Search NASASearch

SEARCH · Search NASA

Results for “Operations”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Mission Operations, Cubed: NASA Marshall Operations Support for SmallSats

SmallSats have come a long way since the Huntsville Operations Support Center (HOSC) at NASA’s Marshall Space Flight Center supported its first “minisatellite” mission in 2010. And just as SmallSats themselves have evolved in those 12 years, so too has the HOSC’s mission support for SmallSats. Marshall Space Flight Center has a long history with payload and mission operations, including support for the Apollo missions to the moon, the Space Shuttle program, and 21 years of continuous around-the-clock science operations support for research aboard the International Space Station. Today, the HOSC is a multi-tenant facility, supporting not only ISS, but also NASA’s Commercial Crew program, the Space Launch System, the Hubble and Chandra observatories and others – including multiple SmallSat missions. Two SmallSat solar sail missions will be among those taking advantage of the HOSC’s resources for planning, training for and executing mission operations – the Near Earth Asteroid (NEA) Scout and Solar Cruiser missions. One of 10 6U CubeSats manifest on the Artemis I launch of NASA’s Space Launch System rocket this year, NEA Scout’s three-year mission will be supported through a more traditional operations concept, with a dedicated Flight Controller staff operating within the HOSC. Scheduled to launch as part of the Interstellar Mapping and Acceleration Probe (IMAP) in February 2025, Solar Cruiser’s 11-month mission will take a next-generation approach to operations by utilizing a multi-mission flight controller concept, as well as Marshall’s Telescience Resource Kit (TreK). TreK provides a suite of software applications and libraries that allow the Mission Operations Center to serve as an in-house ground system which incorporates remote and automation capability options for engineers and scientists. This presentation will compare the approaches the HOSC will use to support these two missions as a way of demonstrating the array of options NASA MSFC offers for operations support for CubeSat and SmallSat missions.

Darren S Wallace

Insights and Observations from Operating a Geostationary Laser Communication Relay Mission: Operational Lessons from NASA’s Laser Communications Relay Demonstration (LCRD) and Associated Optical Ground Stations (OGSs)

The NASA Laser Communications Relay Demonstration (LCRD) has operated on orbit for the last two years. The LCRD Mission consists of a geostationary payload and two optical ground stations. This technology demonstration mission is NASA’s first two-way, end-to-end optical communications relay. LCRD has performed an extensive experiment campaign to analyze laser communication performance for extended operations. This paper discusses various lessons learned while operating the optical relay mission from early commissioning through two years of operation. Before launch, engineers and operators performed analyses to generate operational procedures based on expected LCRD performance. However, only operation on orbit can supply actual performance data. Additional topics covered in this paper include pre-launch and commissioning testing, ephemeris generation and cadence, environmental configurations, and accommodation concerns. The addition of Integrated Laser Communications Relay Demonstration Low Earth Orbit User Modem and Amplifier Terminal (ILLUMA-T) to the optical network supplemented the LCRD team’s operational experiences and enabled them to garner new lessons learned. The authors of this paper include day-to-day flight leads who consulted with on-console operators, engineers, and subject matter experts analyzing data and experiment results to gather the lessons learned described in this paper. LCRD is a joint project involving NASA Goddard Space Flight Center (GSFC), the California Institute of Technology Jet Propulsion Laboratory (JPL), and Massachusetts Institute of Technology Lincoln Laboratory (MIT LL).

Lessons Learned

A Concept of Operations for Far-Term Surface Trajectory-Based Operations (STBO)

The goal of this far-term STBO (Surface Trajectory-Based Operations) ConOps (Concept of Operations) is to increase the efficiency and predictability of airport surface operations, and reduce the environmental impact, by incorporating a time-based component to surface operations. In the far-term NextGen timeframe, airport surface operations will transition from current-day first-come, first-served operations, to strategically scheduled operations in which pilots are recruited as active participants in meeting the precise time-based goals of NextGen surface operations. The far-term STBO concept includes two-phases. Phase 1 introduces time-based traffic flow constraint points, which divide the taxi route into segments with an assigned Required Time of Arrival (RTA). This Phase 1 approach provides temporal certainty only near the traffic flow constraint points, but not in between. Minimal augmentations to the flight deck are required to support required time of arrival (RTA) management. Phase 2 further increases precision and efficiency by introducing full four-dimensional (4D) trajectories, with an x-y location for all times t. This phase assumes adoption of advanced flight deck equipage enabling higher temporal precision sufficient to support aircraft conformance to 4D trajectories. This allows more precision and less temporal uncertainty at all times along the route.

Surface Trajectory-Based Operations (STBO)

Where is the Human in the Loop? Human Factors Analysis of Extended Visual Line of Sight Unmanned Aerial System Operations within a Remote Operations Environment

Many envisioned technological and conceptual innovations focus on allocating more functions to automation, relegating the human as an afterthought if not a nuisance. Yet, until complete autonomy is realized, the human will remain “in the loop”. The National Aeronautics and Space Administration is supporting research for the development and maturation of automated technologies and architectures for the future of advanced air mobility. Standing up a remote operations center used to control, manage, and monitor multiple highly automated vehicles is an important step towards realizing the advanced air mobility vision. At the National Aeronautics and Space Administration’s Langley Research Center, a remote operation center exists and has been tested using humans piloting simulated vehicles. In this paper, we explore the human element within live flight operations that rely on increasingly automated technologies. Four ground control station operators performed multiple live flight operations. We employed a naturalistic approach and relied on qualitative data such as interviews and discussions with subject matter experts to help facilitate discovery. The present work evaluates the functions that the human and the automation had during the live operations, lists psychological constructs that may have promoted or reduced task performance, and provides recommendations on design of the remote operations environment and training of future ground control station operators.

Advanced Air Mobility

Where is the Human in the Loop? Human Factors Analysis of Extended Visual Line of Sight Unmanned Aerial System Operations within a Remote Operations Environment

Many envisioned technological and conceptual innovations focus on allocating more functions to automation, relegating the human as an afterthought if not a nuisance. Yet, until complete autonomy is realized, the human will remain “in the loop”. The National Aeronautics and Space Administration is supporting research for the development and maturation of automated technologies and architectures for the future of advanced air mobility. Standing up a remote operations center used to control, manage, and monitor multiple highly automated vehicles is an important step towards realizing the advanced air mobility vision. At the National Aeronautics and Space Administration’s Langley Research Center, a remote operation center exists and has been tested using humans piloting simulated vehicles. In this paper, we explore the human element within live flight operations that rely on increasingly automated technologies. Four ground control station operators performed multiple live flight operations. We employed a naturalistic approach and relied on qualitative data such as interviews and discussions with subject matter experts to help facilitate discovery. The present work evaluates the functions that the human and the automation had during the live operations, lists psychological constructs that may have promoted or reduced task performance, and provides recommendations on design of the remote operations environment and training of future ground control station operators.

Advanced Air Mobility

IUS/TUG orbital operations and mission support study. Volume 2: Interim upper stage operations

Background data and study results are presented for the interim upper stage (IUS) operations phase of the IUS/tug orbital operations study. The study was conducted to develop IUS operational concepts and an IUS baseline operations plan, and to provide cost estimates for IUS operations. The approach used was to compile and evaluate baseline concepts, definitions, and system, and to use that data as a basis for the IUS operations phase definition, analysis, and costing analysis. Both expendable and reusable IUS configurations were analyzed and two autonomy levels were specified for each configuration. Topics discussed include on-orbit operations and interfaces with the orbiter, the tracking and data relay satellites and ground station support capability analysis, and flight control center sizing to support the IUS operations.

Source record

Operationally Efficient Propulsion System Study (OEPSS) data book. Volume 3: Operations technology

The study was initiated to identify operational problems and cost drivers for current propulsion systems and to identify technology and design approaches to increase the operational efficiency and reduce operations costs for future propulsion systems. To provide readily usable data for the Advanced Launch System (ALS) program, the results of the OEPSS study were organized into a series of OEPSS Data Books. This volume describes operations technologies that will enhance operational efficiency of propulsion systems. A total of 15 operations technologies were identified that will eliminate or mitigate operations problems described in Volume 2. A recommended development plan is presented for eight promising technologies that will simplify the propulsion system and reduce operational requirements.

Vilja, John O.

Operationally Efficient Propulsion System Study (OEPSS) data book. Volume 1: Generic ground operations data

This study was initiated to identify operations problems and cost drivers for current propulsion systems and to identify technology and design approaches to increase the operational efficiency and reduce operations costs for future propulsion systems. To provide readily usable data for the Advance Launch System (ALS) program, the results of the Operationally Efficient Propulsion System Study (OEPSS) were organized into a series of OEPSS Data Books as follows: Volume 1, Generic Ground Operations Data; Volume 2, Ground Operations Problems; Volume 3, Operations Technology; Volume 4, OEPSS Design Concepts; and Volume 5, OEPSS Final Review Briefing, which summarizes the activities and results of the study. This volume presents ground processing data for a generic LOX/LH2 booster and core propulsion system based on current STS experience. The data presented includes: top logic diagram, process flow, activities bar-chart, loaded timelines, manpower requirements in terms of duration, headcount and skill mix per operations and maintenance instruction (OMI), and critical path tasks and durations.

Byrd, Raymond J.

Connecting science and operations: The operations coordinator

For a current space mission under development at the Applied Physics Laboratory, the Mission Operations staff includes a team of 'Operations Coordinators' who have been working with the Mission Science and Spacecraft Development teams since completion of mission conceptual design. The Operations Coordinators are responsible for bringing knowledge of the spacecraft to the Mission Science team and bringing knowledge of the experiment requirements to the Spacecraft Development and Mission Operations teams. Once on-orbit operations begin, the Operations Coordinators will be responsible for implementation of specific science experiments from analysis through scheduling, generation of spacecraft command sequences, delivery of science data to the end user, and operations assessment. The Operations Coordinator concept is proving very effective during the development phase of the current mission.

Marshall, Madeleine H.

Influence of a new generation of operations support systems on current spacecraft operations philosophy: The users feedback

Current trends in the spacecraft mission operations area (spacecraft & mission complexity, project duration, required flexibility are requiring a breakthrough for what concerns philosophy, organization, and support tools. A major evolution is related to space operations 'informationalization', i.e adding to existing operations support & data processing systems a new generation of tools based on advanced information technologies (object-oriented programming, artificial intelligence, data bases, hypertext) that automate, at least partially, operations tasks that used be performed manually (mission & project planning/scheduling, operations procedures elaboration & execution, data analysis & failure diagnosis). All the major facets of this 'informationalization' are addressed at MATRA MARCONI SPACE, operational applications were fielded and generic products are becoming available. These various applications have generated a significant feedback from the users (at ESA, CNES, ARIANESPACE, MATRA MARCONI SPACE), which is now allowing us to precisely measure how the deployment of this new generation of tools, that we called OPSWARE, can 'reengineer' current spacecraft mission operations philosophy, how it can make space operations faster, better, and cheaper. This paper can be considered as an update of the keynote address 'Knowledge-Based Systems for Spacecraft Control' presented during the first 'Ground Data Systems for Spacecraft Control' conference in Darmstadt, June 1990, with a special emphasis on these last two years users feedback.

Darroy, Jean Michel

Altitude-Wind-Tunnel Investigation of a 4000-Pound-Thrust Axial-Flow Turbojet Engine. II - Operational Characteristics: Operational Characteristics - II

An investigation was conducted in the Cleveland altitude wind tunnel to determine the operational characteristics of an axial flow-type turbojet engine with a 4000-pound-thrust rating over a range of pressure altitudes from 5,000 to 50,OOO feet, ram pressure ratios from 1.00 to 1.86, and temperatures from 60 deg to -50 deg F. The low-flow (standard) compressor with which the engine was originally equipped was replaced by a high-flow compressor for part of the investigation. The effects of altitude and airspeed on such operating characteristics as operating range, stability of combustion, acceleration, starting, operation of fuel-control systems, and bearing cooling were investigated. With the low-flow compressor, the engine could be operated at full speed without serious burner unbalance at altitudes up to 50,000 feet. Increasing the altitude and airspeed greatly reduced the operable speed range of the engine by raising the minimum operating speed of the engine. In several runs with the high-flow compressor the maximum engine speed was limited to less than 7600 rpm by combustion blow-out, high tail-pipe temperatures, and compressor stall. Acceleration of the engine was relatively slow and the time required for acceleration increased with altitude. At maximum engine speed a sudden reduction in jet-nozzle area resulted in an immediate increase in thrust. The engine started normally and easily below 20,000 feet with each configuration. The use of a high-voltage ignition system made possible starts at a pressure altitude of 40,000 feet; but on these starts the tail-pipe temperatures were very high, a great deal of fuel burned in and behind the tail-pipe, and acceleration was very slow. Operation of the engine was similar with both fuel regulators except that the modified fuel regulator restricted the fuel flow in such a manner that the acceleration above 6000 rpm was very slow. The bearings did not cool properly at high altitudes and high engine speeds with a low-flow compressor, and bearing cooling was even poorer with a high-flow compressor.

Fleming, William A.

High Altitude Long Endurance Remotely Operated Aircraft - National Airspace System Integration - Simulation IPT: Detailed Airspace Operations Simulation Plan. Version 1.0

The primary goal of Access 5 is to allow safe, reliable and routine operations of High Altitude-Long Endurance Remotely Operated Aircraft (HALE ROAs) within the National Airspace System (NAS). Step 1 of Access 5 addresses the policies, procedures, technologies and implementation issues of introducing such operations into the NAS above pressure altitude 40,000 ft (Flight Level 400 or FL400). Routine HALE ROA activity within the NAS represents a potentially significant change to the tasks and concerns of NAS users, service providers and other stakeholders. Due to the complexity of the NAS, and the importance of maintaining current high levels of safety in the NAS, any significant changes must be thoroughly evaluated prior to implementation. The Access 5 community has been tasked with performing this detailed evaluation of routine HALE-ROA activities in the NAS, and providing to key NAS stakeholders a set of recommended policies and procedures to achieve this goal. Extensive simulation, in concert with a directed flight demonstration program are intended to provide the required supporting evidence that these recommendations are based on sound methods and offer a clear roadmap to achieving safe, reliable and routine HALE ROA operations in the NAS. Through coordination with NAS service providers and policy makers, and with significant input from HALE-ROA manufacturers, operators and pilots, this document presents the detailed simulation plan for Step 1 of Access 5. A brief background of the Access 5 project will be presented with focus on Steps 1 and 2, concerning HALE-ROA operations above FL400 and FL180 respectively. An overview of project management structure follows with particular emphasis on the role of the Simulation IPT and its relationships to other project entities. This discussion will include a description of work packages assigned to the Simulation IPT, and present the specific goals to be achieved for each simulation work package, along with the associated deliverables necessary to achieve these goals and the needs of other Access 5 IPTs. The simulation environment chosen for this task is then outlined. This section includes a description of the system architecture, a list of the necessary assumptions made by the Simulation IPT, and the roles, responsibilities and interactions of simulation participants. The method of simulation conduct is presented in the next section with particular emphasis on scenario development and applicability to evaluation of Step 1 HALE-ROA operations. Following, data collection and analysis methods are discussed for air traffic specialists and air vehicle control station operators. Lastly, a schedule of Step 1 simulation activities is presented for reference.

Source record

NASA's Ares I and Ares V Launch Vehicles -- Effective Space Operations Through Efficient Ground Operations

The United States (U.S.) plans to return to the Moon by 2020, with the development of a new human-rated space transportation system to replace the Space Shuttle, which is due for retirement in 2010 after it completes its missions of building the International Space Station and servicing the Hubble Space Telescope. Powering the future of space-based scientific exploration will be the Ares I Crew Launch Vehicle, which will transport the Orion Crew Exploration Vehicle to orbit where it will rendezvous with the Lunar Lander. which will be delivered by the Ares V Cargo Launch Vehicle. This new transportation infrastructure, developed by the National Aeronautics and Space Administration (NASA), will allow astronauts to leave low-Earth orbit for extended lunar exploration and preparation for the first footprint on Mars. All space-based operations begin and are controlled from Earth. NASA's philosophy is to deliver safe, reliable, and cost-effective solutions to sustain a multi-billion-dollar program across several decades. Leveraging 50 years of lessons learned, NASA is partnering with private industry, while building on proven hardware experience. This paper will discuss how the Engineering Directorate at NASA's Marshall Space Flight Center is working with the Ares Projects Office to streamline ground operations concepts and reduce costs. Currently, NASA's budget is around $17 billion, which is less than 1 percent of the U.S. Federal budget. Of this amount, NASA invests approximately $4.5 billion each year in Space Shuttle operations, regardless of whether the spacecraft is flying or not. The affordability requirement is for the Ares I to reduce this expense by 50 percent, in order to allow NASA to invest more in space-based scientific operations. Focusing on this metric, the Engineering Directorate provides several solutions-oriented approaches, including Lean/Six Sigma practices and streamlined hardware testing and integration, such as assembling major hardware elements before shipping to the Kennedy Space Center for launch operations. This paper provides top-level details for several cost saving initiatives, including both process and product improvements that will result in space transportation systems that are designed with operations efficiencies in mind. The Engineering Directorate provides both the intellectual capital embodied in an experienced workforce and unique facilities in which to validate the information technology tools that allow a nationwide team to collaboratively connect across miles that separate them and the engineering disciplines that integrate various piece parts into a whole system. As NASA transforms ground-based operations, it also is transitioning its workforce from an era of intense hands-on labor to a new one of mechanized conveniences and robust hardware with simpler interfaces. Ensuring that space exploration is on sound footing requires that operations efficiencies be designed into the transportation system and implemented in the development stage. Applying experience gained through decades of ground and space op'erations, while using value-added processes and modern business and engineering tools, is the philosophy upon which a new era of exploration will be built to solve some of the most pressing exploration challenges today -- namely, safety, reliability, and affordability.

Dumbacher, Daniel L.

Evaluation of Silicon-on-Insulator HTOP-01 Operational Amplifier for Wide Temperature Operation

Electronics capable of operation under extreme temperatures are required in many of NASA space exploration missions. Aerospace and military applications, as well as some terrestrial industries constitute environments where electronic systems are anticipated to be exposed to extreme temperatures and wide-range thermal swings. Electronics that are able to withstand and operate efficiently in such harsh environments would simplify, if not eliminate, traditional thermal control elements and their associated structures for proper ambient operation. As a result, overall system mass would be reduced, design would be simplified, and reliability would be improved. Electronic parts that are built utilizing silicon-on-insulator (SOI) technology are known to offer better radiation-tolerance compared to their conventional silicon counterparts, provide faster switching, and consume less power. They also exhibit reduced leakage current and, thus, they are often tailored for high temperature operation. These attributes make SOI-based devices suitable for use in harsh environments where extreme temperatures and wide thermal swings are anticipated. A new operational amplifier, based on silicon-on-insulator technology and geared for high temperature well-logging applications, was recently introduced by Honeywell Corporation. This HTOP-01 dual precision operational amplifier is a low power device, operates on a single supply, and has an internal oscillator and an external clocking option [1]. It is rated for operation from -55 C to +225 C with a maximum output current capability of 50 mA. The amplifier chip is designed as a 14-pin, hermetically-sealed device in a ceramic package. Table I shows some of the device manufacturer s specifications.

Patterson, Richard

Advancements in Remote Ground Control Station Operator Pilot in Command Training Program for Beyond Visual Line of Sight Flight Operations

The training program for a Remote Ground Control Station Operator Pilot in Command (R-GCSO PIC) at NASA Langley Research Center marks a pivotal evolution in preparing operators for Beyond Visual Line of Sight (BVLOS) operations. This program, developed within the Advanced Air Mobility (AAM) project High Density Vertiplex (HDV) subproject, was crafted to bridge the gap between traditional Ground Control Station Operators (GCSO) and R-GCSO PICs, focusing on uncrewed aircraft systems (UAS). It encompassed extensive theoretical and practical training, including hands-on experience with advanced simulators and live flight operations, while ensuring a deep understanding of BVLOS complexities. The training leveraged NASA technologies like the MPATH (Measuring Performance for Autonomy Teaming with Humans) ground control station software and incorporated human factors principles to enhance operational readiness. This paper details the program's development, execution, and the critical insights gained, emphasizing the necessity of continuous adaptation in training methodologies to meet the evolving demands of UAS operations in the National Airspace System.

Ground control station operator

Investigating the impact of a multi-module operation environment on the task performance time of human operators – An explanatory study

The worldwide demand for Small Modular Reactors (SMRs) has surged in recent years due to their enhanced safety and versatility in supporting diverse industrial sectors. A unique feature of SMR operation is that a single human operator is responsible for managing multiple modules. Therefore, securing a sufficient amount of human performance data pertaining to this new environment is essential for the safe operation of SMRs. In this explanatory study, a series of experiments were conducted using the NuScale simulator, a representative SMR design, with student operators. A total of 12 student operators were assigned two types of off-normal events and asked to cope with them using paper-based procedures. Subsequently, their task performance times were compared with those of student operators responsible for a single unit based on the Task Complexity (TACOM) measure. Results indicate that the performance of student operators under the experimental conditions of this study degraded by a factor of 2 to 3, depending on the characteristics of the off-normal events.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS

Lessons Learned During the Transition of SORCE Science Operations to Daylight Only Operations

In July 2013, NASA's Solar Radiation and Climate Experiment experienced a battery anomaly which placed it into safemode halting all science observations. Initial attempts to recover the spacecraft to an operational configuration failed due to the reduced capacity of the battery. As the keystone mission for measuring total solar irradiance, and the cornerstone mission for measuring the solar spectral irradiance there was a strong motivation for developing a new operations concept that would allow SORCE to resume daily measurements of the Sun. The operations team faced many challenges over the next several months. For a five-day period in late 2013 the operations team was able resume science observations to cross-calibrate SORCE data with a new instrument launched in November 2013. After the cross-calibration campaign was completed a new operations concept was deployed which allowed SORCE to perform daylight only operations. In this mode of operations all non-essential components are powered off at each eclipse entry and then turned back on at sunrise. In March 2014 SORCE resumed making daily measurements of the Sun. This paper will review the events and lessons learned from the six-month recovery effort.

Spacecraft Anomaly

Electronic Performance Support for Operational Systems: A Case Study of the Link Monitor and Control Operator Assistant

For complex operational systems, help needs to come from the inside out. It is often not realistic to call a help desk for problems that need immediate attention, especially for tasks that put a heavy cognitive load on the system operator. This session addresses the issues associated with providing electronic performance support for operational systems, including situations where the system is already fielded and can only change through evolution rather than revolution. We present a case study based on our experiences in developing the Link Monitor and Control Operator Assistant for NASA's Deep Space Network (DSN). The goals of the Operator Assistant are to improve the operability of the system and increase the efficiency of mission operations.

Hill, Randall W., Jr.