Search NASA⌕ Search

SEARCH · Search NASA

Results for “PROTECTIVE CLOTHING”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

25 records · Page 2

Study of the Heater-Coil Electrical Insulation for the HL-LHC Low Beta Quadrupoles

In the framework of the HL-LHC project, the present LHC low-β superconducting quadrupoles will be substituted with higher performance Nb 3 Sn magnets (MQXF) with 11.4 T coil peak field. MQXF coils are impregnated with epoxy resin to reduce risk of stress concentration on the brittle conductor. The magnet quench protection is provided by CLIQ and quench heaters to ensure a redundant system. Quench heaters are impregnated with the coils in order to have suitable thermal contact with them, and to prevent the hot spot temperature from exceeding 350K during normal operation in case of a quench. Quench heaters are insulated from the coil by S-2 Glass and polyimide. Here, the test of the first MQXF prototype (4 m long) MQXFAP1 was stopped by a coil-to-ground short circuit triggered by a heater-to-coil short. This issue triggered a root analysis of the causes of this short. Here we prove that the use of a non-conforming cloth in coil impregnation, further weakened by non-conforming high voltage test, has triggered the shorts. Moreover, we present an analysis of the heater-to-coil insulation strength, showing the role of blistering phenomena and how they are triggered by a combination of magnet powering and heater firing.

43 PARTICLE ACCELERATORS↗

Waste Management Processing Projects in the PRC - 16551

EnergySolutions continues to provide waste treatment solutions in the Peoples Republic of China (PRC). In 2015 ES had completed installation of systems at two different Nuclear power sites (Haiyang, an AP-1000{sup TM} site and Yangjiang, a CPR1000 site). This paper discusses progress on these two projects, and provides new information regarding the operation of the systems. The Yangjiang project became operational in the fall of 2015 while the Haiyang project will be done is nearly done with commissioning and is waiting for reactor operations. Haiyang Project: In the Shandong Province on China's northeast coast, EnergySolutions, as part of a consortium with China Power Investment (CPI) and Yuanda Environmental Protection Engineering Company (a PRC state-owned company), has designed and constructed the site's Site Rad Waste Treatment Facility (SRTF). The SRTF provides solid waste processing services for up to 8 AP-1000s{sup TM}. The SRTF performs the following functions: 1. Five year storage for HICs containing spent resin and filters from the nuclear power plants' waste liquid systems (WLS); 2. Sorting and Compaction System for solid waste generated from Nuclear Power Plant (NPP) operations. This system implements: a) Real time radiography to screen 200 liter waste drums for prohibited items, b) Pre-compaction, c) High Resolution Gamma Spectrophotometry (HRGS) for waste characterization, d) Supercompaction, e) Solidification of compacted drums inside overpack drums which are filled with 60 MPa compressive strength grout, and f) Automatic drum lidding which crimps the drum lid to the drum body. 3. Laundry services for NPP anti-contamination clothing. 4. At the nuclear islands, EnergySolutions is providing mobile liquid waste processing systems that utilize EnergySolutions Advanced Liquid Processing System ALPS{sup TM}/Advanced Injection Method System AIM{sup TM} processing systems to supplement the NPP's WLS system when radionuclide concentrations exceed release criteria. The spent resins and filters from the nuclear power plants are placed in EnergySolutions supplied HICs, dewatered using EnergySolutions Self Engaging Dewatering System (SEDS{sup TM}), and then placed in EnergySolutions 8-120B Type B cask for the transport of the HIC between the NPP and the SRTF and, ultimately, to a disposal site once it is ready for operations Yangjiang Project: EnergySolutions is providing liquid waste treatment system (TEU) and solid waste treatment system (TES) for Yangjiang units 3 and 4 for the China Nuclear Power Engineering Company (CNPEC). The Yangjiang site is located approximately 300 kilometers west of Hong Kong. The TEU system processes floor drain, chemical drain, and process drain tanks liquids to achieve a release concentration less than 37 Bq/l. The TES system receives spent resin and filters into HIC containers which are dewatered and subsequently transported to the Yangjiang sites QT building where they are stored for a period of up to 5 years or until a disposal site are available. TEU (Liquid waste treatment) consists of the following unit operations: - ALPS{sup TM}/AIM{sup TM} system, which includes two separate 8 vessel water treatment systems that consist of granular activated carbon (GAC), cation, anion ion and mixed bed media ion exchange (IX) columns; and: - A reverse osmosis system for final polishing, - TES (solid waste system), - SEDS (Self Engaging Dewatering System), - Shielding for the loading and storage of HICs, - Shielded transport container for the transfer of HIC to the QT building for storage, - Shielded transfer bell for the transport of spent filters from the NPP operating area to HIC. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Gamma and Beta Absorbed Dose Conversion Coefficients in the Range from 10 keV to 10 MeV for Accidental Exposures From Point Sources Placed in Clothing in Proximity to the Body [Gamma and Beta Absorbed Dose Conversion Coefficients in the Range from 10 keV to 10 MeV for Accidental Exposures From Point Sources Placed in Clothing in Close Vicinity to the Body]

Here, retrospective dose assessment following acute radiation exposures during radiological incidents can be difficult and inaccurate due to the large uncertainties associated with dose estimation. However, rapid and accurate dose assessment is critical following an incident, such that appropriate treatment can be provided to the patient as early as possible. Incident Dose assessment relies heavily on biological dosimetry with corresponding large uncertainties for inhomogeneous exposures, resulting from the estimates of whole-body doses, while the assessment of absorbed doses to individual tissues might actually be more appropriate for acute radiation exposures.

61 RADIATION PROTECTION AND DOSIMETRY↗

SU-F-T-151: Measurement Evaluation of Skin Dose in Scanning Proton Beam Therapy for Breast Cancer

Purpose: To measure the skin dose and compare it with the calculated dose from a treatment planning system (TPS) for breast cancer treatment using scanning proton beam therapy (SPBT). Methods: A single en-face-beam SPBT plan was generated by a commercial TPS for two breast cancer patients. The treatment volumes were the entire breasts (218 cc and 1500 cc) prescribed to 50.4 Gy (RBE) in 28 fractions. A range shifter of 5 cm water equivalent thickness was used. The organ at risk (skin) was defined to be 5 mm thick from the surface. The skin doses were measured in water with an ADCL calibrated parallel plate (PP) chamber. The measured data were compared with the values calculated in the TPS. Skin dose calculations can be subject to uncertainties created by the definition of the external contour and the limitations of the correction based algorithms, such as proton convolution superposition. Hence, the external contours were expanded by 0, 3 mm and 1 cm to include additional pixels for dose calculation. In addition, to examine the effects of the cloth gown on the skin dose, the skin dose measurements were conducted with and without gown. Results: On average the measured skin dose was 4% higher than the calculated values. At deeper depths, the measured and calculated doses were in better agreement (< 2%). Large discrepancy occur for the dose calculated without external expansion due to volume averaging. The addition of the gown only increased the measured skin dose by 0.4%. Conclusion: The implemented TPS underestimated the skin dose for breast treatments. Superficial dose calculation without external expansion would result in large errors for SPBT for breast cancer.

60 APPLIED LIFE SCIENCES↗

Comparison of Bolus Materials to Highly Absorbent Polypropylene and Rayon Cloth

This study assesses the utility of a highly absorbent polypropylene and rayon cloth (HAPRC) as a bolus material in radiation therapy. A comparison of various bolus materials used clinically at our center to the test bolus material, water-saturated HAPRC, was conducted. The reproducibility of the physical density was assessed by computerized tomography (CT) scanning the water-saturated HAPRC on a uniform density block phantom on multiple occasions, allowing the cloth to dry fully between subsequent CT scans. The cloth was found to have a consistent physical density between 0.8 and 1.0 g/cm{sup 3}. To evaluate the dosimetric impact of the various bolus materials, metal oxide semiconductor field effect transistor dosimetry measurements were performed for a 6 MV treatment beam on the anterior surface of an anthropomorphic thorax phantom. The ability of the bolus material to conform to an irregular surface was assessed by CT scanning the various bolus materials overlaying the nose of an anthropomorphic head phantom and another irregularly shaped test object. The HAPRC conforms well to irregular contours and is relatively inexpensive compared to Superflab and thermoplastic sheets. Before implementing the material into the clinical setting, an appropriate process for laundering the material should be determined, for hygienic reasons.

61 RADIATION PROTECTION AND DOSIMETRY↗

Evaluation of the U.S. Department of Energy Challenge Home Program Certification of Production Builders - Chicago, IL and Devens, MA

TO4 Task 3.1 - K Hovnanian Chicago, IL DOE Challenge Home Program Certified Home Constructed and Verified Specifications DOE Challenge Home Building envelope Ceiling R-49 blown fiberglass, Grade I Walls 2x4 framing @ 16 o.c. with R-13 fiberglass batts, Grade I and 1"" R-5 extruded polystyrene (XPS) insulating sheathing Frame Floors R-38 blown fiberglass, Grade I Basement Walls R-19 fiberglass batts draped full height, Grade I Basement Slab uninsulated Windows Above Grade: ENERGY STAR certified, U=0.29, SHGC=0.28 Basement: Non ENERGY STAR certified, U=0.29, SHGC=0.24 Infiltration 2 ACH 50 Mechanical systems Heat 95% AFUE sealed combustion natural gas furnace in conditioned space Goodman GMH950703BXAF Cooling 13 SEER split system Goodman GSX130301BC DHW AO Smith Vertex 100 0.96 EF natural gas tank water heater in 2nd floor utility closet Hot Water Distribution Redesigned trunk and branch Compliant with EPA WaterSense Efficient Distribution Requirements Ducts Located 100% in conditioned space via floor joists leak free to outside (5% or less) Ventilation Central Fan Integrated Supply (CFIS) ventilation with 6"" insulated outside air duct Fan Controller: Air Cycler FRV, with 6"" motorized damper 50 CFM outside air flow, 33% duty cycle (10 minutes on, 20 minutes off); ASHRAE 62.2-2010 compliance via an exhaust fan - Panasonic FV-08VQ5 WhisperCeiling Rerturn Pathways Active Return at Master Bedroom Transfer Grilles in Secondary Bedrooms Appliances, Lighting, MELs Lights 80% ENERGY STAR certified CFL Appliances ENERGY STAR certified refrigerator, dishwasher, and clothes washer; Natural gas range/oven and clothes dryer" STRUCTURE - Test House Lot 145 - 2013 DOE Challenge Test House Task 3.1 Bolingbrook, IL 60490 House is constructed and is DOE Challenge Verified by Don Nelson, a local rater. The purpose of this project was to evaluate integrated packages of advanced measures in individual test homes to assess their performance with respect to Building America Program goals, specifically compliance with the DOE Challenge Home Program. To that end, Building Science Corporation (BSC) consulted on the construction of five test houses by three cold climate production builders in three separate U.S. cities. (1) K. Hovnanian Homes, Chicago, Illinois (2) David Weekley Homes, Denver, Colorado (3) Transformations, Inc., Devens, Massachusetts. Overall, the builders have concluded that the energy related upgrades (either through the prescriptive or performance path) represent reasonable upgrades. The builders commented that while not every improvement in specification was cost effective (as in a reasonable payback period), many were improvements that could improve the marketability of the homes and serve to attract more energy efficiency discerning prospective homeowners. However, the builders did express reservations about the associated checklists and added certifications. An increase in administrative time was observed with all builders. The checklists and certifications also inherently increase cost due to: (1) Adding services to the scope of work for various trades, such as HERS Rater and heating, ventilation, and air conditioning contractor. (2) Increased material costs related to the checklists, especially the U.S. Environmental Protection Agency Indoor airPLUS and WaterSense Efficient Hot Water Distribution requirement. Ceiling - 18" cellulose Walls - 12" open cell spray foam in double stud walls Foundation - R-10 under slab, 3 1/2" closed-cell spray foam at walls Windows - Harvey U=0.20, SHGC=0.22 Infiltration - 1.0 sq in per 100 sq ft Heating - Mini split heat pump, 10.6 HSPF, 23 SEER Cooling - Mini split heat pump, 10.6 HSPF, 23 SEER DHW - 0.97 EF instantaneous propane water heater Ventilation - bathroom exhaust fans as basic option, HRV upgrade option Adams Circle Devens MA 01434 Cavite Street Devens, MA 01434

Array↗

Lessons Learned From Decommissioning B411 Decontamination Centre at Whiteshell Laboratories - 18211

Whiteshell Laboratories, located in Manitoba, Canada, provided research facilities for the Canadian nuclear industry since the early 1960's. The facility was centered on the largest organically cooled, heavy water moderated nuclear reactor in the world, the WR-1. It is now operated by Canadian Nuclear Laboratories (CNL) and is the first major decommissioning project of a nuclear research establishment in Canada. One of the major projects to support the closure of Whiteshell Laboratories (WL) is the decommissioning and demolition of the Building 411 (B411) Decontamination Centre, which provided a decontamination service for maintaining research and development of experimental rigs, equipment and tools in a safe usable state. It also provided a laundry service for radioactively contaminated clothing. The team successfully self-performed their first demolition of a nuclear facility, but not without challenges. The baseline decommissioning strategy assumed most of the facility would meet unconditional clearance levels; however when characterization revealed the extent of contamination exceeded initial assumptions projected from process knowledge, in conjunction with resource challenges and a waste disposal pathway not firmly established, active remediation of the facility was undertaken. With an unknown waste acceptance criteria for the future waste disposal facility, sludge that had accumulated in a tank used to collect xylene and organic coolant from contaminated tools and equipment and the selection of appropriate waste packages for waste storage, transportation and disposal forced the project team to adjust their demolition timeline. This, coupled with developing an open air demolition plan and managing an uncertain end state criteria, were just some of the major tasks the team successfully navigated. The impact on both schedule and cost performance caused by the change in strategy, and the lessons learned experienced by the WL Decommissioning Project Team that are being applied as the Whiteshell Laboratories Closure Project (WLCP) moves forward with the next major decommissioning challenge, are highlighted in this paper. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗