A Machine Learning-Based Vulnerability Analysis for Cascading Failures of Integrated Power-Gas Systems

This article proposes a cascading failure simulation (CFS) method and a hybrid machine learning method for vulnerability analysis of integrated power-gas systems (IPGSs). The CFS method is designed to study the propagating process of cascading failures between the two systems, generating data for machine learning with initial states randomly sampled. The proposed method considers generator and gas well ramping, transmission line and gas pipeline tripping, island issue handling and load shedding strategies. Then, a hybrid machine learning model with a combined random forest (RF) classification and regression algorithms is proposed to investigate the impact of random initial states on the vulnerability metrics of IPGSs. Extensive case studies are carried out on three test IPGSs to verify the proposed models and algorithms. Simulation results show that the proposed models and algorithms can achieve high accuracy for the vulnerability analysis of IPGSs.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Spatial-Temporal Recurrent Graph Neural Networks for Fault Diagnostics in Power Distribution Systems

Fault diagnostics are extremely important to decide proper actions toward fault isolation and system restoration. The growing integration of inverter-based distributed energy resources imposes strong influences on fault detection using traditional overcurrent relays. This paper utilizes emerging graph learning techniques to build new temporal recurrent graph neural network models for fault diagnostics. The temporal recurrent graph neural network structures can extract the spatial-temporal features from data of voltage measurement units installed at the critical buses. From these features, fault event detection, fault type/phase classification, and fault location are performed. Compared with previous works, the proposed temporal recurrent graph neural networks provide a better generalization for fault diagnostics. Moreover, the proposed scheme retrieves the voltage signals instead of current signals so that there is no need to install relays at all lines of the distribution system. Therefore, the proposed scheme is generalizable and not limited by the number of relays installed. The effectiveness of the proposed method is comprehensively evaluated on the Potsdam microgrid and IEEE 123-node system in comparison with other neural network structures.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Autonomous power expert fault diagnostic system for Space Station Freedom electrical power system testbed

The goal of the Autonomous Power System (APS) program is to develop and apply intelligent problem solving and control to the Space Station Freedom Electrical Power System (SSF/EPS) testbed being developed and demonstrated at NASA Lewis Research Center. The objectives of the program are to establish artificial intelligence technology paths, to craft knowledge-based tools with advanced human-operator interfaces for power systems, and to interface and integrate knowledge-based systems with conventional controllers. The Autonomous Power EXpert (APEX) portion of the APS program will integrate a knowledge-based fault diagnostic system and a power resource planner-scheduler. Then APEX will interface on-line with the SSF/EPS testbed and its Power Management Controller (PMC). The key tasks include establishing knowledge bases for system diagnostics, fault detection and isolation analysis, on-line information accessing through PMC, enhanced data management, and multiple-level, object-oriented operator displays. The first prototype of the diagnostic expert system for fault detection and isolation has been developed. The knowledge bases and the rule-based model that were developed for the Power Distribution Control Unit subsystem of the SSF/EPS testbed are described. A corresponding troubleshooting technique is also described.

Truong, Long V.↗

Fault Locating, Prediction and Protection (FLPPS)

One of the main objectives of this DOE-sponsored project was to reduce customer outage time. Fault location, prediction, and protection are the most important aspects of fault management for the reduction of outage time. In the past most of the research and development on power system faults in these areas has focused on transmission systems, and it is not until recently with deregulation and competition that research on power system faults has begun to focus on the unique aspects of distribution systems. This project was planned with three Phases, approximately one year per phase. The first phase of the project involved an assessment of the state-of-the-art in fault location, prediction, and detection as well as the design, lab testing, and field installation of the advanced protection system on the SCE Circuit of the Future located north of San Bernardino, CA. The new feeder automation scheme, with vacuum fault interrupters, will limit the number of customers affected by the fault. Depending on the fault location, the substation breaker might not even trip. Through the use of fast communications (fiber) the fault locations can be determined and the proper fault interrupting switches opened automatically. With knowledge of circuit loadings at the time of the fault, ties to other circuits can be closed automatically to restore all customers except the faulted section. This new automation scheme limits outage time and increases reliability for customers. The second phase of the project involved the selection, modeling, testing and installation of a fault current limiter on the Circuit of the Future. While this project did not pay for the installation and testing of the fault current limiter, it did perform the evaluation of the fault current limiter and its impacts on the protection system of the Circuit of the Future. After investigation of several fault current limiters, the Zenergy superconducting, saturable core fault current limiter was selected for installation. Because of some testing problems with the Zenergy fault current limiter, installation was delayed until early 2009 with it being put into operation on March 6, 2009. A malfunction of the FCL controller caused the DC power supply to the superconducting magnet to be turned off. This inserted the FCL impedance into the circuit while it was in normal operation causing a voltage resonance condition. While these voltages never reached a point where damage would occur on customer equipment, steps were taken to insure this would not happen again. The FCL was reenergized with load on December 18, 2009. A fault was experienced on the circuit with the FCL in operation on January 14, 2010. The FCL operated properly and reduced the fault current by about 8%, what was expected from tests and modeling. As of the end of the project, the FCL was still in operation on the circuit. The third phase of the project involved the exploration of several advanced protection ideas that might be at a state where they could be applied to the Circuit of the Future and elsewhere in the SCE electrical system. Based on the work done as part of the literature review and survey, as well as a number of internal meetings with engineering staff at SCE, a number of ideas were compiled. These ideas were then evaluated for applicability and ability to be applied on the Circuit of the Future in the time remaining for the project. Some of these basic ideas were implemented on the circuit including measurement of power quality before and after the FCL. It was also decided that we would take what was learned as part of the Circuit of the Future work and extend it to the next generation circuit protection for SCE. Also at this time, SCE put in a proposal to the DOE for the Irvine Smart Grid Demonstration using ARRA funding. SCE was successful in obtaining funding for this proposal, so it was felt that exploration of new protection schemes for this Irvine Smart Grid Demonstration would be a good use of the project resources. With this in mind, a protection system that uses fault interrupting switches, high speed communications, and looping two radial distribution circuits would have the potential for significant reductions in interruption time and number of interruptions for customers.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Transmission-Line Fault Analysis Using Synchronized Sampling

An automated analysis approach, which can automatically characterize fault and subsequent relay operation, is the focus of this paper. It utilizes synchronized samples captured during transients from both ends of the transmission line to detect, classify, and locate transmission-line faults and can verify that the tripped line has indeed experienced a fault. The proposed method is tested for several faults simulated on an IEEE 118-bus test system and it has been concluded that it can detect and classify a fault using prefault and postfault recorded samples within 7 ms of fault inception and can accurately locate a fault with 3% accuracy. This time response performance is highly desirable since with the increasing use of modern circuit breakers, which can open the faulty line in less than two cycles, the time window of the captured waveforms is significantly reduced due to the unavailability of measurement signals after breakers open.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Fault analysis of multichannel spacecraft power systems

The NASA Marshall Space Flight Center proposes to implement computer-controlled fault injection into an electrical power system breadboard to study the reactions of the various control elements of this breadboard. Elements under study include the remote power controllers, the algorithms in the control computers, and the artificially intelligent control programs resident in this breadboard. To this end, a study of electrical power system faults is being performed to yield a list of the most common power system faults. The results of this study will be applied to a multichannel high-voltage DC spacecraft power system called the large autonomous spacecraft electrical power system (LASEPS) breadboard. The results of the power system fault study and the planned implementation of these faults into the LASEPS breadboard are described.

Dugal-Whitehead, Norma R.↗

Fault-tolerant grid frequency measurement algorithm during transients

Many critical electric grid operations rely on accurate grid frequency measurements. Unfortunately, the measurement accuracy can be easily undermined by power system transient faults. During a power system transient fault, the power grid voltages and currents are usually highly distorted by high-frequency components. What is worse, the power grid signals could have discontinuity during some system transient faults such as phase angle jump, and the discontinuity could result in large measurement errors to state-of-the-art grid measurement algorithms. In this study, a fault-tolerant grid frequency measurement algorithm during transients is proposed. The new algorithm consists of two stages. The first stage is a transient detector, and it can detect the occurrence of system transient faults instantaneously. The second stage is the intelligent frequency estimator, and it will adapt its measurements according to the transient detector. The performance of the algorithm is evaluated under different steady-state and transient conditions. Both dependability and security of the fault-tolerant algorithm are assessed by using PSCAD simulation data and IEEE Standard test data.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Fault Diagnosis of Power Systems Using Intelligent Systems

The power system operator's need for a reliable power delivery system calls for a real-time or near-real-time Al-based fault diagnosis tool. Such a tool will allow NASA ground controllers to re-establish a normal or near-normal degraded operating state of the EPS (a DC power system) for Space Station Alpha by isolating the faulted branches and loads of the system. And after isolation, re-energizing those branches and loads that have been found not to have any faults in them. A proposed solution involves using the Fault Diagnosis Intelligent System (FDIS) to perform near-real time fault diagnosis of Alpha's EPS by downloading power transient telemetry at fault-time from onboard data loggers. The FDIS uses an ANN clustering algorithm augmented with a wavelet transform feature extractor. This combination enables this system to perform pattern recognition of the power transient signatures to diagnose the fault type and its location down to the orbital replaceable unit. FDIS has been tested using a simulation of the LeRC Testbed Space Station Freedom configuration including the topology from the DDCU's to the electrical loads attached to the TPDU's. FDIS will work in conjunction with the Power Management Load Scheduler to determine what the state of the system was at the time of the fault condition. This information is used to activate the appropriate diagnostic section, and to refine if necessary the solution obtained. In the latter case, if the FDIS reports back that it is equally likely that the faulty device as 'start tracker #1' and 'time generation unit,' then based on a priori knowledge of the system's state, the refined solution would be 'star tracker #1' located in cabinet ITAS2. It is concluded from the present studies that artificial intelligence diagnostic abilities are improved with the addition of the wavelet transform, and that when such a system such as FDIS is coupled to the Power Management Load Scheduler, a faulty device can be located and isolated from the rest of the system. The benefit of these studies provides NASA with the ability to quickly restore the operating status of a space station from a critical state to a safe degraded mode, thereby saving costs in experimentation rescheduling, fault diagnostics, and prevention of loss-of-life.

Momoh, James A.↗

A study of fault injection in multichannel spacecraft power systems

NASA/Marshall Space Flight Center proposes to implement fault injection into an electrical power system breadboard to study the reactions of the various control elements of this breadboard. Among the elements to be studied are the remote power controllers, the algorithms in the control computers, and the artificially intelligent control programs resident in this breadboard. To this end, a study of electrical power is being performed to yield a list of the most common power system faults. The results of this study are being applied to a multichannel high-voltage DC spacecraft power system called the Large Autonomous Spacecraft Electrical Power System Breadboard. Some of the reactions of the breadboard to some of the faults which have been encountered are presented along with the results of this study.

Dugal-Whitehead, Norma R.↗

Transmission line relay mis-operation detection based on time-synchronized field data

In this paper, a real-time tool to detect transmission line relay mis-operation is implemented. The tool uses time-synchronized measurements obtained from both ends of the line during disturbances. The proposed fault analysis tool comes into the picture only after the protective device has operated and tripped the line. The proposed methodology is able not only to detect, classify, and locate transmission line faults, but also to accurately confirm whether the line was tripped due to a mis-operation of protective relays. The analysis report includes either detailed description of the fault type and location or detection of relay mis-operation. As such, it can be a source of very useful information to support the system restoration. The focus of the paper is on the implementation requirements that allow practical application of the methodology, which is illustrated using the field data obtained the real power system. Testing and validation is done using the field data recorded by digital fault recorders and protective relays. The test data included several hundreds of event records corresponding to both relay mis-operations and actual faults. The discussion of results addresses various challenges encountered during the implementation and validation of the presented methodology.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Expert System Detects Power-Distribution Faults

Autonomous Power Expert (APEX) computer program is prototype expert-system program detecting faults in electrical-power-distribution system. Assists human operators in diagnosing faults and deciding what adjustments or repairs needed for immediate recovery from faults or for maintenance to correct initially nonthreatening conditions that could develop into faults. Written in Lisp.

Walters, Jerry L.↗

Power System Wildfire Risks and Potential Solutions: A Literature Review & Proposed Metric

Several fire risk evaluation, fire tracking, and fire response resources are available. The risk metrics and fire response programs are sometimes modified to include a power system context. The risk metrics often evaluate the risk of fires causing power system faults or outages, especially on transmission systems. The response programs are modified to ensure the safety of power system equipment and first responders as well as to coordinate power system outages to both ensure safety during an active fire and prevent fire ignition during high risk periods. Although some aspects of wildfire responses have been adapted to include power system concerns, adaptations to power system operations and maintenance to include wildfire risks and responses are still nascent. In particular, a risk metric that evaluates the potential for power system components to ignite wildfires is needed to help guide power system upgrade efforts and power system fire safety measures. This document serves as a brief literature review of wildfire risk metrics and response programs and how they relate to power systems. It also includes a proposed risk metric and structure for describing the risk of a power system component igniting a fire.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Power system applications of fiber optics

Power system applications of optical systems, primarily using fiber optics, are reviewed. The first section reviews fibers as components of communication systems. The second section deals with fiber sensors for power systems, reviewing the many ways light sources and fibers can be combined to make measurements. Methods of measuring electric field gradient are discussed. Optical data processing is the subject of the third section, which begins by reviewing some widely different examples and concludes by outlining some potential applications in power systems: fault location in transformers, optical switching for light fired thyristors and fault detection based on the inherent symmetry of most power apparatus. The fourth and final section is concerned with using optical fibers to transmit power to electric equipment in a high voltage situation, potentially replacing expensive high voltage low power transformers. JPL has designed small photodiodes specifically for this purpose, and fabricated and tested several samples. This work is described.

Kirkham, H.↗

Single-phase power distribution system power flow and fault analysis

Alternative methods for power flow and fault analysis of single-phase distribution systems are presented. The algorithms for both power flow and fault analysis utilize a generalized approach to network modeling. The generalized admittance matrix, formed using elements of linear graph theory, is an accurate network model for all possible single-phase network configurations. Unlike the standard nodal admittance matrix formulation algorithms, the generalized approach uses generalized component models for the transmission line and transformer. The standard assumption of a common node voltage reference point is not required to construct the generalized admittance matrix. Therefore, truly accurate simulation results can be obtained for networks that cannot be modeled using traditional techniques.

Halpin, S. M.↗

Estimation of Faults in DC Electrical Power System

This paper demonstrates a novel optimization-based approach to estimating fault states in a DC power system. Potential faults changing the circuit topology are included along with faulty measurements. Our approach can be considered as a relaxation of the mixed estimation problem. We develop a linear model of the circuit and pose a convex problem for estimating the faults and other hidden states. A sparse fault vector solution is computed by using 11 regularization. The solution is computed reliably and efficiently, and gives accurate diagnostics on the faults. We demonstrate a real-time implementation of the approach for an instrumented electrical power system testbed, the ADAPT testbed at NASA ARC. The estimates are computed in milliseconds on a PC. The approach performs well despite unmodeled transients and other modeling uncertainties present in the system.

Gorinevsky, Dimitry↗

Electric Power quality Analysis in research reactor: Impacts on nuclear safety assessment and electrical distribution reliability

The increased requirements on supervision, control, and performance in modern power systems make power quality monitoring a common practise for utilities. Large databases are created and automatic processing of the data is required for fast and effective use of the available information. Aim of the work presented in this paper is the development of tools for analysis of monitoring power quality data and in particular measurements of voltage and currents in various level of electrical power distribution. The study is extended to evaluate the reliability of the electrical system in nuclear plant. Power Quality is a measure of how well a system supports reliable operation of its loads. A power disturbance or event can involve voltage, current, or frequency. Power disturbances can originate in consumer power systems, consumer loads, or the utility. The effect of power quality problems is the loss power supply leading to severe damage to equipments. So, we try to track and improve system reliability. The assessment can be focused on the study of impact of short circuits on the system, harmonics distortion, power factor improvement and effects of transient disturbances on the Electrical System during motor starting and power system fault conditions. We focus also on the review of the Electrical System design against the Nuclear Directorate Safety Assessment principles, including those extended during the last Fukushima nuclear accident. The simplified configuration of the required system can be extended from this simple scheme. To achieve these studies, we have used a demo ETAP power station software for several simulations. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Commercial PV Inverter IEEE 1547.1 Ride-Through Assessments Using an Automated PHIL Test Platform

As more countries seek solutions to their de-carbonization targets using renewable energy (RE) technologies, interconnection standards and national grid codes for distributed energy resources (DER) are being updated to support higher penetrations of RE and improve grid stability. Common grid-code revisions mandate DER devices, such as solar inverters and energy storage systems, ride-through (RT) voltage and frequency disturbances. This is necessary because as the percentage of generation from DER increases, there is a greater risk power system faults will cause many or all DER to trip, triggering a substantial load-generation imbalance and possible cascading blackout. This paper demonstrates for the first time a methodology to verify commercial DER devices are compliant to new voltage, frequency, and rate of change of frequency (ROCOF) RT requirements established in IEEE Std. 1547-2018. The methodology incorporates a software automation tool, called the SunSpec System Validation Platform (SVP), in combination with a hardware-in-the-loop (HIL) system to execute the IEEE Std. 1547.1-2020 RT test protocols. In this paper, the approach is validated with two commercial photovoltaic inverters, the test results are analyzed for compliance, and improvements to the test procedure are suggested.

14 SOLAR ENERGY↗

A Trade-Off Study Between the Primary and Transient Responses of Grid-Forming Inverters

The control parameters of the grid-forming (GFM) inverter-based resources (IBRs) directly impact power system dynamics. The primary control requires the GFM inverter to balance generation and load. It is also preferred that a GFM inverter maintain the terminal frequency after a power system fault. In this paper, we investigate the trade-off between the primary control objective and the transient response. To quantify the transient performance of the GFM inverter, we introduce a new real-time transient stability index (TSI). This index plays a crucial role in our investigation, as it allows us to compare the performance trade-offs of different sets of GFM control parameters.

Lin, Xuheng↗