Search NASA⌕ Search

SEARCH · Search NASA

Results for “PHENIX REACTOR”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Results of the Phenix Dissymmetric Test Benchmark Exercise

In the context of the European H2020 project SESAME, a work package was dedicated to the validation of code coupling for the thermal-hydraulics of pool type reactors. To this end, CEA proposed a benchmark exercise of the so-called dissymmetric test performed at the end of life of the PHENIX reactor. The PHENIX reactor was an experimental reactor operated by CEA in France from 1974 until 2009. The knowledge and data acquired over the lifetime of this reactor are of paramount importance for the development of future sodium-cooled generation IV reactors. At the beginning of this test, the reactor is operated at nominal power (350 MWth) with 3 primary pumps and 4 intermediate heat exchangers. During this test, a pump trip occurs at the secondary side of one of the two loops (one loop provides coolant to two intermediate heat exchangers). The chain reaction is then stopped while the pumps remain operating at nominal speed. Dissymmetric flow patterns are then observed in the cold pool as hot sodium leaves the intermediate heat exchangers that are no longer cooled. The failed secondary pump is then restarted while the rotational speed of the other is reduced. Eventually, a stable homogeneous state is reached. This transient is challenging for both modelers and codes since this exercise tackles an industrial scale reactor featuring complex flows and interactions between different scales. The physical phenomena observed include thermal stratification, flow mixing and buoyancy effects. In order to accurately model these phenomena for a reasonable computational costs, the partners used System Thermal Hydraulics codes coupled with Computational Fluid Dynamics codes and one even included a subchannel code. In this paper, the PHENIX reactor and its behavior during the dissymmetric test are described. Then, a comparison of the different modeling options selected by the partners is offered. Finally, the results are compared to the experimental data and discussed and modelling recommendations are proposed.

code coupling↗

Calculation of the Phenix end-of-life test 'Control Rod Withdrawal' with the ERANOS code

The Inst. of Radiological Protection and Nuclear Safety (IRSN) acts as technical support to French public authorities. As such, IRSN is in charge of safety assessment of operating and under construction reactors, as well as future projects. In this framework, one current objective of IRSN is to evaluate the ability and accuracy of numerical tools to foresee consequences of accidents. Neutronic studies step in the safety assessment from different points of view among which the core design and its protection system. They are necessary to evaluate the core behavior in case of accident in order to assess the integrity of the first barrier and the absence of a prompt criticality risk. To reach this objective one main physical quantity has to be evaluated accurately: the neutronic power distribution in core during whole reactor lifetime. Phenix end of life tests, carried out in 2009, aim at increasing the experience feedback on sodium cooled fast reactors. These experiments have been done in the framework of the development of the 4. generation of nuclear reactors. Ten tests have been carried out: 6 on neutronic and fuel aspects, 2 on thermal hydraulics and 2 for the emergency shutdown. Two of them have been chosen for an international exercise on thermal hydraulics and neutronics in the frame of an IAEA Coordinated Research Project. Concerning neutronics, the Control Rod Withdrawal test is relevant for safety because it allows evaluating the capability of calculation tools to compute the radial power distribution on fast reactors core configurations in which the flux field is very deformed. IRSN participated to this benchmark with the ERANOS code developed by CEA for fast reactors studies. This paper presents the results obtained in the framework of the benchmark activity. A relatively good agreement was found with available measures considering the approximations done in the modeling. The work underlines the importance of burn-up calculations in order to have a fine core concentrations mesh for the calculation of the power distribution. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Overview of the FUTURIX-FTA Irradiation Experiment in the Phénix Reactor

The Advanced Fuels Campaign utilizes the Advanced Test Reactor (ATR) for most of its irradiation testing. Cadmium-shrouded baskets are used in ATR to modify the neutron spectrum to simulate a fast reactor environment for the fuel. FUTURIX-FTA is an irradiation experiment conducted in the Phenix fast reactor in France. Results from FUTURIX-FTA and irradiation tests in ATR using identical fuel compositions will be compared to identify and evaluate any differences in fuel behavior due to differences in the irradiation source.

fast reactor↗

Transmission Electron Microscopy Characterization of Fuel Cladding Chemical Interaction between Minor Actinides bearing U-Pu-Zr Fuel and AIM1 Cladding

Minor actinides (MA) significantly contribute to the long-term radiotoxicity of spent nuclear fuel (SNF). Separating MA from SNF and incorporating it into metallic fuels for fast reactor transmutation is a potential method to reduce this radiotoxicity. Here, this study focuses on transmission electron microscopy characterization of two samples from the fuel cladding chemical interaction (FCCI) region of an americium (Am) and neptunium (Np)-bearing (MA-bearing) uranium-plutonium-zirconium (U-Pu-Zr) fuel irradiated in the Phenix fast reactor to 9.5 % FIMA burnup at approximately 550 °C cladding temperature. The results show that despite the complex chemical interactions between MA and AIM1 cladding elements, excessive FCCI was not induced, and Am penetration depth in the cladding limited to less than 4 µm. Np remained mostly inside fuel. The Zr-rich compounds layer effectively limited the accumulation of lanthanide on the inner cladding surface. Overall, the FCCI behavior between investigated MA-bearing U-Pu-Zr fuel and AIM1 cladding is benign.

Chemical interaction↗

Benefits from R. and D. for D. and D. projects - 15089

CEA (French Alternative Energies and Atomic Energy Commission) is both the operator of important nuclear facilities all over the nuclear cycle, in charge of major new built or D and D projects and a R and D group with dynamic policy of technology transfer: second in France for patents deposit, active partnership agreements with industries, and support for Start-ups. The position of CEA in D and D is unique because of the number and the wide diversity of facilities under decommissioning, with some high level of contamination. Innovative solutions are being developed in 6 main axes to protect the operators, to minimize the overall costs and the volumes of waste: - Investigations in the facilities - Radiological measurement of waste - Robotics, laser cutting devices, virtual reality to simulate and choose the best way to operate, - Decontamination of soils and structures - Waste treatment and conditioning - Methods and Information Technology (IT)Tools for project and waste management The last developments are shown and examples of industrial applications given: encapsulation of Magnesium or vitrification of high level waste for UP1 retreatment plant, treatment of sodium for Phenix fast breeder, treatment of organic liquids, etc. CEA is willing to share actions in partnership with other operators or with industrials so they can use the results for other contracting authorities. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Improvement in Thermal-Ionization Mass Spectrometry (TIMS) using Total Flash Evaporation (TFE) method for lanthanides isotope ratio measurements in transmutation targets

The experiments involved in the PHENIX french nuclear reactor to obtain precise and accurate data on the total capture cross sections of the heavy isotopes and fission products require isotopic ratios measurements with uncertainty of a few per mil. These accurate isotopic ratio measurements are performed with mass spectrometer equipped with multi-collector system. The major difficulty for the analyses of these actinides and fission products is the low quantity of the initial powder enclosed in steel container (3 to 5 mg) and the very low quantities of products formed (several {mu}g) after irradiation. Specific analytical developments are performed by Thermal Ionization Mass Spectrometry (TIMS) to be able to analyse several nanograms of elements with this technique. A specific method of acquisition named Total Flash Evaporation was adapted in this study in the case of lanthanide measurements for quantity deposited on the filament in the order of 2 ng and applied on irradiated fuel. To validate the analytical approach and discuss about the accuracy of the data, the isotopic ratios obtained by TIMS are compared with other mass spectrometric techniques such as Multiple-Collector Inductively Coupled Plasma Mass Spectrometer (MC-ICPMS). (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

New investigations of the Phenix negative reactivity events

In 1989 and 1990, four very fast and high amplitude decreases of the measured neutron flux, known as 'AURN' events, occurred in the Phenix fast neutron reactor and were not well explained despite a significant investigation program carried out in the 90 s. The perspective of the Phenix end of life led the French Nuclear Energy Div. to reinitiate AURN studies in particular with dedicated Phenix tests. It comes out from simulations with improved fluid-structure interaction model of the core movement that an outward movement of the sub-assemblies can generate a power variation consistent with the AURN signals. 'AURN' Phenix tests confirm the abnormal thermal behavior of an experimental sub-assembly, a new A URN scenario has been proposed on this basis. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Phenix Decommissioning Project - Overview

The first heading of your manuscript must be 'Introduction'. Phenix is the only remaining French fast breeder reactor after the shutdown of Superphenix (1999) and Rapsodie (1983). Phenix is located inside the Marcoule nuclear site along the Rhone river near Bagnols-sur-Ceze in southeastern France. Phenix is one of the facilities belonging the French Atomic Energy Commission (CEA) on the Marcoule site. It is a fast breeder reactor (FBR) developed at the end of the 1960's. that has been in operation since 1973 and was connected to the power grid in 1974. It is a second generation prototype developed while the first generation FBR, Rapsodie, was still in operation. Phenix is a 250 electrical MW power plant. During the first 20 years of operation, its main aim was to demonstrate the viability of sodium-cooled FBRs. Since the 1991 radioactive waste management act, Phenix has become an irradiation tool for the actinide transmutation program. To extend its operating life for 6 additional cycles, it was necessary to refurbish the plant; this involved major work performed from 1999 to 2003 at a total cost of about 250 M??. Today, with a realistic expectation, the final shutdown is planned for the beginning of 2009. The main objective of the Phenix dismantling project is to eliminate all the process equipment and clean all the building to remove all the radioactive zones. To reach this objective, three main hazards must be eliminated: Fuel (criticality hazard), Sodium, Radioactive equipment. The complexity of decommissioning a facility such as Phenix is increased by: - the lack of storage facility for high radioactive material, - the decision to treat all the radioactive sodium and sodium waste inside the plant, - the very high irradiation of the core structures due to the presence of cobalt alloys. On the other hand, Phenix plant is still under operating with a qualified staff and the radioactivity coming from structural activation is well known. After the final shutdown, the first operations will be conducted by the same staff under the same safety report. Another interesting fact is that the decommissioning funds project exist and are available. The CEA decided to begin the dismantling phase without waiting because after a period of decay it is not really cheaper or easier to work. This approach needs interim storage facilities not long after the final shutdown. For the low- and intermediate-level radioactive waste there are national storage centers but for the high-level wastes, each operator must manage its waste until a suitable disposal site is available. At Marcoule a new storage facility is now being designed and scheduled to begin operating after 2013-2014. After removal of the fuel and core elements, the primary sodium will be drained and eliminated by a carbonation process. To ensure biological shielding, the reference scenario calls for filling the primary vessel with water. The most radioactive structures (dia-grid and core support) will be cut up with remote tools, after which the rest of the structure will be cut up manually. Phenix contains about 1450 metric tons of sodium. The CEA initially planned to build ATENA, a new facility for all radioactive sodium waste from R and D and FBR facilities. For various reasons, but mainly to save money, the CEA decided to treat all radioactive sodium and sodium waste in the framework of the Phenix dismantling project. There are no real difficulties in the dismantling schedule because of the advanced state of development of the processes selected for the ATENA project. Because of the knowledge already obtained, the issues concern project management, waste management and human resources reduction more than technical 0014challe.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Phenix Power Plant Decommissioning Project - Removal of Core and Neutron Blanket Components

Phenix is a sodium-cooled fast neutron reactor located at the CEA's Rhone Valley Center where it was commissioned in 1974. It has an electric power rating of 250 MW and is operated jointly by the CEA and EDF. Its primary role today is to investigate the transmutation of long-lived radioactive waste into shorter-lived wasteform. Its final shutdown is scheduled for the beginning of 2009 in accordance with the reactor operating program with a mean availability of 80%. In this context the Phenix Power Plant Decommissioning Project was initiated in 2003. It covers the definitive cessation of plant operation and the dismantling (D and D) operations together with the final shutdown preparatory phase. The final shutdown phase corresponds to the initial operations undertaken to remove the maximum of hazardous materials. During this phase, subject to the standard operating methodological procedures, all the fuel in the plant will be removed and most of the other reactor core elements and other removable components (primary pumps, intermediate heat exchangers, control rod mechanisms, etc.) will be also dismantled and packaged in accordance with the available disposition routes. The core elements include fissile and fertile subassemblies, steel reflectors, and lateral neutron shielding rods. About half the lateral neutron shielding rods are accessible using the existing handling equipment; specific development work will be necessary to remove the others. Multiple engineering studies are in progress concerning the removal of the core elements. They address safety concerns taking into account thermal and seismic stresses, waste management including radiological characterization of the objects to be removed and the specification of suitable disposal routes (interim storage or disposal facilities), and scenario studies with the definition of each stage of the waste removal process. All these aspects are discussed in this paper. The feasibility of removing the core elements has been demonstrated with regard to handling and safety. A new handling arm is now being developed to remove the inaccessible core elements. The new earthquake safety calculations completed in 2006 did not reveal any insurmountable difficulties. Major work remains to characterize the core elements and determine the capacity of the disposition routes. The characterization program now in progress will validate the core element activation levels, but must be supplemented by a program to characterize the surface contamination from the primary sodium system. Concerning the disposition routes, several specific containers and shipping casks must be developed; engineering studies are now in progress to obtain the necessary approvals.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

R and D program for core instrumentation improvements devoted for French sodium fast reactors

Under the framework of French R and D studies for Generation IV reactors and more specifically for sodium-cooled fast reactors (SFR); the CEA, EDF and AREVA have launched a joint coordinated research programme. This paper deals with the R and D sets out to achieve better inspection, maintenance, availability and decommissioning. In particular the instrumentation requirements for core monitoring and detection in the case of accidental events. Requirements mainly involve diversifying the means of protection and improving instrumentation performance in terms of responsiveness and sensitivity. Operation feedback from the Phenix and Superphenix prototype reactors and studies, carried out within the scope of the EFR projects, has been used to define the needs for instrumentation enhancement. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Phenix Power Plant Decommissioning Project. Treatment of the Primary Cold Trap

Phenix is a sodium-cooled fast neutron reactor located at the CEA's Rhone Valley Center where it was commissioned in 1974. It has an electric power rating of 250 MW and is operated jointly by the CEA and EDF. Its primary role today is to investigate the transmutation of long-lived radioactive waste into shorter-lived wasteform. Its final shutdown is scheduled for the beginning of 2009. In this context the Phenix Power Plant Decommissioning Project was initiated in 2003. It covers the definitive cessation of plant operation and the dismantling (D and D) operations together with the final shutdown preparatory phase. The final shutdown phase includes the operations authorized within the standard operating methodological framework. The dismantling phase also comprises treatment of sodium-bearing waste and dismantling of the nuclear facilities (reactor block, shielded cells, etc.). Treatment of the Phenix primary cold trap is scheduled to begin in 2016. The analysis program includes the following steps: - Accurately determine the contamination in the trap by carrying out gamma spectrometry measurement campaigns from 2007 to 2013 (the remaining difficulty will be to accurately determine the distribution of the contamination). - Validate the safety studies for the ELA facility. This work is currently in progress; ELA will be commissioned following inactive qualification testing. - Proceed with cutting tests on the knit mesh filter, which are scheduled to begin in 2008.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Multiscale modelling of the phénix dissymmetric test benchmark

The Phenix sodium-cooled fast reactor contains two pools in which characteristic 3D effects like thermal stratification and jets play a significant role. One of the two active heat exchanger sets fails in the dissymmetric test, leading to changes in the thermal stratification and asymmetric conditions in the reactor. Therefore 3D modelling using Computational Fluid Dynamics codes (CFD) is required to model this transient in sufficient detail. However, several aspects of the reactor, like the core and the secondary side of the heat exchanger, can be modelled more efficiently by System Thermal-Hydraulics codes (STH). Therefore multiscale models are developed by coupling CFD and STH codes, exploiting the strengths of both codes in terms of modelling options and computational costs. The results provide insight in the local flow patterns and the temperature distribution during the dissymmetric transient. The results and modelling choices of the participants are compared in this paper and the main findings are discussed in the light of lessons learned from the blind phase of the benchmark and providing recommendations for future modelling of pool-type liquid metal-cooled reactors.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

PHENIX U.S.-Japan Collaboration Investigation of Thermal and Mechanical Properties of Thermal Neutron–Shielded Irradiated Tungsten

The United States and Japan have collaborated on fusion materials research in a series of agreements reaching back to 1981. The PHENIX collaboration is the latest U.S.-Japan project which spans 2013 to 2019 and has the goal of assessing technical feasibility of tungsten-based, helium-cooled plasma-facing component concepts for a demonstration fusion power reactor (DEMO). Task 2 within the PHENIX project is focused on evaluating the neutron irradiation effects in tungsten. For tungsten, the transmutation to Re and Os is at least as important to determining its properties after irradiation as the displacement damage, and the transmutation rate depends on the energy spectrum of the reactor. A large-scale, instrumented irradiation capsule with thermal neutron shielding to better mimic fusion conditions was irradiated in the High Flux Isotope Reactor (HFIR) at Oak Ridge National Laboratory. The tungsten specimens were irradiated in different temperature zones between 500°C and 1200°C to doses of ~0.2 to 0.7 displacements per atom. More than 20 varieties of pure tungsten and tungsten alloys were included in the irradiation, and they were evaluated in the 3025E hot-cell facility and at the Low Activation Materials Development and Analysis Laboratory. The elevated temperature tensile, fracture toughness, hardness, thermal conductivity, electrical resistivity, density, elemental composition, and microstructure properties of the irradiated materials are being collected. Furthermore, this paper overviews the experimental design, specimen matrix, and the initial results of postirradiation examinations.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Calculation of the Phenix end-of-life test in natural circulation with the CATHARE code

The Inst. of Radiological Protection and Nuclear Safety (IRSN) acts as technical support to French public authorities. As such, IRSN is in charge of safety assessment of operating and under construction reactors, as well as future projects. In this framework, one current objective of IRSN is to evaluate the ability and accuracy of numerical tools to foresee consequences of accidents. One of the advantages pointed up for fast reactors cooled by heavy liquid metal is the possibility of decay heat removal based on natural convection. The promotion of this passive cooling mode in future safety demonstrations will involve the use of adapted and validated numerical codes. After the final shutdown of the Phenix sodium cooled fast reactor in 2009, a set of tests covering different areas was conducted for code validation, including a natural circulation test in the primary circuit. Experimental data were issued by CEA to organize a benchmark exercise in the frame of an IAEA Coordinated Research Project (CRP), with the objective to assess the system-codes capability in simulating the thermal-hydraulics behavior of sodium cooled fast reactors in such accidental conditions. IRSN participated to this benchmark with the CATHARE code. This code, co-developed by CEA, EDF, AREVA and IRSN and widely used for PWR safety studies, was recently extended for sodium applications. This paper presents the CATHARE modeling of the Phenix primary circuit and the results obtained. A relatively good agreement was found with available measurements considering the experimental uncertainties. This work stressed the local aspects of phenomena occurring during the natural convection establishment and the limits of a 0D/1D approach. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Validation of miniature test specimens for post-irradiation thermal diffusivity measurement

Radioactivity levels for conventional thermal diffusivity test specimens are often prohibitively high for examination with candidate metallic materials, such as tungsten and reduced activation steels for fusion energy. Therefore, in the ongoing Japan–US PHENIX project, irradiation in the high flux isotope reactor (HFIR) was performed with the miniature specimen form of diameter (D) 3 mm × thickness (T) 1/2 mm small disk for thermal diffusivity measurement. In this study, the thermal diffusivity measurement of this miniature specimen is validated using a Netzsch LFA-467 ‘Hyper Flash’ thermal analyzer and ‘graphene nanoplatelets containing agent’. Finally, with careful surface treatment and data analysis, the miniature specimens showed almost the same value as the diameter 10 mm standard specimens.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Technology gap analysis on sodium-cooled reactor fuel handling system supporting advanced burner reactor development.

The goals of the Global Nuclear Energy Partnership (GNEP) are to expand the use of nuclear energy to meet increasing global energy demand in an environmentally sustainable manner, to address nuclear waste management issues without making separated plutonium, and to address nonproliferation concerns. The advanced burner reactor (ABR) is a fast reactor concept which supports the GNEP fuel cycle system. Since the integral fast reactor (IFR) and advanced liquid-metal reactor (ALMR) projects were terminated in 1994, there has been no major development on sodium-cooled fast reactors in the United States. Therefore, in support of the GNEP fast reactor program, the history of sodium-cooled reactor development was reviewed to support the initiation of this technology within the United States and to gain an understanding of the technology gaps that may still remain for sodium fast reactor technology. The fuel-handling system is a key element of any fast reactor design. The major functions of this system are to receive, test, store, and then load fresh fuel into the core; unload from the core; then clean, test, store, and ship spent fuel. Major requirements are that the system must be reliable and relatively easy to maintain. In addition, the system should be designed so that it does not adversely impact plant economics from the viewpoints of capital investment or plant operations. In this gap analysis, information on fuel-handling operating experiences in the following reactor plants was carefully reviewed: EBR-I, SRE, HNPF, Fermi, SEFOR, FFTF, CRBR, EBR-II, DFR, PFR, Rapsodie, Phenix, Superphenix, KNK, SNR-300, Joyo, and Monju. The results of this evaluation indicate that a standardized fuel-handling system for a commercial fast reactor is yet to be established. However, in the past sodium-cooled reactor plants, most major fuel-handling components-such as the rotatable plug, in-vessel fuel-handling machine, ex-vessel fuel transportation cask, ex-vessel sodium-cooled storage, and cleaning stations-have accumulated satisfactory construction and operation experiences. In addition, two special issues for future development are described in this report: large capacity interim storage and transuranic-bearing fuel handling.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

An overview of the activities carried out by the IAEA Technical Working Group on Fast Reactors

The Technical Working Group on Fast Reactors (TWG-FR) of the International Atomic Energy Agency (IAEA) is a group of experts to provide advice and support programme implementation, reflecting a global network of excellence and expertise in the area of advanced technologies and R and O for fast reactors and sub-critical hybrid systems. Consistent with its mandate, the TWG-FR assists in defining and carrying out the Agency's activities in the field of nuclear power technology development for fast reactors and sub-critical hybrid systems. It promotes the exchange of information on national and multi-national programmes and new developments and experience, with the goal to identify and review problems of importance and to stimulate and facilitate cooperation, development and practical application of fast reactors and sub-critical hybrid systems. Finally, the TWG-FR provides Member States with information about the current status and development trends of advanced technologies for fast reactors and sub-critical hybrid systems. The TWG-FR coordinates its activities with other IAEA projects and initiatives, especially those of the Technical Working Group on Nuclear Fuel Cycle Options (TWG-NFCO), the Dept. of Nuclear Safety and Security and, last but not least, the International Project on Innovative Nuclear Reactors and the Fuel Cycle INPRO. It also cooperates with FR-related initiatives implemented within the framework of other international programmes (e.g. GIF, OECD/NEA, ESNII, etc.). The paper presents the recent relevant activities of the TWG-FR as well as the status of the current Coordinated Research Projects jointly carried out by a number of organizations representing the various Member States within the TWG-FR. In particular they concern benchmark analyses of: - the sodium natural circulation tests performed during Phenix End-of-Life experiments; - the sodium natural convection in the upper plenum of the Monju reactor vessel; - an EBR-II Shutdown Heat Removal Test. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Thermal diffusivity of irradiated tungsten and tungsten-rhenium alloys

The Japan-US PHENIX project irradiated tungsten materials in the RB-19J capsule experiment in the High Flux Isotope Reactor (HFIR). A gadolinium (Gd) shielding was used to absorb the thermal neutrons and reduce rhenium and osmium generation in tungsten. Pure tungsten and K-doped W-3% Re samples were irradiated at 532 – 662 °C to dose of 0.21-0.46 dpa, with the grain orientation perpendicular or parallel to the disk surface. Thermal diffusivity measurements were performed from 100 °C to 500 °C. Furthermore, additional measurements followed after annealing up to 900 °C. Irradiated pure tungsten specimens showed similar thermal diffusivity results compared with an unirradiated W-1% Re specimen in another study. The transmutation amount of Re was calculated to be about 0.52% for those specimens that showed good agreement with this study. Specimens irradiated in this study to different doses presented almost the same thermal diffusivity. Annealing up to 800 °C resulted in no recovery of thermal diffusivity. These results show that the contribution of crystalline defects to degradation of thermal diffusivity is quite limited. In addition, the thermal diffusivity of the irradiated specimens was getting close to that of the unirradiated specimens at elevated temperature.

36 MATERIALS SCIENCE↗