Search NASA⌕ Search

SEARCH · Search NASA

Results for “PROJECTION OPERATORS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Projection-operator calculations of the lowest e(-)-He resonance

The 1s (2s)2:2S Schulz resonance of He(-) is investigated theoretically, applying the full projection-operator formalism developed by Temkin and Bhatia (1985) in a Rayleigh-Ritz variational calculation. The technique is described in detail, and results for five different approximations of the He target state are presented in a table. Good convergence is obtained, but it is found that even the best calculated value of the resonance is about 130 meV higher than the experimentally measured value of 19.367 + or - 0.007 eV (Brunt et al., 1977), a discrepancy attributed to the contribution of the shift in the Feshbach formalism.

Berk, A.↗

Quasi-projection-operator calculation of autoionization states of O5/+/ /O VI/ and Si11/+/ /Si XII/

A practical approach to calculating diagnostic parameters includes both scattering and statelike (autoionization) elements. The paper presents inelastic quasi-projection-operator calculations of autoionization states of the three-electron ions of oxygen and silicon for states below the n = 3 manifod of the respective two-electron parent (O VI and Si XII). Wave functions containing up to 40 configurations are calculated. The O VI calculated results agree with experimental results within the experimental error (about + or - 2 eV) while for the Si XII case, it was necessary to include relativistic effects. Where formulas are available (states for which p + q = 2), the Si XII results are also in good agreement with experimental results for 2Se, 2Po, and 2De states. Since the calculated results for some of the higher states did not agree with identifications proposed by Trabert et al. (1979), alternative identifications are suggested.

Wakid, S.↗

Quasi-projection-operator calculation of inelastic resonances in He/-/ and Li

Feshbach resonances of electrons incident of He and Li(+) are calculated below the 3(S-3) target threshold by means of the inelastic quasi-projection-operator technique of Temkin and Bhatia (1972). A configuration-interaction-type wave function is employed with up to 46 configurations. The calculations reveal, with reasonable accuracy, all presently observed Feshbach resonances. The method does not reveal shape resonances, but, for isoelectronic systems with greater nuclear charge, it is argued that shape resonance should become less important. This is already apparent in the case of Li, for which the known resonances are calculated and higher resonances, for which there are as yet no experimental data, are predicted.

Wakid, S.↗

Using projection operators with maximum overlap methods to simplify challenging self-consistent field optimization

Maximum overlap methods are effective tools for optimizing challenging ground- and excited-state wave functions using self-consistent field models such as Hartree-Fock and Kohn-Sham density functional theory. Nevertheless, such models have shown significant sensitivity to the user-defined initial guess of the target wave function. Here in this work, a projection operator framework is defined and used to provide a metric for non-aufbau orbital selection in maximum-overlap-methods. The resulting algorithms, termed the Projection-based Maximum Overlap Method (PMOM) and Projection-based Initial Maximum Overlap Method (PIMOM), are shown to perform exceptionally well when using simple user-defined target solutions based on occupied/virtual molecular orbital permutations. This work also presents a new metric that provides a simple and conceptually convenient measure of agreement between the desired target and the current or final SCF results during a calculation employing a maximum-overlap method.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Umatilla River Fish Passage Operations Project : Annual Progress Report October 2007 - September 2008.

Threemile Falls Dam (Threemile Dam), located near the town of Umatilla, is the major collection and counting point for adult salmonids returning to the Umatilla River. Returning salmon and steelhead were enumerated at Threemile Dam from June 7, 2007 to August 11, 2008. A total of 3,133 summer steelhead (Oncorhynchus mykiss); 1,487 adult, 1,067 jack, and 999 subjack fall Chinook (O. tshawytscha); 5,140 adult and 150 jack coho (O. kisutch); and 2,009 adult, 517 jack, and 128 subjack spring Chinook (O. tshawytscha) were counted. All fish were enumerated at the east bank facility. Of the fish counted, 1,442 summer steelhead and 88 adult and 84 jack spring Chinook were hauled upstream from Threemile Dam. There were 1,497 summer steelhead; 609 adult, 1,018 jack and 979 subjack fall Chinook; 5,036 adult and 144 jack coho; and 1,117 adult, 386 jack and 125 subjack spring Chinook either released at, or allowed to volitionally migrate past, Threemile Dam. Also, 110 summer steelhead; 878 adult and 43 jack fall Chinook; and 560 adult and 28 jack spring Chinook were collected as broodstock for the Umatilla River hatchery program. In addition, there were 241 adult and 15 jack spring Chinook collected at Threemile Dam for outplanting in the South Fork Walla Walla River and Mill Cr, a tributary of the mainstem Walla Walla River. The Westland Canal juvenile facility (Westland), located near the town of Echo at river mile (RM) 27, is the major collection point for out-migrating juvenile salmonids and steelhead kelts. The canal was open for 158 days between February 11, 2008 and July 18, 2008. During that period, fish were bypassed back to the river 150 days and were trapped 6 days. There were also 2 days when fish were directed into and held in the canal forebay between the time the bypass was closed and the trap opened. An estimated 64 pounds of fish were transported from the Westland trapping facility. Approximately 25.8% of the fish transported were salmonids. In addition, one adult Pacific lamprey was trapped and released above the Westland ladder this year. The Threemile Dam west bank juvenile bypass was opened on March 11, 2008 in conjunction with water deliveries and continued through the summer. West Extension Irrigation District (WEID) discontinued diverting live flow on June 24, 2008 but the bypass remained open throughout the project year. The juvenile trap was not operated this project year.

13 HYDRO ENERGY↗

The Impact Of The MCU Life Extension Solvent On Sludge Batch 8 Projected Operating Windows

As a part of the Actinide Removal Process (ARP)/Modular Caustic Side Solvent Extraction Unit (MCU) Life Extension Project, a next generation solvent (NGS) and a new strip acid will be deployed. The strip acid will be changed from dilute nitric acid to dilute boric acid (0.01 M). Because of these changes, experimental testing or evaluations with the next generation solvent are required to determine the impact of these changes (if any) to Chemical Process Cell (CPC) activities, glass formulation strategies, and melter operations at the Defense Waste Processing Facility (DWPF). The introduction of the dilute (0.01 M) boric acid stream into the DWPF flowsheet has a potential impact on glass formulation and frit development efforts since B 2 O 3 is a major oxide in frits developed for DWPF. Prior knowledge of this stream can be accounted for during frit development efforts but that was not the case for Sludge Batch 8 (SB8). Frit 803 has already been recommended and procured for SB8 processing; altering the frit to account for the incoming boron from the strip effluent (SE) is not an option for SB8. Therefore, the operational robustness of Frit 803 to the introduction of SE including its compositional tolerances (i.e., up to 0.0125M boric acid) is of interest and was the focus of this study. The primary question to be addressed in the current study was: What is the impact (if any) on the projected operating windows for the Frit 803 - SB8 flowsheet to additions of B 2 O 3 from the SE in the Sludge Receipt and Adjustment Tank (SRAT)? More specifically, will Frit 803 be robust to the potential compositional changes occurring in the SRAT due to sludge variation, varying additions of ARP and/or the introduction of SE by providing access to waste loadings (WLs) of interest to DWPF? The Measurement Acceptability Region (MAR) results indicate there is very little, if any, impact on the projected operating windows for the Frit 803 - SB8 system regardless of the presence or absence of ARP and SE (up to 2 wt% B 2 O 3 contained in the SRAT and up to 2000 gallons of ARP). It should be noted that 0.95 wt% B 2 O 3 is the nominal projected concentration in the SRAT based on a 0.0125M boric acid flowsheet with 70,000 liters of SE being added to the SRAT.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Apollo Medical Operations Project: Recommendations to Improve Crew Health and Performance for Future Exploration Missions and Lunar Surface Operations

Medical requirements for the future Crew Exploration Vehicle (CEV), Lunar Surface Access Module (LSAM), advanced Extravehicular Activity (EVA) suits and Lunar habitat are currently being developed. Crews returning to the lunar surface will construct the lunar habitat and conduct scientific research. Inherent in aggressive surface activities is the potential risk of injury to crewmembers. Physiological responses to and the operational environment of short forays during the Apollo lunar missions were studied and documented. Little is known about the operational environment in which crews will live and work and the hardware that will be used for long-duration lunar surface operations.Additional information is needed regarding productivity and the events that affect crew function such as a compressed timeline. The Space Medicine Division at the NASA Johnson Space Center (JSC) requested a study in December 2005 to identify Apollo mission issues relevant to medical operations that had impact to crew health and/or performance. The operationally oriented goals of this project were to develop or modify medical requirements for new exploration vehicles and habitats, create a centralized database for future access, and share relevant Apollo information with the multiple entities at NASA and abroad participating in the exploration effort.

Scheuring, Richard A.↗

The Apollo Medical Operations Project: Recommendations to Improve Crew Health and Performance for Future Exploration Missions and Lunar Surface Operations

Medical requirements for the future Crew Exploration Vehicle (CEV), Lunar Surface Access Module (LSAM), advanced Extravehicular Activity (EVA) suits and Lunar habitat are currently being developed. Crews returning to the lunar surface will construct the lunar habitat and conduct scientific research. Inherent in aggressive surface activities is the potential risk of injury to crewmembers. Physiological responses and the operational environment for short forays during the Apollo lunar missions were studied and documented. Little is known about the operational environment in which crews will live and work and the hardware will be used for long-duration lunar surface operations. Additional information is needed regarding productivity and the events that affect crew function such as a compressed timeline. The Space Medicine Division at the NASA Johnson Space Center (JSC) requested a study in December 2005 to identify Apollo mission issues relevant to medical operations that had impact to crew health and/or performance. The operationally oriented goals of this project were to develop or modify medical requirements for new exploration vehicles and habitats, create a centralized database for future access, and share relevant Apollo information with the multiple entities at NASA and abroad participating in the exploration effort.

Scheuring, Richard A.↗

Telerobotic Perception During Asteroid and Mars Regolith Operations Project

Current space telerobotic systems are constrained to only operating in bright light and dust-free conditions. This project will study the effects of difficult lighting and dust conditions on telerobotic perception systems to better assess and refine regolith operations on other neighboring celestial bodies. In partnership with Embry-Riddle Aeronautical University and Caterpillar, Inc., optical, LiDAR and RADAR sensing equipment will be used in performing the study. This project will create a known dust environment in the Swamp Works Granular Mechanics & Regolith Operations (GMRO) Laboratory regolith test bin to characterize the behavior of the sensing equipment in various calibrated lighting and dust conditions. It will also identify potential methods for mitigating the impacts of these undesirable conditions on the performance of the sensing equipment. Enhancing the capability of telerobotic perception systems will help improve life on earth for those working in dangerous, dusty mining conditions, as well as help advance the same technologies used for safer self-driving automobiles in various lighting and weather conditions. It will also prove to be a critical skill needed for advancing robotic and human exploration throughout our solar system, for activities such as mining on an asteroid or pioneering the first colony on Mars.

Technology Portfolio System↗

Response to “Comment on ‘Rethinking first-principles electron transport theories with projection operators: The problems caused by partitioning the basis set’” [J. Chem. Phys. 140, 177103 (2014)]

The thesis of Brandbyge's comment [J. Chem. Phys. 140, 177103 (2014)] is that our operator decoupling condition is immaterial to transport theories, and it appeals to discussions of nonorthogonal basis sets in transport calculations in its arguments. We maintain that the operator condition is to be preferred over the usual matrix conditions and subsequently detail problems in the existing approaches. From this operator perspective, we conclude that nonorthogonal projectors cannot be used and that the projectors must be selected to satisfy the operator decoupling condition. Because these conclusions pertain to operators, the choice of basis set is not germane.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

The Ceres S'Cool Project: Operational but not Routine

The first Clouds and the Earth's Radiant Energy System (CERES) instrument has been returning useful data on Earth's radiation budget from the Tropical Rainfall Measuring Mission (TRMM) spacecraft since late 1997. Validation of the initial data is now intensively underway. As one component of this validation, the CERES Students' Cloud Observations On-Line (S'COOL) project has been operational since April 1998 - the 2nd CERES validation month. S'COOL involves school children in over 140 schools in 15 countries on 5 continents in making and reporting observations and measurements which they and CERES scientists can then compare to the satellite retrievals. The project is planned to continue through the life of the CERES Project (nominally 15 years), and new participants are invited to join on a continuous basis. This paper will report on the first year of the operational phase of the project, during which a number of exciting events occurred (a demonstration of the project to First Lady Hillary Rodham Clinton, and visits by CERES personnel to participating schools, among others). It will further report on some of the noteworthy observations and comparisons which have been made possible by this project. We have found that schools are often located in interesting places, in terms of the clouds found there and the satellite's ability to observe these clouds. The paper will also report on the learning opportunities delivered by this project, and on new questions about the planet and its climate which arise in the students' minds as a result of their active participation.

Chambers, Lin H.↗

The CERES S'COOL Project: Operational but not Routine

The first Clouds and the Earth's Radiant Energy System (CERES) instrument has been returning useful data on Earth's radiation budget from the Tropical Rainfall Measuring Mission (TRMM) spacecraft since late 1997. Validation of the initial data is now intensively underway. As one component of this validation, the CERES Students Cloud Observations On-Line (S'COOL) project has been operational since April 1998 - the 2nd CERES validation month. S'COOL involves school children in over 140 schools in 15 countries on 5 continents in making and reporting observations and measurements which they and CERES scientists can then compare to the satellite retrievals. The project is planned to continue through the life of the CERES Project (nominally 15 years), and new participants are invited to join on a continuous basis. This paper will report on the first year of the operational phase of the project, during which a number of exciting events occurred (a demonstration of the project to First Lady Hillary Rodham Clinton, and visits by CERES personnel to participating schools, among others). It will further report on some of the noteworthy observations and comparisons which have been made possible by this project. We have found that schools are often located in interesting places, in terms of the clouds found there and the satellite's ability to observe these clouds. The paper will also report on the learning opportunities delivered by this project, and on new questions about the planet and its climate which arise in the students minds as a result of their active participation.

Chambers, Lin H.↗

The Impact Of The MCU Life Extension Solvent On Sludge Batch 8 Projected Operating Windows

As a part of the Actinide Removal Process (ARP)/Modular Caustic Side Solvent Extraction Unit (MCU) Life Extension Project, a next generation solvent (NGS) and a new strip acid will be deployed. The strip acid will be changed from dilute nitric acid to dilute boric acid (0.01 M). Because of these changes, experimental testing or evaluations with the next generation solvent are required to determine the impact of these changes (if any) to Chemical Process Cell (CPC) activities, glass formulation strategies, and melter operations at the Defense Waste Processing Facility (DWPF). The introduction of the dilute (0.01M) boric acid stream into the DWPF flowsheet has a potential impact on glass formulation and frit development efforts since B2O3 is a major oxide in frits developed for DWPF.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Recommendations for Exploration Space Medicine from the Apollo Medical Operations Project

Introduction: A study was requested in December, 2005 by the Space Medicine Division at the NASA-Johnson Space Center (JSC) to identify Apollo mission issues relevant to medical operations that had impact to crew health and/or performance. The objective was to use this new information to develop medical requirements for the future Crew Exploration Vehicle (CEV), Lunar Surface Access Module (LSAM), Lunar Habitat, and Advanced Extravehicular Activity (EVA) suits that are currently being developed within the exploration architecture. Methods: Available resources pertaining to medical operations on the Apollo 7 through 17 missions were reviewed. Ten categories of hardware, systems, or crew factors were identified in the background research, generating 655 data records in a database. A review of the records resulted in 280 questions that were then posed to surviving Apollo crewmembers by mail, face-to-face meetings, or online interaction. Response analysis to these questions formed the basis of recommendations to items in each of the categories. Results: Thirteen of 22 surviving Apollo astronauts (59%) participated in the project. Approximately 236 pages of responses to the questions were captured, resulting in 107 recommendations offered for medical consideration in the design of future vehicles and EVA suits based on the Apollo experience. Discussion: The goals of this project included: 1) Develop or modify medical requirements for new vehicles; 2) create a centralized database for future access; and 3) take this new knowledge and educate the various directorates at NASA-JSC who are participating in the exploration effort. To date, the Apollo Medical Operations recommendations are being incorporated into the exploration mission architecture at various levels and a centralized database has been developed. The Apollo crewmembers input has proved to be an invaluable resource, prompting ongoing collaboration as the requirements for the future exploration missions continue to evolve and be refined.

Scheuring, R. a.↗

Two 175 ton geothermal chiller heat pumps for leed platinum building technology demonstration project. Operation data, data collection and marketing

The activities funded by this grant helped educate and inform approximately six thousand individuals who participated in guided tours of the geothermal chiller plant at Johnson Controls Corporate Headquarters in Glendale, Wisconsin over the three year term of the project. In addition to those who took the formal tour, thousands more were exposed to hands-on learning at the self-service video kiosks located in the headquarters building and augmented reality tablet app that allowed for self-guided tours. The tours, video, and app focused on the advantages of geothermal heat pump chillers, including energy savings and environmental impact. The overall tour and collateral also demonstrated the practical application of this technology and how it can be designed into a system that includes many other sustainable technologies without sacrificing comfort or health of building occupants Among tour participants were nearly 1,000 individuals, representing 130 organizations identified as potential purchasers of geothermal heat pump chillers. In addition to these commercial clients, tours were well attended by engineering, facilities, and business trade groups. This has also been a popular tour for groups from Universities around the Midwest and K-12 schools from Wisconsin and Northern Illinois A sequence of operations was put into place to control the chillers and they have been tuned and maintained to optimize the benefit from the geothermal water loop. Data on incoming and outgoing water temperature and flow from the geothermal field was logged and sent to DOE monthly during the grant period to demonstrate energy savings.

15 GEOTHERMAL ENERGY↗

Quasi-projection-operator calculation of autoionization states of Li

Calculations of positions of the first three 2S, 2P autoionization states of lithium are reported. The results agree with experimental values (available in four of the six cases) to almost four-place accuracy. A comment is included concerning the current status of quasi-projection optical-potential scattering calculations for nonresonant e-He phase shifts.

Bhatia, A. K.↗