Economic Impact of Permitting Timelines on Geothermal Power in California, Nevada, and Utah

The United States has great geothermal power potential; however, only a small fraction of this resource has been utilized for power generation. Various barriers, including technical, financial, and regulatory permit delays, are attributed to the lower penetration of geothermal energy into the national grid. Unpredictable environmental reviews and permitting timelines are some of the non-technical barriers that can cause delays in geothermal exploration and utilization plans. This document provides an assessment of the potential economic impact of permitting costs and timelines on geothermal power in California, Nevada, and Utah. Development of geothermal resources requires multi-layered regulatory permitting by local, state, and federal agencies. In this study, we collected and reviewed permit timelines and associated cost data for several existing geothermal power plants as well as for geothermal projects currently undergoing permitting processes for exploration and development activities in California, Nevada, and Utah. We interviewed several geothermal developers and staff from multiple permitting agencies to obtain insight from both sides (i.e., people applying for permits and people processing those applications for California Environmental Quality Act [CEQA] and National Environmental Policy Act [NEPA] reviews and other regulatory compliance). The intent of this project was also to identify informative pathways for the geothermal stakeholder community by which the permitting process could be streamlined.

15 GEOTHERMAL ENERGY↗

Soft costs and EVSE – Knowledge gaps as a barrier to successful projects

There has been a recent push to increase access to electric vehicle (EV) charging infrastructure. The National Electric Vehicle Infrastructure (NEVI) program, part of the Bipartisan Infrastructure Law (BIL) has made significant funding available for major charging infrastructure projects along state thruways, and many state and local incentives exist for EV owners to install chargers in their homes. However, deployment of these chargers has not kept up with demand, primarily due to issues in project planning, permitting processes, and unforeseen delays. This paper serves as a review of the current understanding of these and other non-hardware costs in EV charging infrastructure projects (collectively known as “soft costs”). We found that soft costs in EV charging infrastructure projects are not well understood. Specifically, there is little agreement on how soft costs should be categorized and tracked, and less agreement still on best practices for controlling these costs and lowering barriers to infrastructure deployment. A broader review of EV charging infrastructure cost analyses shows that these costs can have significant impacts on project outcomes. EV charging infrastructure projects may be able to examine the success of the solar industry in lowering soft costs, and a similar effort may lower project costs significantly. Further work on standardizing and collecting data on EV charging infrastructure costs is required to begin addressing and controlling these costs.

32 - ENERGY CONSERVATION, CONSUMPTION, AND UTILIZA↗

SolarAPP+ Pilot Analysis: Performance and Impact of Instant, Online Solar Permitting

The National Renewable Energy Laboratory (NREL) led a collaborative effort to develop the Solar Automated Permit Processing Plus (SolarAPP+), a no-cost solar permitting software solution to address residential solar photovoltaic (PV) permitting resource constraints and streamline solar adoption processes among authorities having jurisdiction (AHJs). The SolarAPP+ is an online portal that automates permit plan review, enabling an instant permit approval process for code-compliant residential PV systems. Based on national model building, electrical, and fire codes, the SolarAPP+ automatically performs a compliance check of permit inputs against code requirements and produces an inspection checklist that can be used to verify installation practices, workmanship, and adherence to the approved design. NREL conducted a two-phase pilot with five participating AHJs and 16 solar contractors, spanning from November 2020 through December 2021, evaluating the ability of SolarAPP+ to deliver instant permits and its impact on four critical areas within each AHJ: permit review timelines; solar adoption timelines; AHJ time saved; and inspection results. The pilot confirmed that SolarAPP+ reduced permit review times to less than one day, reduced solar adoption timelines by an average of 12 days, saved an estimated 2,067 staff hours, and had comparable inspection results to those found in traditional permitting. The pilot further identified key lessons for improving SolarAPP+, including ways to streamline SolarAPP+ adoption, development of training resources, and expansion of supported products.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Mapping individual logical processes in information searching

An interactive dialog with a computerized information collection was recorded and plotted in the form of a flow chart. The process permits one to identify the logical processes employed in considerable detail and is therefore suggested as a tool for measuring individual thought processes in a variety of situations. A sample of an actual test case is given.

Smetana, F. O.↗

Marine Energy Environmental Permitting and Compliance Costs

Costs to permit Marine Energy projects are poorly understood. In this paper we examine environmental compliance and permitting costs for 19 projects in the U.S., covering the last 2 decades. Guided discussions were conducted with developers over a 3-year period to obtain historical and ongoing project cost data relative to environmental studies (e.g., baseline or pre-project site characterization as well as post-installation effects monitoring), stakeholder outreach, and mitigation, as well as qualitative experience of the permitting process. Data are organized in categories of technology type, permitted capacity, pre- and post-installation, geographic location, and funding types. We also compare our findings with earlier logic models created for the Department of Energy (i.e., Reference Models). Environmental studies most commonly performed were for Fish and Fisheries, Noise, Marine Habitat/Benthic Studies and Marine Mammals. Studies for tidal projects were more expensive than those performed for wave projects and the range of reported project costs tended to be wider than ranges predicted by logic models. For eight projects reporting full project costs, from project start to FERC or USACE permit, the average amount for environmental permitting compliance was 14.6%.

16 TIDAL AND WAVE POWER↗

Expedited desalination permitting enables adaptive planning and water system cost reduction

Seawater desalination is a drought-proof water supply for coastal cities, but widespread development of desalination plants in the U.S. has been limited by both cost and the complexity of permitting processes designed to minimize environmental impact . This work estimates the value of accelerating the permitting timeline without changing environmental or social standards. On average, faster permitting reduces the frequency of desalination plant construction and operation, the overall costs of robust water system operation, the environmental impacts of drought-tolerant water supplies due to shorter duration of plant operation. Expedited permitting allows fundamental changes in how water infrastructure is deployed, facilitating a transition from anticipatory construction and continuous operation of seawater desalination capacity as a redundant drought buffer to just-in-time (i.e. adaptive) deployment of seawater desalination capacity when critical drought thresholds are crossed. We demonstrate the value of expedited desalination permitting in enabling adaptive planning and reducing water system costs using a simple case study in Santa Barbara, CA. We discuss additional forms of adaptive water infrastructure planning as enabled by faster permitting and address their challenges and opportunities. Lastly, we identify synergies between innovation in adaptive planning, innovation in expedited permitting practices, and innovation in water technology.

adaptive planning↗

SolarAPP+ Performance Review: Final Technical Report

The National Renewable Energy Laboratory (NREL) and its project partners have developed the novel Solar Automated Permit Processing plus (SolarAPP+) software platform that provides a flexible, web-based PV-permitting tool for residential systems that can be integrated with existing and complementary software platforms. The main objective of this research is to analyze the implementation of SolarAPP+. Analysis was conducted by identifying the benefits, tradeoffs, and overall performance of SolarAPP+, including achieving its goals of delivering automated, code compliant systems, influencing permitting cycle times, and improving application submittals and/or inspection performance. The NREL team published the results of this analysis in annual SolarAPP+ Performance Review technical reports.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Benefits of the SolarAPP+ Online Permitting Software

The Solar Automated Permit Processing Plus (SolarAPP+) software is an online platform that provides plan review and instantly issues permits for code-compliant residential photovoltaic (PV) systems.

automated permitting↗

5 Easy Steps to SolarAPP+ Adoption

The Solar Automated Permit Processing Plus (SolarAPP+) software is an online platform that provides plan review and instantly issues permits for code-compliant residential photovoltaic (PV) systems. Here's how your jurisdiction can get started.

automated permitting↗

Large-Scale Solar Development: A Playbook for Southwest Virginia

his playbook is an introductory guide for local governments to facilitate large-scale solar projects in Southwest Virginia. In a region that has a long history of energy production, solar technologies offer enormous potential for economic development and job growth. Large-scale solar can take many forms, including rooftop or ground-mounted installations at local corporate offices, nonprofit organizations, or schools. It can also encompass utility-scale projects over many acres on former agricultural or timberlands, mined lands, or industrial sites. Regardless of the type of project, solar is a widely popular, cost-competitive energy choice that helps create sustainable and prosperous communities. This playbook is directed to municipal and county governments that have an essential role to play in encouraging large-scale solar projects. The first section provides an overview of state and national trends, including recent state legislation that will impact local oversight of solar development. This is followed by an overview of the solar project approval process from a developer’s perspective. The next section is an overview of the state and local permitting process for solar projects, followed by other development considerations such as local tax revenue options, financing incentives, and considerations for solar on brownfields and previously mined lands. The playbook concludes with a step-by-step guide for local governments to facilitate large-scale solar development.This playbook is part of the Solar Workgroup of Southwest Virginia’s effort to bring solar energy and associated jobs to the region. Over the past few years, the workgroup has met with stakeholder groups and crafted a strategy for local solar energy development. The workgroup has collaborated with cities and counties to bring SolSmart designation to eight counties and cities, implemented group purchase campaigns for commercial solar, and led research efforts.

14 SOLAR ENERGY↗

Getting Electric Vehicle Ready in Indian Country

As electric vehicles (EV) become more common, Tribes can guide how charging infrastructure is planned, approved, and built on Tribal lands. Tribes can prepare for future infrastructure projects by updating codes, zoning, parking rules, and permitting process, as well as improving electrical infrastructure and broadband access.

33 ADVANCED PROPULSION SYSTEMS↗

Films, Preimpregnated Tapes and Composites Made from Polyimide "Salt-Like" Solutions

High quality films, preimpregnated tape (prepegs), and composites have been fabricated from polyimide precursor 'saltlike' solutions. These salt-like solutions have a low viscosity (5,000 to 10,000 cp) and a high solids content (50-65% by weight) and can be coated onto reinforcing fiber to produce prepegs with excellent tack and drape at 12-15% residual solvent (approximately 4-6% water from thermal imidization reaction). The processing of these types of prepegs significantly overcomes solvent removal problems and allows excellent fiber wet out. In addition, the physical characteristics of the polyimide precursor salt-like solutions permits processing into high-performance materials through the use of standard prepregging and composite fabrication equipment. The resultant composites are of high quality.

Cano, Roberto J.↗

Metafusion: A breakthrough in metallurgy

The Metafuse Process is a patented development in the field of thin film coatings utilizing cold fusion which results in a true inter-dispersion of dissimilar materials along a gradual transition gradient through a boundary of several hundred atomic layers. The process is performed at ambient temperatures and pressures requiring relatively little energy and creating little or no heat. The process permits a remarkable range of material combinations and joining of materials which are normally incompatible. Initial applications include titanium carbide into and onto the copper resistance welding electrodes and tungsten carbide onto the cutting edges of tool steel blades. The process is achieved through application of an RF signal of low power and is based on the theory of vacancy fusion.

Joseph, Adrian A.↗

Resolution of electron emission mechanisms in an argon arc with a hot tungsten cathode

The regenerative nature of the interaction between the electron emission processes at the cathode surface and the ion-, excited-atom-, and photon-production processes in the plasma was examined. Semiquantitative estimates of the thickness of the species production layer, the current partition, and the time constants were made. These results were used to interpret experimental measurements of the current decay of an argon arc at 46.7 kPa, 3.2-7.9 A, and 28-18 V, with a self-sustained hot tungsten cathode. After the discharge is suddenly connected to a voltage clamp, the disparity of decay rates for different emission processes permits the separation of thermionic emission from the faster-decaying components. The observed thermionic current constitutes about 30% of the total emission. The high nonthermionic portions of the current could not be explained in terms of the present understanding of the emission processes.

Chen, M. M.↗

Guideline for Characterizing and Evaluating a Candidate Project Site for Solar Thermal Applications

This document presents a structured procedure for characterizing and evaluating candidate project sites for concentrating solar power (CSP) and solar heat for industrial processes (SHIP) applications. The objective is to provide project developers, researchers, and other stakeholders with a consistent, technology-agnostic framework for early-stage site assessment, enabling informed decision-making prior to significant investment in project development. Site selection is a critical factor in project success or failure for both CSP and SHIP projects. Key factors such as solar resource availability, land characteristics, environmental and regulatory constraints, infrastructure availability, and community context are determined by the choice of project site and can materially impact project performance, cost, schedule, and overall viability. This procedure is designed to systematically evaluate these factors, identify potential fatal flaws, and prioritize the most favorable candidate sites for further development. The process begins with rapid screening-level evaluation, using publicly available data to assess solar resource, land availability and suitability, zoning and land-use compatibility, and exclusion zones such as protected lands or sensitive habitats. Sites that meet the minimum screening criteria advance to a more detailed characterization. Subsequent sections of this report provide guidance for a next-level assessment of the most important technical and environmental parameters, including: 1) Solar resource quality, variability, and uncertainty using multiyear datasets and, where appropriate, on-site measurement campaigns; 2) Meteorological conditions such as wind, temperature, extreme weather events, and soiling impacts; 3) Land characteristics including slope, shading, and geotechnical conditions; and 4) Environmental and regulatory considerations, including permitting processes, endangered species, cultural resources, and visual impacts. The procedure also addresses infrastructure and integration considerations, including: 1) Grid interconnection requirements for CSP power generation projects; 2) Electrical and operational integration for SHIP facilities; 3) Water availability, quality, and permitting constraints, which are particularly critical for CSP in arid regions; and 4) Site access, construction logistics, and availability of workforce and supporting services. Recognizing the importance of social and economic context, the procedure includes evaluation of community engagement factors, such as stakeholder sentiment, proximity to sensitive visual receptors, workforce development opportunities, and local economic incentives. The outputs of these assessments are synthesized in a cost and risk evaluation, translating site characteristics into expected impacts on capital cost, operating cost, schedule, and technical risk. This is complemented by screening-level performance modeling, including 8760 simulations and long-term projections, to quantify expected energy or thermal output, assess variability thereof, and support comparison between candidate sites. Finally, the procedure provides high-level guidance on a structured go/no-go decision framework, categorizing sites based on identified risks and constraints, and outlining a clear path forward to feasibility studies and front-end engineering design for viable projects. By standardizing the site characterization process across both CSP and SHIP applications, this guideline aims to: 1) Improve consistency and transparency in early-stage project evaluation; 2) Reduce development risk and avoid investment in nonviable project sites; 3) Support collaboration between developers, researchers, and public agencies; and 4) Accelerate successful deployment of concentrating solar technologies for both power generation and industrial process heat.

14 SOLAR ENERGY↗

NORTH DAKOTA CARBONSAFE PHASE III: SITE CHARACTERIZATION AND PERMITTING OF GEOLOGIC STORAGE OF CARBON DIOXIDE

The Energy & Environmental Research Center (EERC), in partnership with Minnkota Power Cooperative Inc. (Minnkota), SLB, and Computer Modelling Group Ltd. (CMG), supported wide-scale deployment of carbon capture and storage (CCS) as part of the U.S. Department of Energy (DOE) National Energy Technology Laboratory Carbon Storage Assurance Facility Enterprise (CarbonSAFE) Initiative Phase III. This phase included the acquisition, analysis, and development of information to fully characterize two storage complexes to demonstrate viable storage resources for commercial volumes of CO2 (defined by DOE as a minimum of 50 million tonnes [MMt] of CO2 within a 30-year period) (National Energy Technology Laboratory, 2024). Phase III also involved the preparation, submission, and approval of North Dakota underground injection control (UIC) Class VI storage facility permits (SFPs)—required precursors to applications for Class VI injection well permits. The presumed viability of commercial-scale CCS, situated adjacent to Minnkota’s Milton R. Young Station (MRYS), is validated by Minnkota’s continued pursuit of Project Tundra—an initiative to build the world’s largest lignite-based CCS project in central North Dakota (www.projecttundrand.com). Project Tundra comprises two scopes of work, Tundra Capture (installation of postcombustion CO2 capture at MRYS) and Tundra SGS (secure geologic storage). The efforts of North Dakota CarbonSAFE Phase III, Site Characterization and Permitting, supported Tundra SGS. Extensive site-specific characterization activities included a successful multimeasurement geophysical approach and drilling a stratigraphic test well (J-ROC 1, subsequently renamed Liberty-1) adjacent to MRYS. Core collection and analyses, downhole testing and fluid sampling, and geophysical logging were performed on J-ROC 1 and on a nearby stratigraphic test well (known as J-LOC 1), which was drilled, cored, and tested under a complementary project funded by the North Dakota Lignite Research Program. The injection tests performed on J-LOC 1 positively impacted the CarbonSAFE project, resulting in fewer proposed injection wells and significant construction, operations, and monitoring cost savings. The characterization data collected and analyses performed were integrated into geologic models, and successive numerical simulations were run to determine CO2 plume extent and subsurface pressure buildup associated with the planned CO2 injection rate of nearly 4 MMt per year. The latter doubles the CarbonSAFE Initiative goal with an estimated 100 MMt of CO2 stored in 20 years. Application of the U.S. Environmental Protection Agency’s (EPA’s) method for estimating the Class VI Rule area of review (AOR) to the overpressurized Broom Creek Formation inspired an alternative method of calculation, called risk-based AOR delineation. This peer-reviewed method was applied for the first time during the storage facility-permitting process. The two SFP applications submitted in 2021 successfully resulted in North Dakota Industrial Commission (NDIC) orders in 2022 authorizing the creation of the storage facility areas and amalgamation of pore space as well as establishing financial responsibility requirements. After approval of the SFPs, Minnkota filed in 2022 applications for permits to reenter the J-ROC 1 well and to drill two new wells—all with the intended purpose to become Class VI injection wells. To establish eligibility under the Internal Revenue Code for Section 45Q tax incentives, a monitoring, reporting, and verification (MRV) plan was prepared and submitted by Minnkota to EPA in 2022, resulting in the first such plan approved in North Dakota. Also in 2022, under the National Environmental Policy Act (NEPA), Minnkota prepared and submitted an environmental information volume (EIV) describing the proposed CCS project and associated potential environmental impacts. Based on the EIV, DOE determined that the proposed construction project required an environmental assessment, and Minnkota submitted the first draft in 2023 and a revised draft in 2024. Both submissions were followed by a public comment period. Subsequently, DOE issued a finding of no significant impact (FONSI) on September 13, 2024. A successful outreach program, strongly based in the production, presentation, and dissemination of informational material, fostered an environment to aid stakeholders in making informed decisions regarding the planned project. Opportunities for public input were provided at various steps along the way, including at county planning and zoning meetings, before and during the SFP administrative hearing, and during environmental assessment public comment periods. In addition, land/pore space owners and mineral owners had various points of contact, including granting access rights, securing pore space leasing, and mineral owner notifications. Based upon the successful storage facility permitting issued by NDIC, approval of the MRV plan by EPA, and receipt of a FONSI under the NEPA, Minnkota is continuing its pursuit of Project Tundra. In December 2023, the Office of Clean Energy Demonstrations under its Carbon Capture Demonstrations Projects Program announced funding for the capture system (Office of Clean Energy Demonstrations, 2023) and a proposal for CarbonSAFE Phase IV: Construction funding was submitted in March 2024 for the storage project. A go/no-go decision to proceed with construction and operations in the Broom Creek Formation is anticipated in 2024. References National Energy Technology Laboratory, CarbonSafe Initiative, https://netl.doe.gov/carbon-management/carbon-storage/carbonsafe (accessed August 2024). Office of Clean Energy Demonstrations, 2023, OCED selects three projects in CA, ND, and TX to reduce harmful carbon pollution, create new economic opportunities, and advance carbon reducing technologies, December, www.energy.gov/oced/articles/oced-selects-three-projects-ca-nd-and-tx-reduce-harmful-carbon-pollution-create-new (accessed August 2024).

Peck, Wesley↗

Geothermal Interagency Collaboration Task Force: Summary of Findings

This report summarizes the findings of the Geothermal Interagency Collaboration Task Force (Task Force) and associated stakeholder forums and Tribal listening sessions. The Task Force included federal agencies and state agencies in California and Nevada with a nexus to geothermal regulatory and permitting approvals. The Task Force met twice over the course of 2022 to discuss current geothermal regulatory and permitting challenges and strategies for improved coordination and permit processing. In addition, the project team held four forums/listening sessions in 2022 with geothermal industry representatives, environmental non-governmental organizations, and Tribes to gain additional insight and perspective on the geothermal regulatory process and managing potential cultural and natural resource conflicts that may arise during geothermal development.

15 GEOTHERMAL ENERGY↗