirements must be known, however as the design cycle proceeds it is all but inevitable that the conditions will change. Upon that change, the previously optimized trajectory may no longer be optimal, or meet design requirements. The current paradigm for adjusting to these updates is generating point solutions for every change in the design's requirements [2]. This can be a tedious, time-consuming task as changes in virtually any piece of a launch vehicle's design can have a disproportionately large effect on the ascent trajectory, as the solution space of the trajectory optimization problem is both non-linear and multimodal [3]. In addition, an industry standard tool, Program to Optimize Simulated Trajectories (POST), requires an expert analyst to produce simulated trajectories that are feasible and optimal [4]. In a previous publication the authors presented a method for combatting these challenges [5]. In order to bring more detailed information into Conceptual and Pre-Conceptual design, knowledge of the effects originating from changes to the vehicle must be calculated. In order to do this, a model capable of quantitatively describing any vehicle within the entire design space under consideration must be constructed. This model must be based upon analysis of acceptable fidelity, which in this work comes from POST. Design space interrogation can be achieved with surrogate modeling, a parametric, polynomial equation representing a tool. A surrogate model must be informed by data from the tool with enough points to represent the solution space for the chosen number of variables with an acceptable level of error. Therefore, Design Of Experiments (DOE) is used to select points within the design space to maximize information gained on the design space while minimizing number of data points required. To represent a design space with a non-trivial number of variable parameters the number of points required still represent an amount of work which would take an inordinate amount of time via the current paradigm of manual analysis, and so an automated method was developed. The best practices of expert trajectory analysts working within NASA Marshall's Advanced Concepts Office (ACO) were implemented within a tool called multiPOST. These practices include how to use the output data from a previous run of POST to inform the next, determining whether a trajectory solution is feasible from a real-world perspective, and how to handle program execution errors. The tool was then augmented with multiprocessing capability to enable analysis on multiple trajectories simultaneously, allowing throughput to scale with available computational resources. In this update to the previous work the authors discuss issues with the method and solutions.

Patrick D Dees↗

Ombuds Office 2023 Biennial Report

The Los Alamos National Laboratory (LANL) Ombuds Charter requires the Ombuds Office to issue a report every two years to the Laboratory Director. The prior Ombuds Biennial Report was published in July of 2021, celebrating 25 years of Ombuds history at the Lab. This 2023 report details office transitions and new initiatives over the past two years, along with our ongoing conflict resolution work of one-on-one discussions, classes, presentations, workshops, and facilitations. The Ombuds Office supports the mission of LANL in myriad ways. We champion the LANL culture statement of “ How we do work is as important as What we do,” and we reinforce LANL’s values of integrity, service, excellence, and teamwork. Accordingly, the mission of the Ombuds Office is to support employees in their work, enhance communication, mitigate conflict, and encourage a positive working environment. The Ombuds Office adheres to the International Ombuds Association’s (IOA) Standards of Practice and Code of Ethics (see Appendix). As such, the Ombuds Office is informal, confidential, impartial, and independent. We do not advocate for managers or employees. We don’t tell people what to do; we don’t give advice. All of our services are voluntary. LANL employees seek out the Ombuds Office as a neutral place where they can collect their thoughts, whether in person, on the phone, or online. We help individuals explore and navigate tough issues. Employees expand their understanding of their options, assess what is within their control, and decide what is in their best interest. The Ombuds Office promotes smart, professional conflict management. This report highlights the work of the Ombuds Office and provides a closer look at both quantitative and qualitative data, including anecdotal information and endorsements. It concludes with a discussion of further opportunities to expand the reach of the Ombuds Office to more LANL employees.

99 GENERAL AND MISCELLANEOUS↗

Recommended Practices for Managing Induced Seismicity Risk Associated with Geologic Carbon Storage

The geologic storage of carbon dioxide (CO 2 ) is one method to help reduce or eliminate atmospheric CO 2 emissions. The sequestered CO 2 is originally captured from the atmosphere or from a stationary industrial source and subsequently injected into a deep subsurface porous rock formation. To facilitate the successful deployment of field scale carbon storage projects, the U.S. Department of Energy (DOE) is developing tools and protocols for defensible, science-based frameworks to quantify and mitigate risks associated with the long-term storage of CO 2 . This protocol specifically addresses the risk of induced seismicity due to injection in a geologic carbon storage (GCS) site. This integrated and risk-based protocol is a product of the U.S. DOE Fossil Energy’s National Risk Assessment Partnership (NRAP), a multi-year collaborative research effort of Los Alamos National Laboratory (LANL), Lawrence Berkeley National Laboratory (LBNL), Lawrence Livermore National Laboratory (LLNL), National Energy Technology Laboratory (NETL), and Pacific Northwest National Laboratory (PNNL). These recommended practices describe a set of 7 steps to evaluate, manage, communicate, and mitigate the risk of induced seismicity at GCS sites. The base methodology of the recommended practices follows a framework similar to the Protocol for Addressing Induced Seismicity Associated with Enhanced Geothermal Systems (Majer et al., 2012), developed for the Geothermal Technology Office of the U.S. DOE. These recommended practices present a framework to systematically assess the induced seismicity risk and quantify the associated uncertainties. These recommendations are based on current research and are sufficiently general to allow for modification and application to a variety of different types of sites. The substance of the recommended practices contained herein includes both technical and non-technical issues, and covers all operational stages of the GCS project lifecycle. They start at the preliminary risk assessment phase, continue through site assessment and characterization, include best practice communication and seismic monitoring plan methodologies, discuss the evaluation and mitigation of seismic hazard and risk, and closes with an exploration of operational management plans, which conclude when the induced seismicity risk abates back to background level. The focus of these recommendations is on actively managing the risks associated with induced seismicity by developing an actionable risk management plan that starts at the project proposal stage and continues through site closure through an iterative assessment and improvement process. The audience of this document is expected to include all interested stakeholders (e.g., operators, project developers, regulators, and the general public) and is expressly written to be accessible to this broad range of partners. This document is intended to disseminate knowledge gained through recent advances in the science of induced seismicity hazard and risk assessments, to provide updates based on recent experience gained by similar corollary injection-induced seismicity cases, and most importantly to establish a uniform framework to carry out a successful induced seismicity risk management plan for carbon storage projects in the future. These recommendations do not directly address any domestic or international regulations or standards. A complementary NRAP report makes recommendations for the assessment and management of environmental subsurface risks associated with unwanted fluid migration at GCS sites (Thomas et al., 2021) and should be referred to in order to address those additional GCS site risks.

54 ENVIRONMENTAL SCIENCES↗

Recommended Practices for Managing Induced Seismicity Risk Associated with Geologic Carbon Storage

The geologic storage of carbon dioxide (CO 2 ) is one method to help reduce or eliminate atmospheric CO 2 emissions. The sequestered CO 2 is originally captured from the atmosphere or from a stationary industrial source and subsequently injected into a deep subsurface porous rock formation. To facilitate the successful deployment of field scale carbon storage projects, the U.S. Department of Energy (DOE) is developing tools and protocols for defensible, science-based frameworks to quantify and mitigate risks associated with the long-term storage of CO 2 . This protocol specifically addresses the risk of induced seismicity due to injection in a geologic carbon storage (GCS) site. This integrated and risk-based protocol is a product of the U.S. DOE Fossil Energy’s National Risk Assessment Partnership (NRAP), a multi-year collaborative research effort of Los Alamos National Laboratory (LANL), Lawrence Berkeley National Laboratory (LBNL), Lawrence Livermore National Laboratory (LLNL), National Energy Technology Laboratory (NETL), and Pacific Northwest National Laboratory (PNNL). These recommended practices describe a set of 7 steps to evaluate, manage, communicate, and mitigate the risk of induced seismicity at GCS sites. The base methodology of the recommended practices follows a framework similar to the $\textit{Protocol for Addressing Induced Seismicity Associated with Enhanced Geothermal Systems}$ (Majer et al., 2012), developed for the Geothermal Technology Office of the U.S. DOE. These recommended practices present a framework to systematically assess the induced seismicity risk and quantify the associated uncertainties. These recommendations are based on current research and are sufficiently general to allow for modification and application to a variety of different types of sites. The substance of the recommended practices contained herein includes both technical and non-technical issues, and covers all operational stages of the GCS project lifecycle. They start at the preliminary risk assessment phase, continue through site assessment and characterization, include best practice communication and seismic monitoring plan methodologies, discuss the evaluation and mitigation of seismic hazard and risk, and closes with an exploration of operational management plans, which conclude when the induced seismicity risk abates back to background level. The focus of these recommendations is on actively managing the risks associated with induced seismicity by developing an actionable risk management plan that starts at the project proposal stage and continues through site closure through an iterative assessment and improvement process. The audience of this document is expected to include all interested stakeholders (e.g., operators, project developers, regulators, and the general public) and is expressly written to be accessible to this broad range of partners. This document is intended to disseminate knowledge gained through recent advances in the science of induced seismicity hazard and risk assessments, to provide updates based on recent experience gained by similar corollary injection-induced seismicity cases, and most importantly to establish a uniform framework to carry out a successful induced seismicity risk management plan for carbon storage projects in the future. These recommendations do not directly address any domestic or international regulations or standards. A complementary NRAP report makes recommendations for the assessment and management of environmental subsurface risks associated with unwanted fluid migration at GCS sites (Thomas et al., 2021) and should be referred to in order to address those additional GCS site risks

58 GEOSCIENCES↗