PLUTONIUM-238 PRODUCTION TARGET DESIGN STUDIES

A new supply chain is planned for plutonium-238 using existing reactors at the Oak Ridge National Laboratory (ORNL) and Idaho National Laboratory (INL) and existing chemical recovery facilities at ORNL. Validation and testing activities for new irradiation target designs have been conducted in three phases over a 2 year period to provide data for scale-up to production. Target design, qualification, target fabrication, and irradiation of fully-loaded targets have been accomplished. Data from post-irradiation examination (PIE) supports safety analysis and irradiation of future target designs.

hfir↗

Decommissioning, Dismantling and Disarming: a Unique Information Showroom Inside the G2 Reactor at Marcoule Centre (France) - 12068

The paper aims at presenting the new information showroom called 'Escom G2' (for 'Espace Communication') inaugurated by the French Atomic Energy and Alternative Energies Commission (CEA) in spring 2011. This showroom is settled directly inside the main building of the G2 nuclear reactor: a facility formerly dedicated to weapon-grade plutonium production since the late 1950's at the Marcoule nuclear centre, in south of France. After its shutdown, and reprocessing of the last spent fuels, a first dismantling step was successfully completed from 1986 to 1996. Unique in France and in Europe, Escom G2 is focused on France dismantling expertise and its action for disarmament. This showroom comprises of a 300-square meters permanent exhibition, organized around four themes: France strategy for disarmament, decommissioning and dismantling technical aspects, uranium and plutonium production cycles. Each of these topics is illustrated with posters, photos, models and technical pieces from the dismantled plants. It is now used to present France's action in disarmament to highly ranked audiences such as: state representatives, diplomats, journalists... The paper explains the background story of this original project. As a matter of fact, in 1996 France was the first nuclear state to decide to shut down and dismantle its fissile material production facilities for nuclear weapons. First, the paper presents the history of the G2 reactor in the early ages of Marcoule site, its operating highlights as well as its main dismantling operations, are presented. In Marcoule, where the three industrial-scale reactors G1, G2 and G3 used to be operated for plutonium production (to be then reprocessed in the nearby UP1 plant), the initial dismantling phase has now been completed (in 1980's for G1 and in 1996 for G2 and G3). The second phase, aimed at completely dismantling these three reactors, will restart in 2020, and is directly linked to the opening of a future national storage facility for irradiated graphite waste. Then, the paper recalls communication events and official visits hosted in Pierrelatte and Marcoule, following a formal invitation from the French President Mr. Nicolas Sarkozy. These visits, which were organized in order to illustrate the irreversibility of these dismantling operations, allowed visitors to discovers places that used to be former highly classified areas. Three official visits were organized in 2008 and 2009 for representatives of the Conference on Disarmament Member States, non-governmental experts and journalists. All participants visited the dismantled uranium enrichment plant in Pierrelatte, the G2 reactor and the UP1 plant in Marcoule. The visits were successful and visitors were especially impressed by the G2 reactor and its massive industrial architecture, symbolic of the early ages of nuclear history. In late 2010, this feedback convinced CEA Military Application Directorate (CEA DAM) that a permanent showroom could be installed inside the reactor, making it possible to preserve the cultural value of this historical landmark, and to continue its ongoing effort of communication and outreach. The paper explains the design of this concept: the museography project with a professional designer, the communication material conception and the features of such an original place. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Baseline process description for simulating plutonium oxide production for precalc project

Savannah River National Laboratory (SRNL) started a multi-year project, the PreCalc Project, to develop a computational simulation of a plutonium oxide (PuO 2 ) production facility with the objective to study the fundamental relationships between morphological and physicochemical properties. This report provides a detailed baseline process description to be used by SRNL personnel and collaborators to facilitate the initial design and construction of the simulation. The PreCalc Project team selected the HB-Line Plutonium Finishing Facility as the basis for a nominal baseline process since the facility is operational and significant model validation data can be obtained. The process boundary as well as process and facility design details necessary for multi-scale, multi-physics models are provided.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

ORNL automates key process in plutonium-238 production

Oak Ridge National Laboratory scientists have automated part of the process of producing plutonium-238, which is used by NASA to fuel deep space exploration. Resolving this key bottleneck will help boost annual production of the radioisotope towards NASA’s goal of 1.5 kilograms of Pu-238 per year by 2025.

07 ISOTOPE AND RADIATION SOURCES↗

Long-term stewardship - surveillance and maintenance at Hanford - 15155

In FY 2015, Hanford's Long-Term Stewardship (LTS) Program is tasked to complete the required entries into five cocooned plutonium production reactors (105-C, 105-D, 105-F, 105-H and 105-N), which sit adjacent to the Columbia River. The first reactor entered in October 2014, the cocooned plutonium production reactor, 105-F, signaled the LTS Program's entry into the Surveillance and Maintenance (S and M) era. Reactor entries at Hanford are conducted at 5-year intervals to assess the condition of the structures and evaluate potential deterioration of the reactor core, shield walls and roof. The cocooned structures are designed to protect the reactor core for up to 75 years while radioactive decay continues, ultimately making the structures safe for demolition and removal. The 105-F entry demonstrates that the LTS program at Hanford is shifting from a program focused on transitioning cleaned up land and waste sites to a program focused primarily on S and M activities. The entry process is carefully planned, choreographed and monitored to ensure safety of the workers and minimize the time the reactor structure is opened. The process includes controlled opening of the reactor, air quality monitoring, structural safety inspections, and radiological clearance. Once the structure is cleared for entry, assessments of the structural integrity and radiologic conditions are completed. Evaluation of the interior temperature and flood monitoring equipment is conducted. Facility visits by regulators and DOE personnel close out the process prior to welding the door closed until the next assessment, five years later. This paper will document execution of the entry work package, identify challenges overcome, and provide video documentation as reference material for future workers and the public. The current LTS program has responsibility for approximately 100,000 acres, over 200 waste sites and six cocooned reactors. Just over 5,600 documents have been identified, indexed and tagged for storage in the LTS document library. The program has successfully completed seven consecutive transitions since July 2011, with six more transitions planned in the next 18 months to support the U.S. Department of Energy Richland Operations Office's (DOE-RL) near-term cleanup objectives to significantly reduce the footprint of active cleanup operations for the River Corridor. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Development of the generation III (ATR generation I) Plutonium-238 production target design

A domestic supply chain to produce 238 Pu fuel for radioisotope thermoelectric generators is critical for enabling future space exploration. A multi-laboratory effort has worked to establish a common target design to efficiently produce 238 Pu in two research reactors. This approach ensures that the annual production goals set forth by NASA are met, while also establishing redundant production capabilities. Here, this paper describes the effort to develop the common target design as well as considerations for future applications for the irradiation platform.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Preserving Plutonium-244 as a National Asset

Plutonium-244 (244 Pu) is an extremely rare and long-lived isotope of plutonium with a half-life of 80 million years. Measureable amounts of 244 Pu are found in neither reactor-grade nor weapons-grade plutonium. Production of this isotope requires a very high thermal flux to permit the two successive neutron captures that convert 242 Pu to 243 Pu to 244 Pu, particularly given the short (about 5 hour) half-life of 243 Pu. Such conditions simply do not exist in plutonium production processes. Therefore, 244 Pu is ideal for precise radiochemical analyses measuring plutonium material properties and isotopic concentrations in items containing plutonium. Isotope dilution mass spectrometry is about ten times more sensitive when using 244 Pu rather than 242 Pu for determining plutonium isotopic content. The isotope can also be irradiated in small quantities to produce superheavy elements. The majority of the existing global inventory of 244 Pu is contained in the outer housing of Mark-18A targets at the Savannah River Site (SRS). The total inventory is about 20 grams of 244 Pu in about 400 grams of plutonium distributed among the 65 targets. Currently, there are no specific plans to preserve these targets. Although the cost of separating and preserving this material would be considerable, it is trivial in comparison to new production costs. For all practical purposes, the material is irreplaceable, because new production would cost billions of dollars and require a series of irradiation and chemical separation cycles spanning up to 50 years. This paper will discuss a set of options for overcoming the significant challenges to preserve the 244 Pu as a National Asset: (1) the need to relocate the material from SRS in a timely manner, (2) the need to reduce the volume of material to the extent possible for storage, and (3) the need to establish an operational capability to enrich the 244 Pu in significant quantities. This paper suggests that if all the Mark-18A plutonium is separated, it would occupy a small volume and would be inexpensive to store while an enrichment capability is developed. Very small quantities could be enriched in existing mass separators to support critical needs.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Central plateau remediation optimization study

The Central Plateau is a 195-km2 (75 mi 2 ) area located in the center of the 1,517 km2 (586 mi 2 ) Hanford Site in south central Washington State (Figure ES-1). The Hanford Site was established in 1943 and was originally designed, built, and operated to produce plutonium for nuclear weapons. During World War II, plutonium production reactors were constructed along the Columbia River. Separations facilities (canyon buildings) were constructed in the Central Plateau to chemically extract plutonium from irradiated fuel. While plutonium production continued at the Hanford Site through the 1980s, additional mission activities, such as energy research/development and isotope separation, began in the 1950s. The Hanford Site mission, managed by the US Department of Energy (DOE) is now focused on treatment of wastes generated during past operations, and the cleanup of excess facilities and environmental contamination to mitigate impacts to human health and the environment. On the Central Plateau, there are hundreds of currently active and excess facilities and more than 1,000 soil waste sites and pipelines that will require remediation as part of final cleanup.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Studies of Plutonium-238 Production at the High Flux Isotope Reactor

The High Flux Isotope Reactor (HFIR) at Oak Ridge National Laboratory (ORNL) is a versatile 85 MW{sub th}, pressurized, light water-cooled and -moderated research reactor. The core consists of two fuel elements, an inner fuel element (IFE) and an outer fuel element (OFE), each constructed of involute fuel plates containing high-enriched-uranium (HEU) fuel ({approx}93 wt% {sup 235}U/U) in the form of U{sub 3}O{sub 8} in an Al matrix and encapsulated in Al-6061 clad. An over-moderated flux trap is located in the center of the core, a large beryllium reflector is located on the outside of the core, and two control elements (CE) are located between the fuel and the reflector. The flux trap and reflector house numerous experimental facilities which are used for isotope production, material irradiation, and cold/thermal neutron scattering. Over the past five decades, the US Department of Energy (DOE) and its agencies have been producing radioisotope power systems used by the National Aeronautics and Space Administration (NASA) for unmanned, long-term space exploration missions. Plutonium-238 is used to power Radioisotope Thermoelectric Generators (RTG) because it has a very long half-life (t{sub 1/2} {approx} 89 yr.) and it generates about 0.5 watts/gram when it decays via alpha emission. Due to the recent shortage and uncertainty of future production, the DOE has proposed a plan to the US Congress to produce {sup 238}Pu by irradiating {sup 237}Np as early as in fiscal year 2011. An annual production rate of 1.5 to 2.0 kg of {sup 238}Pu is expected to satisfy these needs and could be produced in existing national nuclear facilities like HFIR and the Advanced Test Reactor (ATR) at the Idaho National Laboratory (INL). Reactors at the Savannah River Site were used in the past for {sup 238}Pu production but were shut down after the last production in 1988. The nation's {sup 237}Np inventory is currently stored at INL. A plan for producing {sup 238}Pu at US research reactor facilities such as the High Flux Isotope Reactor at ORNL has been initiated by the US DOE and NASA for space exploration needs. Two Monte Carlo-based depletion codes, TRITON (ORNL) and VESTA (IRSN), were used to study the {sup 238}Pu production rates with varying target configurations in a typical HFIR fuel cycle. Preliminary studies have shown that approximately 11 grams and within 15 to 17 grams of {sup 238}Pu could be produced in the first irradiation cycle in one small and one large VXF facility, respectively, when irradiating fresh target arrays as those herein described. Important to note is that in this study we discovered that small differences in assumptions could affect the production rates of Pu-238 observed. The exact flux at a specific target location can have a significant impact upon production, so any differences in how the control elements are modeled as a function of exposure, will also cause differences in production rates. In fact, the surface plot of the large VXF target Pu-238 production shown in Figure 3 illustrates that the pins closest to the core can potentially have production rates as high as 3 times those of pins away from the core, thus implying that a cycle-to-cycle rotation of the targets may be well advised. A methodology for generating spatially-dependent, multi-group self-shielded cross sections and flux files with the KENO and CENTRM codes has been created so that standalone ORIGEN-S inputs can be quickly constructed to perform a variety of {sup 238}Pu production scenarios, i.e. combinations of the number of arrays loaded and the number of irradiation cycles. The studies herein shown with VESTA and TRITON/KENO will be used to benchmark the standalone ORIGEN.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Infrastructure and DFLAW Support at Hanford - 20443

Manhattan Project era infrastructure systems are degrading at an accelerated pace across the Department of Energy's (DOE) Environmental Management complex. Revitalizing, rejuvenating and right-sizing these systems to ensure reliability for ongoing cleanup missions is a major focus at the 580-square- mile Hanford Site in southeast Washington State. The push to complete construction, commissioning, startup, and operation of facilities and systems in the Direct-Feed Low-Activity Waste (DFLAW) program at Hanford by 2023 requires considerable coordination among site contractors and a significant investment in infrastructure. The passage of time also poses a challenge. It has been about 75 years since facilities were first operated at the site, and approximately 40 years of plutonium production created a legacy of unidentified active and abandoned underground obstacles and waste sites that must be avoided when building and upgrading the infrastructure. Converting infrastructure systems originally built to support plutonium production from the 1940's to the 1980's and upgrading those systems to optimize technology is an ever-changing balance of funding profiles, available resources and execution strategies. The DOE Richland Operations Office (RL) has long recognized the need for increased investment in Hanford Site infrastructure to support the future processing of approximately 56 million gallons of waste currently stored in large underground tanks. When DFLAW is fully operational, safe and reliable infrastructure systems will be needed to ensure continuity of operations around the clock, 365 days a year. These include roadways, water, power, sewer, information technology systems and facilities. To ensure the readiness of Hanford's infrastructure to support treating tank waste in the next three years, 15 projects were identified with a combined value of $133.8 million. Through calendar year 2019, 7 infrastructure projects have been substantially completed and the remaining 8 projects, with a remaining value of $103.8 million, are scheduled to be completed by December 2023. RL and its site services/infrastructure contractor, Mission Support Alliance (MSA), regularly evaluate the needs of the DFLAW program and other Hanford Site missions to ensure the highest priority systems are addressed. In addition to a fast-approaching deadline for round-the-clock treatment operations, RL and MSA face another significant infrastructure challenge. As cleanup is being completed in a 220-square-mile area called the River Corridor, most of the cleanup operations going forward will occur in a 20-square-mile area in the center of the Hanford Site, known as the Central Plateau. Infrastructure systems are becoming more congested in an already overcrowded area. This paper/presentation will outline some of the challenges Hanford faces while executing infrastructure reliability projects. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Hanford Technology Development (Tank Farms) - 12509

The mission of the Department of Energy's Office of River Protection (ORP) is to safely retrieve and treat the 56 million gallons of Hanford's tank waste and close the Tank Farms to protect the Columbia River. The millions of gallons of tank waste are a byproduct of decades of plutonium production. After irradiated fuel rods were taken from the nuclear reactors to the processing facilities at Hanford they were exposed to a series of chemicals designed to dissolve away the rod, which enabled workers to retrieve the plutonium. Once those chemicals were exposed to the fuel rods they became radioactive and extremely hot. They also couldn't be used in this process more than once. Because the chemicals are caustic and extremely hazardous to humans and the environment, underground storage tanks were built to hold these chemicals until a more permanent solution could be found. One key part of the ongoing work at Hanford is retrieving waste from the single-shell tanks, some of which have leaked in the past, and transferring that waste to the double-shell tanks - none of which have ever leaked. The 56 million gallons of radioactive tank waste is stored in 177 underground tanks, 149 of which are single-shell tanks built between 1943 and 1964. The tanks sit approximately 250 feet above the water table. Hanford's single-shell tanks are decades past their 20-year design life. In the past, up to 67 of the single-shell tanks are known or suspected to have leaked as much as one million gallons of waste to the surrounding soil. Starting in the late 1950's, waste leaks from dozens of the single-shell tanks were detected or suspected. Most of the waste is in the soil around the tanks, but some of this waste is thought to have reached groundwater. The Vadose Zone Project was established to understand the radioactive and chemical contamination in the soil beneath the tanks as the result of leaks and discharges from past plutonium-production operations. The vadose zone is the area of soil between the ground surface and the water table 200-to-300 feet below. The project tracks and monitors contamination in the soil. Technologies are being developed and deployed to detect and monitor contaminants. Interim surface barriers, which are barriers put over the single-shell tanks, prevent rain and snow from soaking into the ground and spreading contamination. The impermeable barrier placed over T Farm, which was the site of the largest tank waste leak in Hanford's history, is 60,000 square feet and sloped to drain moisture outside the tank farm. The barrier over TY Farm is constructed of asphalt and drains moisture to a nearby evaporation basin. Our discussion of technology will address the incredible challenge of removing waste from Hanford's single-shell tanks. Under the terms of the Tri-Party Agreement, ORP is required to remove 99 percent of the tank waste, or until the limits of technology have been reached. All pumpable liquids have been removed from the single-shell tanks, and work now focuses on removing the non-pumpable liquids. Waste retrieval was completed from the first single-shell tank in late 2003. Since then, another six single-shell tanks have been retrieved to regulatory standards. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Savannah River Site HB-Line Plutonium Oxide Production Process Simulation Model - 17458

The AFS II/Plutonium Oxide Production process is in its initial operational phase at the Savannah River Site's (SRS) HB-Line. The process is new for the facility where it is being performed, but the facility itself has been in use on and off for over 50 years. Beginning this process inside the facility has resulted in multiple process delays, due to both equipment issues and process restrictions. In order to better understand the process and to identify ways to improve facility performance, Savannah River Nuclear Solutions (SRNS), in conjuncture with Newport News Shipbuilding (NNS), developed the HB-Line Process Simulation Model. This tool completely replicates the operations that comprise the HB-Line process and simulates all of the constraints associated with the process. The model realistically accounts for the number of personnel required for a process step, the time required for a process step to occur, rules related to the parallel operation of process steps, and realistic equipment and operational delay data. The result is a tool that allows SRNS to test different scenarios for improving the process throughput, while realistically accounting for potential process delays and restrictions. The tool is currently in use and has allowed SRNS to present to their customer, the National Nuclear Security Administration (NNSA), estimated production capabilities over wide-ranging timetables and assumptions. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Development of an Efficient Approach to Perform Neutronics Simulations for Plutonium-238 Production

Conversion of 238Pu decay heat into usable electricity is imperative to power National Aeronautics and Space Administration (NASA) deep space exploration missions; however, the current stockpile of 238Pu is diminishing and the quality is less than ideal. In response, the US Department of Energy and NASA have undertaken a program to reestablish a domestic 238Pu production program and a technology demonstration sub-project has been initiated. Neutronics simulations for 238Pu production play a vital role in this project because the results guide reactor safety-basis, target design and optimization, and post-irradiation examination activities. A new, efficient neutronics simulation tool written in Python was developed to evaluate, with the highest fidelity possible with approved tools, the time-dependent nuclide evolution and heat deposition rates in 238Pu production targets irradiated in the High Flux Isotope Reactor (HFIR). The Python Activation and Heat Deposition Script (PAHDS) was developed specifically for experiment analysis in HFIR and couples the MCNP5 and SCALE 6.1.3 software quality assured tools to take advantage of an existing high-fidelity MCNP HFIR model, the most up-to-date ORIGEN code, and the most up-to-date nuclear data. Three cycle simulations were performed with PAHDS implementing ENDF/B-VII.0, ENDF/B-VII.1, and the Hybrid Library GPD-Rev0 cross-section libraries. The 238Pu production results were benchmarked against VESTA-obtained results and the impact of various cross-section libraries on the calculated metrics were assessed.

depletion↗

Nuclear Archaeology to Distinguish Plutonium and Tritium Production Modes in Heavy-Water Reactors

Several nuclear archaeology techniques have been proposed to determine historic plutonium production in dedicated nuclear reactors. These methods rely on sampling materials from the reactor core or specially designed monitor tags, to examine suited isotopic ratios and deduce the amount of plutonium produced. However, some production reactors can be used to produce other isotopes than plutonium, such as tritium. If a reactor has been declared to produce tritium, it could be crucial to confirm that this was the case and that the reactor was not used to produce plutonium instead. In this paper, we describe how isotopic ratios discrepancies can be used to distinguish between plutonium and tritium production modes. Here, we present results obtained via the simulation of reactor lattices inspired by Savannah River Site heavy water production reactors and show that elements such as hafnium and tungsten can be conveniently used to detect undeclared production of plutonium.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

2020 Vision for Tank Waste Cleanup (One System Integration) - 12506

The mission of the Department of Energy's Office of River Protection (ORP) is to safely retrieve and treat the 56 million gallons of Hanford's tank waste and close the Tank Farms to protect the Columbia River. The millions of gallons of waste are a by-product of decades of plutonium production. After irradiated fuel rods were taken from the nuclear reactors to the processing facilities at Hanford they were exposed to a series of chemicals designed to dissolve away the rod, which enabled workers to retrieve the plutonium. Once those chemicals were exposed to the fuel rods they became radioactive and extremely hot. They also couldn't be used in this process more than once. Because the chemicals are caustic and extremely hazardous to humans and the environment, underground storage tanks were built to hold these chemicals until a more permanent solution could be found. The Cleanup of Hanford's 56 million gallons of radioactive and chemical waste stored in 177 large underground tanks represents the Department's largest and most complex environmental remediation project. Sixty percent by volume of the nation's high-level radioactive waste is stored in the underground tanks grouped into 18 'tank farms' on Hanford's central plateau. Hanford's mission to safely remove, treat and dispose of this waste includes the construction of a first-of-its-kind Waste Treatment Plant (WTP), ongoing retrieval of waste from single-shell tanks, and building or upgrading the waste feed delivery infrastructure that will deliver the waste to and support operations of the WTP beginning in 2019. Our discussion of the 2020 Vision for Hanford tank waste cleanup will address the significant progress made to date and ongoing activities to manage the operations of the tank farms and WTP as a single system capable of retrieving, delivering, treating and disposing Hanford's tank waste. The initiation of hot operations and subsequent full operations of the WTP are not only dependent upon the successful design and construction of the WTP, but also on appropriately preparing the tank farms and waste feed delivery infrastructure to reliably and consistently deliver waste feed to the WTP for many decades. The key components of the 2020 vision are: all WTP facilities are commissioned, turned-over and operational, achieving the earliest possible hot operations of completed WTP facilities, and supplying low-activity waste (LAW) feed directly to the LAW Facility using in-tank/near tank supplemental treatment technologies. A One System Integrated Project Team (IPT) was recently formed to focus on developing and executing the programs that will be critical to successful waste feed delivery and WTP startup. The team is comprised of members from Bechtel National, Inc. (BNI), Washington River Protection Solutions LLC (WRPS), and DOE-ORP and DOE-WTP. The IPT will combine WTP and WRPS capabilities in a mission-focused model that is clearly defined, empowered and cost efficient. The genesis for this new team and much of the 2020 vision is based on the work of an earlier team that was tasked with identifying the optimum approach to startup, commissioning, and turnover of WTP facilities for operations. This team worked backwards from 2020 - a date when the project will be completed and steady-state operations will be underway - and identified success criteria to achieving safe and efficient operations of the WTP. The team was not constrained by any existing contract work scope, labor, or funding parameters. Several essential strategies were identified to effectively realize the one-system model of integrated feed stream delivery, WTP operations, and product delivery, and to accomplish the team's vision of hot operations beginning in 2016: - Use a phased startup and turnover approach that will allow WTP facilities to be transitioned to an operational state on as short a timeline as credible. - Align Tank Farm (TF) and WTP objectives such that feed can be supplied to the WTP when it is required for hot operations. - Ensure immobilized waste and waste recycle streams can be received by the TF when required to support 2016 production of immobilized low-activity waste (ILAW). - Ensure the required baseline and additional funding is provided beginning in fiscal year 2011. - Modify TF and WTP contracts to adequately address this vision. The 2020 Vision provides a summary of strategies and key actions that optimize the approach to startup, commissioning, and turnover of WTP facilities. This vision focuses on the legally enforceable requirement to achieve the Consent Decree milestones of starting radioactive operations in 2019, and achieving initial WTP operations in 2022. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Thermal properties of simulated Hanford waste glasses

Abstract The Hanford Tank Waste Treatment and Immobilization Plant will vitrify the mixed hazardous wastes generated from 45 years of plutonium production at the Hanford Site in Washington State. The molten glasses will be poured into stainless steel containers or canisters and subsequently cooled for storage and disposal. For appropriate facility design and operations to handle such highly energy‐consuming processes, knowledge of the material properties is required. The thermal properties (heat capacity, thermal diffusivity, and thermal conductivity) of representative high‐level and low‐activity waste glasses were studied as functions of temperature in the range of 200°C‐800°C (relevant to the cooling process). Simultaneous differential scanning calorimetry‐thermal gravimetry (DSC‐TGA), Xe‐flash diffusivity, pycnometry, and dilatometry were implemented. The study showed that simultaneous DSC‐TGA would be a reliable method for obtaining the heat capacity of various glasses in the temperature range of interest. Accurate thermal properties from this study were shown to provide a more realistic guideline for capacity and time constraints of the heat removal process when compared to the original conservative design‐basis engineering estimates. The estimates, though useful for design in the absence of measured physical properties, can now be supplanted and the measured thermal properties can be used in design verification activities.

Rodriguez, Carmen P.↗

Improving proliferation resistance of high breeding gain generation 4 reactors using blankets composed of light water reactor waste

Fertile blankets can be used in fast reactors to enhance the breeding gain as well as the passive safety characteristics. However, such blankets typically result in the production of weapons grade plutonium. For this reason they are often excluded from Generation IV reactor designs. In this paper we demonstrate that using blankets manufactured directly from spent light water (LWR) reactor fuel it is possible to produce a plutonium product with non-proliferation characteristics on a par with spent LWR fuel of 30-50 MWd/kg burnup. The beneficial breeding and safety characteristics are retained. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Summary of Plutonium-238 Production Alternatives Analysis (Final Report)

The Team implemented a two-phase evaluation process. During the first phase, a wide variety of past and new candidate facilities and processing methods were assessed against the criteria established by DOE for this assessment. Any system or system element selected for consideration as an alternative within the project to reestablish domestic production of Pu-238 must meet the following minimum criteria: Any required source material must be readily available in the United States, without requiring the development of reprocessing technologies or investments in systems to separate material from identified sources. It must be cost, schedule, and risk competitive with existing baseline technology. Any identified facilities required to support the concept must be available to the program for the entire project life cycle (notionally 35 years, unless the concept is so novel as to require a shorter duration). It must present a solution that can generate at least 1.5 Kg of Pu-238 oxide per year, for at least 35 years. It must present a low-risk, near-term solution to the National Aeronautics and Space Administration’s urgent mission need. DOE has implemented this requirement by eliminating from project consideration any alternative with key technologies at less than Technology Readiness Level 5. The Team evaluated the options meeting these criteria using a more detailed assessment of the reasonable facility variations and compared them to the preferred option, which consists of target irradiation at the Advanced Test Reactor (ATR) and the High Flux Isotope Reactor (HFIR), target fabrication and chemical separations processing at the ORNL Radiochemical Engineering Development Center, and neptunium 237 storage at the Materials and Fuels Complex at INL. This preferred option is consistent with the Records of Decision from the earlier National Environmental Policy Act (NEPA) documentation

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗