Search NASA⌕ Search

SEARCH · Search NASA

Results for “Probabilistic Risk analysis”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Application of Risk Assessment Tools in the Continuous Risk Management (CRM) Process

Marshall Space Flight Center (MSFC) of the National Aeronautics and Space Administration (NASA) is currently implementing the Continuous Risk Management (CRM) Program developed by the Carnegie Mellon University and recommended by NASA as the Risk Management (RM) implementation approach. The four most frequently used risk assessment tools in the center are: (a) Failure Modes and Effects Analysis (FMEA), Hazard Analysis (HA), Fault Tree Analysis (FTA), and Probabilistic Risk Analysis (PRA). There are some guidelines for selecting the type of risk assessment tools during the project formulation phase of a project, but there is not enough guidance as to how to apply these tools in the Continuous Risk Management process (CRM). But the ways the safety and risk assessment tools are used make a significant difference in the effectiveness in the risk management function. Decisions regarding, what events are to be included in the analysis, to what level of details should the analysis be continued, make significant difference in the effectiveness of risk management program. Tools of risk analysis also depends on the phase of a project e.g. at the initial phase of a project, when not much data are available on hardware, standard FMEA cannot be applied; instead a functional FMEA may be appropriate. This study attempted to provide some directives to alleviate the difficulty in applying FTA, PRA, and FMEA in the CRM process. Hazard Analysis was not included in the scope of the study due to the short duration of the summer research project.

Paul S. Ray↗

NASA Taxonomies for Searching Problem Reports and FMEAs

Many types of hazard and risk analyses are used during the life cycle of complex systems, including Failure Modes and Effects Analysis (FMEA), Hazard Analysis, Fault Tree and Event Tree Analysis, Probabilistic Risk Assessment, Reliability Analysis and analysis of Problem Reporting and Corrective Action (PRACA) databases. The success of these methods depends on the availability of input data and the analysts knowledge. Standard nomenclature can increase the reusability of hazard, risk and problem data. When nomenclature in the source texts is not standard, taxonomies with mapping words (sets of rough synonyms) can be combined with semantic search to identify items and tag them with metadata based on a rich standard nomenclature. Semantic search uses word meanings in the context of parsed phrases to find matches. The NASA taxonomies provide the word meanings. Spacecraft taxonomies and ontologies (generalization hierarchies with attributes and relationships, based on terms meanings) are being developed for types of subsystems, functions, entities, hazards and failures. The ontologies are broad and general, covering hardware, software and human systems. Semantic search of Space Station texts was used to validate and extend the taxonomies. The taxonomies have also been used to extract system connectivity (interaction) models and functions from requirements text. Now the Reconciler semantic search tool and the taxonomies are being applied to improve search in the Space Shuttle PRACA database, to discover recurring patterns of failure. Usual methods of string search and keyword search fall short because the entries are terse and have numerous shortcuts (irregular abbreviations, nonstandard acronyms, cryptic codes) and modifier words cannot be used in sentence context to refine the search. The limited and fixed FMEA categories associated with the entries do not make the fine distinctions needed in the search. The approach assigns PRACA report titles to problem classes in the taxonomy. Each ontology class includes mapping words - near-synonyms naming different manifestations of that problem class. The mapping words for Problems, Entities and Functions are converted to a canonical form plus any of a small set of modifier words (e.g. non-uniformity NOT + UNIFORM.) The report titles are parsed as sentences if possible, or treated as a flat sequence of word tokens if parsing fails. When canonical forms in the title match mapping words, the PRACA entry is associated with the corresponding Problem, Entity or Function in the ontology. The user can search for types of failures associated with types of equipment, clustering by type of problem (e.g., all bearings found with problems of being uneven: rough, irregular, gritty ). The results could also be used for tagging PRACA report entries with rich metadata. This approach could also be applied to searching and tagging failure modes, failure effects and mitigations in FMEAs. In the pilot work, parsing 52K+ truncated titles (the test cases that were available), has resulted in identification of both a type of equipment and type of problem in about 75% of the cases. The results are displayed in a manner analogous to Google search results. The effort has also led to the enrichment of the taxonomy, adding some new categories and many new mapping words. Further work would make enhancements that have been identified for improving the clustering and further reducing the false alarm rate. (In searching for recurring problems, good clustering is more important than reducing false alarms). Searching complete PRACA reports should lead to immediate improvement.

Malin, Jane T.↗

ADAPTIVE SURROGATES WITHIN THE RAVEN FRAMEWORK FOR DYNAMIC PROBABILISTIC RISK ASSESSMENT ANALYSIS

The RAVEN code has been under development at the Idaho National Laboratory since 2012. Its main goal is to create a multi-purpose platform for the deploying of all the capabilities needed for Probabilistic Risk Assessment (PRA), Uncertainty Quantification (UQ), data mining analysis and optimization studies. RAVEN has demonstrated a good level of maturity in terms of state-of-art and advanced analysis methodologies. In the past year the RAVEN code has been released as open-source project and is available to download (raven.inl.gov) free of charge. The main subject of this paper is to present a new system within the RAVEN framework to drastically accelerate PRA and UQ analysis using acceleration schemes based on surrogate modeling. This system is based on the heavy usage of surrogate modeling and artificial intelligence algorithms, able to emulate the response of a physical system in closed domains (domains where the surrogate models have been constructed from). The aim of this paper is to show to the community how the employment of surrogate modeling techniques can be a viable solution for the current and future challenges in terms of PRA, UQ and Safety Margins characterizations. In addition, in this manuscript it is presented the construction of a RAVEN new entity named “HybridModel” that is aimed to switch between a high-fidelity code and its linked surrogate, accelerating the PRA and UQ processes without largely reducing the accuracy of the results of the analyses. All these new capabilities will be shown with an application example about a Station Black Out scenario for a prototypical Pressurized Water Reactor (modeled with RELAP5-3D).

97 MATHEMATICS AND COMPUTING↗

Resilient Grid Operational Strategies

Extreme weather-related disturbances, such as hurricanes, are a leading cause of grid outages historically. Although physical asset hardening is perhaps the most common way to mitigate the impacts of severe weather, operational strategies may be deployed to limit the extent of societal and economic losses associated with weather-related physical damage.1 The purpose of this study is to examine bulk power-system operational strategies that can be deployed to mitigate the impact of severe weather disruptions caused by hurricanes, thereby increasing grid resilience to maintain continuity of critical infrastructure during extreme weather. To estimate the impacts of resilient grid operational strategies, Los Alamos National Laboratory (LANL) developed a framework for hurricane probabilistic risk analysis (PRA). The probabilistic nature of this framework allows us to estimate the probability distribution of likely impacts, as opposed to the worst-case impacts. The project scope does not include strategies that are not operations related, such as transmission system hardening (e.g., undergrounding, transmission tower reinforcement and substation flood protection) and solutions in the distribution network.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Evaluating FRI3D for Cost Savings in Fire Hazard Analysis at DOE Sites

A fire hazard analysis, required for many U.S. Department of Energy (DOE) facilities, is a complex, cumbersome, and costly process. Fire hazard analyses may be viewed as a checkbox, but ideally and in spirit with the DOE-STD-1066, the fire hazard analysis (FHA) should be a part of the workflow and used to help in modifications, maintenance, and improving operational safety. With current FHA development processes, it is both time and cost prohibitive for true integration. A tool called Fire Risk Investigation in 3D or FRI3D was developed under the DOE Light Water Reactor Sustainability program to simplify and automate many aspects of a fire probabilistic risk analysis for existing nuclear power plants. The FRI3D tool automates fire scenarios by combining approved fire simulation codes, U.S. Nuclear Regulatory Commission fire calculations methods, 3D modeling and visualization, and probabilistic risk analysis models into a single workflow supported with a user interface. FRI3D was initially designed for used in combination with a PRA, this case study, evaluated using FRI3D for a plant modification, determined the benefits that detailed fire modeling can have for U.S. Department of Energy facilities with or without a PRA model. It also looked at what tasks from DOE requirements could be reduced using the tool and what is needed to integrate fire hazard analysis into site workflow.

97 - MATHEMATICS AND COMPUTING↗

Modeling and Quantification of Team Performance in Human Reliability Analysis for Probabilistic Risk Assessment

Probabilistic Risk Assessment (PRA) and Human Reliability Assessment (HRA) are important technical contributors to the United States (U.S.) Nuclear Regulatory Commission’s (NRC) risk-informed and performance based approach to regulating U.S. commercial nuclear activities. Furthermore, all currently operating commercial NPPs in the U.S. are required by federal regulation to be staffed with crews of operators. Yet, aspects of team performance are underspecified in most HRA methods that are widely used in the nuclear industry. There are a variety of "emergent" team cognition and teamwork errors (e.g., communication errors) that are 1) distinct from individual human errors, and 2) important to understand from a PRA perspective. The lack of robust models or quantification of team performance is an issue that affects the accuracy and validity of HRA methods and models, leading to significant uncertainty in estimating HEPs. This paper describes research that has the objective to model and quantify team dynamics and teamwork within NPP control room crews for risk informed applications, thereby improving the technical basis of HRA, which improves the risk-informed approach the NRC uses to regulate the U.S. commercial nuclear industry.

99 GENERAL AND MISCELLANEOUS↗

Bayesian Inference for NASA Probabilistic Risk and Reliability Analysis

This document, Bayesian Inference for NASA Probabilistic Risk and Reliability Analysis, is intended to provide guidelines for the collection and evaluation of risk and reliability-related data. It is aimed at scientists and engineers familiar with risk and reliability methods and provides a hands-on approach to the investigation and application of a variety of risk and reliability data assessment methods, tools, and techniques. This document provides both: A broad perspective on data analysis collection and evaluation issues. A narrow focus on the methods to implement a comprehensive information repository. The topics addressed herein cover the fundamentals of how data and information are to be used in risk and reliability analysis models and their potential role in decision making. Understanding these topics is essential to attaining a risk informed decision making environment that is being sought by NASA requirements and procedures such as 8000.4 (Agency Risk Management Procedural Requirements), NPR 8705.05 (Probabilistic Risk Assessment Procedures for NASA Programs and Projects), and the System Safety requirements of NPR 8715.3 (NASA General Safety Program Requirements).

Dezfuli, Homayoon↗

Survey of Cyber Risk Analysis Techniques for Use in the Nuclear Industry

Using traditional probabilistic risk analysis methods for severe accident safety risk management on non-digital systems, structures, and components at nuclear power plants is well-established. In contrast, cyber risk analysis of digital assets is still an immature field with unproven techniques due, in part, to the continuously changing threat environment and the challenge of digital assets failing in unexpected ways. As the nuclear fleet continues to adopt digital instrumentation and control systems, it is increasingly important to have effective and efficient cyber risk analysis techniques to support risk management decisions, such as risk elimination by system redesign or risk mitigation by implementation of prioritized security controls. To understand the state of the art in cyber risk analysis for future research, we surveyed 36 publications across ten application domains. We describe our survey methodology and rate each technique based upon scope, adoptability, and repeatability. In this work, we examine the unique constraints of the nuclear industry and outline the strengths and weaknesses of using the cyber risk analysis techniques in the industry, highlighting gaps with current techniques. We also discuss challenges and potential research directions for advancing the science for both existing and new advanced reactors.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

A systematic decision-making methodology to formalize the selection of degree of realism in screening analysis of probabilistic risk assessment

In the nuclear power domain, Probabilistic Risk Assessment (PRA) is used to inform decision-making for Nuclear Power Plants (NPPs). Recently, there has been an increase in the utilization of modeling and simulation (M&S) to support the estimation of PRA inputs. Risk analysts should carefully select the PRA items that require M&S and their degree of realism (DoR) with consideration of the required resources. To support this selection, this article formulates a systematic decision-making approach for the DoR selection. The DoR selection is made based on two predictive decision-making attributes: the predicted differences in safety risk estimate (ΔSaRi) and the cost of analysis (ΔCAN). This research also develops and quantifies causal models to estimate ΔSaRi and ΔCAN. The causal model-based prediction of ΔSaRi and ΔCAN helps reduce the trial-and-error nature of the DoR selection in the PRA screening analysis and provides insights for DoR selection and the gradual refinements of PRA realism. This approach is demonstrated for a case study on fire PRA of NPPs, where an adequate DoR is selected from two fire models: an engineering correlation and a zone model.

Alkhatib, Sari [Department of Nuclear, Plasma, and↗

Report on the U.S. DOE Geothermal Technologies Program's 2009 Risk Analysis

NREL conducted an annual program risk analysis on behalf of the U.S. Department of Energy Geothermal Technologies Program (GTP). NREL implemented a probabilistic risk analysis of GTP-sponsored research, development, and demonstration (RD&D) work, primarily for enhanced geothermal systems (EGS). The analysis examined estimates of improvement potential derived from program RD&D work for two types of technology performance metric (TPM): EGS-enabling technologies potential and EGS cost improvement potential. Four risk teams (exploration, wells/pumps/tools, reservoir engineering, and power conversion) comprised of industry experts, DOE laboratory researchers, academic researchers, and laboratory subcontractors estimated the RD&D impacts and TPM-improvement probability distributions. The assessment employed a risk analysis spreadsheet add-in that uses Monte Carlo simulation to drive the Geothermal Electric Technology Evaluation Model (GETEM). The GETEM-based risk analysis used baseline data from the experts' discussion of multiple reports and data sources. Risk results are expressed in terms of each metric's units and/or the program's top-level metric: levelized costs of electricity (LCOE). Results--both qualitative comments and quantitative improvement potential--are thorough and cohesive in three of the four expert groups. This conference paper summarizes the industry's current thinking on various metrics and potential for research improvement in geothermal technologies.

15 GEOTHERMAL ENERGY↗

Report on the U.S. DOE Geothermal Technologies Program's 2009 Risk Analysis

NREL conducted an annual program risk analysis on behalf of the U.S. Department of Energy Geothermal Technologies Program (GTP). NREL implemented a probabilistic risk analysis of GTP-sponsored research, development, and demonstration (RD&D) work, primarily for enhanced geothermal systems (EGS). The analysis examined estimates of improvement potential derived from program RD&D work for two types of technology performance metric (TPM): EGS-enabling technologies potential and EGS cost improvement potential. Four risk teams (exploration, wells/pumps/tools, reservoir engineering, and power conversion) comprised of industry experts, DOE laboratory researchers, academic researchers, and laboratory subcontractors estimated the RD&D impacts and TPM-improvement probability distributions. The assessment employed a risk analysis spreadsheet add-in that uses Monte Carlo simulation to drive the Geothermal Electric Technology Evaluation Model (GETEM). The GETEM-based risk analysis used baseline data from the experts' discussion of multiple reports and data sources. Risk results are expressed in terms of each metric's units and/or the program's top-level metric: levelized costs of electricity (LCOE). Results--both qualitative comments and quantitative improvement potential--are thorough and cohesive in three of the four expert groups. This conference paper summarizes the industry's current thinking on various metrics and potential for research improvement in geothermal technologies.

15 GEOTHERMAL ENERGY↗

A systematic risk management approach employed on the CloudSat project

The CloudSat Project has developed a simplified approach for fault tree analysis and probabilistic risk assessment. A system-level fault tree has been constructed to identify credible fault scenarios and failure modes leading up to a potential failure to meet the nominal mission success criteria.

risk management fault tree analysis probabilistic ↗

Raven

RAVEN (Risk Analysis Virtual Environment) is a flexible and multi-purpose probabilistic risk analysis, uncertainty quantification, parameter optimization and data knowledge-discovering framework. https://raven.inl.gov/

Slaughter, AndrewE.↗

Assessment of verification and validation status - RELAP5-3D and RAVEN

The United States nuclear industry is facing a strong challenge to ensure maximum safety while enhancing economic benefit. Safety is a key parameter to all aspects related to light water reactor (LWR) nuclear power plants (NPPs), especially cost savings. Since the goal is to extend the lifetimes of these NPPs, the traditional deterministic safety concept may not guarantee a current economic asset. The Light Water Reactor Sustainability (LWRS) Program has been promoting a wide range of research and development (R&D) in this field to maximize the safety, economics, and performance of these NPPs through improved scientific understanding. One of the best practices to achieve this goal is to identify and optimize safety margins, which can lead to cost reduction. To do this, under the LWRS framework, the Risk-Informed Systems Analysis (RISA) Pathway will focus on the optimization of safety margin and minimization of uncertainties to ensure both safety and economics at the highest level. The RISA Pathway will provide enhanced capabilities for analyzing and characterizing LWR systems performance by developing and demonstrating methods, tools, and data to enable risk-informed margins management (RIMM). The goals of the RISA Pathway are twofold: (1) deploy the risk-informed tools and methods that enable better representation of safety margins and factors that contribute to cost and safety; and (2) conduct advanced risk assessment applications with industry to support margin management strategies that enable more cost-effective plant operation. The tools and methods provided by the RISA Pathway will support effective margin management for both active and passive safety systems, structures, and components (SSC) of an NPP. The tools and methods used in the RISA Pathway should have high confidence and highest technical maturity for and implementation to industry at its current setting. They should also have a capability to support risk-informed decision making for both probabilistic and deterministic elements of safety. The RISA Pathway will, therefore, perform a comprehensive assessment of verification and validation (V&V) status of RISA Toolkit to enhance credibility RISA Toolkit which be used by industry. This report summarizes assessment technical maturity of RISA thermal-hydraulics accident analysis code RELAP5-3D and multi-purpose probabilistic risk analysis tool RAVEN V&V status including specific information of the tool such as capability and features, quality assurance program, developer/independent V&V record, separation/integral tests history, user documents, and feedback.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Accounting for Point Estimate Uncertainty in Space Systems Reliability and Risk Analysis

Understanding and accounting for uncertainty in risk analysis is a critical step in the management and communication of risk in engineered systems. The component and system-level analysis to determine the probability of a negative outcome and its consequence is often quantified by a point estimate. Many Program and Enterprise decisions involving technical concerns and issues rely on reliability engineering activities to produce quantified risk analysis to inform the decision making process. At NASA, it is common to use a Probabilistic Risk Analysis (PRA) to inform the overall risk to Loss of Mission or Loss of Crew that involves integration across all spacecraft subsystem fault trees to produce an overall probability of mission failure. The point estimate is an estimate of this overall probability and is an immediate result of a fault tree model. It is the result of a model where the probability of each event is taken to be equal to its mean. The value provides an approximation of the overall mean without running any uncertainty calculations (e.g., no sampling). Using only the point estimate can lead to a false sense of precision and the point estimate may not match the resulting mean when uncertainty is taken into consideration. This paper will explore five conditions that can cause the PRA model mean to diverge from the point estimate and will provide engineers and managers insight into the importance of understanding uncertainty in the elements of PRA models.

Paul J Collier↗

Fault Management Algorithm Risk Assessment for the NASA Space Launch System

This paper presents the false positive (FP) and false negative (FN) risk assessment process currently being conducted for the Space Launch System (SLS) Artemis II Fault Management (FM) detection functions. The analysis scope, general assumptions and guide rules, and key modeling concepts were discussed to establish the basis of the risk assessments conducted. Initial analyses indicated a dominance in the total risk by software and firmware failures. This paper presents efforts applied to refine the software risks and the overall impact of implementing those modifications. Current analyses conducted on the detection functions implemented for the SLS Artemis II mission indicate primary risk drivers for the individual FM detection functions are flight software failures, firmware design failures, and hardware Common Cause Failures (CCFs). There still remains issues of how to account for time and redundancy in the software risk estimations.

probability risk analysis↗

Fault Management Algorithm Risk Assessment for the NASA Space Launch System

This presentation describes the false positive (FP) and false negative (FN) risk assessment process currently being conducted for the Space Launch System (SLS) Artemis II Fault Management (FM) detection functions. The analysis scope, general assumptions and guide rules, and key modeling concepts were discussed to establish the basis of the risk assessments conducted. Initial analyses indicated a dominance in the total risk by software and firmware failures. This paper presents efforts applied to refine the software risks and the overall impact of implementing those modifications. Current analyses conducted on the detection functions implemented for the SLS Artemis II mission indicate primary risk drivers for the individual FM detection functions are flight software failures, firmware design failures, and hardware Common Cause Failures (CCFs). There still remains issues of how to account for time and redundancy in the software risk estimations.

probability risk analysis↗