At least 37 records · Page 2

Best Practices in Integrated Resource Planning: A guide for planners developing the electricity resource mix of the future

Most states today require regulated electric utilities to file an IRP every 1 to 5 years, and some utilities voluntarily prepare these plans. Planning needs have changed in recent years due to emerging load growth, plant retirements, rising costs, and more extreme weather events – among other factors. In response, Synapse Energy Economics and Lawrence Berkeley National Laboratory produced a joint report, Best Practices in Integrated Resource Planning: A guide for planners developing the electricity resource mix of the future. The guide offers best planning practices for electricity systems undergoing a major transition, but also contains a wealth of practical guidance to develop technically sophisticated, clearer, more effective, and state-of-the-art electric utility resource plans. The guide is for resource planning professionals and stakeholders involved in resource planning processes. This diverse group includes utility personnel tasked with conducting resource planning and making investment decisions, state regulatory commissions that develop planning guidance and oversee the resource planning process, and stakeholders that represent a wide range of interests—utility consumer advocates, environmental groups, industrial customers, local governments, independent power producers, and many other

29 ENERGY PLANNING, POLICY, AND ECONOMY

State Requirements for Electric Distribution System Planning

Utilities have conducted distribution planning since they first began building and operating electricity systems. But filing these plans for regulatory and stakeholder review is a relatively recent phenomenon. This report summarizes legislative and regulatory requirements for regulated electric utilities to file some type of distribution system plan in 20 U.S. jurisdictions. Some plans focus on expedited cost recovery for certain types of distribution system improvements; other plans focus on investments for grid modernization or distributed energy resources. Increasingly, states are adopting requirements for Integrated Distribution Plans. Such plans provide holistic grid investment strategies that address state and local policies and increasing complexity at the grid edge. The report covers the following topics for distribution system plans, highlighting advanced practices: -State goals and objectives -Procedural requirements -Forecasting loads and distributed energy resources -Hosting capacity analysis -Baseline information requirements -Grid modernization strategy -Grid needs assessment -Non-wires solutions -Reliability and resilience analyses -Stakeholder engagement -Equity -Pilots -Coordination with other planning processes The report includes links to legislation; regulatory requirements, proceedings, and orders; and filed utility plans. The U.S. Department of Energy’s Office of Electricity provided funding support.

24 POWER TRANSMISSION AND DISTRIBUTION

Research Reactors Division Infrastructure Investment Plan for the High Flux Isotope Reactor

The High Flux Isotope Reactor (HFIR) is a unique national asset. Operational for nearly 60 years, continued investment into the aging infrastructure is necessary to ensure operation for another 6 decades. Additionally, growing missions require HFIR as well as important upgrades. Consequently, carefully integrated planning is required to ensure that infrastructure investments are timely executed to ensure long-term, reliable operation of HFIR. Concerns about challenges to the operational reliability of HFIR resulted in a recommendation from the 2023 Operations Review by the US Department of Energy (DOE) Office of Basic Energy Sciences that a HFIR management strategy be developed to address the infrastructure needs. This report defines the investment needs, which are evolving as new upgrade efforts are better defined. HFIR is part of the three-source strategy within the Neutron Sciences Directorate (NScD) and contributes to the five strategic science areas outlined in the NScD 10 Year Strategic Science Plan: quantum materials, soft matter, materials and engineering, chemistry, and biosciences. Fundamental to this strategy are three core values: operational excellence, responsible stewardship, and servant leadership. These values guide our mission of safe and reliable operation of the reactor and require a strong and just nuclear safety culture, a solemn respect for responsible care of the facility, good workforce development, robust procedures and processes, an effective communication strategy, world-class asset management, a determined customer focus, and a commitment to protecting the environment, the safety and health of the public and our people, and the quality of work performed within our facility. These principles are all essential to operate HFIR at a world-class level. The Research Reactors Division (RRD) will lead a new era of neutron science and isotope production at HFIR through responsible and purposeful leadership and unwavering support of the science community. The approach outlined in this plan highlights the direction leadership is taking to ensure that HFIR is ready to support the science challenges and national needs of the future and that the United States maintains world leadership in neutron sciences. The plan is in alignment with the DOE’s desire to continue operating HFIR and with the NScD strategic science goals for the future. HFIR is an aging facility with numerous infrastructure challenges and needs. It has an aging workforce in relation to the general population of Oak Ridge National Laboratory (ORNL), with many expected retirements over the next 5–10 years. With an increase in work scope caused by changing national priorities and science goals, several critical hires have been identified. To manage HFIR’s infrastructure needs, a prioritized list of equipment upgrades has been identified along with an analysis of future staffing requirements. A desire to operate HFIR at eight cycles per year will necessarily require some significant changes to procedures and processes currently in place as well as targeted staffing additions. Many of the equipment upgrades identified in this plan will significantly increase the reliability of the plant, thus contributing to the effort to reach the goal of safely operating eight cycles per year. A plan to attain eight-cycle operation is being prepared in parallel with the activities identified in this plan, although the actions identified to satisfy both plans will overlap. This plan identifies new infrastructure needs—for both plant equipment and staffing—thus necessitating formulation of future budget requests to fund the increased work scope and improvement activities. Some activities are currently being scheduled with the expectation that funding will be received. Any delays to funding or reductions of funding from the identified cost estimations will directly and negatively affect the plan’s implementation.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS

Data-driven Community-centered Resilient Assessment and Planning Toolkit for Nexus of Energy and Water (DCRAPT-NEW)

Urban areas, including Detroit and Pittsburgh, have suffered significant dual outages of the electrical and water infrastructure in the past decade due, in part, to the increasing number of extreme weather events. With increasing temperatures and rainfall intensity, these regions need to prepare for increasing extreme events through community-based energy and water resilience analysis, planning, and enhancement. This project developed a suite of open-source, open-access, community-centered, data-driven assessment and distributed energy resource (DER) and planning tools for energy and water resilience enhancement in urban areas. Through establishing a multi-level community awareness and engagement mechanism and a comprehensive collection of power outage and flooding data, an innovative group of community energy and water resilience assessment and planning tools have been developed for a wide range of users with differing and variable sets of data available to them. The developed tools include (1) DOE EAGLE-I data-driven, deep-learning assisted resilience assessment and DER planning tools at the county level with socioeconomic factors incorporated; (2) Utility annual power outage data-driven tools for long term resilience assessment and DER planning and 15-min power outage data-driven tools for short term resilience assessment and planning; (3) Detailed engineering tools for energy and water systems resilience assessment and planning when the system topology and component fragility curves are available; (4) Alternative Resiliency Metric Calculation that extracts and separates outage and restoration processes; and (5) Co-optimization tools that evaluate the resilience of the power and sewage system and allow users to conduct joint planning with energy and wastewater systems. The developed tools provide planners, decision-makers, and stakeholders with powerful capabilities to systematically evaluate system/community resilience and optimal and actionable guidance for enhancing resilience while prioritizing DER investments. The tools have been used and validated in Detroit and Pittsburgh and can be used in other areas of the nation. In addition, this project will (1) advance the knowledge and applications of machine-learning methods in analyzing and fusing different layers of information and generating meaningful data points such as generating rare weather events; (2) significantly improve the energy and water resilience of the identified communities in Detroit and Pittsburgh and prepare for more frequent and severe weather conditions; (3) help communities assess extreme weather event impacts and address short-term and long-term resilience-related issues The developed tools have been made public via GitHub and demonstrated to community stakeholders and utility companies via the two annual workshops and numerous community engagement meetings. The project outcomes are also disseminated through publications in various journals and conference proceedings, and presentations at top conferences.

13 HYDRO ENERGY

Uruguay's Action Plan and Experience for Power Sector Decarbonization

A collaborative report from the Clean Energy Ministerial (CEM), Lessons Learned for Rapid Decarbonization of Power Sectors, was delivered to energy ministers and presented at the 13th CEM (CEM13) in the United States in September 2022. In light of these lessons learned and discussed at CEM13, several jurisdictions signaled intent to develop Action Plans for power sector decarbonization. The first cohort of Action Plans was released at CEM14 in India in July 2023. The Uruguay Ministry of Industry, Energy and Mining is pleased to release this Action Plan as a contribution to the second cohort of Action Plans released at CEM15 in Brazil in October 2024. The Action Plans, supported by the 21st Century Power Partnership, and other CEM workstreams via direct technical assistance and capacity building, are intended to focus on select implementation actions given each country's existing power sector goals and activities, and are an opportunity for countries to display leadership in power sector decarbonization. The Action Plans are organized in a framework for planning, building, and operating, as well as stakeholder engagement where appropriate based on country priorities. They complement, but are differentiated from, other international power sector initiatives such as the Breakthrough Agenda (whose broad purpose is to raise collective ambition) and the Global Power System Transformation Consortium (whose goals are to convene power system operators to accelerate research innovations and foster peer learning). These Action Plans are voluntary, developed by each country individually, not comprehensive of all activities within the jurisdiction, and are living documents that are subject to change.

21st Century Power Partnership

Investigating the effects of cooperative transmission expansion planning on grid performance during heat waves with varying spatial scales

There is growing recognition of the advantages of interregional transmission capacity to decarbonize electricity grids. A less explored benefit is potential performance improvements during extreme weather events. This study examines the impacts of cooperative transmission expansion planning using an advanced modeling chain to simulate power grid operations of the United States Western Interconnection in 2019 and 2059 under different levels of collaboration between transmission planning regions. Two historical heat waves in 2019 with varying geographical coverage are replayed under future climate change in 2059 to assess the transmission cooperation benefits during grid stress. The results show that cooperative transmission planning yields the best outcomes in terms of reducing wholesale electricity prices and minimizing energy outages both for the whole interconnection and individual transmission planning regions. Compared to individual planning, cooperative planning reduces wholesale electricity prices by 64.3 % and interconnection-wide total costs (transmission investments + grid operations) by 34.6 % in 2059. It also helps decrease greenhouse gas emissions by increasing renewable energy utilization. However, the benefits of cooperation diminish during the widespread heat wave when all regions face extreme electricity demand due to higher space cooling needs. Despite this, cooperative transmission planning remains advantageous, particularly for California Independent System Operator with significant diurnal solar generation capacity. This study suggests that cooperation in transmission planning is crucial for reducing costs and increasing reliability both during normal periods and extreme weather events. It highlights the importance of optimizing the strategic investments to mitigate challenges posed by wider-scale extreme weather events of the future.

24 POWER TRANSMISSION AND DISTRIBUTION

Generative large language models for predictive maintenance planning

Maintenance planning and the generation of necessary components for tasks can prove time-consuming and complex. Automating the creation of recurring or similar tasks by leveraging previous planning packages and data, while uncovering insights to automate planning package generation, presents an opportunity to conserve valuable time and resources. This work aims to harness the textual and probabilistic capabilities of large language models (LLMs) to automate the generation of planning packages. Utilizing diverse data sources ranging from raw data to handwritten text, both singular and collaborative LLMs are trained and tested. Results demonstrate their capability to generate essential planning package components, effectively replicating the statistical patterns in the data. This demonstrates the use of these tools inside a digital asset for automated planning. This work outlines a methodology for constructing datasets, a training suite, and evaluation methods for LLM-based textual and conversational planning tools utilized in an asset digital twin. Results indicate that the fine-tuned models generate estimated planning information within the statistical ranges observed in real maintenance data. The models achieve high accuracy (>90%) in document question-answering and instruction generation tasks. Furthermore, the conversational retrieval-augmented generation (RAG) assistant system achieves 100% document retrieval accuracy, while conversational information capture exceeds 98% across the majority of work-package assistant modules.

97 MATHEMATICS AND COMPUTING

Brazil's Action Plan for Rapid Decarbonization of Power Sectors

A collaborative report from the Clean Energy Ministerial (CEM) on Lessons Learned for Rapid Decarbonization of Power Sectors was delivered to energy ministers and presented at the CEM13 in the United States in September 2022. In light of these lessons learned and discussed at CEM13, several jurisdictions signaled intent to develop Action Plans for power sector decarbonization. The first cohort of Action Plans was released at CEM14 in India in July 2023. The second cohort of action plans will be presented at CEM15 in Brazil. The Action Plans, supported by the 21st Century Power Partnership, and other CEM workstreams via direct technical assistance and capacity building, are intended to focus on select implementation actions, given each country's existing power sector goals and activities, and are an opportunity for countries to display leadership in power sector decarbonization. The Action Plans are organized in a framework for Planning, Building and Operating, as well as Stakeholder Engagement where appropriate based on country priorities. They complement, but are differentiated from, other international power sector initiatives such as the Breakthrough Agenda (whose broad purpose is to raise collective ambition) and the Global Power System Transformation Consortium (whose goals are to convene power system operators to accelerate research innovations and foster peer learning). These Action Plans are voluntary, developed by each country individually, not comprehensive of all activities within the jurisdiction, and are living documents that are subject to change.

21st Century Power Partnership

Illinois Storage Corridor CarbonSAFE Phase III: Stakeholder Engagement and Outreach Plan

The Stakeholder Engagement and Outreach Plan provides a comprehensive framework for engaging stakeholders of the Illinois Storage Corridor (ISC) project. The ISC project is a CarbonSAFE Phase III project designed to facilitate commercial deployment of carbon capture, utilization, and storage (CCUS) in Illinois. The project aims to establish a multi-industry carbon storage corridor through development of storage sites near the One Earth Energy (OEE) ethanol production facility in north-central Illinois and the Prairie State Generating Company (PSGC) coal-fired power plant in south-central Illinois, with combined annual CO 2 capture ultimately exceeding 8.6 million tons per year. Stakeholder engagement is recognized as a critical component for successful CCUS deployment, alongside technical and economic considerations. As an emerging technology, CCUS may not be well understood by the general population, and lack of public awareness can lead to opposition that poses significant barriers to project development. This plan addresses this challenge through systematic stakeholder identification, analysis, planning, and implementation of engagement actions. The plan is structured around four main sections: Communication, Stakeholder Analysis, Stakeholder Engagement, and Environmental Justice. Activities will be conducted under Tasks 1 and 4 of the project's Statement of Project Objectives, with two key subtasks: (1) developing a stakeholder analysis and engagement plan through face-to-face meetings, facilitated discussions, and surveys; and (2) implementing stakeholder engagement and public outreach activities including meetings, open houses, and permit hearings. The Illinois State Geological Survey (ISGS) will manage engagement activities following DOE-NETL best practices, focusing on providing objective, fact-based information about CCUS and the ISC project. A comprehensive Communication Plan establishes protocols for media contacts, site visits, and crisis communications. The stakeholder analysis follows a structured workflow process divided into Pre-feasibility and Feasibility phases, incorporating contextual understanding, assessment, data collection, and analysis. Key stakeholder groups include government bodies, educational organizations, conservation and environmental groups, agricultural communities, and religious organizations. The plan addresses common stakeholder questions regarding project risks, benefits, safety, property values, liability, and environmental impacts. Recommendations emphasize developing clear messaging, creating informational materials, and preparing to address both project-specific and broader environmental concerns to ensure transparent communication and build stakeholder support throughout project implementation.

25 ENERGY STORAGE

Underground Test Area (UGTA) Sampling Plan for Corrective Action Units 101 and 102: Central and Western Pahute Mesa, Nevada National Security Site, Nevada, Revision 2

The purpose of this groundwater sampling plan (referred to herein as “the Plan”) is to describe the approach for collecting and analyzing groundwater samples to meet the objectives of the U.S. Department of Energy (DOE), Environmental Management (EM) Nevada Program’s Underground Test Area (UGTA) Activity. The Plan is focused on the Central and Western Pahute Mesa corrective action units (CAUs 101 and 102), which are currently in the Corrective Action Decision Document (CADD)/Corrective Action Plan (CAP) stage of the Federal Facility Agreement and Consent Order (FFACO) UGTA Strategy. The remaining UGTA CAUs are in the final stage of the UGTA strategy (Closure Report [CR] stage), and monitoring requirements for these CAUs are described in the Federal Facility Agreement and Consent Order Nevada National Security Site Use Restriction Management Plan (DOE/EMNV, 2024a). The Plan supersedes the Nevada National Security Site Integrated Groundwater Sampling Plan and its ensuing Record of Technical Change (ROTC) (DOE/EMNV, 2019b).

54 ENVIRONMENTAL SCIENCES

Coordinated Natural Gas and Electric Planning: Case Studies of Current Approaches and Practices

This paper examines how natural gas and electric utilities across eight U.S. states and two Canadian provinces are beginning to coordinate historically separate planning processes in response to growing system interdependencies, policy mandates, aging infrastructure, and changing customer energy choices. Electricity planning has long relied on robust integrated resource planning frameworks that weigh numerous objectives, risks, and costs. Natural gas planning, on the other hand, is typically less transparent and more narrowly focused on safety and system integrity. As economic, reliability, and policy drivers place new and shared demands on both systems, jurisdictions and utilities are experimenting with approaches such as coordinated forecasting, non pipeline alternatives, and combined planning pilots. A few have issued regulatory or statutory directives for greater data sharing and methodological alignment. Case studies from British Columbia, California, Colorado, Illinois, Massachusetts, Minnesota, New York, Québec, Rhode Island, and Washington illustrate a wide range of approaches to rethinking siloed planning. The paper identifies several common themes across the jurisdictions examined. It provides observations on the methods, processes, and organizational steps that may be needed in the future to address the challenges being faced by states and utilities. Lastly, it identifies some initial steps that states and utilities can consider if they would like to pursue more integrated, cost-effective, policy-aligned energy system planning.

03 NATURAL GAS

Cooperation in Transmission Expansion Planning: Enhancing Grid Reliability and Efficiency Under a Changing Climate

Electricity grids are challenged to maintain reliability during more intense and frequent extreme weather events due to climate change. This challenge is exacerbated by multi-sector electrification and power sector decarbonization through increased reliance on variable renewable energy, which necessitates the expansion of transmission infrastructure. However, transmission expansion planning is often complicated by intertwined planning authorities and jurisdictions, and allocation of large capital investment needs. These factors cause authorities to manage transmission investments individually (i.e., only/mostly intraregional planning), which can lead to suboptimal transmission networks. This study investigates the potential benefits of cooperative transmission expansion planning (i.e., both intraregional and interregional planning that optimizes transmission investments across the entire physical system). Using sectoral and economic optimization, and machine learning models, it analyzes the impact of different levels of cooperation among transmission planning regions within U.S. Western Interconnection in 2019 and 2059 via an iterative investment process. Furthermore, it examines the effects of future climate change on transmission cooperation by simulating historical heat waves from 2019 under conditions of 2059. The results indicate that cooperative transmission planning leads to lower wholesale electricity prices, decreased energy outages, and reduced greenhouse gas emissions. However, the advantages of collaboration diminish during widespread heat waves, despite remaining beneficial especially for regions like California Independent System Operator with substantial solar installations. The study underscores the importance of transmission cooperation in reducing costs and enhancing reliability, emphasizing the need for strategic investments in storage to address challenges posed by future extreme weather events with varying spatial scales.

Capacity Expansion Model

A product data network to enable faster, easier, and better planning of building envelopes

The building envelopes contributes significantly to the energy-efficiency of the building. Building performance simulation has made it possible to compare façade technologies regarding energy demand, daylighting, thermal and visual comfort in detail. Planners, such as architects and engineers, need experience to find product data with the right quality and level of detail, and to process the data to fit the calculation and the application. In the available time, planners can compare only a limited number of products, which means that better solutions could go unnoticed. This paper presents a new concept for making product data easily accessible for building façade planning. The concept consists of a network of databases for the efficient exchange and use of optical and calorimetric data of glazing units, shading devices, and combinations of both. The paper presents the research questions, an analysis of the current challenges, six design goals for the product data network and its implementation together with a discussion. Many product data sources can be connected to many planning software applications via the specified application programming interface. When planning software connects to the product data network, the planning of building envelopes can be much faster because planners do not need to spend so much time to search and process product data manually. The planning of building envelopes can also become much easier, especially for planners with limited experience. They do not need to understand all the details about which data fits which calculation if the software company implements this. The planning of building envelopes can become much more reliable when software companies validate their use of the product data network, because the current manual process is prone to errors. The planning of building envelopes can also improve because more products can be compared in the available time, allowing better solutions to be found.

Maurer, Christoph

Carbon Transport and Storage Planning and Viability Support Tools

The EDX disCO2ver Carbon Transport and Storage Planning and Viability Support Tools are made up of the Carbon Storage Planning Inquiry Tool (CS PlanIT, Justman et al. 2024) and the Carbon Storage Technical Viability Approach Support Tool (CS TVA). Together, these tools support data access to support understanding data availability to support planning efforts for carbon transport and storage. The Carbon Storage Planning Inquiry Tool (CS PlanIT) is an online web mapping application designed to help users explore, query, and evaluate multiple data layers to support and accelerate carbon storage resource and feasibility assessments and planning efforts. CS PlanIT currently contains a range of datasets associated with geologic, technical, and infrastructure factors. The data sets can be filtered geographically for an area of interest to update statistics and charts within the dashboard. The dashboard is divided into different sections called widgets, relating to different steps in the carbon storage planning process. The resources in this submission include a link to PlanIT, as well as a data catalog and link to user documentation. The original citation for the CS PlanIT tool, which has now been integrated into the toolset here, was: - Devin Justman, Scott Pantaleone, Maneesh Sharma, Lucy Romeo, Paige Morkner, CS PlanIT (Carbon Storage Planning Inquiry Tool) , 6/28/2024, https://edx.netl.doe.gov/dataset/cs-planit-carbon-storage-planning-inquiry-tool, DOI: 10.18141/2377953 The Carbon Storage Technical Viability Approach Support (CS TVA) Tool displays spatial data availability for the many components of Geologic Carbon Storage (GCS) technical viability assessment (Creason al 2025). Identifying sites suitable for GCS requires evaluating the intersection of myriad factors, including reservoir conditions, subsurface and surface hazards, infrastructure requirements, and energy community metrics. The technical viability of a site can only be confirmed for instances where all these factors have data available, and where those data support viability. Additional Resources related to the Technical Viability Assessment Tool: - Julia Mulhern, Casey White, Araceli Lara, Neyda Cordero Rodriguez, Zachary Jackson, Jacob Shay, Gabriel Creason, MacKenzie Mark-Moser, Paige Morkner, Kelly Rose, Carbon Storage Technical Viability Approach (CS TVA) Database, 3/26/2025, https://edx.netl.doe.gov/dataset/edx4ccs-carbon-storage-technical-viability-approach-database , DOI:10.18141/1984655 - Julia Mulhern, MacKenzie Mark-Moser, Gabriel Creason, Casey White, Araceli Lara, Neyda Cordero Rodriguez, Zach Jackson, Paige Morkner, Kelly Rose, Carbon Storage Technical Viability Approach (CS TVA) Matrix, 3/27/2025, https://edx.netl.doe.gov/dataset/carbon-storage-technical-viability-approach-cs-tva-matrix , DOI: 10.18141/2539979 - Gabriel Creason, Zach Jackson, Neyda Cordero Rodriguez, Julia Mulhern, Casey White, Araceli Lara, MacKenzie Mark-Moser, Paige Morkner, Kelly Rose, Carbon Storage Technical Viability Approach (CS TVA) Data Availability Results Database, 3/27/2025, https://edx.netl.doe.gov/dataset/carbon-storage-technical-viability-approach-cs-tva-data-availability-results-database, DOI:10.18141/2538557

Carbon storage

Preliminary Workforce Development and Environmental and Co-use Management Plans for a Floating Offshore Wind Platform - CRADA 609 (Final Report)

Pacific Northwest National Laboratory (PNNL) provided technical assistance to Glosten, Inc. and its affiliate, PelaStar, LLC to advance the development of their floating offshore wind (FOSW) platform. PNNL provided guidance and assessment in two areas that are important to address in the development of FOSW platforms: (1) workforce development and (2) environmental impacts and ocean co-use considerations. This work was funded by the U.S. Department of Energy’s (DOE) Wind Energy Technologies Office (WETO) through Phase 2 of the FLoating Offshore Wind ReadINess (FLOWIN) Prize. It should be noted that the Plans presented in this report are specific to the PelaStar tension-leg platform (TLP) and may not be applicable to all FOSW platforms. Workforce development and environmental/co-use impacts are highly dependent on the geographical region in which activities take place. At the request of PelaStar, PNNL focused on two regions where development may take place: the Gulf of Maine and Northern California. PNNL generated a preliminary Workforce Development Plan for PelaStar, which includes estimated job numbers and skillsets required to establish a workforce to manufacture, install, and operate their platform as part of FOSW projects. The Plan offers methods to increase diversity, equity, and inclusion practices when developing a new workforce and includes colleges and training centers for potential recruitment. Both positive and negative impacts to communities are evaluated, with potential mitigation strategies for reducing negative impacts. The structure of Community Benefit Agreements and Project Labor Agreements are discussed, noting the limitations of the role of a platform manufacturer versus the offshore wind developer. PNNL also drafted a preliminary Environmental and Co-Use Management Plan that serves as a guide to preparing an environmental assessment related to the installation and operation of PelaStar’s unique TLP design, including its potential ecological, socioeconomic, and emissions impacts. The Plan summarizes information on relevant regulatory requirements, potential impact producing factors, monitoring and mitigation measures, and physical and biological resources in the Gulf of Maine and Northern California. One of the primary perceived benefits of the PelaStar TLP is its reduced footprint due to its tensioned tendons versus catenary or taut moorings, but more research must be done as there are no studies on PelaStar’s TLP system to-date. The section also highlights ocean co-use considerations for PelaStar’s TLP system, specifically for fisheries, including existing perspectives, methods, examples, and limitations. The PNNL team established through this preliminary work and review of available literature and resources that there is not yet much research or planning around FOSW. With FOSW being a new industry, many of the findings and planning are adapted from fixed bottom offshore wind, which itself is only just taking off in the United States. More research is needed to establish best practices for workforce development and to assess environmental and ocean co-use impacts and mitigation approaches.

17 WIND ENERGY

ARM FY2026 Radar Plan

The U.S. Department of Energy (DOE) Atmospheric Radiation Measurement (ARM) User Facility maintains a suite of advanced atmospheric radar systems that serve as critical tools in ARM’s mission to provide continuous, high-quality observations for advancing the understanding and modeling of atmospheric processes. These radar systems enable detailed characterization of clouds, precipitation, and dynamic structures in the atmosphere, supporting a broad range of scientific applications. The number of deployed systems exceeds what current staffing levels can fully support for continuous 24/7/365 operation. As such, it is essential to have a clearly defined and community-informed plan that prioritizes radar operations and communicates ARM’s strategy for sustaining and evolving these observational assets. This FY2026 Radar Plan outlines ARM’s approach to managing its radar portfolio—balancing scientific impact, operational feasibility, and long-term sustainability. It reflects ARM’s continued commitment to delivering calibrated, well-documented radar data products that enable process-level studies and support the development and evaluation of weather and climate models. Through this plan, ARM aims to ensure transparency in decision-making, alignment with user needs, and support for innovative science across the facility’s fixed and mobile observatories. Given uncertainties around the Fiscal Year (FY) 2026 budget, this plan was developed to assume business as usual and will be updated as budgets and plans may change. It should be noted that, given the limited timeframe involved, this plan will be more succinct than previous plans.

47 OTHER INSTRUMENTATION

Distribution System Plan Template and Guide for Electric Utilities for Adaptation by States and Utilities [Slides]

LBNL researchers developed a template and companion guide for structuring distribution system plans. The template covers 10 key sections in utility distribution system plans and underlying topics: -Executive Summary -Planning Objectives -Current Distribution System -Planning Approach -Asst Management, Reliability and Resilience -O&M Expenses -Capacity Expansion Planning -Solution Identification -Cost-effectiveness -Implementation For each section in the template, the companion guide provides: a description of the topics covered and their importance; the type of content to include in the plan; an example utility approach; and references to other utility plans that serve as models for the topic.

24 POWER TRANSMISSION AND DISTRIBUTION

Energy Baseline Assessment and Project Considerations for the Wai'anae Moku Community Energy Plan

This report was prepared as a supplement to the Waianae moku community's energy plan and includes results of two activities conducted by the National Laboratory of the Rockies in support of the planning process: (1) an energy baseline assessment and (2) considerations and resources for possible energy projects prioritized by the community in its energy plan. Results of the energy assessment describe the energy landscape in the state of Hawaii, on the island of Oahu, and in the Waianae moku at the time the plan was developed, with the intention of supporting informed community participation in the planning process. Considerations and resources align with each of the energy project ideas identified in the community's energy plan, and are intended to describe the current context and activities related to each, along with possible next steps toward implementation, and additional resources. The report concludes with takeaways for the community to consider as they pursue their energy goals.

29 ENERGY PLANNING, POLICY, AND ECONOMY