Search NASA⌕ Search

SEARCH · Search NASA

Results for “Operations Personnel”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

The Application of Machine Learning Techniques to Meteorological Forecasting

Fog and inland-penetrating sea-breezes occur often at SRS and have a strong impact on site operations. Site personnel therefore require accurate forecasts of these events, but both are difficult to forecast using traditional techniques. Our goal is to apply machine learning (ML) techniques to the problem of forecasting fog and the sea breeze at the Savannah River Site. We apply several such techniques - decision trees, regression, and a series of classification/regression techniques – and train them using the large datasets collected by our group at SRS and from external organizations that maintain databases of regional meteorological variables.

54 ENVIRONMENTAL SCIENCES↗

Smartphone-Based Device for Colorimetric Detection of MicroRNA Biomarkers Using Nanoparticle-Based Assay

The detection of microRNAs (miRNAs) is emerging as a clinically important tool for the non-invasive detection of a wide variety of diseases ranging from cancers and cardiovascular illnesses to infectious diseases. Over the years, miRNA detection schemes have become accessible to clinicians, but they still require sophisticated and bulky laboratory equipment and trained personnel to operate. The exceptional computing ability and ease of use of modern smartphones coupled with fieldable optical detection technologies can provide a useful and portable alternative to these laboratory systems. Herein, we present the development of a smartphone-based device called Krometriks, which is capable of simple and rapid colorimetric detection of microRNA (miRNAs) using a nanoparticle-based assay. The device consists of a smartphone, a 3D printed accessory, and a custom-built dedicated mobile app. We illustrate the utility of Krometriks for the detection of an important miRNA disease biomarker, miR-21, using a nanoplasmonics-based assay developed by our group. We show that Krometriks can detect miRNA down to nanomolar concentrations with detection results comparable to a laboratory-based benchtop spectrophotometer. With slight changes to the accessory design, Krometriks can be made compatible with different types of smartphone models and specifications. Thus, the Krometriks device offers a practical colorimetric platform that has the potential to provide accessible and affordable miRNA diagnostics for point-of-care and field applications in low-resource settings.

Krishnan, Tushar (ORCID:0000000342610336)↗

Internal Collaboration on Recent Nuclear Criticality Safety Assessments

Prevention of inadvertent criticality at facilities with large quantities of fissionable materials is one of the most important requirements those facilities grapple with. Given that criticality cannot be mitigated, only eliminated, a hard line must be taken on this requirement. The facilities and sites with the possibility of such an event must abide by a plethora of requirements, most stemming from the ANSI/ANS-8 series of consensus standards. One such standard, ANSI/ANS-8.19, Administrative Practices for Nuclear Criticality Safety, gives requirements and recommendations necessary for establishing a nuclear criticality safety program for a given facility or site. One of those requirements includes periodic assessments of the NCS program. To meet the assessment requirement, Los Alamos National Laboratory (LANL) conducts periodic assessments on individual facilities and overall programmatic health aspects. The teams developed to perform these assessments include people both inside and outside the LANL NCS program. Recently, the Nuclear Criticality Safety Division and the Critical Experiments Team of the Advanced Nuclear Technology Group established a collaboration to aid in fulfilling the assessment requirement.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Risk Model for EM Decision Support Toolsets

The Government Office of Accountability (GAO) has published several reports identifying the need for the Department of Energy (DOE) Office of Environmental Management (EM) to address mounting costs for DoE's cleanup program. DOEEM could greatly benefit from independent decision tool-sets/models that would allow them to evaluate options and inform business decision at the enterprise level considering site-specific life cycle costs and system plans. Program goals: Develop a tool-set that enables EM to independently evaluate alternatives, assess outcomes from different contracting strategies, and inform critical decisions for the enterprise. Project goals: Adaption of a Risk Model for integration with complimentary tool-sets for project level decision making. Operational Events: Discrete event model that evaluates operational variables (e.g. capacity, throughput, maintenance constraints) and identify bottlenecks. Identifying and Bounding Project Risk: Identify risks that impact confidence in meeting goals (e.g. production). Life cycle Cost: Evaluate impacts of staffing levels, inventory, and capital investments on life cycle costs. Methods and approach: Monte Carlo Analysis is being executed to generate results: Input derives from Risk Register Data; Tied to Projected and Target Schedules; Incorporates float duration within the model. Assumes associated risk mitigation actions being completed within a timeline of five fiscal years. Metrics include: Confidence in Meeting Production Goal; Confidence in Safety Standards; Confidence in Continuous Operation; Other Metrics can be added as appropriate regarding specific site needs. The adapted risk model can be used as a stand alone decision tool or can be integrated complementary tool-sets (i.e. process and cost models) for project-specific decisions. These support tool-sets can then be integrated with others for site- and complex- level evaluations. Future work includes designing an adaptable and modular framework that would allow integration of multiple tool-sets for holistic and/or targeted evaluation of alternative strategies for decision making that could lead to risk and cost reduction across the enterprise.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

DOE Hanford Tank Side Cesium Removal System (TSCR) Update: Fabrication and Factory Acceptance Testing - 20300

The Tank Side Cesium Removal (TSCR) System is a modular, quickly-deployable, and passively safe system for efficiently removing solids and cesium from alkaline liquid waste raffinate created by fuel processing on the Hanford site. This paper provides an overview of the project with particular emphasis on completion of fabrication and factory acceptance testing (FAT). All TSCR System components are inside three enclosures known as the Process Enclosure, Ancillary Enclosure, and Control Enclosure. The Process Enclosure is seismic design category II (SDC-II) and built to withstand the rigors of transportation and lifting, high winds, volcanic ash fall, and heavy precipitation (snow) over a temperature range of -25 to 115 deg. F. The Process Enclosure and Control Enclosure were fabricated in AVANTech's Columbia, SC facility, while the Ancillary Enclosure was fabricated in AVANTech's Richland, WA facility. The design and preliminary documented safety analysis were completed in December 2019, with all work being performed in accordance with ASME NQA-1 quality assurance requirements. The Process Enclosure, Ion Exchange Columns (IXCs), and several other TSCR components have a nuclear safety function and are designated as safety significant structures, systems, and components (SS-SSCs). The NQA-1 Commercial Grade Dedication (CGD) process was used to identify critical characteristics in order to accept materials and items used for fabrication of several safety significant TSCR components. This paper also addresses unique aspects and challenges of implementing CGD in DOE facilities and systems. After fabrication and preliminary testing, the Process and Control Enclosures were shipped to AVANTech's Richland facility where the complete TSCR System was setup and connected in a represented layout and configuration that will be used on the Hanford site. Test tanks and pumps were put in place and connected to the TSCR Process Enclosure in a manner that mimicked interfacing Double Shell Tanks in the 241-AP Tank Farm. The TSCR System was then tested/operated under conditions equivalent to those planned for onsite operation. Testing was separated into five separate phases as defined below: - Phase 1: Confirmation of TSCR System readiness for the FAT; - Phase 2: Verification of TSCR System operation under standard conditions; - Phase 3: Demonstration of TSCR System operation under non-standard conditions; - Phase 4: Demonstration of ion exchange media removal from an IXC; and - Phase 5: Completion of TSCR System lift plans and site mobilization. The Hanford Tank Operations Contractor, Washington River Protection Solutions (WRPS), participated in all phases of testing. Testing at AVANTech's Richland Facility allowed WRPS personnel to familiarize themselves with TSCR operations in a radiologically clean facility prior to onsite mobilization. Engineering and operations personnel gained valuable experience that allowed them to better refine onsite operational protocols and procedures - including handling and movement of IXCs with a forklift. This paper describes the technologies used by the TSCR System as well as how these technologies are deployed and operated to advance the Hanford mission of safely, efficiently, and effectively treating tank waste. It also provides detailed information on fabrication and FAT, including operational data from simulated tank waste runs. A project schedule for WRPS' planned construction acceptance testing, operational acceptance testing, and actual tank waste treatment is provided. This presentation should be of great interest to parties responsible for the design, testing, and mobilization of modular NQA-1 technologies for the treatment of raffinate and similar liquid wastes containing high concentrations of radioactive cesium. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Corrective Maintenance Paradigm Shift at Hanford's Tank Farms - 20077

Hanford's Tank Farms facilities have been used to safely store waste for over 70 years, with the first single-shell tanks being constructed in 1943. Tank Farm facilities consist of 149 single-shell tanks, 28 double-shell tanks, an evaporator facility, and wastewater treatment facilities. Tank Farm facilities are aging, with a tremendous corrective maintenance burden on the Tank Farm contractor. The mission of Tank Farm facilities is soon changing from waste storage to waste staging for the Hanford Waste Treatment and Immobilization Plant (WTP). WTP operations will demand a significant increase in Tank Farm facility operations, in which corrective maintenance outage windows will shrink drastically. This realization has forced the Tank Farm contractor to consider a paradigm shift in Tank Farm facilities Maintenance planning, and the use of reliability Engineering tools. The Tank Farm Production Operations Engineering Cognizant System Engineering (CSE) organization has led the way in motivating this paradigm shift. This shift has been realized through the use of: 1) technical exchange with other Department of Energy (DOE) contractors to develop improvements in the CSE program, 2) a shift from the use of lagging to leading system health indicators, and 3) a Plant Health Committee to unite Engineering, Operations, and Maintenance personnel toward a productive maintenance strategy. The CSE organization has held several technical exchanges with other DOE contractors to discuss CSE concepts, and how to better maintain aging infrastructure. The technical exchange with other contractors has greatly reduced the time required to make improvements in the Tank Farm CSE program. Other DOE contractors have already faced issues surrounding aging infrastructure, and have vast experience in improving the reliability and usable life of structures and components in nuclear facilities. The past CSE program used lagging health indicators to determine the health of systems. The key lagging indicator used to determine system health was availability, which is the percentage of time that a facility was ready for operation compared to the time the facility was demanded for operation. Availability was a good indicator of health in the waste storage mission of Tank Farms, where safe storage was the most important function of the facility, and where maintenance outage windows were typically long-duration. In current and future operations, outage windows are reducing, resulting in the need for much more reliable systems. Systems that have had high availability may suddenly become inoperable due to a failed component or sub-system. In several instances, the use of availability as an indicator of system health failed to predict system/equipment failure before its occurrence. In discussions with other DOE contractors, a set of reliability tools, including leading indicators of health, has been implemented in the CSE program. This primarily involves the use of failure modes and effects analysis and the study of equipment failure to develop system monitoring plans that focus on trending data to detect oncoming equipment failure ahead of time. In addition, the use of a Plant Health Committee has added significantly to the paradigm shift from a corrective maintenance philosophy to the use of predictive and preventive maintenance. The Plant Health Committee is a chartered team consisting of Engineering, Operations, and Maintenance personnel. CSEs use this forum to present the results of their performance monitoring, including the presentation of health via leading health indicators. The most positive aspect of this committee is the communication that it creates within these critical organizations. The Operations and Maintenance organization benefit from focusing maintenance on the reliability-centered focus provided by Engineering. Engineering benefits from the operational experience of the Operations organization and from the failure data that can be provided by Maintenance personnel. The continued use of the Plant Health Committee is expected to further decrease maintenance outage times, in better support of oncoming 24/7 operations. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Human Factors Considerations for Automating Microreactors

The U.S. Nuclear Regulatory Commission (NRC) has interacted with vendors pursuing the commercialization of microreactors ( <10 MW th ). It is envisioned that microreactors could be assembled and fueled in a factory and shipped to a site. Many of the sites are expected to be remote locations requiring off-grid power or in some cases military bases. However, before this new class of nuclear reactor can be fully developed and implemented by designers, an effort must be made to explore the technical issues and provide reasonable assurance to the public regarding health and safety impacts centered on various technical issues. Prior works have examined many of these issues. One issue not yet fully explored is the possible change in role of the operations and support personnel. Due to the passive safety features of microreactors and their low level of nuclear material, the microreactor facilities may automate more functions and rely on inherent safety features more than its predecessor nuclear power plants. In some instances, human operators may not be located onsite and may instead be operating or monitoring the facility from a remote location. Some designs also call for operators to supervise and control multiple microreactors from the control room. This report explores the issues around reduced staffing of microreactors, highlights the historical safety functions associated with human operators, assesses current licensing requirements for appropriateness to varying levels of personnel support, and describes a recommended regulatory approach for reviewing the impact of reduced staff to the operation of microreactors. The report evaluates these issues through an extensive literature survey and Subject Matter Expert interviews. The literature covers research topics related to Human Factors Engineering as well as regulatory guidance given by the Nuclear Regulatory Commission.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Portable and Cost-Effective Device for Reliable Detection of Counterfeit and Non-compliant Refrigerants in Diverse Applications

Counterfeit refrigerants pose significant challenges to safety, system reliability, and operational effectiveness due to their harmful contaminants or incompatible chemical compositions. Utilizing these noncompliant products can lead to reduced efficiency, equipment failures, and expensive repairs. Additionally, heightened demand for alternative refrigerants during the industry's transition has created supply gaps, enabling counterfeit products to proliferate. Accurate detection and analysis tools are therefore essential to verify refrigerant authenticity and ensure system integrity in diverse applications. This paper presents the development of a portable device designed for reliable identification and detailed analysis of refrigerant composition. By integrating precision gas sampling, controlled pressure regulation, and automated sensor technology, the device not only detects deviations from standard refrigerant properties but also provides a comprehensive composition breakdown. Pre-calibrated sensors measure the refrigerant gas to identify specific concentrations and contaminants, with an intuitive LED-based indicator system ensuring quick interpretation of results. The user-friendly interface enables operators to select refrigerant types for targeted testing, further enhancing accuracy and usability for field technicians. Comprehensive testing was conducted on mildly flammable A2L refrigerants, showcasing the device’s robustness and adaptability in analyzing composition and detecting discrepancies. The device demonstrated consistent accuracy across a range of refrigerant samples, affirming its reliability in diverse operational environments. Its design minimizes contamination risks during sampling and provides detailed composition results within 90 seconds, ensuring efficient and precise analysis. With a projected price point under $150, the proposed solution delivers affordability alongside its lightweight portability and straightforward operation. Unlike complex and costly alternatives, such as gas chromatography systems, this device provides an accessible option for technicians, customs personnel, and industry operators in need of quick and effective refrigerant verification. Compatible with both current formulations and emerging refrigerant technologies, the device addresses critical counterfeit detection needs across a range of applications. By delivering accurate composition analysis and counterfeit identification, this innovation enhances system performance, safety, and operational reliability in crucial industries.

Cheekatamarla, Praveen [ORNL] (ORCID:0000000248827↗

The Myth of Fungible FTE: A Quantitative Assessment of Matrixed Resource Allocation

Matrix organizations allow scientific facilities to share specialized personnel across projects, operations, maintenance, and strategic initiatives. Nominal staffing allocations, however, may not capture the schedule consequences of fragmented individual commitments, limited access to specialist groups, and intermittent availability of key decision makers. We developed a stochas- tic, daily-time-step simulation of a hypothetical medium-sized accelerator-facility project com- prising sequential phases and parallel tasks. Each task requires role-specific work measured in FTE-days. Ordinary personnel may be unavailable because they contribute concurrently to other institutional activities, while designated key roles have independently specified daily un- availability probabilities. An organization-wide priority factor scales the number of people from each functional group who can effectively contribute to the project. It is interpreted as a composite proxy for project access and workforce fragmentation across competing commit- ments. We examined project completion time as a function of this factor and Project Lead unavailability using 100 Monte Carlo runs per condition. Increasing priority factor from 0.1 to 1.0 reduced median completion time from 1708.5 days (interquartile range 1681.5–1735.25) to 390 days (interquartile range 379–399). At priority factor = 0.1, increasing Project Lead unavailability from 0.5 to 0.9 increased median completion time from 1713.5 days (interquartile range 1691–1733.25) to 4,417 days (interquartile range 4271.75–4550.5). The model quantifies the commonly expected sensitivity of project schedules to fragmented resource commitments and limited coordination availability. Within this model, the results also indicate a possible threshold regime in which small increases in workforce availability yield only modest sched- ule improvements until sufficient capacity becomes accessible, after which project performance improves sharply. With further validation and calibration, this quantitative framework could support resource-allocation decisions during initial project planning and subsequent schedule rebaselining.

Bai, Mei [SLAC National Accelerator Laboratory (SL↗

Representation and Impact of Water Head on Power System Planning and Operation

Representing water head information in power system model files, can provide a more realistic model of the system and thereby inform operation and planning personnel in the decision-making process. This article describes a procedure for modifying the power system model files (steady-state and dynamic) to represent water head information. Additionally, the impact of representing the water head on power system reliability studies including contingency analysis, cascading failure analysis and dynamic frequency response analysis has been investigated, using the modified power system models. This paper considers the detailed Western Electricity Coordination Council model during summer and winter conditions as the test system for the impact analysis. Results show that under reduced water head: 1) the number of critical voltage and branch flow violations increases; 2) chances of cascading failure and island formation increases; and 3) frequency nadir decreases as compared to those of the base cases where the water head information is not represented.

13 - HYDRO ENERGY↗

Residual Dose and Environmental Monitoring for the Fermilab Main Injector Tunnel Using the Data Acquisition Logging Engine (Dale)

The Recycler and the Main Injector are part of the Fermilab Accelerator complex used to deliver proton beam to the different experiments. It is very important to control and minimize losses in both machines during operation, to reduce personnel dose from residual activation and to preserve component lifetime. To minimize losses, we need to identify the loss points and adjust the components accordingly. The Data Acquisition Loss Engine (DALE) platform has been developed within the Main Injector department and upgraded throughout the years. DALE is used to survey the entire enclosure for residual dose rates and environmental readings when unrestricted access to the enclosure is possible. Currently DALE has two radiation meters, which are aligned along each machine, so loss points can be identified for both at the same time. DALE attaches to the enclosure carts and is continuously in motion monitoring dose rates and other environmental readings. In this paper we will describe how DALE is used to provide radiation maps of the residual dose rates in the enclosure. We will also compare the loss points with the Beam Loss monitor data.

43 PARTICLE ACCELERATORS↗

Introducing the 9500 Node Distribution Test System to Support Advanced Power Applications: An Operations-Focused Approach

The 9500 Node Test System is a representative section of distribution power system model developed as a part of the GridAPPS-D™ project, an effort funded by DOE as a part of the Grid Modernization Lab Consortium (GMLC) program. The test system was developed to fulfill a growing need to represent the rapidly evolving state of electric distribution systems by combining elements of legacy infrastructure systems, modern feeder topologies, and an anticipated future with smart grid technologies. It also provides a network model capable of supporting the simulation of operational scenarios such as the ones in a utility distribution control center. This test system allows the evaluation of the performance of advanced power applications in real-time, such as one that simulates the operations of an Advanced Distribution Management Systems (ADMS), Distributed Energy Resource Management Systems (DERMS), etc. in a Distribution control center. This model is an extension of the widely used IEEE 8500 Node Test Feeder and is currently being validated to become an IEEE test case to help increase adoption and widespread usage among both academia and industry. It is a full-size model representative of a section of a utility’s distribution system with multiple feeders fed from different substations. The model includes multiple distribution circuits, a sub-transmission system, multiple substations, behind the meter customer rooftop photovoltaics (PV), and multiple utility-scale distributed energy resources. To enable accurate simulations of operational scenarios, the 9500 Node Test System is designed to support procedure-based operations, with the ability to realistically demonstrate switching operations, feeder reconfiguration, adjustment of volt-var control equipment, dispatch of distributed generation, and response to planned and unplanned outages. The 9500 Node Test System includes three radial distribution feeders with 12.3 MVA of average load, consisting of both medium voltage and low voltage equipment each supplied by a different distribution substation. The three distribution feeders are connected to each other through Normally-Open switches which can be closed when needed to simulate restoration scenarios due to a fault. One feeder represents today’s grid with low penetration of customer-side renewables. The second represents a potential future grid with microgrids and 100% renewable penetration. The third has no customer generation resources, a district steam plant, and a utility-scale solar farm. The three diverse circuits were created to allow the simulation of both today’s situation as well as potential future scenarios. All three feeders have customers connected by low-voltage secondary triplex lines. This test system meets all requirements outlined in the report for creating a simulation environment that would enable discussion between key technical stakeholders as well as having the potential to accelerate operational application development and their subsequent testing and integration. The new model is a possible representation of what we believe the distribution grid may look like in the future: a high penetration of renewables, reconfigurable radial and mesh topology, numerous DERs, islanded microgrids, and significantly increased data and measurement density. The system supports both the solution of existing and newer algorithms but also enables the evaluation of applications in a realistic operational environment defined by task oriented procedural steps that represent the interaction between the control center operator and field personnel.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Advanced Fuel Cycle Cost Basis Report: Module D1-2 LWR Pelletized MOX Fuel Fabrication

Nature of this 2021 Module update from previous AFC-CBRs: Use of U,Pu MOX life cycle cost data from late 1970s Non-proliferation Assessment Systems Analysis Program (NASAP). This archived data has been updated in 2018-2019 to reflect today’s regulatory and economic conditions and is presented in 2017. For the lower unit cost MOX fabrication case the PuO 2 from the reprocessed LWR SNF is assumed to be fabricated immediately after aqueous PUREX reprocessing, thus minimizing the time for undesirable actinide radioisotopes, from the standpoint of radiation safety, to build in. Fabricated MOX utilizing separated and multi-year stored Pu from aqueously reprocessed SNF has also been added to this Module as a second LWR MOX fabrication variant, requiring additional and more costly glovebox design and operations to protect personnel. This new NASAP-informed data augments historical data and unit cost projections appearing in the 2009 (Shropshire et al 2009), 2012 (Dixon et al 2012), and 2017 Dixon et al 2017) AFC-CBRs. The “What-it-takes” 2017 unit fabrication cost values based on the updated NASAP studies are escalated to 2020$ for this 2021 Update Report.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

SPC-70734 Rev 1 MARVEL Primary Coolant System (PCS) Fill and Eutectic NaK Procurement

This specification contains the requirements for the filling the Microreactor Applications Research Validation and Evaluation (MARVEL) reactor Primary Coolant System (PCS) with eutectic sodium-potassium (NaK). The subcontractor will design and fabricate a NaK filling system (referred to herein as the PCS Fill System), the requisite volume of high purity NaK, and perform filling operations in conjunction with the Contractor Operations. The MARVEL reactor system will be operated by the Contractor, and the PCS fill system will be operated by Subcontractor personnel.

21 - SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLAN↗

H-Canyon Jumper Gasket Sealing Evaluation

H-Canyon Documented Safety Analysis approved December 2019 credits the leak integrity of H-Canyon (HCA) process tanks, piping, and jumpers in preventing the release of radioactive material in a post seismic environment. Demonstration of leak tightness capability for this equipment was achieved through substantial analytical effort. However, one potential weak point that affects leak integrity exists at the gasketed joint between Hanford Connectors (HC) and nozzles. Review of the HCA Crane Log over a three-year period indicates the HCs periodically leak. Savannah River National Laboratory (SRNL) was requested to perform gasket compression tests that evaluate gasket relaxation characteristics, i.e., creep, and provide improvements to the HC installation process that can reduce or eliminate the frequency of leaks at HCs. A HC torque value of 312 ft-lbf is the target value used because it is the minimum torque value, with 95% confidence, when an unlubricated HC is impacted for standard sealing period of 9 seconds. In the HCA pipe-jumper connections are installed remotely by using HCs. HCs inherently add to the uncertainty of a gasketed joint because a calibrated torque value cannot be applied. The gasket material is a special material made of asbestos-fiber impregnated with Teflon. This material has been used for decades and generally performs well but does leak intermittently as gaskets creep and preloaded torque is lost. Gasket types are either snap-ring (SR) or lampshade (LS). Both gasket types cover the same seating area. The SR gasket is designed to remain with the jumper when the jumper is removed leaving the nozzle faces clean of any debris. SR gaskets are initially installed when the jumper is fabricated. Changing gaskets is time consuming and the radioactive environment presents risks to personnel. When jumpers are removed LS gaskets could be used to better seal the connection to reduce down time and ALARA concerns. That is, an LS gasket would be remotely positioned over the nozzle and the HC reinstalled. Testing also included two situations not typical of plant operation. One situation was the use of the non-standard double-layered gaskets (DG), and the other situation was the use of a LS without removal of the installed SR gasket. The DG was used when the supply of LS gaskets ended, so that testing could continue. It was of interest to demonstrate this gasket’s creep response because the DG, which was two gaskets glued together, was thicker than the LS gasket and the thicker material was expected to elicit a greater creep characteristics. The second situation of using two gaskets together by installing an LS gasket without removing the installed gasket is not allowed by the ASME Codes. However, by demonstrating the creep history of such a gasket arrangement it could be considered as an option that could possibly seal a connection while significantly reducing operational down time and personnel risk. Forty tests were conducted, and the overall results demonstrate the initial applied force and how the gasket changes with time. The change in sealing force, in terms of torque, was then measured to obtain a force history as the gaskets creep. This report documents the results of those tests as well as the method used to perform the tests.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Bridging the Gap Between Modern UX Design and Particle Accelerator Control Room Interfaces

Accelerator control systems often represent relatively complex and safety-sensitive human-machine interfaces within process control industries. These systems are technically robust and reflect the cumulative integration of solutions built and adapted across decades. One of the regular, unfortunate casualties of provisional accelerator control system updates is their human-system interfaces (HSIs) which often lag behind modern usability and design standards. An additional challenge is that although there is a multitude of established human factors (HF), and user experience (UX) principles for everyday digital applications, there are very few (if any) established principles for complex and safety-critical applications for an accelerator. This paper argues for the importance of established HF and UX principles (herein referred to as human-centered design principles) into the development of accelerator HSIs, emphasizing the need for clarity, consistency, responsiveness, and cognitive accessibility. Drawing from HF/UX best practices and human-centered design, this paper discusses how these approaches can enhance operator performance, reduce human error, and improve accelerator personnel collaboration. Case studies from Accelerator Control Operations Research Network (ACORN) at Fermilab are explored to demonstrate how interfaces built with human-centered design principles can scale with system complexity while remaining intuitive and efficient for diverse user roles including operators, machine experts, and engineers. By bridging the gap between traditional control system design and modern human-centered design methods, this paper provides a roadmap for evolving accelerator HSIs into more usable, maintainable, and effective tools.

Hill, Rachael [Idaho Natl. Lab.]↗

Meteorological services annual data report for 2019

This document presents the meteorological data collected at Brookhaven National Laboratory (BNL) by Meteorological Services (Met Services) for the calendar year 2019. The purpose is to publicize the data sets available to emergency personnel, researchers and facility operations. Met services has been collecting data at BNL since 1949. Data from 1994 to the present is available in digital format. Data is presented in monthly plots of one-minute data. This allows the reader the ability to peruse the data for trends or anomalies that may be of interest to them. Full data sets are available to BNL personnel and to a limited degree outside researchers. The full data sets allow plotting the data on expanded time scales to obtain greater details (e.g., daily solar variability, inversions, etc.).

54 ENVIRONMENTAL SCIENCES↗

Meteorological services annual data report for 2020

This document presents the meteorological data collected at Brookhaven National Laboratory (BNL) by Meteorological Services (Met Services) for the calendar year 2020. The purpose is to publicize the data sets available to emergency personnel, researchers and facility operations. Met services has been collecting data at BNL since 1949. Data from 1994 to the present is available in digital format. Data is presented in monthly plots of one-minute data. This allows the reader the ability to peruse the data for trends or anomalies that may be of interest to them. Full data sets are available to BNL personnel and to a limited degree outside researchers. The full data sets allow plotting the data on expanded time scales to obtain greater details (e.g., daily solar variability, inversions, etc.).

54 ENVIRONMENTAL SCIENCES↗