Search NASA⌕ Search

SEARCH · Search NASA

Results for “PROJECT PLANNING”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

PMDT: AI-Enabled Predictive Maintenance Digital Twins for Advanced Nuclear Reactors

Our team made substantial technical progress on various fronts during the course of the program. Multiple milestones were geared towards demonstrating the feasibility of machine learning based predictive maintenance digital twins towards reducing O&M costs, whereas some other milestones actually focused on identifying technical gaps and developing technologies such as humble AI to provide necessary robustness to the ML-based models. We were able to demonstrate in many cases that Machine learning-based methods can be successfully adapted for Nuclear plant environments especially for remote monitoring applications. Detailed analyses were carried out with plant and full scope simulation data along with capabilities of enhanced analytics to assess and set realistic expectations on cost reductions in O&M. These assessments are paving the way for investments towards reactor design improvements as well project planning for SMR projects as they develop and mature in the next few years. Technology developed under this program got direct visibility to GE Hitachi and their utility customers and resulted in positive intents to deploy some of the elements from design phase. The project additionally resulted in several reports, publications, software and data generation that will be useful in deployment and O&M services for BWRX300 fleets.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Lessons Learned from the Clean Energy to Communities (C2C) Peer-Learning Cohort Incorporating Community Priorities into Electric Vehicle Plans and Projects

The National Renewable Energy Laboratory (NREL), with support from World Resources Institute (WRI), designed and led a six-month peer-learning cohort from January through July 2024 on "Enhancing Resilience at Critical Facilities through Solar, Storage, and Microgrids" as part of the U.S Department of Energy's Clean Energy to Communities (nrel.gov/c2c) (C2C) program. Representatives from 15 municipalities, municipal utilities, colleges, and Tribes from across the United States participated in monthly workshops covering best practices for planning and deploying local resilience projects. This document shares key takeaways, lessons learned, and resources from the cohort including key steps that can be taken to help entities design effective community engagement processes around clean mobility.

ADVANCED PROPULSION SYSTEMS,ENERGY PLANNING, POLIC↗

Soft costs and EVSE – Knowledge gaps as a barrier to successful projects

There has been a recent push to increase access to electric vehicle (EV) charging infrastructure. The National Electric Vehicle Infrastructure (NEVI) program, part of the Bipartisan Infrastructure Law (BIL) has made significant funding available for major charging infrastructure projects along state thruways, and many state and local incentives exist for EV owners to install chargers in their homes. However, deployment of these chargers has not kept up with demand, primarily due to issues in project planning, permitting processes, and unforeseen delays. This paper serves as a review of the current understanding of these and other non-hardware costs in EV charging infrastructure projects (collectively known as “soft costs”). We found that soft costs in EV charging infrastructure projects are not well understood. Specifically, there is little agreement on how soft costs should be categorized and tracked, and less agreement still on best practices for controlling these costs and lowering barriers to infrastructure deployment. A broader review of EV charging infrastructure cost analyses shows that these costs can have significant impacts on project outcomes. EV charging infrastructure projects may be able to examine the success of the solar industry in lowering soft costs, and a similar effort may lower project costs significantly. Further work on standardizing and collecting data on EV charging infrastructure costs is required to begin addressing and controlling these costs.

32 - ENERGY CONSERVATION, CONSUMPTION, AND UTILIZA↗

Uncertainty Analysis in Multi‐Sector Systems: Considerations for Risk Analysis, Projection, and Planning for Complex Systems

Abstract Simulation models of multi‐sector systems are increasingly used to understand societal resilience to climate and economic shocks and change. However, multi‐sector systems are also subject to numerous uncertainties that prevent the direct application of simulation models for prediction and planning, particularly when extrapolating past behavior to a nonstationary future. Recent studies have developed a combination of methods to characterize, attribute, and quantify these uncertainties for both single‐ and multi‐sector systems. Here, we review challenges and complications to the idealized goal of fully quantifying all uncertainties in a multi‐sector model and their interactions with policy design as they emerge at different stages of analysis: (a) inference and model calibration; (b) projecting future outcomes; and (c) scenario discovery and identification of risk regimes. We also identify potential methods and research opportunities to help navigate the tradeoffs inherent in uncertainty analyses for complex systems. During this discussion, we provide a classification of uncertainty types and discuss model coupling frameworks to support interdisciplinary collaboration on multi‐sector dynamics (MSD) research. Finally, we conclude with recommendations for best practices to ensure that MSD research can be properly contextualized with respect to the underlying uncertainties.

54 ENVIRONMENTAL SCIENCES↗

Multi-pronged approach to improving carbon utilization by cyanobacterial cultures

The goal of this project was to increase the efficiency of carbon utilization by a Synechocystis biofuel production strain in a photobioreactor system by at least 50% using a multi-pronged approach that combined the best features of both biological and physicochemical CO 2 capture technologies to: 1) increase rates and extent of CO 2 absorption into the culture medium by addition of biocompatible amine solvents and a nanobubble gas delivery system, and 2) increase cellular rates of inorganic carbon uptake and carbon fixation through genetic engineering. In addition, the project plan included evaluating the use of fermentation effluent gases as a CO 2 source and demonstrating performance under outdoor conditions in closed-pond photobioreactor systems. These combined efforts would be guided by integrated technoeconomic and life-cycle analyses. Both physicochemical CO 2 capture technologies explored proved to be successful. The amine solvent monoethanolamine (MEA) was found to be biocompatible with a Synechocystis laurate production strain. Using an adaptive evolution strategy, an MEA-tolerant laurate production strain was developed that showed significantly increased carbon utilization over the parent strain. To our knowledge this was the first time nanobubble (NB) technology had been used as a carbon delivery system for algae production and it also proved quite successful as a proof of concept. Solutions containing CO 2 nanobubbles (Nano-BG11) at concentrations significantly higher than the aqueous CO 2 concentrations achieved with gas sparging were successfully generated and characterized with regard to bubble size (nm), concentration (NB/L), and pH stability as per project plan. Growth studies proved challenging. However, once the source of a puzzling growth defect was found and remedied Synechocystis was able to grow somewhat better in Nano-BG11 than in standard BG11 medium.

09 BIOMASS FUELS↗

Secure Distributed Energy Resource Communications (sDERC)

The slides will be presented at a DOE CESER Peer Review for the Risk Management Tools and Technology (RMT) that provide an overview of the sDERC project. The slides discuss the project plan for this new project and how the results will be demonstrated at the conclusion of this project. The peer review is scheduled for August 27-29.

Chavez, Adrian R.↗

A screening model for predicting injection well pressure buildup and plume extent in CO 2 geologic storage projects

We present a new screening model for predicting injection well pressure buildup and CO 2 plume migration for CO 2 geologic sequestration projects. The model requires only limited information and is quite accurate when compared to detailed simulation results. Such models can assist project developers during the early days of project planning (e.g., for 45Q related projects), and also help regulators perform simple checks against detailed numerical models. The screening model consists of two correlations: one for injectivity index in terms of the slope of the CO 2 fractional flow curve, and the second for total storage efficiency within the footprint of plume as a function of gravity number and slope of the CO 2 fractional flow curve. Using these two correlations, as well as a knowledge of some basic reservoir characteristics and estimates of fluid properties from standard correlations, the injection-well pressure buildup and CO 2 plume extent in the formation can be readily estimated. Finally, the new correlations show a good match with the results of the underlying simulations, and also provide good agreement with independent calculations for two example problems.

42 ENGINEERING↗

Evaluation of Minimum Detectable Activities for Stack Sample Analyses

The Rad-NESHAP program takes samples at major point sources to track how much of select nuclides are being emitted out of the stack. Samples are taken at the site where the radiological operations are being performed. The samples are then sent to analytical laboratories for analysis to determine what nuclides exist in the sample. However, due to the sensitivity of the instruments, false positives are often reported. To reduce the number of false positives, the results reported from the analytical labs are compared to set detection limits. Anything below the set detection limit is considered part of the background while anything above the limit is considered a positive hit. Therefore, the detection limit must be set low enough that any false negatives do not result in a significant dose missed at the end of the year but high enough that there are not enough false positives to skew the annual dose being reported. All detection limits listed in this section for the analyses below were designed to meet the stated equivalent emissions rate and subsequent off-site doses. These minimum detectable activities (MDAs) were developed in the 1990s and documented in the memo cited for each analysis below. These limits and memos are all currently referenced in the Quality Assurance Project Plan (QAPP) for the Rad-NESHAP Compliance Task, which is being updated to a Project Implementation Plan (PIP) concurrently with this document. As part of this update process, the original MDAs defined in this section needed to be verified that they were still conservative and meet the off-site dose levels stated.

2019 MDA↗

Advanced Characterization of Particulate Flows for Concentrating Solar Power Applications

The overarching goal of this project was to gain a greater fundamental understanding of heat and mass transfer in particulate-media in concentrated solar power (CSP) applications for thermal energy storage (TES) and to disseminate results to support parallel Gen3 research initiatives. Project objectives were achieved through three planned project phases to systematically characterize the heat transfer and flow properties for particulate (granular) flows at elevated temperatures up to 800 °C. These objectives were accomplished using a combination of fundamental experimental measurements, modeling, and simplified flow experiments over a range of temperatures. This work addressed a serious gap within the field related to the understanding and modeling of granular flow behavior and the related heat transfer at different temperatures, which directly correspond to the operating points of CSP applications which use particles for heat storage.

14 SOLAR ENERGY↗

Pala Energy Options Analysis (Final Report)

The Pala Energy Options Project scope focused on assessing electric and thermal energy related options for the Pala Band of Mission Indians. Although the assessment also considered options for transportation fuels – including potential for electrification – and other energy uses, initial reviews with PED staff indicated that the most practical and substantial options likely would involve serving current building electric and thermal energy resources and uses. Assessment scope varies by specific options considered; some merited in-depth assessment for immediate action to initiate or advance implementation, while higher level assessments were more appropriate for options that would take longer to implement and would require updated in-depth assessments during project planning and design phases. The primary objectives of the Project were to 1) identify energy resources/loads, 2) assess energy needs and exports, 3) investigate and evaluate supply-side and demand side energy options, and 4) select and prioritize options in an implementation plan.

14 SOLAR ENERGY↗

Sludge Removal: Success and Partnership with T Plant - 20510

U.S. DOE contractor CH2M Hill Plateau Remediation Company (CHPRC) has safely and efficiently managed the removal of highly radioactive sludge from the 105-K West Reactor fuel storage basin (105- KW Basin) near the Columbia River. In mid-September 2019, sludge retrieval was completed after 21 storage containers were safely loaded with highly radioactive sludge and transported approximately 13 miles from the 105-KW Basin to T Plant, located in the 200 West Area on the Central Plateau of the Hanford Site. Sludge removal represents the last major source term reduction necessary before the K West Reactor and fuel storage basin can transition to closure activities in preparation for final deactivation and demolition. The technical complexity of the sludge retrieval process, coupled with the challenging physical and radiological characteristics of the waste, necessitated a methodical and deliberate approach using unique design and operational solutions to safely conduct the work. This challenge was further complicated by the need to plan and conduct the work in two separate facilities, each subject to the controls and requirements of its own nuclear facility safety basis. The project overcame these challenges through creating an integrated team that actively engaged, communicated and coordinated each phase of the project to ensure successful completion. This paper will cover how these key elements of the Sludge Removal Project led to its success: - Integrating project planning and management; - Lessons learned from design and construction; - Preparing for a successful campaign (lessons learned from testing and start-up); - Lessons learned from operating in two separate facilities, transporting sludge containers on the Hanford Site and ensuring compliance with a range of regulatory and safety basis requirements. The establishment of an integrated group spanning two facilities and multiple organizations created a team capable of overcoming the challenges necessary to successfully plan and execute the sludge retrieval mission. Sharing lessons learned from this successful project can enhance the ability of teams across the DOE complex to successfully plan and execute complex projects. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Strategies for Successful Energy Project Financing [Slides]

The Energy to Communities (E2C) peer-learning cohort program provides technical assistance to groups of 15 community entities around a common energy topic over the course of 6 months. Every month, participants join a virtual meeting where they hear from experts and exchange strategies and best practices with their peers.This cohort, "Successful Energy Project Implementation" will explore common challenges in implementing energy projects and learn strategies to turn project plans into reality. Each participant will focus on a local energy project or priority as a cornerstone for their learning throughout the series. This presentation focuses on strategies for successful project financing. This workshop is on April 29, 2026.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Energy Project Siting, Permitting, and Community Impacts [Slides]

The Energy to Communities (E2C) peer-learning cohort program provides technical assistance to groups of 15 community entities around a common energy topic over the course of 6 months. Every month, participants join a virtual meeting where they hear from experts and exchange strategies and best practices with their peers.This cohort, "Successful Energy Project Implementation" will explore common challenges in implementing energy projects and learn strategies to turn project plans into reality. Each participant will focus on a local energy project or priority as a cornerstone for their learning throughout the series. This presentation focuses on strategies for successful project financing. This workshop is on April 29, 2026.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

E2C Successful Project Implementation Cohort: Overview of Solar, Microgrid and Resilience Project Development [Slides]

The Energy to Communities (E2C) peer-learning cohort program provides technical assistance to groups of 15 community entities around a common energy topic over the course of 6 months. Every month, participants join a virtual meeting where they hear from experts and exchange strategies and best practices with their peers. This cohort, "Successful Energy Project Implementation" will explore common challenges in implementing energy projects and learn strategies to turn project plans into reality. Each participant will focus on a local energy project or priority as a cornerstone for their learning throughout the series. This presentation overviews the basics of developing solar, microgrid and resilience projects with emphasis on understanding the project development process.

14 SOLAR ENERGY↗

E2C Cohorts: Overview of Project Procurement, Performance Monitoring, and O&M [Slides]

The Energy to Communities (E2C) peer-learning cohort program provides technical assistance to groups of 15 community entities around a common energy topic over the course of 6 months. Every month, participants join a virtual meeting where they hear from experts and exchange strategies and best practices with their peers. This cohort, "Successful Energy Project Implementation" will explore common challenges in implementing energy projects and learn strategies to turn project plans into reality. Each participant will focus on a local energy project or priority as a cornerstone for their learning throughout the series. This presentation is focused on project performance, monitoring, and O&M. This workshop is on May 27.

14 SOLAR ENERGY↗

Overview of Community Solar Project Development [Slides]

The Energy to Communities (E2C) peer-learning cohort program provides technical assistance to groups of 15 community entities around a common energy topic over the course of 6 months. Every month, participants join a virtual meeting where they hear from experts and exchange strategies and best practices with their peers. This cohort, "Successful Energy Project Implementation" will explore common challenges in implementing energy projects and learn strategies to turn project plans into reality. Each participant will focus on a local energy project or priority as a cornerstone for their learning throughout the series. This presentation overviews the basics of developing community solar projects with emphasis on technical scope and ownership structures.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Resources for E-Mobility Program Implementation [Slides]

The Energy to Communities (E2C) peer-learning cohort program provides technical assistance to groups of 15 community entities around a common energy topic over the course of 6 months. Every month, participants join a virtual meeting where they hear from experts and exchange strategies and best practices with their peers. This cohort, "Successful Energy Project Implementation" will explore common challenges in implementing energy projects and learn strategies to turn project plans into reality. Each participant will focus on a local energy project or priority as a cornerstone for their learning throughout the series.This presentation overviews the basics of developing electric mobility projects with emphasis on leveraging the right tools to advance technical scoping and program design.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗