At least 37 records · Page 2

Cybersecurity Anomaly Detection in SCADA-Assisted OT Networks Using Ensemble-Based State Prediction Model

The cybersecurity threats of power system gradually grow due to the increased sophisticated interactions between Information Technology (IT) and Operational Technology (OT) networks. False data injection attack (FDIA) that aims to compromise the Supervisory Control and Data Acquisition (SCADA) measurement and disturb the system operation is one of such cyber threats. Such attacks can potentially lead to significant operational issues at the control centers and substations, and hence, result in severe physical consequences. To avoid catastrophic failure across the power grid resulting from these attacks, it is essential to arm the OT network with real-time vulnerability assessment tools. To this end, this paper outlines various drawbacks of the Purdue architecture model to defend against cyberattacks in the OT network. Furthermore, a novel ensemble-based state prediction model is proposed to detect cybersecurity anomalies in SCADA assisted OT networks. The proposed model uses control center level generation and load forecasts, scheduled, and forced outages, power flow solutions, and the substation level historical data. The hypothesis of the proposed scheme relies on the fact that additional control center and substation data can hardly be accessed and compromised by attackers. One of the vital features of the proposed scheme is an hour-ahead prediction of the operational feasibility of the SCADA measurement range at the control center and substation in real time helps in detecting anomalies in measurements across both substation and the control center.

24 POWER TRANSMISSION AND DISTRIBUTION↗

S-band and Ku-band return service interference between TDRSS users

The Tracking Data Relay Satellite System (TDRSS) return service performance can be degraded by interference from another user when two or more spacecraft communicate with the same Tracking Data Relay Satellite (TDRS) at the same time. This paper describes the S-band and Ku-band return service self interference environment expected in the 1996 - 2010 timeframe and shows the self-interference expected for selected TDRSS users based on Communications Link Analysis and Simulation System (CLASS) Automated Conflict Resolution System (ACRS) and Interference Monitor (IM) tools. The results show: which user links are susceptible to interference from other users, the interference statistics, and whether or not interference can be avoided with appropriate interference mitigation techniques such as scheduling, cross-polarization, or Pseudo random Noise (PN) spreading. The analysis results enable Space Network (SN) managers to determine the impacts of self-interference on the TDRSS service availability. They also enable project offices to determine whether they should select return service communications parameters, such as polarization and PN spreading, to minimize the probability of being impacted by self-interference; try to schedule TDRSS support around other user spacecraft communications schedules; or accept communication outages due to self-interference.

Harrell, Linda↗

Network reconfiguration and distributed energy resource scheduling for improved distribution system resilience

Electric utility companies work to restore as much load as possible after power outages caused by extreme weather events. In this paper, an outage management strategy is proposed to enhance distribution system resilience through network reconfiguration and distributed energy resources (DERs) scheduling. After a line fault, the proposed algorithm can identify radial network topology based on the rank of the incidence matrix. The reconfiguration is implemented by switching tie lines and sectionalizing lines. With the new network topology, an optimal DER scheduling problem is solved to minimize the accumulative cost for dispatchable DER operation and load reduction. Finally, the optimal topology that minimizes the accumulative cost is selected from all radial topologies. The computational workload is relatively low because only linear programming needs to be solved. Using the case studies of the IEEE 69-bus and IEEE 123-bus systems, we consider the worst-case scenarios in which faults occur in the upstream feeder. The simulation results demonstrate that the proposed strategy allows for a relatively high percentage of the load to remain in service after line faults. Furthermore, compared with microgrid-formation approaches, the proposed strategy has advantages when applied to the distribution systems with several normally-open tie lines and low DER penetration.

42 ENGINEERING↗

Deep Reinforcement Learning From Demonstrations to Assist Service Restoration in Islanded Microgrids

Microgrids can be operated in island mode during utility grid outages to support service restoration and improve system resilience. To schedule and dispatch distributed energy resources (DERs) in an islanded microgrid, conventional model-based methods rely on accurate distribution network models and lack generalization and adaptability. Data-driven methods are promising for DER coordination but face practical challenges such as potential hazards to microgrids during online training and insufficient online training opportunities due to low outage rates. This paper presents a novel two-stage learning framework that builds on the deep deterministic policy gradient from demonstrations to identify an optimal restoration strategy. At the pre-training stage, imitation learning is applied to equip the control agent with expert experiences to guarantee acceptable initial performance. At the online training stage, action clipping, reward shaping, and expert demonstrations are leveraged to ensure safe exploration while accelerating the training process. In conclusion, the proposed method is illustrated using the IEEE 123-node system and compared with a representative model-based method and the standard deep deterministic policy gradient method to prove solution accuracy and demonstrate increased computational efficiency.

Du, Yan↗

NASCOM network ground communications availability report

A performance analysis of NASCOM Network circuits is presented. An objective of 99.80 percent availability has been established for all network circuits and an acceptable level of 99.50. A network narrative summary for the current month includes changes in network configurations, current month's totals for modes of service and trouble category losses, a discussion of trends, and significant losses that affected the performance indexes of individual or groups of circuits. A table and narrative summary of those circuits that failed to meet the objective of 99.80% availability for all network circuits and an acceptable level of 99.50. Lost time and interruption tables showing all circuits affected by outages, by trouble category, with their total time and events, scheduled operating hours, and individual availability indexes also are included. Selected circuits whose availabilities have or continue to affect the overall network availability are also analyzed.

Source record↗

Optimal Network Reconfiguration and Scheduling With Hardware-in-the-Loop Validation for Improved Microgrid Resilience

With the increased occurrence of various major extreme weather events, power outages and prompt power system restorations have recently drawn more attention to the resilience and recovery of power systems. From the perspective of a more resilient power delivery at the distribution grid, system restoration using network topology reconfiguration together with optimal scheduling of distributed energy resources are adopted in this paper. The proposed optimization model aims at minimizing the total load shedding cost and other operational costs, in which linearized topological constraints borrowed from graph theory and linearized DistFlow models are respectively used to maintain the radial network topology and power flow balance after system contingencies. To demonstrate the applicability of the proposed strategy, a real-world case study of a networked three-microgrid system in Adjuntas, Puerto Rico, is used with the consideration of different independent/interconnected microgrid scenarios, contingencies, and fairness settings. Furthermore, hardware-in-the-loop testing is conducted for the same three-microgrid network, where the closely matched results with the simulated ones have validated the effectiveness of the proposed restoration strategy, which is now ready to move one step forward towards field deployment. Finally, to test the proposed restoration strategy in a larger networked system, the modified IEEE-33 bus test distribution system is considered, and the results show a more resilient power delivery for critical loads under three and four line outages.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Resource Scheduling for a Network of Communications Antennas

This paper describes tha Demand Access Network Scheduler (DANS) system for automatically scheduling and rescheduling resources for a network of communication antennas. DANS accepts a baseline schedule and supports rescheduling of antenna and subsystem resources to satisfy tracking goals in the event of changing track requests, equipment outages, and inclement weather.

Deep↗

Stochastic Microgrid Scheduling With Chance‐Constrained Resilience Consideration

Traditionally, it is assumed that microgrids transition seamlessly from grid‐connected operation to islanded mode in the event of sudden main grid outages. In reality, the islanding process, especially unintentional islanding, is rarely seamless. Instead, it is subject to voltage and frequency fluctuations caused by the instantaneous disconnection of the point of common coupling (PCC) switch, variations in loads and renewable generation output and even the protection tripping of distributed energy resources (DERs). To mitigate these fluctuations and facilitate a smooth islanding process, we propose a stochastic microgrid scheduling model that incorporates chance‐constrained resilience measures. Specifically, the resilience measure is defined as the probability of successful islanding (PSI), that is, the probability that a microgrid can mitigate the generation‐demand imbalance caused by the disconnection of the PCC switch, variations in load and renewable generation and DER tripping. This measure is modelled using chance constraints. Unlike existing reliability and resilience indices, which typically neglect the possibility of microgrid/DER failure under extreme events and assume their survival while primarily focussing on reducing impact duration or magnitude, the proposed PSI‐based framework explicitly addresses microgrid and DER survival during the islanding transition. The formulated nonlinear chance constraints are approximated using a multiinterval approach and equivalently represented as a mixed‐integer linear programming (MILP) formulation. Case study results validate the proposed method, showing that the PSI estimation error is reduced to less than 8%, compared to approximately 28% with existing methods. Various sensitivity analyses on the DER tripping rate and PSI settings were performed to validate the robustness of the proposed method. In particular, the necessity of accounting for DER tripping in the PSI calculation was demonstrated.

chance constrained optimization↗

Electrochemical Impedance Spectroscopy of Alloys in a Simulated Space Shuttle Launch Environment

Type 304L stainless steel (304L SS) tubing is currently used in various supply lines that service the Orbiter at NASA's John F. Kennedy Space Center Launch Pads in Florida (USA). The atmosphere at the Space Shuffle launch site is very corrosive due to a combination of factors, such as the proximity of the Atlantic Ocean and the concentrated hydrochloric acid produced by the fuel combustion reaction in the solid rocket boosters. The acidic chloride environment is aggressive to most metals and causes severe pitting in many of the common stainless steel alloys such as 304L SS. Stainless steel tubing is susceptible to pitting corrosion that can cause cracking and rupture of both high-pressure gas and fluid systems. Outages in the systems where failures occur can impact the normal operation of the shuttle and launch schedules. The use of a more corrosion resistant tubing alloy for launch pad applications would greatly reduce the probability of failure, improve safety, lessen maintenance costs, and reduce downtime. A study which included ten alloys was undertaken to find a more corrosion resistant material to replace the existing 304L SS tubing. The study included atmospheric exposure at NASA's John F. Kennedy Space Center outdoor corrosion test site near the launch pads and electrochemical measurements in the laboratory which included DC techniques and electrochemical impedance spectroscopy (EIS). This paper presents the results from EIS measurements on three of the alloys: AL6XN (UN N08367), 254SMO (UNS S32l54), and 304L SS (UNS S30403). Type 304L SS was included in the study as a control. The alloys were tested in three electrolyte solutions which consisted of neutral 3.55% NaC1, 3.55% NaCl in O.1N HC1, and 3.55% NaCl in 1.ON HC1. The solutions were chosen to simulate environments that were expected to be less, similar, and more aggressive, respectively, than those present at the Space Shuttle launch pads. The results from the EIS measurements were analyzed to evaluate the corrosion susceptibility of the alloys and to predict the long-term corrosion performance of the subject materials. The results from the EIS measurements for the three alloys indicated that the higher-alloyed 254SMO and AL6XN exhibited a significantly improved resistance to corrosion than the 304L SS as the concentration of hydrochloric acid in the 3.55% NaC1 solution was increased. The polarization resistance values obtained from the EIS measurements were consistent with those from linear polarization measurements, and were indicative of the actual long-term corrosion performance of the alloys during a two-year atmospheric exposure study.

Calle, L. M.↗

Repair and Resource Scheduling in Unbalanced Distribution Systems Using Neighborhood Search

—This paper proposes an optimization strategy to assist utility operators to recover power distribution systems after large outages. Specifically, a mixed-integer linear programming (MILP) model is developed for co-optimizing crews, resources, and network operations. The MILP model coordinates damage isolation, network reconfiguration, distributed generator re-dispatch, and crew/resource logistics. In addition, a framework for integrating different types of photovoltaic (PV) systems in the restoration process is developed. We consider two different types of crews, namely, line crews for damage repair and tree crews for obstacle removal. We also model the repair resource logistic constraints. Furthermore, a new algorithm is developed for solving the distribution system repair and restoration problem (DSRRP). The algorithm starts by solving DSRRP using an assignmentbased method, then a neighborhood search method is designed to iteratively improve the solution. The proposed method is validated on modified IEEE 123- and 8500-bus distribution test systems.

Outage management↗

Power System Resilience Enhancement in Typhoons Using a Three-Stage Day-Ahead Unit Commitment

In this work, we propose a three-stage resilient unit commitment model which considers uncertain typhoon paths and line outages to improve the power system resilience against typhoon events. The proposed solution coordinates resources in response to the worst-case scenario for each possible typhoon path. The optimal decision is based on the characterization of the power system schedule into three stages of preventive control, emergency control, and restoration. Preventive control is performed before the typhoon occurs by quickly adjusting the three-stage resilient unit commitment schedule; emergency control is conducted during the typhoon by shedding local loads to meet the power balance, while other control strategies are assumed to be unavailable due to possible interruptions in the communication system; restoration is realized after the typhoon, when resources are optimally dispatched to repair the outages of critical devices and recover the normal operation state of the power system quickly. Considering the typhoon path uncertainty, we have introduced a stochastic model for possible typhoon paths where all possible affected lines along each typhoon path are assumed to be on outage during the typhoon. Accordingly, we explore the strategy for co-optimizing the three stages in unit commitment. The proposed model is tested on the IEEE 118-bus system and the real-world provincial system to verify its effectiveness.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Frequency Nadir Constrained Unit Commitment for High Renewable Penetration Island Power Systems

The process of energy decarbonization in island power systems is accelerated due to the swift integration of inverter-based renewable energy resources (IBRs). The unique features of such systems, including rapid frequency changes resulting from potential generation outages or imbalances due to the unpredictability of renewable power, pose a significant challenge in maintaining the frequency nadir without external support. This paper presents a unit commitment (UC) model with data-driven frequency nadir constraints, including either frequency nadir or minimum inertia requirements, helping to limit frequency deviations after significant generator outages. The constraints are formulated using a linear regression model that takes advantage of real-world, year-long generation scheduling and dynamic simulation data. The efficacy of the proposed UC model is verified through a year-long simulation in an actual island power system using historical weather data. The alternative minimum inertia constraint, derived from actual system operation assumptions, is also evaluated. Findings demonstrate that the proposed frequency nadir constraint notably improves the system's frequency nadir under high photovoltaic (PV) penetration levels, albeit with a slight increase in generation costs, when compared to the alternative minimum inertia constraint.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Frequency-Nadir-Constrained Unit Commitment for Low-Inertia, High-IBR Island Power Systems [Slides]

The process of energy decarbonization in island power systems is accelerated due to the swift integration of inverter-based renewable energy resources (IBRs). The unique features of such systems, including rapid frequency changes resulting from potential generation outages or imbalances due to the unpredictability of renewable power, pose a significant challenge in maintaining the frequency nadir without external support. This paper presents a unit commitment (UC) model with data-driven frequency nadir constraints, including either frequency nadir or minimum inertia requirements, helping to limit frequency deviations after significant generator outages. The constraints are formulated using a linear regression model that takes advantage of real-world, year-long generation scheduling and dynamic simulation data. The efficacy of the proposed UC model is verified through a year-long simulation in an actual island power system using historical weather data. The alternative minimum inertia constraint, derived from actual system operation assumptions, is also evaluated. Findings demonstrate that the proposed frequency nadir constraint notably improves the system's frequency nadir under high photovoltaic (PV) penetration levels, albeit with a slight increase in generation costs, when compared to the alternative minimum inertia constraint.

14 SOLAR ENERGY↗

Overcoming Communications Outages in Inverter Downtime Analysis: Preprint

Inverters are often reported to be the highest-impact failure point in PV systems. This importance is belied by the simplistic assumptions about inverter downtime losses used in industrial energy modeling. Energy models often assume the extent of inverter-related losses is limited to 1% of annual production from scheduled inverter preventative maintenance. In reality, inverter-related production losses are much more variable, although data from large-scale surveys of fielded systems are rare. Here we present a method of detecting inverter downtime events and estimating the associated lost production using inverter- and meter-level power data. Because communications outages are of similar frequency to true production outages, the method pays particular attention to distinguishing communications outages from true production outages. The results of applying the method at fleet-scale are presented and discussed.

41 EE - Solar Energy Technologies Office (EE-4S)↗

Automated power management and control

A comprehensive automation design is being developed for Space Station Freedom's electric power system. A joint effort between NASA's Office of Aeronautics and Exploration Technology and NASA's Office of Space Station Freedom, it strives to increase station productivity by applying expert systems and conventional algorithms to automate power system operation. The initial station operation will use ground-based dispatches to perform the necessary command and control tasks. These tasks constitute planning and decision-making activities that strive to eliminate unplanned outages. We perceive an opportunity to help these dispatchers make fast and consistent on-line decisions by automating three key tasks: failure detection and diagnosis, resource scheduling, and security analysis. Expert systems will be used for the diagnostics and for the security analysis; conventional algorithms will be used for the resource scheduling.

Dolce, James L.↗

Localization of Ad-Hoc Lunar Constellations in Communication Failure Modes for Distributed Spacecraft Autonomy

As lunar missions increase in complexity inspired by NASA’s Artemis Program, they will require reliable and sufficient capability of the Position, Navigation, and Timing (PNT) system to support their scientific objectives. In addition, NASA's Commercial Lunar Payload Services (CLPS) program initiates the proliferation of public and private exploration partnerships using small satellites from commercial and private organizations, expanding traditionally confined low Earth orbit to be used for missions beyond geosynchronous orbit (Zucherman et al., 2022). Therefore, the Lunar PNT system is also required to provide navigation services compatible with the smaller platforms being sent by the public and private sectors, like CubeSats. However, traditional approaches to deep space missions’ navigation based on ground radio facilities have difficulties in providing sufficient support for the increasing number of users and communication at a distance from the Earth (Kaplev et al., 2022). In particular, the existing Lunar navigation technologies such as weak signal global positioning system (GPS) and deep space network (DSN) are not able to ensure operations of the upcoming small-scale Lunar missions due to their limitations in localization performance as well as capacity aspects. Another way to provide Lunar PNT service is to create a dedicated Lunar global navigation satellite system (GNSS) constellation, like GNSS systems on Earth. Space agencies like NASA, ESA, and JAXA are now developing the lunar communications relay and navigation systems (LCRNS) and Lunar navigation satellite systems (LNSS). In their systems, satellites will be deployed in moon orbits to provide the communication, positioning, navigation, and timing (CPNT) service at the lunar south pole region where the Artemis base camp will be expected (Murata et al., 2022). Meanwhile, common challenges considered in lunar PNT research arise from poor geometry of the terrestrial GNSS satellites when seen from the lunar user, highly perturbed lunar orbits, and limitations in power, size, and cost of the equipment on lunar satellites (Iiyama et al., 2023). It is also not clear if there will be enough Lunar users to support the cost and resources this would require as the Low-cost surface missions may not be able to support the large power, mass, and weight requirements that these navigation solutions entail (Niemoeller et al., 2022). As an alternative, existing Lunar science and exploration assets could be used to create a low-cost, autonomous, ad-hoc, and on-demand mission-centric Lunar PNT swarm capable of providing PNT services to these low-cost lunar missions (Hagenau et al., 2021). Introducing the non-dedicated and ad-hoc Lunar navigation constellation gives a way to provide PNT services on-demand. The non-dedicated swarm assets of Lunar constellations are designed to localize themselves with minimal interaction with Earth by adding cooperative autonomous localization to lunar missions, freeing up valuable bandwidth and ground segment resources. An autonomous localization of Lunar constellations is based on the concept of the decentralized PNT system with a distributed extended Kalman filter (DEKF) approach to state estimation for minimal onboard operating costs. In the distributed data processing algorithm, computation is broken down and assigned to each satellite, resulting in a considerably decreased computational amount while maintaining the accuracy of the orbit ephemeris and clock offsets as the result of centralized data processing (Wen et al., 2019). The DEKF requires spacecraft to perform two-way ranging operations with each other to communicate simultaneously, leveraging neighbor two-way intersatellite link (ISL) measurements such as pseudoranges to, and relative velocities between, visible satellites as sensor values (Frank et al., 2021). The Lunar autonomous PNT simulation (LAPS) demonstrated the feasibility of orbital asset localization among ad-hoc Lunar small-sat constellations based on the DEKF in Hagenau et al. (2021) and evaluated the matching algorithm proposed by Frank et al. (2021) in scheduling position estimation updates. In previous papers, all assets and measurements are assumed to be always available without consideration of the impact of intermittent and permanent communication failure. This study presents localization performance with increasing levels of network degradation for swarm assets and users to demonstrate the robustness of the decentralized Lunar PNT service in more realistic scenarios. Main issues arising from communication failure include spacecraft permanent or transient loss, antenna failures, message delays, etc. We tested four possible reasons for network degradation for 7 days in 21 satellites frozen with an altitude of 5500 km, evenly spaced around 3 circular, 40 inclination orbital planes where each spacecraft has two directional antennas. As anchor nodes with an independent estimate of their position are required in the DEKF approach, two ground nodes in each pole and one node in the gateway were implemented in the simulation. First, the most probable failure scenario involves the loss of a single spacecraft due to solar interference and technical malfunctions of the assets. Losing the availability of a single spacecraft means losing the two-way ISL measurement of the asset in the DEKF update. In order to provide the best possible quality of PNT service with limited time and resources, the distributed Lunar constellations must schedule the communication activities. The scheduler leverages mixed-integer linear programming (MILP) for the coordination and scheduling of the desired “as-needed” localization service (Niemoeller et al., 2022). We assume the scheduler has completely excluded the spacecraft information before the DEKF update in the failure scenario. When a random spacecraft has been turned off at a specific time, the robustness of the autonomous Lunar PNT system is evaluated. The simulation results give an 11.5% degradation in median position accuracy compared to the idealized performance excluding the asset loss. Second, a large number of assets may vanish due to major hardware problems or meteor strikes around the moon. A multiple spacecraft loss can degrade the localization performance very fast by losing the communication ability to do cross-plane measurements and in-plane measurements in a 3-plane constellation. When the matching-based scheduler is aware of ISL availability, we investigate a large number of in-plane and cross-plane asset vanishments both in close proximity and equally spaced throughout the orbital plane. According to the simulations, the loss of in-plane measurements gives 40.2% degradation while cross-plane measurements degrade 50.5% of asset localization performance among available assets. Therefore, it is concluded that cross-plane measurements are more important in improving the position estimation accuracy. Third, spacecraft failure information can be lost due to the internal message delay, resulting in the DEKF update scheduler to solve the matching problem with unavailable assets. The DEKF update cycle is comprised of network setup, communication, and computations where a global broadcast network and a 2-way ISL network setup take 6 minutes in total (Frank et al., 2021). Once the broadcast network successfully transmits and receives information, a random spacecraft may lose its availability right before solving the matching problem. This means the matching solution is no longer optimal, resulting in degradation in the localization performance. A numerical assessment shows the matching-based scheduler with knowing failure holds 11.5% of position accuracy degradation, whereas the scheduler without knowing failure gives 34% degraded localization performance without asset loss. Fourth, a transient loss of a single or multiple spacecraft may occur due to their antenna outages. After losing the two-way ISL availability for a few DEKF update cycles, the availability of spacecraft can easily be recovered as their states have been independently updated using measurements from anchor nodes. It is likely that the longer failure will result in worse localization performance. We have tested the transient failure of a random single asset for 30 min in the simulation, which is losing 3 update cycles in the DEKF system. From the simulation results, the position accuracy has been degraded to 4.84% which is better than the degraded localization performance of 11.5% from the permanent loss scenario among available assets. In conclusion, the autonomous Lunar PNT system based on the DEKF approach shows the ability to maintain resilience and robustness in the possible communication failure scenarios, ensuring that localization accuracy is preserved across various network degradation and outages. Future studies on investigating user localization performance near the South Pole and the broadcast network system will be continued in the following months.

Yeji Kim↗

Re-Engineering the ISS Payload Operations Control Center During Increased Utilization and Critical Onboard Events

With an increase in the utilization and hours of payload operations being executed onboard the International Space Station (ISS), upgrading the NASA Marshall Space Flight Center (MSFC) Huntsville Operations Support Center (HOSC) ISS Payload Control Area (PCA) was essential to gaining efficiencies and assurance of current and future payload health and science return. PCA houses the Payload Operations Integration Center (POIC) responsible for the execution of all NASA payloads onboard the ISS. POIC Flight Controllers are responsible for the operation of voice, stowage, command, telemetry, video, power, thermal, and environmental control in support of ISS science experiments. The methodologies and execution of the PCA refurbishment were planned and performed within a four month period in order to assure uninterrupted operation of ISS payloads and minimal impacts to payload operations teams. To vacate the PCA, three additional HOSC control rooms were reconfigured to handle ISS realtime operations, Backup Control Center (BCC) to Mission Control in Houston, simulations, and testing functions. This involved coordination and cooperation from teams of ISS operations controllers, multiple engineering and design disciplines, management, and construction companies performing an array of activities simultaneously and in sync delivering a final product with no issues that impacted the schedule. For each console operator discipline, studies of Information Technology (IT) tools and equipment layouts, ergonomics, and lines of sight were performed. Infusing some of the latest IT into the project was an essential goal in ensuring future growth and success of the ISS payload science returns. Engineering evaluations led to a state of the art media wall implementation and more efficient ethernet cabling distribution providing the latest products and the best solution for the POIC. These engineering innovations led to cost savings for the project. Constraints involved in the management of the project included executing over 450 crew-hours of ISS real-time payload operations including a major onboard communications upgrade, SpaceX un-berth, a Soyuz launch, roll-out of ISS live video and interviews from the POIC, annual BCC certification and hurricane season, and ISS simulations and testing. Continuous ISS payload operations were possible during the PCA facility modifications with the reconfiguration of four control rooms and standup of two temporary control areas. Another major restriction to the project was an ongoing facility upgrade that included a NASA Headquarters mandated replacement of all electrical and mechanical systems and replacement of an external generator. These upgrades required a facility power outage during the PCA upgrades. The project also encompassed console layout designs and ordering, amenities selections and ordering, excessing of old equipment, moves, disposal of old IT equipment, camera installations, facility tour re-schedules, and contract justifications. These were just some of the tasks needed for a successful project.

Marsh, Angela L.↗

Re-Engineering the ISS Payload Operations Control Center During Increased Utilization and Critical Onboard Events

With an increase in utilization and hours of payload operations being executed onboard the International Space Station (ISS), upgrading the NASA Marshall Space Flight Center (MSFC) Huntsville Operations Support Center (HOSC) ISS Payload Control Area (PCA) was essential to gaining efficiencies and assurance of current and future payload health and science return. PCA houses the Payload Operations Integration Center (POIC) responsible for the execution of all NASA payloads onboard the ISS. POIC Flight Controllers are responsible for the operation of voice, stowage, command, telemetry, video, power, thermal, and environmental control in support of ISS science experiments. The methodologies and execution of the PCA refurbishment were planned and performed within a four-month period in order to assure uninterrupted operation of ISS payloads and minimal impacts to payload operations teams. To vacate the PCA, three additional HOSC control rooms were reconfigured to handle ISS real-time operations, Backup Control Center (BCC) to Mission Control in Houston, simulations, and testing functions. This involved coordination and cooperation from teams of ISS operations controllers, multiple engineering and design disciplines, management, and construction companies performing an array of activities simultaneously and in sync delivering a final product with no issues that impacted the schedule. For each console operator discipline, studies of Information Technology (IT) tools and equipment layouts, ergonomics, and lines of sight were performed. Infusing some of the latest IT into the project was an essential goal in ensuring future growth and success of the ISS payload science returns. Engineering evaluations led to a state of the art Video Wall implementation and more efficient ethernet cabling distribution providing the latest products and the best solution for the POIC. These engineering innovations led to cost savings for the project. Constraints involved in the management of the project included executing over 450 crew-hours of ISS real-time payload operations including a major onboard communications upgrade, SpaceX un-berth, a Soyuz launch, roll-out of ISS live video and interviews from the POIC, annual BCC certification and hurricane season, and ISS simulations and testing. Continuous ISS payload operations were possible during the PCA facility modifications with the reconfiguration of four control rooms and standup of two temporary control areas. Another major restriction to the project was an ongoing facility upgrade that included a NASA Headquarters mandated replacement of all electrical and mechanical systems and replacement of an external generator. These upgrades required a facility power outage during the PCA upgrades. The project also encompassed console layout designs and ordering, amenities selections and ordering, excessing of old equipment, moves, disposal of old IT equipment, camera installations, facility tour re-schedules, and contract justifications. These were just some of the tasks needed for a successful project. This paper describes the logistics and lessons learned in upgrading a control center capability in the middle of complex real-time operations. Combining the efficiencies of controller interaction and new technology infusion were prime drivers for this upgrade to handle the increased utilization of science research on ISS. The success of this project could not jeopardize the current operations while these facility upgrades occurred.