Search NASA⌕ Search

SEARCH · Search NASA

Results for “PMB”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

TU-FG-BRB-03: Basis Vector Model Based Method for Proton Stopping Power Estimation From Experimental Dual Energy CT Data

Purpose: This work aims at reducing the uncertainty in proton stopping power (SP) estimation by a novel combination of a linear, separable basis vector model (BVM) for stopping power calculation (Med Phys 43:600) and a statistical, model-based dual-energy CT (DECT) image reconstruction algorithm (TMI 35:685). The method was applied to experimental data. Methods: BVM assumes the photon attenuation coefficients, electron densities, and mean excitation energies (I-values) of unknown materials can be approximated by a combination of the corresponding quantities of two reference materials. The DECT projection data for a phantom with 5 different known materials was collected on a Philips Brilliance scanner using two scans at 90 kVp and 140 kVp. The line integral alternating minimization (LIAM) algorithm was used to recover the two BVM coefficient images using the measured source spectra. The proton stopping powers are then estimated from the Bethe-Bloch equation using electron densities and I-values derived from the BVM coefficients. The proton stopping powers and proton ranges for the phantom materials estimated via our BVM based DECT method are compared to ICRU reference values and a post-processing DECT analysis (Yang PMB 55:1343) applied to vendorreconstructed images using the Torikoshi parametric fit model (tPFM). Results: For the phantom materials, the average stopping power estimations for 175 MeV protons derived from our method are within 1% of the ICRU reference values (except for Teflon with a 1.48% error), with an average standard deviation of 0.46% over pixels. The resultant proton ranges agree with the reference values within 2 mm. Conclusion: Our principled DECT iterative reconstruction algorithm, incorporating optimal beam hardening and scatter corrections, in conjunction with a simple linear BVM model, achieves more accurate and robust proton stopping power maps than the post-processing, nonlinear tPFM based DECT analysis applied to conventional reconstructions of low and high energy scans. Funding Support: NIH R01CA 75371; NCI grant R01 CA 149305.

60 APPLIED LIFE SCIENCES↗

WE-AB-202-11: Radiobiological Modeling of Tumor Response During Radiotherapy Based On Pre-Treatment Dynamic PET Imaging Data

Purpose: To evaluate the ability of a multiscale radiobiological model of tumor response to predict mid-treatment hypoxia images, based on pretreatment imaging of perfusion and hypoxia with [18-F]FMISO dynamic PET and glucose metabolism with [18-F]FDG PET. Methods: A mechanistic tumor control probability (TCP) radiobiological model describing the interplay between tumor cell proliferation and hypoxia (Jeong et al., PMB 2013) was extended to account for intra-tumor nutrient heterogeneity, dynamic cell migration due to nutrient gradients, and stromal cells. This extended model was tested on 10 head and neck cancer patients treated with chemoradiotherapy, randomly drawn from a larger MSKCC protocol involving baseline and mid-therapy dynamic PET scans. For each voxel, initial fractions of proliferative and hypoxic tumor cells were obtained by finding an approximate solution to a system of linear equations relating cell fractions to voxel-level FDG uptake, perfusion (FMISO K{sub 1}) and hypoxia (FMISO k{sub 3}). The TCP model then predicted their evolution over time up until the mid treatment scan. Finally, the linear model was reapplied to predict each lesion’s median hypoxia level (k{sub 3}[med,sim]) which in turn was compared to the FMISO k{sub 3}[med] measured at mid-therapy. Results: The average k3[med] of the tumors in pre-treatment scans was 0.0035 min{sup −1}, with an inter-tumor standard deviation of σ[pre]=0.0034 min{sup −1}. The initial simulated k{sub 3}[med,sim] of each tumor agreed with the corresponding measurements within 0.1σ[pre]. In 7 out of 10 lesions, the mid-treatment k{sub 3}[med,sim] prediction agreed with the data within 0.3σ[pre]. The remaining cases corresponded to the most extreme relative changes in k{sub 3}[med]. Conclusion: This work presents a method to personalize the prediction of a TCP model using pre-treatment kinetic imaging data, and validates the modeling of radiotherapy response by predicting changes in median hypoxia values during treatment. Variations from predicted response may be a useful biomarker, which should be further explored. Partially supported by NIH grant #1 R01 CA157770-01A1 and a grant from Varian Corporation.

60 APPLIED LIFE SCIENCES↗

Sci-Sat AM: Radiation Dosimetry and Practical Therapy Solutions - 05: Not all geometries are equivalent for magnetic field Fano cavity tests

The coupling of MRI and radiation treatment systems for the application of magnetic resonance guided radiation therapy necessitates a reliable magnetic field capable Monte Carlo (MC) code. In addition to the influence of the magnetic field on dose distributions, the question of proper calibration has arisen due to the several percent variation of ion chamber and solid state detector responses in magnetic fields when compared to the 0 T case (Reynolds et al., Med Phys, 2013). In the absence of a magnetic field, EGSnrc has been shown to pass the Fano cavity test (a rigorous benchmarking tool of MC codes) at the 0.1 % level (Kawrakow, Med.Phys, 2000), and similar results should be required of magnetic field capable MC algorithms. To properly test such developing MC codes, the Fano cavity theorem has been adapted to function in a magnetic field (Bouchard et al., PMB, 2015). In this work, the Fano cavity test is applied in a slab and ion-chamber-like geometries to test the transport options of an implemented magnetic field algorithm in EGSnrc. Results show that the deviation of the MC dose from the expected Fano cavity theory value is highly sensitive to the choice of geometry, and the ion chamber geometry appears to pass the test more easily than larger slab geometries. As magnetic field MC codes begin to be used for dose simulations and correction factor calculations, care must be taken to apply the most rigorous Fano test geometries to ensure reliability of such algorithms.

60 APPLIED LIFE SCIENCES↗

Testing and Processing of Pre-production 325 MHz Single Spoke Resonator Power Couplers for PIP-II Project

Fundamental 325 MHz power couplers are designed, built and tested for SSR cavities in PIP-II project. Couplers should work in CW mode at power level 7.5kW w/o beam and ~15 kW with the 2 mA beam. At pre-production stage we built and tested 6 couplers, produced by CPI (FNAL) and PMB (IJCLab) and 4 more couplers will be tested soon. Two of tested couplers had TiN coated ceramic window. In warm test stand two couplers were mounted on the coupling chamber and tested in SW regime at full reflection with phase controlled by position of short and reflection insert. Couplers were tested at pulse mode (up to 25kW) and cw mode (12kW) with HV bias or without bias. Test results demonstrated that 3.5 kV DC bias completely suppresses multipactor in coupler. Vacuum activity in coupler was controlled by e-pickups and build-in vacuum gauges, located near the vacuum side of window. Power processing without DC bias was done for several couplers with and without TiN coating on ceramic window. Test results are presented and discussing in paper.

43 PARTICLE ACCELERATORS↗

Summary of US DOE R&D Activities on Graphite Oxidation (2006–2021)

The objective of the international collaboration between United States Department of Energy (U.S.-DOE) and Generation IV International Forum (GIF) is the development of the next generation of nuclear energy systems. The current GIF Project Arrangement (PA) on Materials (2018-2022) was revised in 2019 and extended for another 10 years (2020-2030). The Work Package 1 (“Graphite”) of the extended Project Plan (PP) on Materials specifies technical tasks and High Level Deliverables for research and development (R&D) activities related to using graphite in fuel elements, reflectors, and support structures of Very High Temperature Reactors (VHTR). The graphite tasks include specification and acquisition, qualification and development of new grades, characterization of properties, and development of behavior models. Specifically, Task 1.4 (“Graphite Oxidation Behavior”) outlines planned activities related to acute oxidation by air and chronic oxidation by impurities in the helium coolant. A final report on experimental data regarding graphite oxidation behavior is scheduled for 2022 (deliverable 3.1.1.4.a). In preparation of this deliverable, this document summarizes the R&D activities funded by U.S.-DOE from 2006 (the inception of the VHTR system arrangement) through present (2021). This report is being submitted to the GIF Graphite Working Group (GWG) to serve as input for the GWG high-level deliverable to the Project Management Board (PMB) of PA on Materials. Besides U.S.-DOE, other organizations participating to Task 1.4 of the current PA on Materials are: European Commission’s Joint Research Center (JRC), Korea Atomic Energy Research Institute (KAERI), and Japan Atomic Energy Agency (JAEA). U.S.-DOE is the main contributor on graphite oxidation R&D, with 85 % commitment of total funding during 2018-2022.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

TESTING AND PROCESSING OF PRE-PRODUCTION 325 MHZ SINGLE SPOKE RESONATOR POWER COUPLERS FOR PIP-II PROJECT

Fundamental 325 MHz power couplers are designed, built and tested for SSR cavities in PIP-II project [1]. Couplers should work in CW mode at power level 7.5kW w/o beam and ~15 kW with the 2 mA beam. At pre-production stage we built and tested 6 couplers, produced by CPI (FNAL) and PMB (IJCLab) and 4 more couplers will be tested soon. Two of tested couplers had TiN coated ceramic window. In warm test stand two couplers were mounted on the coupling chamber and tested in SW regime at full reflection with phase controlled by position of short and reflection insert. Couplers were tested at pulse mode (up to 25kW) and cw mode (12kW) with HV bias or without bias. Test results demonstrated that 3.5 kV DC bias completely suppresses multipactor in coupler. Vacuum activity in coupler was controlled by e-pickups and build-in vacuum gauges, located near the vacuum side of window. Power processing without DC bias was done for several couplers with and without TiN coating on ceramic window. Test results are presented and discussing in paper.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

RIVER PROTECTION PROJECT SYSTEM PLAN

The U.S. Department of Energy (DOE), Office of River Protection (ORP) manages the River Protection Project (RPP). The RPP mission is to retrieve and treat Hanford's tank waste and close the tank farms to protect the Columbia River. As a result, ORP is responsible for the retrieval, treatment, and disposal of approximately 57 million gallons 1 of radioactive waste contained in the Hanford Site waste tanks and closure2 of all the tanks and associated facilities. The previous revision of the System Plan was issued in May 2008. ORP has made a number of changes to the tank waste treatment strategy and plans since the last revision of this document, and additional changes are under consideration. ORP has contracts in place to implement the strategy for completion of the mission and establish the capability to complete the overall mission. The current strategl involves a number of interrelated activities. ORP will reduce risk to the environment posed by tank wastes by the following: (1) Retrieving the waste from the single-shell tanks (SST) to double-shell tanks (DST) and delivering the waste to the Waste Treatment and Immobilization Plant (WTP). (2) Constructing and operating the WTP, which will safely treat all of the high-level waste (HLW) fraction contained in the tank farms. About one-third of the low-activity waste (LAW) fraction separated from the HLW fraction in the WTP will be immobilized in the WTP LAW Vitrification Facility. (3) Developing and deploying supplemental treatment capability assumed to be a second LAW vitrification facility that can safely treat about two-thirds of the LAW contained in the tank farms. (4) Developing and deploying supplemental pretreatment capability currently assumed to be an Aluminum Removal Facility (ARF) using a lithium hydrotalcite process to mitigate sodium management issues. (5) Developing and deploying treatment and packaging capability for contact-handled transuranic (CH-TRU) tank waste for possible shipment to and disposal at the Waste Isolation Pilot Plant (WIPP) in New Mexico. (6) Deploying interim storage capacity for the immobilized high-level waste (IHLW) pending determination of the final disposal pathway. (7) Closing the SST and DST tank farms, ancillary facilities, and all associated waste management and treatment facilities. (8) Optimizing the overall mission by resolution of technical and programmatic uncertainties, configuring the tank farms to provide a steady, well-balanced feed to the WTP, and performing trade-offs of the required amount and type of supplemental treatment and of the amount of HLW glass versus LAW glass. ORP has made and continues to make modifications to the WTP contract as needed to improve projected plant performance and address known or emerging risks. Key elements needed to implement the strategy described above are included within the scope of the Tank Operations Contract (TOC). Interim stabilization of the SSTs was completed in March 2004. As of April 2009, retrieval of seven SSTs has been completed and retrieval of four additional SSTs has been completed to the limits of technology. Demonstration of supplemental LAW treatment technologies has stopped temporarily pending revision of mission need requirements. Award of a new contract for tank operations (TOC), the ongoing tank waste retrieval experience, HLW disposal issues, and uncertainties in waste feed delivery and waste treatment led to the revision of the Performance Measurement Baseline (PM B), which is currently under review prior to approval. 6 This System Plan is aligned with the current WTP schedule, with hot commissioning beginning in 2018, and full operations beginning in late 2019. Major decisions regarding the use of supplemental treatment and the associated technology, the ultimate needed capacity, and its relationship to the WTP have not yet been finalized. This System Plan assumes that the outcome of these decisions will be to provide a second LAW vitrification facility. No final implementation decisions regarding supplemental technology can be made until the Tank Closure and Waste Management Environmental Impact Statement is completed and a Record of Decision is issued by DOE. Technical solutions are being developed to mitigate the impact from substantially increased estimates of sodium to be added during pretreatment of the tank waste solids. This may involve one or more of the following options: (1) refining or modifying the flowsheet to reduce the required amount of additional sodium, (2) increasing the overall LAW vitrification capacity, (3) increasing the incorporation of sodium into the LAW glass, (4) increasing the incorporation of aluminum in the HLW glass to reduce caustic leaching requirements, or (5) implementing other technical solutions. For planning purposes, the PMB assumes that option (5) above, in the form of an ARF, will be successful in reducing the sodium required to be added during pretreatment of the tank waste.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

CabanaPD

CabanaPD is a meshfree peridynamics application built with Cabana and Kokkos. Kokkos enables performance portability across hardware architectures and Cabana provides particle capabilities including multi-node MPI support. The main components of CabanaPD are particle initialization, neighbor list generation, force and energy computation, time integration, and multi-node particle communication. In addition, options for creating pre-cracked regions and particle boundary conditions are available. CabanaPD currently enables two common force models: prototype microelastic brittle (PMB) and linear peridynamic solid (LPS). For both of these models, versions with and without fracture as well as linearized model options are available. CabanaPD is designed to be extensible for addition of more complex force models, boundary conditions, etc.

Reeve, Sam↗

Comparison of Measured and Block Structured Simulations for the F-16XL Aircraft

This article presents a comparison of the predictions of three RANS codes for flight conditions of the F-16XL aircraft which feature vortical flow. The three codes, ENSOLV, PMB and PAB3D, solve on structured multi-block grids. Flight data for comparison was available in the form of surface pressures, skin friction, boundary layer data and photographs of tufts. The three codes provided predictions which were consistent with expectations based on the turbulence modelling used, which was k- , k- with vortex corrections and an Algebraic Stress Model. The agreement with flight data was good, with the exception of the outer wing primary vortex strength. The confidence in the application of the CFD codes to complex fighter configurations increased significantly through this study.

Boelens, O. J.↗

NASA TEERM Project: Corn Based Blast Media

Coatings removal is a necessary part of the maintenance, repair, and overhaul activities at many NASA centers and contractor support sites. Sensitive substrates, such as composites and thin aluminum alloys require special handling such as the use of chemical stripping, pneumatic hand sanding, or softer blast media. Type V, acrylic based PMB is commonly used to de-coat, strip, or de-paint the delicate substrates of the Solid Rocket Boosters (SRBs) currently used in support of the Shuttle and slated to be used in support of CxP.

Griffin, Chuck↗

Integrated Baseline Review (IBR) Handbook

An Integrated Baseline Review (IBR) is a review of a supplier?s Performance Measurement Baseline (PMB). It is conducted by Program/Project Managers and their technical staffs on contracts and in-house work requiring compliance with NASA Earned Value Management System (EVMS) policy as defined in program/project policy, NPR 7120.5, or in NASA Federal Acquisition Regulations. The IBR Handbook may also be of use to those responsible for preparing the Terms of Reference for internal project reviews. While risks may be identified and actions tracked as a result of the IBR, it is important to note that an IBR cannot be failed.

Source record↗

Update on the Current R&D Activity in the U.S.

This presentation is to fulfil DOE commitment to GIF VHTR Materials PMB. Notched creep rupture testing: Weldment V-notch specimen test finished. 800C 60MPa, 15,716 hour rupture life. Two double V-notch specimen tests have finished. Crack growth tests: System modification was required for creep and creep-fatigue testing, Epsilon 3548COD Extensometer has been ordered, to allow load-line displacement measurements, to be paired with direct current potential drop already used to measure crack length, Sample redesigned in accordance to ASTM E2760 and E1457 to allow for both creep and creep-fatigue crack growth rate testing. Alloy 800H Weldments (1/2) and Alloy 800H Weldments (2/2), Variable Fatigue Testing, and Multi=axial Stress Relaxation. Continue work to finish 800H model, examine ?universal? constitutive model form.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

TRISO Fuel Performance Evaluation

TRISO Fuel Performance Evaluation outlining design and radionuclide source term, fuel performance during normal operation, fuel performance during core heatup accidents, other accident scenarios, and GenIV VHTR Fuel and Fuel Cycle PMB.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Status of U.S. DOE Deliverables 0 July 2023

An annual status of the US TRISO fuel qualification program is provided, with a focus on activities linked to the Generation IV International Forum (GIF) Very High Temperature Reactor (VHTR) Fuel and Fuel Cycle (FFC) Project Management Board (PMB).

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Environmental Cleanup of the East Tennessee Technology Park Year One - Execution with Certainty SM - 13120

On August 1, 2011, URS - CH2M Oak Ridge LLC (UCOR) began its five-year, $1.4 billion cleanup of the East Tennessee Technology Park (ETTP), located on the U.S. Department of Energy's (DOE) Oak Ridge Reservation in Tennessee. UCOR will close out cleanup operations that began in 1998 under a previous contract. When the Contract Base scope of work [1] is completed in 2016, the K-25 gaseous diffusion building will have been demolished and all waste dispositioned, demolition will have started on the K-27 gaseous diffusion building, all contact-handled and remote-handled transuranic waste in inventory (approximately 500 cubic meters) will have been transferred to the Transuranic Waste Processing Center, previously designated 'No-Path-To-Disposition Waste' will have been dispositioned to the extent possible, and UCOR will have managed DOE Office of Environmental Management (EM)- owned facilities at ETTP, Oak Ridge National Laboratory (ORNL), and the Y-12 National Security Complex in a safe and cost-effective manner. Since assuming its responsibilities as the ETTP cleanup contractor, UCOR has completed its life-cycle Performance Measurement Baseline; received its Earned Value Management System (EVMS) certification; advanced the deactivation and demolition (D and D) of the K-25 gaseous diffusion building; recovered and completed the Tank W-1A and K-1070-B Burial Ground remediation projects; characterized, packaged, and shipped contact-handled transuranic waste to the Transuranic Waste Processing Center; disposed of more than 90,000 cubic yards of cleanup waste while managing the Environmental Management Waste Management Facility (EMWMF); and provided operations, surveillance, and maintenance activities at DOE EM facilities at ETTP, ORNL, and the Y-12 National Security Complex. Project performance as of December 31, 2012 has been excellent: - Cost Performance Index - 1.06; - Schedule Performance Index - 1.02. At the same time, since safety is the foundation of all cleanup work, UCOR's safety record goes hand in hand with its excellent project performance. Through calendar year 2012, UCOR's recordable injury rate was 0.33, and the company has worked close to 4 million hours without a lost work day injury. UCOR's safety record is one of the best in the DOE EM Complex. This performance was due, in large part, to the people and processes URS and CH2M HILL, the parent companies of UCOR, brought to the project. Key approaches included: - Selected and deployed experienced staff in key leadership positions throughout the organization; - Approached 'Transition' as the 'true' beginning of the cleanup project - kicking off a number of project initiatives such as Partnering, PMB development, D and D Plan execution, etc. - Established a project baseline for performance measurement and obtained EVMS certification in record time; - Determined material differences and changed conditions that warranted contract change - then quickly addressed these changes with the DOE client; - Aligned the project and the contract within one year - also done in record time; - Implemented Safety Trained Supervisor and Safety Conscious Work Environment Programs, and kicked off the pursuit of certification under DOE's Voluntary Protection Program. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Strategies and Lessons-Learned for the Successful Alignment of Contract Cost with the Contract Budget Base (CBB) within the First Year of Contract Award - 13154

In order to provide a sound basis and foundation for integrated Project and Contract change management, it is imperative to ensure the alignment of the Negotiated Contract Costs (NCC) with the Contract Budget Base (CBB), where CBB is defined as the Performance Measurement Baseline (PMB) plus Management Reserve (MR). The achievement of this alignment assures customer and contractor agreement on scope, requirements, quantities, schedule and cost, which facilitates the identification of change conditions and ultimate agreement on the value of changes to the NCC and the CBB. Delays in contract/CBB true up/reconciliation can negatively effect measurement of project progress, limiting owner understanding of liability, and may result in increased contract disagreements and potential claims. The Department of Energy Oak Ridge Office of Environmental Management (OR-EM) and URS - CH2M Oak Ridge LLC (UCOR) achieved alignment of the NCC with the CBB within 10 months of UCOR taking over work on the East Tennessee Technology Park (ETTP) cleanup contract by: 1. Managing as a discrete project; 2. Establishing expectations and setting tone of interactions; 3. Using personnel experienced with Federal Acquisition Regulation (FAR); 4. Partnering; 5. Establishing ombudsmen. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Completing the Cleanup of the US Department of Energy's East Tennessee Technology Park - Four Years Early - 16067

On August 1, 2011, URS - CH2M Oak Ridge LLC (UCOR) began its $2.6 billion cleanup of the East Tennessee Technology Park (ETTP), the former Oak Ridge Gaseous Diffusion Plant, located on the U.S. Department of Energy's (DOE) Oak Ridge Reservation (ORR) in Tennessee. Under the contract, the scope of work to be completed includes demolition of all gaseous diffusion buildings, namely K-25, K-31 and K-27, as well as other facilities such as the Toxic Substance Control Act (TSCA) Incinerator, the K-1200 Centrifuge Complex and the K-1037 Barrier Plant. Additionally, UCOR will remove contaminated soils and treat contaminated groundwater. Waste generated by these cleanup activities will be disposed at onsite as well as offsite facilities. UCOR will also continue to manage hundreds of the DOE Oak Ridge Office of Environmental Management (OREM)-owned facilities across the ORR. Due largely to funding challenges early in the project, the DOE estimated in their October 2013 Program Plan 2014-2024 that ETTP cleanup would not be achieved until 2024, four years later than originally scheduled in UCOR's contract with the DOE. In November 2014, the DOE Manager for OREM, Susan Cange, publicly shared her 'vision' for ETTP cleanup by 2020, four years earlier than the DOE's current plan. As part of Vision 2020, all gaseous diffusion buildings would be demolished by the end of 2016. In response to Ms. Cange's vision, UCOR published a Strategic Plan describing how ETTP could be cleaned up by 2020, provided that a number of funding and programmatic and technical challenges could be overcome. UCOR is in the midst of implementing its Strategic Plan, and progress is being made to that end. Since assuming its responsibilities as the ETTP cleanup contractor, UCOR has completed its life-cycle Performance Measurement Baseline (PMB); received its Earned Value Management System (EVMS) certification; completed the D and D of the 44-acre K-25 and 17-acre K-31 gaseous diffusion buildings; completed the K-1070- B Burial Ground remediation project; completed RCRA closure of the TSCA Incinerator; and disposed of more than 541,411 cubic yards of cleanup waste while managing the on-site Environmental Management Waste Management Facility (EMWMF). In 2015, UCOR achieved safety 'Star Status' under the DOE's Voluntary Protection Program (VPP); completed the demolition of the K-31 gaseous diffusion building; advanced the characterization and deactivation of the K-27 gaseous diffusion building, readying the building for the start of demolition in 2016; and began characterization activities in the K-1037 Barrier Plant as well as a number of facilities in the Poplar Creek Area of the ETTP Site. Project performance through December 31, 2015, is as follows: Cost Performance Index - 1.12, Schedule Performance Index - 1.02. Since safety is the foundation of all cleanup work, UCOR's safety record goes hand-in-hand with its project performance. Through calendar year 2015, UCOR's recordable injury rate was 0.94 occurrences per 200,000 work hours, and the day away case rate was 0.31. These rates are both below the DOE and UCOR goals. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗